Environmental Monitoring Report
# Annual Report December 2018
Indonesia: Neighborhood Upgrading and Shelter
Project – Phase 2
Prepared by the Directorate General of Human Settlements, Ministry of Public Works and Housing
for the Republic of Indonesia and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 30 November 2018)
Currency unit – rupiah currency name in lowercase (Rp)
Rp1.00 = $0.00007 $1.00 = Rp14,240
ADB – Asian Development Bank APBD – Anggaran Pendapatan and Belanja Daerah (Regional
Budget Income and Expenditure) DGHS – Directorate of Human Settlements
NOTE
(i) The fiscal year (FY) of the Government of Indonesia and its agencies ends on 31 December. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2011 ends on 31 December 2011.
(ii) In this report, "$" refers to US dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
___________________________________________________________________________
1
Annual Environmental Monitoring Report
2017 ANNUAL ENVIRONMENTAL MONITORING REPORT
ADB LOAN 3122-INO: Neighborhood Upgrading and Shelter Project
Phase 2 (NUSP-2)
Bridge constructed at Beting Kuala Kapias Neighborhood
Prepared by
Directorate General of Human Settlements - Ministry of Public Works and Housing
for
Asian Development Bank
November 2018
Annual Environmental Monitoring Report 2017
2
Table of Contents
Table of Contents ....................................................................................................................... 2
List of Tables ........................................................................................................................... 3
List of Figures ........................................................................................................................... 3
ABBREVIATIONS ...................................................................................................................... 4
CHAPTER 1. INTRODUCTION ................................................................................................ 5
CHAPTER 2. KEY PROJECT ACTIVITIES AND PROGRESS ................................................. 7
2.1. Community Contracts ......................................................................................................... 7
2.2. Complex Civil Work Contracts ............................................................................................ 9
2.3. New Site Development (NSD) ............................................................................................11
CHAPTER 3. ENVIRONMENTAL MITIGATION AND MONITORING STATUS .......................13
3.1. Requirements of Environmental Safeguards ......................................................................13
3.2. Key Roles and Responsibilities ..........................................................................................13
3.3. Community Contracts ........................................................................................................15
3.4. Complex Civil Work Contracts ...........................................................................................16
3.5. New Site Development Contracts ......................................................................................16
CHAPTER 4. PUBLIC CONSULTATION AND DISCUSSION ..................................................17
CHAPTER 5. INFORMATION DISCLOSURE ..........................................................................18
CHAPTER 6. GRIEVANCE REDRESS MECHANISM .............................................................19
CHAPTER 7. PROJECT STAFFING AND CAPACITY BUILDING ...........................................21
CHAPTER 8. KEY ISSUES AND CORRECTIVE ACTIONS ....................................................23
CHAPTER 9. CONCLUSIONS AND RECOMMENDATIONS ..................................................25
APPENDICES
Appendix 1. SPPL of Community Contracts .......................................................................... 27
Appendix 2. UKL-UPL and SPPL of Complex Civil Work Contract ........................................ 29
Appendix 3. UKL-UPL and Environmental Permit for the New Site Development .................. 31
Appendix 4. Environmental Mitigation and Monitoring Implementation - Bugul Lor
Neighborhood, Pasuruan City ............................................................................ 32
Annual Environmental Monitoring Report 2017
3
List of Tables
Table 1. Community Contracts Awarded in 2017 .................................................................... 8
Table 2. Complex Civil Works Contracts Awarded in 2017 .................................................... 10
