Environmental Monitoring Report
Project No.: 46077-001 Bi-annual report (January – June 2016) July, 2016
Tajikistan: Improved Maternal and Child Health through Connectivity Project Prepared by: PIU for Roads Rehabilitation For: the Ministry of Transport of the Republic of Tajikistan and the Asian Development Bank This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Table of Contents
I. INTRODUCTION 1
1.1. Project Description 1
1.2. Objective and Methodology of the Report 2
1.3. Institutional frameworks for the project organization and
environmental management team 3
1.4. Relationships with Contractor and PIU 5
1.5. Construction activities and Project Progress during last 6 months 6
1.5.1. Construction facilities 6
II. Environmental Monitoring 13
2.1. Noise and Vibration 13
2.2. Water Quality 15
2.3. Air Quality 17
Dust Suppression 20
2.4. Flora and Fauna Monitoring 20
2.5. Monitoring of Occupational Health and Safety, and HIV-AIDS Issues 20
III. Environmental Management 21
3.1. EMMP, SSEMP and Work Plans 21
3.2. Site Inspections and Audits 21
3.3. Non- Compliance Notices 21
3.4. Correction Action Plan’s Fulfillment Status 22
3.5. Recommended Corrections Fulfillment Status by post-construction
audit 23
3.6. Consultation and Complaints 23
ANNEXES 24
Annex 1. Photolog of activities 24
Annex 2. Check-list for environmental post-construction audit 38
Annex 3. Documentation 40
I
Abbreviations and Acronyms
ADB Asian Development Bank AMP Asphalt mixing plant BOD Biochemical Oxygen Demand CEP Committee for Environmental Protection CO Carbon Monoxide CSP Crushing-screening plant C6H6O Phenol CH2O Formaldehyde DEP Department of Environmental Protection EA Executive Agency EIA Environmental Impact Assessment EMMP Environmental Mitigation and Monitoring Plan ES Environmental Specialist ESM Environmental Supervisor and Monitoring Expert HSE Health, Safety and Environment Management GOST Gosudarstvennye Standarty (ex-USSR Technical Standards) GoT Government of Tajikistan IEE Initial Environmental Examination km kilometer km2 square kilometer m meter m2 square meter mg/L milligram per liter MH Ministry of Health MOT Ministry of Transport MPC Maximum Permissible Concentration MPE Maximum permissible emissions MPW Maximum permitted wastes NOx Nitrogen Oxides PIU Project Implementation Unit for road rehabilitation SEE State Environmental Review or “Ecological Expertise” SNIP Stroitelnye Normy I Pravila (Civil construction norms and rules) SO2 Sulphur dioxide SSEMP Site Specific Environmental Management Plan TOR Terms of Reference TSP Total Suspended Particles TSS Total Suspended Solids
II
I. INTRODUCTION
1.1. Project Description
1. This fourth final environmental monitoring report encompasses the Project which intends:
rehabilitation of 9 km of the Rasht-Navabad road and maintenance of 66-meter existing bridge
over Sorbog River. Rasht-Navabad road with length of 18 km is located in mountainous region of
Rasht valley. The road connects district center of the Rasht - Gharm town - with the second
settlement in size of Navabad and Jamoats of Nusratullo Makhsum, Obi Mehnat, Boqi Rahimzoda
and Tagoba. The primary objective of the project is to improve maternal and child health
conditions for isolated rural communities of five sub-districts in Rasht district.
2. The aim of the Project was the improvement of access to strengthened health services of
marginalized rural poor people. The Project supported following components (i) rehabilitation of
the bridge and improvement of the rural road, which is linked with the CAREC corridors 3 and 5,
and (ii) increase use of effective health services and nutrition practices in communities.
3. Technical characteristics of the entire road are corresponding to public domain road category
IV. Requirements of the SNIP 2.05.02-85 «Highways» were taken into account during
development of detailed design1.
4. The Contractor implemented the following works at certain road sections 2:
• Bridge works at km 17+045 over Sorbog River;
• Drain ditch construction on the right side;
• Roadside facilities (road signs and guardrails) through entire road;
• From km 0+00 to km 6+000 and from km 14+480 to km 18+480 to conduct earthworks, rock
excavation, pavement works, drainage works and roadside facilities.
• Reinforced concrete causeway construction at km 14.
5. The Contract is funded by the Asian Development Bank (ADB) and the Government of the
Republic of Tajikistan for Rasht-Navabad road rehabilitation and maintenance of bridge over
Sorbog River.
6. Land acquisition and resettlement for this project is not required. Demolition of any
dwelling and non-dwelling structures and displacement of utilities for this project is not required.
7. The categorization of the Project regarding environmental safeguard aspects has been
carried out by ADB. Based on the existing ADB Environmental Safeguards Policy (2009), this
Project falls under ADB’s project Category B: Minor impacts able to mitigate are expected to
occur.
1 Category IV road requires a design speed of 60 km/hour in rolling terrain (30 km/hour in mountain terrain), and a
carriageway of two 3.0-meters lanes. 2 Works under the project extension included rehabilitation of an additional 1,590 km section of the Rasht-Navabad
road.
1
8. The IEE established that there were no significant environmental issues that could not be
either prevented or adequately mitigated to levels acceptable to Tajik and international standards.