Table 3. Agency and Community Organization Responsibilities ............................................ 13
Table 4. Key Issues and the Corrective Actions .................................................................... 23
List of Figures
Figure 1. NUSP-2 Project Location ......................................................................................... 5
Figure 2. Construction of neighborhood road in Muktiharjo Kidul (Semarang City) .................. 7
Figure 3. Construction of drainage system in Kelurahan Dusun Besar (Bengkulu City) ........... 8
Figure 4. Bridge Construction in Kelurahan Beting Kuala Kapias (Tanjung Balai) ................. 10
Figure 5. Progress of NSD Development .............................................................................. 12
Figure 6. Grievance Redress Mechanism ............................................................................. 19
Annual Environmental Monitoring Report 2017
4
ABBREVIATIONS
ADB Asian Development Bank
BLH Badan Lingkungan Hidup (Local Environment Office)
CA Community Advisor
CAP Community Action Plan
CC City Coordinator
CIO Community Implementing Organization (or BKM Badan Keswadayaan
Masyarakat)
CPMU Central Project Management Unit
DGHS Directorate General of Housing Settlements
EA Executing Agency
EARF Environmental Review and Assessment Framework
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
FY Fiscal Year
IEE Initial Environmental Examination
IPAL
KPP
Instalasi Pengolahan Air Limbah (Communal Wastewater Treatment Plant)
Kelompok Pemanfaat dan Pemelihara (Operation and Maintenance Team)
LCO Local Coordinating Office
MDG Millennium Development Goals
MPWH Ministry of Public Work and Housing
Muskel Musyawarah Kelurahan (neighborhood assembly meeting)
NMC National Management Consultant
NSD New Site Development
NUSP-2 Neighborhood Upgrading and Shelter Project Phase 2
O&M Operation and Maintenance
PIP Pengembangan Infrastruktur Permukiman (Settlement Infrastructure
Development)
PIU Project Implementing Unit (Satker or Satuan Kerja)
PMU Project Management Unit
RAB Rencana Anggaran Belanja (Budget Planning)
RMC Regional Management Consultant
Satker Satuan Kerja (Project Implementing Unit)
SKS Survey Kampung Sendiri or Village Survey
SPPL Surat Pernyataan Kesanggupan Pengelolaan dan Pemantauan Lingkungan
(Statement Letter for Environmental Management and Monitoring)
TIPP Tim Inti Perencanaan Partisipatif (Core team for Participatory Planning)
UKL-UPL Upaya Pengelolaan Lingkungan – Upaya Pemantauan Lingkungan
(Environmental Management Effort - Environmental Monitoring Effort
Document)
Annual Environmental Monitoring Report 2017
5
CHAPTER 1. INTRODUCTION
1. Project Background. The Neighborhood Upgrading and Shelter Project – Phase 2
(NUSP-2) is aimed to upgrade basic public infrastructure in slum settlements, and contribute
to meeting Millennium Development Goal (MDG) targets for achieving significant improvement
in the lives of slum dwellers (MDG target 7D) and halving the proportion of urban households
without sustainable access to safe drinking water and basic sanitation (MDG target 7C).1 The
NUSP-2 also contributes to the implementation of Cities without Slums Program launched by
the Indonesian Government.2
2. The NUSP-2 is an ADB-funded project, particularly upgrading and/or developing basic
infrastructure and facilities for selected slum areas at 209 neighborhoods (kelurahan). These
neighborhoods are distributed in 20 districts (kabupaten) and municipalities (kota) located
across Sumatra, Java, Kalimantan, Sulawesi, Nusa Tenggara and Maluku Islands as shown
in Figure 1. The executing agency of the NUSP-2 is the Directorate General of Human
Settlements (Direktorat Jenderal Cipta Karya) of the Ministry of Public Works and Housing
(MPWH).
Figure 1. NUSP-2 Project Location
1 The 2015 MDG target for the proportion of the urban population living in slums is 6%; in 2011, 12.6% of the
urban population lived in slums. The 2015 MDG target for the proportion of households with sustainable access to an improved water source is 75.5%; in 2011, 40.5% of urban households had access to an improved water source, 72.5% had access to basic sanitation. The proportion of households with access to safe water and basic sanitation in slum areas is assumed to be much lower.
2 The Cities without Slums Program is incorporated in the National Long-Term Development Plan, 2005–2025. It
aims to reduce slum areas in cities by 2025 by promoting concerted initiatives by the central and local governments, private sector, and civil society.