A complete Environmental Management Plan has been prepared, with tables listing mitigation
measures and monitoring actions to be undertaken during the pre-construction, detailed design,
construction and operating period of the project.
9. At the same time, the project will bring several positive environmental and social impacts, and
in particular, reduction in: dust due to poor condition of the road surface, causing health problems;
less stagnant water pools in road portion with damaged and subsided level, less erosion and
flashing of bridge linked 5 isolated Jamoats and settlements with the district center and etc. Direct
positive impacts will be also generated by improved access to strengthened health services,
improved mobility, access, and communications, more employment and increased incomes.
Figure 1 below shows location of project sites in scale of the country.
Figure 1: Project Location Map
1.2. Objective and Methodology of the Report
10. On 4th September 2014 a Top International Engineering Corporation / China was contracted
as Contractor for the implementation of the Project.
2
11. This report was prepared on the basis of: (1) monthly progress reports and quarterly
environmental monitoring reports of the Contractor; (2) assessment made during the site visits;
and (3) and other information obtained from the Contractor.
12. The Initial Environmental Examination of January 2013 contains an Environmental
Management Plan (in the following named EMMP – Environmental Mitigation and Monitoring
Plan) stipulating mitigation and monitoring measures for the design, construction, commissioning
and operation phases. One of the requirements within this EMMP is that the construction
contractor shall set up a safety plan to the construction activities. In October 2014, Top
International Engineering Corporation, China, the Contractor, has developed the Site Specific or
Construction Environmental Management Plan (in the following called SSEMP) for the avoidance
of risks to the health of the workforce on the job site as well as for the protection of the
environment as a site-specific plan made on the basis of the Initial Environmental Examination for
this project. The purpose of environmental monitoring is to monitor compliance of the project
activities with the EMMP and the SSEMP. This Report is prepared for the first six months of 2016.
13. Additionally, the purpose of this environmental monitoring report is to satisfy the requirements
of environmental safeguard systems of Tajikistan and the Asian Development Bank (2009
Safeguard Policy Statement) as well as to fulfill the requirements stipulated in the grant document
for the Government of the Republic of Tajikistan.
14. The main findings are based on a review of monthly engineering progress reports and
quarterly monitoring and progress reports submitted by the Contractor, and on findings obtained
during the site inspections executed between January and June 2016 by the Contractor’s
environmental expert for monitoring of environmental impacts. Further, the PIU environmental
specialist regularly supervised environmental monitoring of relevant parameters administered by
the Contractor as well as additionally reviewed project design, social and other associated
documents.
1.3. Institutional frameworks for the project organization and environmental
management team
15. The Executing Agency (EA) is the Ministry of Transport of the Republic of Tajikistan (MOT).
The EA had set up a Project Implementation Unit for Road Rehabilitation (PIU) to manage day-to-
day coordination, implementation, monitoring and administration activities of the project. Within
the PIU one person was appointed as Project Manager. In addition to his duties, the Project
Manager is supporting PIU environmental expert with inspections and other tasks on all
environmental issues related to this project within the frame of the available person-months. The
schematic below shows the structure of the environmental management team.
3
Figure 2. Institutional Chart of the Environmental Safeguards Arrangement
16. The PIU is responsible for the implementation of the mitigation and regular monitoring
measures as outlined in the IEE Report. In February 2015 Mr. Bakhtiyor Begmuradov
(tel.+992934885225) was appointed by the PIU as environmental specialist to ensure that project
activities are in compliance with the EMMP and SSEMP.
17. The responsibility of fulfilling environmental requirements of Government of Tajikistan and
conducting the required level of environmental assessment consistent with ADB guidelines lies
within the PIU of the EA. The IEE report, based on ADB’s Environmental Guidelines, is reviewed
by the EA. ADB internally reviewed and approved the report. The IEE report received final
approval by the State Ecological Expertise of the Government of Tajikistan.
18. The Contractor implemented the construction works. Contractor’s Environmental Unit is
responsible for implementation of the EMMP and SSEMP and monitors the construction activities
and is responsible for reporting. In November 2014 one environmental specialist was appointed
from the Construction Contractor - Top International Engineering Corporation – Mr. Bashid Suriev
(tel.+992938689268). He is also responsible for implementation of all environmental safeguards
aspects stipulated in the EMMP and in the contractor’s SSEMP.
19. Table 1 presents main responsibilities with regards to environmental safeguards requirements.
Table 1. Environmental arrangements for project phases
Project Stage
Responsible Organization
Responsibilities
Preconstruction
PIU
Fulfill GoT requirements by obtaining Environmental Clearance Certificate (CEP, Ecological Expertise) and other necessary approvals. Elaboration of IEE including Resettlement and Compensation Plan if any. Provide copies of the documents upon request from interested parties. Incorporate mitigation measures into engineering design and
4
Project Stage
Responsible Organization
Responsibilities
technical specification. Incorporate environmental mitigation and monitoring measures into contract document. Update the EMMP (mitigation measures, monitoring program, institutional responsibilities, costs, etc.) during the detailed design stage. (i) oversee the implementation of projects; (ii) maintain appropriate accounts and manage procurement, engagement of consultants, and disbursement in accordance with ADB guidelines; (iii) ensure effective coordination and liaison with ADB and the GoT on project-related activities and reports; (iv) monitor and report on the progress of the projects; and (v) schedule reviews, audits, and evaluations, and provide resulting reports regularly to the Independent Commission. PIU will also assist implementing agencies in organizing information campaigns to create awareness among rural communities and the institutions serving them at the local level.