Tanjung
Balai
Bengkulu
Serang
Sukabumi
Semarang
Pasuruan
Bima
Tanjung
Jabung Barat
Kapuas
Bandar
Lampung
Makassar
Kendari
Ambon
Batam
Palembang
Banjarmasin
Pekalongan
Palangkaraya
Bone
Palopo
Annual Environmental Monitoring Report 2017
6
3. The NUSP-2 assists the local governments in upgrading and/or developing basic
infrastructure and facilities at selected neighborhoods in order to achieve the following: Output
1: Institutional capacities for managing pro-poor urban development strengthened; Output 2:
Infrastructure in slum neighborhoods upgraded; and Output 3: New settlements for poor
families established.
4. There are seven types of infrastructures and facilities built under the NUSP-2, among
others, construction of road, bridge, basic sanitation facilities, and communal wastewater
treatment plant; installation of clean water supply and street lighting; and provision of
municipal solid waste handling facility and transportation as well as basic fire-fighting
equipment.
5. Objective and Scope of the Monitoring Report. This Annual Environmental
Monitoring Report is developed by NMC Safeguard Team/Project Management Unit of the
NUSP-2 to describe the project activities and associated progress and implementation of the
environmental safeguards requirement of the Environmental Review and Assessment
Framework (EARF) in 2017. Further, this report describes the compliance status of
environmental mitigation and monitoring conducted against the EARF requirements.
Corrective actions identified in the ADB Review Mission in 2017, if any, are elaborated in this
report to improve compliance in the upcoming year.
Annual Environmental Monitoring Report 2017
7
CHAPTER 2. KEY PROJECT ACTIVITIES AND PROGRESS
6. This chapter summarizes key project activities and progress associated with the
NUSP-2 implementation in 2017. These include the community and complex civil work
contracts awarded as well as the construction of neighborhood infrastructure and facilities to
be constructed as part of the new site development (NSD) during the reporting period.
2.1. Community Contracts
7. In 2017 the NUSP-2 awarded 208 community contracts for neighborhood upgrading
civil works (skala lingkungan) to local Community Implementation Organizations (CIO).
Construction works that are considered technically modest and can be conducted by the
community without using specialized or heavy equipment qualify for the community-typed
contracts mentioned earlier. Figure 2 and Figure 3 are examples of the construction works
awarded under the community contract scheme.
Figure 2. Construction of neighborhood road in Muktiharjo Kidul (Semarang City)
Annual Environmental Monitoring Report 2017
8
Figure 3. Construction of drainage system in Kelurahan Dusun Besar (Bengkulu City)
Table 1 provides information on 209 community contracts awarded in 2017 as part of the
NUSP-2 implementation at 20 cities and districts in Indonesia.
Table 1. Community Contracts Awarded in 2017
No City/District (Province)
Number of
Neighborhoods
Involved
Construction and/or Installation Conducted
1 Tanjung Balai City
(North Sumatra Province)
15 Concrete paved road, drainage system, culvert, and
bridge.
2 Tanjung Jabung Barat
District (Jambi Province)
9 Road and drainage system.
3 Palembang City
(South Sumatra Province)
20 Vase, bench and street lighting.
Concrete paved road, bridge, and solid waste
collection area.
4 Bengkulu City
(Bengkulu Province)
10 Street lighting.
Concrete paved road, drainage channel, retaining wall,
and provision of clean water well.
5 Bandar Lampung City
(Lampung Province)
16 Street lighting.
Concrete paved road, drainage channel, retaining wall,
clean water well and toilet.
6 Batam City
(Riau Islands Province)
6 Concrete paved road and drainage channel.
7 Sukabumi City
(West Java Province)
12 Concrete paved road, drainage channel, communal
septic tank and waste water treatment plant, retaining
wall, hand dug and bore water wells.
8 Semarang City (Central
Java Province)
17 Concrete road and bridge, drainage channel, public
toilet, solid waste collection area, and street light
installation.
9 Pekalongan City 7 Concrete road, drainage channel, retaining wall, street
Annual Environmental Monitoring Report 2017
9
No City/District (Province)
Number of
Neighborhoods
Involved
Construction and/or Installation Conducted
(Central Java Province) light, and green open space.
10 Pasuruan City
(East Java Province)
11 Concrete road and bridge, drainage channel,
communal septic tank, and purchase of garbage
collector vehicle
11 Serang City
(Banten Province)
7 Concrete road and bridge, drainage channel, public
toilet, retaining wall, hand-dug well, solid waste
collection area, and purchase of garbage collector
vehicle
12 Kapuas District (Central
Kalimantan Province)
10 Concrete road, wooden bridge, wooden trails road,
public toilet, and drainage channel.
13 Palangka Raya City
(Central Kalimantan
Province)
8 Wooden trails road, concrete and paving road, and
drainage channel.
14 Banjarmasin City (South
Kalimantan Province)
11 Installation of culvert, concrete road and bridge, and
drainage channel.
15 Bima City (West Nusa
Tenggara Province)
9 Drainage channel, concrete road and bridge.
16 Bone City (South Sulawesi
Province)
4 Drainage channel and concrete road.
17 Makassar City (South
Sulawesi Province)
12 Drainage channel, concrete road, and communal
septic tank.
18 Palopo City
(South Sulawesi Province)
9 Drainage channel, concrete road, public toilet, retaining
wall, purchasing of waste bins, installation of clean
water pipeline, and green open space
19 Kendari City
(South East Sulawesi)
10 Concrete road and bridge, wooden road, hand-dug
well, drainage channel, and purchase of garbage motor
vehicle.
20 Ambon City
(Maluku Province)
6 Drainage channel, retaining wall, concrete road, and
purchase of garbage motor vehicle and waste bins.
Source: NUSP-2 Management Information System (2017).
2.2. Complex Civil Work Contracts
8. The complex civil work contracts are awarded to companies (instead of community
groups) through bidding process, particularly for construction works involving multiple
neighborhoods and specific materials and heavy and/or specialized equipment that may need
to be mobilized from other areas. In 2017, NUSP-2 awarded complex civil work contracts for
constructing facilities and infrastructure in a total of 16 cites and districts in Indonesia. Figure
4 shows the bridge construction awarded under the complex civil work contract.
Annual Environmental Monitoring Report 2017
10
Figure 4. Bridge Constructed at Kelurahan Beting Kuala Kapias (Tanjung Balai)
9. The types of community facilities and infrastructure constructed or installed in 2017
under the complex civil works contracts at more than 20 neighborhoods (kelurahans) and
cities distributed in 13 provinces in Indonesia are presented in the following table.
Table 2. Complex Civil Works Contracts Awarded in 2017
No City/District (Province) Construction and/or Installation Conducted
1 Kelurahan Sungai Pelenggut, Batam City
(Riau Islands Province).
Concrete road and drainage system.
2 Kelurahan Gunung Sulah, Bandar
Lampung City (Lampung Province)
Asphalt road and drainage system.
3 Kelurahan Panorama, Bengkulu City
(Bengkulu Province)
Concrete road and drainage system.
4 Kelurahan Beting Kuala Kapias, Tanjung
Balai City (North Sumatra Province)
Concrete road and bridge
5 Kelurahan Tungkal II, Tanjung Jabung
Barat District (Jambi Province)
Drainage system
6 Kelurahan Kaligawe and Meteseh,
Semarang (Central Java Province)
Paved road, asphalt road and drainage system
7 Kelurahan Sukakarya, Sukabumi city
(West Java Province)
Asphalt road, drainage system, communal IPAL
and public toilet.
8 Kelurahan Mandanrejo and Ngemplakrejo
and Pasuruan (East Java Province)
Drainage system, groundwater reservoir.