Construction
PIU
Ensure the implementation of environmental management measures at each stage of the construction, prepare required monitoring reports, and update the EMMP, as necessary. Review the Site Specific Environmental Management Plan to be prepared by the contractor. Conduct monitoring of implementation of mitigation measures by contractor. Review and consolidate bi-annual reports and submit to ADB
Contractor
Prepare a Site Specific Environmental Management Plan prior to any site works. Implement mitigation measures and submit monthly reports to the PIU
Committee for Environmental Protection under the Government of Tajikistan
Review monitoring reports and conduct periodic inspections and monitoring
Operation
MOT Undertake environmental monitoring consistent with Environmental Monitoring Plan and prepare annual reports
Committee for Environmental Protection under the Government of Tajikistan
Review monitoring reports and conduct periodic monitoring as required
1.4. Relationships with Contractor and PIU
20. According to the agreement the Contractor provided six reports for the period January-June
2016 and held relevant meetings with responsible environmental engineers.
5
1.5. Construction activities and Project Progress during last 6 months
21. The activities dealing with construction in the previous six months of 2016 were as follows:
Table 2: Previous Six Months Progress (under the Contract with the Top International Engineering Corporation)
No. Month of the year 2016
Activities
1 January None 2 February None 3 March None 4 April Road rehabilitation works (earthworks, drainage etc) 5 May Road rehabilitation works (asphalt pavement) 6 June Road rehabilitation works (road shoulders, marking and signs installation)
22. Within the framework of the project’s environmental management, the supervision tasks
consisted of continuous monitoring by the PIU, environmental monitoring and management of the
project implementation and assistance in ensuring the implementation of environmental
management practices at each stage of the construction. The monitoring was done to comply with
the Environmental Monitoring and Management plan (EMMP) and contractor’s SSEMP in line with
ADB’s environmental safeguards policies and the environmental regulations of Republic of
Tajikistan. The monitoring report covers the construction (project implementation) activities from
January to June 2016 and comparison of status of construction sites in beginning and end of the
works in June 2016.
23. The environmental monitoring consists of two logical parts, and these are: (1) monitoring of
the compliance with EMMP and SSEMP; and (2) monitoring of the ambient environmental
conditions. The assessment of compliance with the EMMP and SSEMP commenced with the
review of the environmental management conditions required for compliance during the
construction stage of the project. The other part of the environmental monitoring is the monitoring
of ambient environmental condition. Instrumental monitoring including Water and Air Quality
Monitoring and Noise level monitoring were conducted in the reporting period by Contractor. The
construction activities were observed during site visits taking note of the obvious environmental
impacts of the construction activities.
Construction facilities
Construction workers camp at Km 2+200
24. The camp which consists of the kitchen and a dining room, living premises for workers were
operating till the end of May 2015 at the territory of former collection point of sericulture products.
During reporting period the camp was not operational due insignificant number of workers
involved for the road rehabilitation works. The Contractor’s personnel were accommodated at
private houses.
6
Figure 3. Operational camp site: workers premises – status at March 2015
Figure 4. Demobilized camp site – status at March 2016
Asphalt mixing plant (AMP)
25. The Top International Engineering Corporation was granted for use an asphalt plant and
quarry, which is located near the bridge over the river Sorbog (Km 17+00).
26. During this last working season in 2016 the plant produced concrete for the bridge
rehabilitation needs only. Now AMP does not operate and no workers are present at the site.
7
Figure 5. Non-operational AMP – status in June 2016
27. As per last environmental inspection comparably significant amount of hazardous wastes
such as scrap-metal, empty cement bags, broken equipment and etc. were disposed without
control. The Contractor took significant efforts to improve this situation. Now (as per July 22,
2016) AMP site is free of hazardous wastes (Figure 6 and 7).
Figure 6: Industrial and domestic wastes are disposed without control - status as per June 2016
8
Figure 7: Cleaned AMP site – in compliance - status as per July 2016
28. Thus recent recommendations to correct the issues that are raised in the notices were noted
and correction actions were implemented.
Construction activities
29. During the last six months of construction activities (January-June 2016) the following works
were done:
• Rehabilitation of the road (1,590 km);
• Installation of the safety signs and road marking;
• Levelling and compacting of the road shoulders.
30. In order to comply with the requirements of EMMP/SSEMP Traffic Management Plan the
flagmen have been working, temporary warning signs were installed on both sides of the bridge
and rehabilitated segments of the road. The speed for traffic was limited to 20-25 km/hour.
31. In total, in the framework of construction activities (2014 - 2016) the following works were
done:
a) Rehabilitation of the road (10,590 km), including:
• Earthworks – 5850 m3;
9
• Rock excavation – 12000 m3;
• Removal and storage of old asphalt – 9500 m3;
• Shoulders and grained material – 3000 m3;
• Crushing stones – 100000 m3;
• Wearing base course layer of a uniform thickness of 150 mm – 10,590 km;
• Tack coat3 – 480 m3;
• Hot asphalt pavement - 2800 m3;
• Culverts, drainage system, and dyke – as per design;
• Levelling and compacting of the road shoulders – 10,600 km.
b) Road safety improvement, including:
• Installation of the safety signs;
• Road markings.
c) Bridge works, including:
• Embankment - 10000 m3;
• Rehabilitation of bridge.
d) Works on restoration/construction of medical facilities, including:
• Construction of building;
• Improvement of public services;
• Construction of access pathways;
• Landscape works, including arrangement of flower beds and gardens, etc.