9 Kelurahan Bandengan and Kandang
Panjang, Pekalongan City (Central Java
Province)
Drainage system, asphalt road, concrete road,
street lighting and pump house
Annual Environmental Monitoring Report 2017
11
No City/District (Province) Construction and/or Installation Conducted
10 Kelurahan Selat Dalam, Kapuas District,
(Central Kalimantan Province)
Draiange system, 3R integrated waste
management areas, and purchasing of waste
containers
11 Kelurahan Dara, Bima City (West Nusa
Tenggara Province)
Draianage system and asphalt road
12 Kelurahan Lette, Tamarunang and Bunga Eja
Beru, Makassar (South Sulawesi Province)
Paved road, drainage system and perimeter fence
13 Kelurahan Ponjalae, Palopo (South Sulawesi
Province)
Drainage system and installation of concrete plate
14 Kelurahan Lalolara, Kendari (South-East
Sulawesi Province)
Asphalt road, drainage and public open space.
15 Kelurahan Karang Panjang and Rijali, Ambon,
(Maluku Province)
Concrete road, pedestrian, drainage system,
reinforce bridge, retaining Wall, landscaping,
communal wastewater treatment plant, and passive
hydrant.
16 Kelurahan Lonrae, Bone City (South Sulawesi
Province)
Concrete bridge and road.
Source: NUSP-2 Management Information System (2017).
2.3. New Site Development (NSD)
10. As part of the ADB funding, the NUSP-2 plans to construct neighborhood facilities and
infrastructures at four new site developments (NSD) in Purirano (Kendari City), Sampoddo
(Palopo City), Handil Berkat (Kapuas District), and Jatiwangi (Bima City). The facilities and
infrastructure to be constructed include paving roads, drainage system, clean water supply,
solid waste management system and landscape for open green space for the newly built
neighborhood. The NSD construction work is also implemented by contracted firms selected
through bidding process. As of 2017, some houses in the NSD of Kendari and Palopo Cities
have been developed; and land preparation/clearing for the NSD in Kapuas District and Bima
City is being progressed.
11. Figure 5 presents the status of four NSD sites as of 2017. The houses in the NSD are
developed by the DGHS and local governments.
Purirano NSD
Annual Environmental Monitoring Report 2017
12
Sampoddo NSD
Handil Berkat NSD
Jatiwangi NSD
Figure 5. Progress of NSD Development
Annual Environmental Monitoring Report 2017
13
CHAPTER 3. ENVIRONMENTAL MITIGATION AND MONITORING STATUS
3.1. Requirements of Environmental Safeguards
12. According to the ADB’s Safeguard Policy Statement (2009), the NUSP-2 is classified
as the Category B Project, i.e. the project could have some adverse environmental impacts,
but of lesser degree or significance than those in category A, but the impacts are site specific
and can be readily addressed through common mitigation measures. The NUSP-2 creates
positive impacts on the environment and improves the wellbeing of the community through
alleviation of slum areas in emerging cities in Indonesia.
13. The Environmental Assessment and Review Framework (EARF) document has been
prepared in 2014, and it provides screening procedure and checklist to review environmental
implications of the infrastructure and facility to be constructed as part of the NUSP-2. The
EARF requires that:
An initial environmental examination (IEE) document according to the ADB requirement is
prepared and endorsed by DGHS and ADB as part of the new site development (NSD)
proposal; and
Environmental Mitigation and Monitoring Plan (UKL-UPL) or Statement Letter to Conduct
Environmental Mitigation and Monitoring (SPPL) is prepared and endorsed by DGHS
according to the Ministry of Environment Regulations No. 5/2012 on Types of Activities
and/or Projects Requiring Environmental Impact Assessment (AMDAL) and No. 16/2012
on the Guidance for the Preparation of Environmental Documents; and Ministry of Public
Work Regulation No. 10/PRT/M/2008 on Types of Activities and/or Projects in the Public
Work Sector Subject to be Completed with the Environmental Management Effort-
Environmental Monitoring Effort (UKL-UPL) document.