32. Removed asphalt spoils are temporary stockpiled at Km 14+00 and 18+00 in the empty land
plot, which is far from settlements and dwelling area. Old asphalt spoils were delivered to MoT
unit of Rasht district for further use. Figure 8 below shows location of the stockpile area provided
by local authorities. See more pictures in Annex 1 and scanned certificate of handover of old
asphalt in Annex 3.
Figure 8. Asphalt stockpile location map.
3 A thin coating of tar or asphalt applied before a road is paved to form an adhesive bond.
10
Bridge works
33. The bridge was rehabilitated during previous working season in 2015. Construction works on
bridge rehabilitation and embankment strengthening were implemented in period from September
to November 2015, when level of water discharge was low. Figure 9 below shows how
embankment of Sorbog river near the bridge was damaged in June 2016.
Figure 9. Water discharge was very high in June 2016 (Sorbog river, km 17+500) and some elements of the embankment were damaged
34. It is required to restore damaged embankment within warranty period.
Restoration/construction of medical facility
35. New medical facility in Navobod hospital was constructed, furnished and equipped by the
Project.
36. Newly constructed building of diagnosis center in Navobod and laboratory are in good
condition – improved sanitary facilities (toilets, water supply and septic systems, bathrooms and
etc.) are in compliance with safeguards requirements. Provided equipment (special transportation
vehicle, diagnostic equipment and etc.) are modern and met the needs and requirements.
11
Figure 10. New medical facility with granted equipment and sanitary facilities in Navabad hospital
37. Doctors and medical staff of this pilot medical facility expressed that project brought good
benefit for women on this area, improved and increased quality and quantity of urgent medical
services.
12
II. Environmental Monitoring
38. Baseline survey was not conducted by the Contractor. That is why environmental monitoring
baseline data is used obtained by CAREC corridors 3 and 5 project. Instrumental monitoring of
water and air quality was conducted in April 2016. Routine monitoring data of water, air quality
and noise level were received from Contractor for the period from January to June 2016.
39. Visual observations of the ambient environmental condition of the project corridor were done
during the site visits in this reporting period as well as before.
2.1. Noise and Vibration
40. Monitoring of noise showed that rehabilitation works were conducted relatively far from the
residential areas. However, the Contractor as it was advised limited work time and end any works
latest by 10 p.m. To reduce noise generated mainly by heavy equipment during their operation,
these machines were equipped with silencers or vehicles with low sound output were used.
41. In accordance with IEE/EMMP following points were used for noise measuring:
Table 3: Noise Sensitive Receptors
# Location Receptor Distance to
Road
1 Jamoat N.Mahsum Primary School No. 84 20 meters 2 Jamoat N.Mahsum Medical center 50 meters 3 Jamoat N.Mahsum Pedagogical Institute 150 meters 4 Jamoat N.Mahsum Tuberculosis hospital 100 meters 5 Navobod Boarding school 5 meters
42. Due to completion of many works the Contractor was recommended to monitor following
noise and vibration point for the period of January-June 2016:
Table 4: Proposed Noise Level Measuring Points
# Name Distance
1 Concrete causeway km 14+00 43. The Contractor as before conducted noise level measuring by the vibro-sound-level meter,
model TESTO-815 at km 14+00. Please see the Table 5 below for latest data and to compare the
noise level during all period of monitoring for construction phase.
Table 5.1: Noise monitoring data, km 00+00; 3+900; 7+00; 7+900; 17+500.
No
Location
Noise Standards in dB
Baseline indices
Latest monitoring
indices 07.00-23.00 23.00-07.00 09.2014 12.2014
1. Rasht, km 0+00 75 75 70 60,5 2. Rasht, km 3+900 80 80 72 70,5 3. Saripul, km 7+900 80 55 55 45,3 4. Borrow pit, km 7+00 55 80 80 75,0
13
5. CSP, km 17+500 80 80 69 75,5
Table 5.2: Noise monitoring data, km 00+00; 3+900; 7+900; 17+00; 17+500.
No
Location
Noise Standards in dB
Baseline indices
Latest monitoring
indices 07.00-23.00 23.00-07.00 09.2014 06.2015
1. Rasht, 0+00 km 75 75 70 45-62 2. Rasht, 3+900 km 80 80 72 48-69 3. Saripul, 7+900 km 80 55 55 47-65 4. Quarry,17+00 km 55 80 80 65-73 5. CSP, 17+500 km 80 80 69 70-79
Table 5.3: Noise monitoring data, km 17+00; 17+500.
No
Location
Noise Standards in dB
Baseline indices
Latest monitoring
indices 07.00-23.00 23.00-07.00 09.2014 09.2015
1. Quarry,17+00 km 55 80 80 45-55 2. CSP, 17+500 km 80 80 69 76-80 3. Bridge, 17+500 km 75 75 N/A 70-75
Table 5.4: Noise monitoring data, km 14+00.
No
Location
Noise Standards in dB
Baseline indices
Latest monitoring
indices 07.00-23.00 23.00-07.00 09.2014 04.2016
1. Causeway, 14+000 km 75 75 N/A 70-75 Standards: 55-45 dBA (max) - Residential area 75-75 dBA (max) - Commercial area 80-80 dBA (max) - Industrial area 50-40 dBA (max) - Hospitals 55-55 dBA (max) - Schools, Library
44. Noise level in influence zone of the Project in the
first half of 2016 didn't exceed permissible norms. Noise
sources units (road construction equipment) worked in the normal mode. No complaints were
received and/or recorded from the population during the reporting period.
Figure 11. Noise level measuring at site
14
Figure 12. Map of the Noise level measuring points – April 2016
45. As for vibration it was recommended to use more light or smaller tools and devices to avoid
the cracking of adjacent buildings. No cracks or other damages were observed from the beginning
of works in 2015 and during this reporting period of January-June 2016.
2.2. Water Quality
46. The project crosses the river Sorbog, and it is located near the river Surkhob. In some areas
of the project corridor groundwater level is high, especially near the rivers.
47. The leaking of oil or fuel can lead to contamination of surface and groundwater. All actions
required by the EMMP to avoid getting the fuel and oil into the river were implemented in
accordance with requirements of IEE/EMP/SSEMP.
48. The Contractor was advised to select appropriate water sampling points (where works will be
conducted near the water sources) and conduct instrumental monitoring every 3 months. A
relevant Water Quality Management Plan was developed as Annex to the EMMP/SSEMP.
49. During the Construction Phase the Surface water quality were monitored (Routine Surface
Water Quality Monitoring) not less than once every three months during the course of the Works.
Monitoring results shall be submitted to PIU in two working days of the completion of the
monitoring period for analysis and review. Actions taken in response to the monitoring results
shall also be required.
50. Only one appropriate water sampling point was recommended for analysis – about 100
meters downstream from the bridge crossing the river Sorbog.
15
51. Please see the Table 6 below for latest data and to compare the quality of water during all
period of monitoring for construction phase.
Table 6.1: Water quality monitoring data, Sorbog River, km 17+500.
No.
Month
Characteristic
RT National Standards Baseline Indices
Latest monitoring
indices
FP
DW 09.2014 12.2014
1. SP, mg/l 75 25 10,3 15,0 2. Salinity, mg/l 1000 1000 156,0 175,0 3. BOD5, mg/l 3,0 3,0 2,3 1,5 4. Dissolved oxygen, mg/l not less 4,0 not less 4,0 10,0 11,0 5. Oil products, mg/l not available not available not available not available 6. Coli index, nos./l 1000 3 2,8 1,4
Table 6.2: Water quality monitoring data, Sorbog River, km 17+500.
No.
Month
Characteristic
RT National Standards Baseline Indices
Latest monitoring
indices
FP
DW 09.2014 06.2015
1. SP, mg/l 75 25 10,3 48,0 2. Salinity, mg/l 1000 1000 156,0 162,00 3. BOD5, mg/l 3,0 3,0 2,3 2,0 4. Dissolved oxygen, mg/l not less 4,0 not less 4,0 10,0 10,0 5. Oil products, mg/l not available not available not available not available 6. Coli index, nos./l 1000 3 2,8 1,7
Table 6.3: Water quality monitoring data, Sorbog River, km 17+500.
No.
Month
Characteristic
RT National Standards Baseline Indices
Latest monitoring
indices
FP
DW 09.2014 09.2015
1. SP, mg/l 75 25 10,3 40,0 2. Salinity, mg/l 1000 1000 156,0 164,0 3. BOD5, mg/l 3,0 3,0 2,3 2,1 4. Dissolved oxygen, mg/l No less 4,0 No less 4,0 10,0 11,0 5. Oil products, mg/l N/A N/A N/A N/A 6. Coli index, nos./l 1000 3 2,8 1,1
16
Table 6.4: Water quality monitoring data, Sorbog River, km 17+500.
No.
Month
Characteristic
RT National Standards Baseline Indices
Latest monitoring
indices
FP
DW 09.2014 04.2016
1. TSP, mg/l 75 25 10,3 40,0 2. Salinity, mg/l 1000 1000 156,0 167,0 3. BOD5, mg/l 3,0 3,0 2,3 2,4 4. Dissolved oxygen, mg/l No less 4,0 No less 4,0 10,0 11,6 5. Oil products, mg/l N/A N/A N/A N/A 6. Coli index, nos./l 1000 3 2,8 2,1
Figure 13. Map of the Water quality sampling point
52. Water sampling was conducted once every three months during the course of the Works, i.e.
in compliance with the EMMP requirements in terms of water quality. There was not observed any
cases of exceeding of MPC norms in examined water samples, water quality was complied with
confirmed standard of the Republic of Tajikistan. No direct disposal of sanitary and wash water to
surface water was observed.
2.3. Air Quality
53. Gasoline and diesel driven machinery are checked before using in the well-equipped vehicle
inspection stations. Thus all heavy equipment and machinery were in compliance with the EMMP
requirements in terms of air quality.
54. Fuel-efficient and well-maintained haulage trucks are used to minimize exhaust emissions.
Trucks were regularly checked in vehicle inspection stations as well. Stockpiled soil and sand
were slightly wetted before loading when project works are conducted during windy conditions.