3.2. Key Roles and Responsibilities
14. Table 3 summarizes the key roles and responsibilities of the executing and
implementing agencies as well as community organizations involved in the implementation of
the NUSP-2 including their respective environmental responsibilities. Related evidences as an
example on the undertaking of these roles and activities, particularly at the city/district level,
community implementing organization (CIO), and neighborhood level are included in
Appendices 1 to 4.
Table 3. Agency and Community Organization Responsibilities
Institutions and Responsibilities Activities and Status
Directorate General of Housing Settlement (Executing Agency)
Overall coordination, supervision,
monitoring.
The Commitment Officer (Satker PPK) of DGHS conducted
meetings with the NMC’s Team Leader and Safeguard Team to oversee overall implementation of the NUSP-2. The meetings were
conducted on ad hoc basis.
Preparation and submission of quarterly
progress and evaluation reports.
The PMU submitted the mentioned quarterly progress and
evaluation reports to ADB.
Prepare guidelines for the
environmental due diligence and
The DGHS published a Technical Guideline on Social and
Environmental Management in September 2016. This guideline is
Annual Environmental Monitoring Report 2017
14
Institutions and Responsibilities Activities and Status
monitoring of environmental
management plan.
equipped with forms of checklists and templates to assist the
implementing agencies at local government level to screen, assess
and mitigate as well as monitor environmental and social impacts
associated with the NUSP-2 intervention.
Public Works (Local Coordinating Officer) at City or District Level
Provide overall coordination,
supervision, monitoring and approval of
village proposals including
environmental checklists.
In all 20 cities, the LCO at the Local Planning Agency oversees the
overall implementation of NUSP-2 intervention, including approval
of the village proposals.
Prepare quarterly progress reports
including environmental.
The LCO provided inputs to the PMU on the quarterly progress of
the NUSP-2 intervention. No specific progress and environmental
reports are prepared by the LCO.
Provide technical support to community
advisors and BKMs/CIOs.
The technical support provided by LCO through consultation and
coordination when the time BKM/CIO presents their CAP.
Carry out environmental due diligence. For the community contract, the environmental due diligence
was carried out using the environmental screening checklist.
Subsequently, this information is utilized to develop the SPPL for
submission to the local environmental agency.
For the complex civil work contract, the UKL-UPL and the
Environmental Permit are applied for government approval or
SPPL is prepared.
For the NSD, IEE and UKL-UPL are prepared for ADB/DGHS
endorsement and local government respectively.
The list of UKL-UPL, SPPL, and IEE prepared is included in this
monitoring report.
Monitor the implementation of the
environmental management plan.
The LCO has not formally monitored or documented the
implementation of environmental management plan.
Environmental Agency at City or District Level (Badan Lingkungan Hidup/BLH)
Provide guidance on environmental
checklists.
There is no evident suggesting that the BLH provides guidance on
the implementation of environmental checklist.
Coordinate with community advisors to
conduct site visits to validate the
screening/assessment results.
Some BLHs conducted site visits to validate the environmental
screening results during the community meeting, but these
activities are not documented.
Review the engineering design and
environmental checklists and provide
permit for construction of a deep well.
There is no deep well constructed as part of the NUSP-2.
Conduct random checking during
construction and after completion to
inspect environmental procedures and
impacts.
This checking has not been undertaken.
Health Agency at City or District Level
Test collected water quality samples to
determine if collected water sources
meet the drinking water standards.
This water testing was not conducted, except for Sukabumi City, as
most of the clean water supply to be constructed for the NSD sites
will be sourced from treated water from the municipality water
company (known as Perusahaan Daerah Air Minum or PDAM).
Community Implementation Organization (CIO)
Responsible for establishing project
implementation units.
The CIO established the project implementing units in the form of
self-empowered community group (Kelompok Swadaya
Masyarakat) to implement the NUSP-2 activities.