55. Vehicles while transporting inert and other loose construction materials were covered with
tarpaulins.
17
56. Used concrete and asphalt producing plant and other equipment were rather small and are
not close to sensitive receptors.
57. Air quality instrumental monitoring was proposed under EMMP and implemented during the
project life. Since January 2015 and until June 2016 were conducted 5 air quality samplings, i.e.
each 3 months.
58. Last instrumental sampling of air quality was conducted in April 2016 at three points within
impact area of emissions sources (CSP, asphalt plant, borrow pits).
Figure 14. Map of the Air quality sampling points
59. Due to completion of many works Contractor was recommended following sampling points for
air quality monitoring for the period January-June 2016:
Table 7: Proposed Air Quality Sampling Points
# Name Distance 1 Bridge over Sorbog River 17+500 km 2 AMP 17+000 km
60. Table 8 below with data from the beginning of construction phase allows comparing the
quality of air during all period of monitoring for construction phase.
18
Table 8.1: Content of Inorganic dust (TSP), mg/m3
No
Month Testing location
RT standard mg/m3 Baseline indices
Latest monitoring
indices 09.2014 12.2014
1. Rasht, km 0+00 0,15 0,09 0,10 2. Saripul, km 7+900 0,15 0,08 0,09 3. Km 15-00, CSP 0,15 0,11 0,12
4. km 17+00 (AMP and borrow pits)
0,15 0,12 0,09
Table 8.2: Content of Inorganic dust (TSP), mg/m3
No
Month Testing location
RT standard mg/m3 Baseline indices
Latest monitoring
indices 09.2014 06.2015
1. Rasht, km 0+00 0,15 0,09 0,07 2. Dashti Rasht, km 3+900 0,15 0,08 0,06 3. Km 17-00, CSP 0,15 0,11 0,06
4. km 17+00 (AMP and borrow pits)
0,15 0,12 0,07
Table 8.3: Content of Inorganic dust (TSP), mg/m3
No
Month Testing location
RT standard mg/m3 Baseline indices
Latest monitoring
indices 09.2014 09.2015
1. Km 17-00, CSP 0,15 0,11 0,13
2. km 17+00 (AMP and borrow pits)
0,15 0,12 0,12
3. km 17+500 (bridge) 0,15 N/A 0,11
Table 8.4: Content of Inorganic dust (TSP), mg/m3
No
Month Testing location
RT standard mg/m3 Baseline indices
Latest monitoring
indices 09.2014 04.2016
1. Km 17-00, CSP 0,15 0,11 0,11
2. km 17+00 (AMP and borrow pits)
0,15 0,12 0,11
3. km 17+500 (bridge) 0,15 N/A 0,11
61. Concentration of harmful substances in ambient air at all points within project impact area did
not exceed permissible norms (MPC).
19
Dust Suppression 62. Precipitation level during almost all reporting period was rather high and there was no need
for conduction of dust suppressions by watering. However during the Construction Phase the
Contractor conducted dust suppression actions several times in cases of dry and windy weather.
No complaints were received neither from workers nor from the population on this item.
2.4. Flora and Fauna Monitoring
63. In recent decades, deforestation has become a serious threat in Tajikistan, especially within
the Project Corridor. Valuable juniper, walnut, birch and pistachio forests have shrunk by 20 to
25%, and tree cutting has led to an outbreak of weeds, alien and quarantine plant species,
erosion, landslides and the impoverishment of winter pastures. Only about 3% of Tajikistan is
really forested, and its main function is to protect the environment. Since forests secure water,
prevent erosion and protect soils, logging is generally prohibited except for sanitary tree-cuttings
and restoration works. Clear-cutting is never allowed, only selective cutting. There are no
significant forests within the Project corridor.
64. One protected area - Komarow preserve is located at the distance of 20 km from the Project
Road: no protected area is in the vicinity of the Project road.
65. Other than the Surhob and Sorbog rivers there are no perennial water bodies within or near
the project road. No rare, endangered, or protected fish species or habitats are found within the
vicinity of the Project Road.
66. During the Construction Phase no trees were removed in areas where the road is
rehabilitated. The condition of flora and fauna within project impact area was favorable during first
half of 2016.
2.5. Monitoring of Occupational Health and Safety, and HIV-AIDS Issues
67. No accidents were registered during the Construction Phase including this year. Relevant
measures were undertaken by contractors during implementation of project works to comply with
the requirements and measures for the protection of occupational health and safety (SSEMP):
• The Contractor developed a safety training program, consisting of an initial course on health and safety. All workers have to attend the safety training courses starting from the first week of employment. Technical safety instructions courses are held on a monthly basis during all working seasons. During the Construction Phase 12 safety instructions courses are held in total.
• Workers and engineers are provided with protective equipment and clothing, e.g. helmets, special work wear, safety belts, gloves, protective glasses etc.
• The Contractor was recommended to have properly equipped first aid kit at sites.
• The Contractor was recommended to conduct an instruction course on HIV / AIDS. This must be repeated at three month intervals. During the Construction Phase 5 instruction courses on HIV / AIDS are held and 33 workers attended it in total.
20
III. Environmental Management
3.1. EMMP, SSEMP and Work Plans
68. The assessment of compliance with the Environmental Monitoring and Management Plan
(EMMP) and the Contractor’s Site Specific Environment Management Plan with Health and Safety
sections commenced with a review of the environmental management requirements for
compliance during the construction stage of the project.
69. The Contractor submitted 6 progress reports with HSE sections and one Quarterly
Environmental Monitoring report for the period from January to June 2016.
70. In total during the project life 18 progress reports with HSE sections and 5 Quarterly
Environmental Monitoring reports were submitted by the Contactor.
3.2. Site Inspections and Audits
71. In 2016 three site inspections (22 February 2016, 12 April 2016 and 28 June 2016) and one
environmental audit (22 July 2016) were conducted by PIU’s Environmental Specialist to verify the
effectiveness of environmental protection measures in achieving the goals specified in the
environmental monitoring and management plan (EMMP), check the compliance with EMMP and
SSEMP during the reporting period. The site inspections were conducted on various
environmental aspects of the project. During the inspections, a number of environmental and
safety issues were observed and noted. These issues were subsequently brought to the attention
of the personnel concerned on the Contractor’s side. The issues observed are generally related to
potential contamination and sanitation conditions at AMP and some other moderate problems.
72. During the inspections visual surveys on-site, meetings with workers, contractor’s
environmental engineers, local environmental authorities and specialists were conducted.
73. Project completion environmental audit was conducted on 22 July 2016 by PIU (Project
Manager, Environmental Specialist) and Contractor (Site Engineer and Environmental Specialist)
representatives. The purpose of the final audit is to make sure that there are no significant
residual impacts on the environment after completion of construction and that all temporary
structures demobilized or transferred to other responsible party. The focus of the auditor's
observation is given to the current state of the environment at the site after the completion of
construction. Check-list for environmental post-construction audit is attached as Annex 2.
3.3. Non- Compliance Notices
74. Non-compliance notices were issued as follows:
• Oil spills in some small parts of the AMP site (near temporary fueling station). The station need to be removed or improved properly. Oil spilled soils need to be settled properly.
• Household waste and rubbish was found in various areas of the AMP. Used scrap and other materials were improperly stored at the site or stored in a disorderly manner – risk of safety.
21
75. More detailed recommendations to correct the issues that was raised in these notices, stating
the entities responsible for their implementation, are given in the Section 3.5 - Correction Actions
by the project closure.
3.4. Correction Action Plan’s Fulfillment Status
76. The status of actions done to fulfill non-compliance notices indicated in previous report is
shown in Table 9 below.
Table 9: Status of fulfillment of non-compliance notices
No Environmental issues
identified Corrective actions to be taken
Deadlines to resolve the
issues
Status of fulfillment
1 Not full compliance to sanitary requirements at AMP site
Improve sanitary conditions:
• the Contractor should maintain sanitary condition of the sites – collect all rubbish and dispose them properly
• Temporary fuelling station at AMP is in poor condition. Oil spills in some small parts of the site. The station need to be replaced or improved properly. Contaminated soils must be removed and disposed properly.
Regularly By the next working season
Partially fulfilled Partially fulfilled (fueling tanks are empty but contaminated soils are not removed yet)
2 Progress reports
Reports with more details for
Health, Safety and Environment
should be submitted in time
Regularly by 3rd day of next month
Fulfilled
3 Environmental documentation
Finalize folder of relevant environmental documentation (monitoring data, permissions, acts of use completion of construction facilities and etc., delivery of empty barrels to stakeholders or other treatment if any, etc.).
By the next working season
Partially fulfilled
4 Closure of construction facilities at AMP site
All remaining wastes should be removed and disposed accordingly during and after completion of works. Site should be relevantly cleaned up, and harmonized with outward landscape
TBC
Partially fulfilled (AMP is closed but not all wastes removed)
22
3.5. Recommended Corrections Fulfillment Status by post-construction audit
77. As already mentioned above few non-compliance notices were issued during last site inspection. In order to ensure compliance with the EMMP and the HSE Plan the Contractor was obliged to take relevant corrective actions in close coordination with PMU. Final environmental audit ensured that all corrective measures are done or planned to be done during the warranty period (Table 10):
Table 10: Corrections implementation status during post-construction audit – July 2016
No Environmental issues identified
Corrective actions to be taken Deadlines to resolve the issues
Status of fulfillment
1
Closure of
construction
facilities at AMP
site
All remaining wastes and scrap metal should be removed and disposed accordingly during and after completion of works. Site should be relevantly cleaned up, and harmonized with outward landscape
By 15 July 2016
Fulfilled
2 Environmental documentation
Finalize folder of relevant environmental documentation (monitoring data, permissions, acts of completion of construction facilities and etc., delivery of empty barrels to stakeholders or other treatment if any, etc.).
By 15 July 2016
Fulfilled
3 Not all signs and markings completed
All road safety signs and markings must be installed
By the commissioning
Fulfilled
4 Damaged embankment
All damaged sections of the river Sorbog embankment must be rehabilitated
By the commissioning
Not fulfilled
(embankment
rehabilitation would be
completed during the
defect liability period
and this issue will be
covered in the project-
completion report)
5
Final audit of completed construction sites
Final environmental audit of completed construction works should be done in accordance with provided templates (given by RETA8663 NES)
By the end of July 2015
Fulfilled
3.6. Consultation and Complaints
78. Complaints from residents or affected persons shall go to PIU Grievance Redress committee at sites and to PIU office in Dushanbe. During the project implementation including last six months the PIU and the Contractor did not receive any complaints from residents.
23
ANNEXES
Annex 1. Photolog of activities
Figure 1. New asphalt pavement of the road in June 2015
Figure 2. The Project corridor in December 2014
24
Figure 3. Rehabilitated section of the road with markings in July 2016
Figure 4. Roadbed in March 2015
25
Figure 5. PIURR specialists are controlling works of Contractor – June 2016
Figure 6. Engineers of PIURR are controlling works of Contractor – June 2015
26
Figure 7. PIU monitoring mission – December 2015
Figure 8. Joint ADB and PIU monitoring mission – June 2015
27
Figure 9. New asphalt pavement works – May 2015
Figure 10. Bridge over the Sorbog River – status in December 2015
28
Figure 11. Bridge over the Sorbog River – March 2015
Figure 12. Bridge over the Sorbog River – July 2016
29
Figure 13. New infrastructure alongside the road – June 2016
Figure 14. New infrastructure alongside the road – June 2016
30
Figure 15. New infrastructure alongside the road – June 2016
Figure 16. New infrastructure alongside the road – June 2016
31
Figure 17. New infrastructure alongside the road – July 2016
Figure 18. New infrastructure alongside the road – July 2016
32
Figure 19. Air quality monitoring equipment
Figure 20. Noise level monitoring – March 2015
33
Figure 21. Water quality testing – July 2015
Figure 22. Environmental status of the project zone in June 2016
34
Figure 23. Environmental status of the project zone in July 2016
Figure 24. Environmental status of the project zone in July 2016
35
Figure 25. Rehabilitated drainage ditch - June 2016
Figure 26. New safety signs alongside the road - July 2016
36
Figure 27. New safety signs alongside the road - July 2016
37
Annex 2. Check-list for environmental post-construction audit
№ Activity Impact Mitigation measures according
EMP/SSEMP Control Measures conducted
Comments/ Recommendations
1 Oil management Oil spills during equipment and machinery repairing or refuelling
Avoid oil spill to open soil. Repair works to be taken on concrete cover area.
PIU/DEP
Repair works are taken in specialized service stations. However minor oil spills were observed at temporary fuelling station. Contaminated soils are removed.
2 Waste management
Waste accumulation, air and soil pollution
Collect and disposal all wastes at designated location;
PIU/DEP Wastes are collected and disposed regularly;
Scrap metals properly stored to be sent to designated organization for recycling
PIU/DEP
Scrap metals are collected and disposed; Small amount of collected scrap metals were removed from the AMP site.
3 Remove disabled equipment from the area
Housekeeping matters
Contractor equipment and machinery removed;
PIU/DEP
Contractor equipment and machinery were removed;
4 Old pavement Old asphalt causing pollution, if improperly stored.
Old asphalt properly stored to be sent to designated organization for recycling and re-using.
PIU/DEP Old asphalt properly stored and delivered to designated organization for recycling and re-using (district department for road maintenance).
It is recommended recycle and re-use old asphalt as soon as possible.
5 Borrow sites and quarries
Land slide, soil erosion, change in riverbed and landscape, accidents
Borrow sites and quarries restored PIU/DEP Borrow sites and quarries restored
6 Existing Damage or disturbance to Reinstatement to pre-construction PIU/DEP No existing Infrastructure
Project: G9171 TAJ: Improved Maternal and Child Health through Connectivity Project
EA PIU RR
Section: all Contractor: Top International Engineering Corporation
Date: July 22, 2016 Auditors: 1. Bakhtiyor Begmuradov, PIU Environmental Specialist 2. Bashid Suriev, Contractor’s Environmental Specialist
38
Infrastructure facilities
existing services (supply of electricity, water, telecom etc.)
conditions or proper relocation, to be certified by the service companies
facilities were affected by the project.
7 Camp site facilities
Residual pollution and disturbance to the localities
All temporary facilities removed and cleaned up
PIU/DEP All temporary facilities removed and cleaned up
8 Hospital in Navabad
Medical wastes N/A PIU/DEP All hazardous medical wastes (persistent organic pollutant) are collected and disposed at designated location for further processing or elimination;
It is required to equip the hospital by special high-temperature stove to burn such wastes.
9 Others…
Audited sites:
1. The road and roadsides itself - from beginning to the end
2. Bridge over Sorbog River
3. Quarries and crushing plants site
4. Borrow pits
5. Asphalt plant site
6. Construction camp site
7. Old asphalt storage sites
8. Hospital in Navabad
9. Other sites if needed
Prepared by: _______________________________________________________ Bashid Suriev, Contractor’s Environmental Specialist
Checked by: ______________________________________________________ Bakhtiyor Begmuradov, PIU Environmental Specialist
Approved by: _____________________________________________________ Ruslan Nazmiev, Project Manager
39
Annex 3. Documentation
Figure 1. Certificate of handover for markings.
40
Figure 2. Old asphalt certificate of handover.
41
Figure 3. Road and bridge works certificate of handover.
42
43
44
Figure 4. Medical facility works certificate of handover.
45
46
Figure 5. Certificate of handover for medical equipment and furniture
47
Figure 6. Certificate of handover for medical vehicle and equipment
48
Figure 7. Certificate of handover for road construction equipment
49