Responsible for conducting
environmental checklists assisted by
The CIO, assisted by the CA and CC, conducted environmental
screening by visual inspection and review of the RKM/CAP using
Annual Environmental Monitoring Report 2017
15
Institutions and Responsibilities Activities and Status
community advisors/safeguard
specialist.
the forms included in the Technical Guideline for Social and
Environmental Management (2016).
Formulate O & M mechanisms.
The CIO established the O & M group (Kelompok Pemanfaat dan
Pemelihara/KPP) to be responsible for maintenance of the
neighborhood facility and infrastructure constructed as part of the
NUSP-2. However, there is no record or documentation suggesting
the conduct of this.
Responsible for monitoring construction
activities and conducting inspection for
completed interventions.
The progress of the NUSP-2 intervention was conducted when the
construction activities achieve 63% and 100% progress, and
reported to the respective LCO/CC.
Disclose, on the neighborhood board,
neighborhood proposals and contracts
including environmental checklists.
The discussion to develop and finalize the neighborhood proposals
was conducted through neighborhood discussion (musyawarah
kelurahan). However, the proposals, contracts, and checklists are
not disclosed on the neighborhood board.
Responsible for taking any negative
feedback related to site, construction,
and operation from other neighborhood
members and organizing meetings to
solve problems.
This responsibility was conducted through neighborhood
discussion.
Responsible for reporting environmental
monitoring to LCOs
The environmental monitoring is reported using the Form SFG-5
completed with the minutes of meeting of the monitoring at 63%
and 100% of construction progress. The minutes and pictures of
this activity were uploaded into the NUSP-2’ website.
3.3. Community Contracts
15. Environmental Mitigation. Prior to construction, the CIO prepared a Community
Action Plans (CAP) including the environmental and social screening using the form/checklist
provided in the the NUSP-2 Technical Guidelines on Social and Environmental Management.
The CA/CIO then conducted a neighborhood meeting to disseminate and discuss the CAP.
The results of the environmental and social screening were incorporated into the SPPL that
was subsequently submitted to the local environmental agency (Badan Lingkungan
Hidup/BLH) for registration. The SPPL contains identified potential environmental impacts and
measures to mitigate these impacts during the construction work. The list of SPPL submitted
for the community contract activities is presented in Appendix 1.
16. Some water spraying for dust suppression, covering the construction materials using
tarpaulin, and providing the workers with personnel protective equipment as well as other
mitigation included in the SPPL were reportedly conducted during the construction activities.
However, documentation with this regard is lacking.
17. Environmental Monitoring. The CA/CIO visually monitored the implementation of the
mitigation measures to make sure that they complied with the SPPL during the project up to
hand over to the LCO and subsequently to the local community as the beneficiary of the
NUSP-2. They monitored the progress of infrastructure being built by visual inspection and
made some documentation pictures of the progress on 0%; 63% and 100%. These processes
Annual Environmental Monitoring Report 2017
16
were being uploaded into the website of Management Information System through application
by the CA. The City Coordinator would check the uploaded files and gave approval.
18. Subsequently, the Safeguard Regional Management Consultant (based in Palembang,
Semarang and Makassar, representing the west, central, and eastern regions of Indonesia)
checked and reviewed the status of the process and made some analysis to be reported to
the Safeguard Team of NMC. The NMC incorporated this report into the quarterly report and
submitted to ADB. However, reporting on the implementation of environmental mitigation
during and after the construction activities were not formally documented.
3.4. Complex Civil Work Contracts
19. Environmental Mitigation. The environmental mitigation implemented for the
complex civil work contracts is similar to that of the community contract in that SPPL is
required for most construction activities of the neighborhood infrastructure and facilities. In few
cases, UKL-UPL document is required instead of SPPL for the mentioned activities. The list of
UKL-UPL and SPPL submitted for the community contract activities is presented in Appendix
2.
20. Some water spraying for dust suppression, covering the construction materials using
tarpaulin, and providing the workers with personnel protective equipment as well as other
mitigation included in the SPPL were reportedly conducted during the construction activities.
However, documentation with this regard is lacking.
21. Environmental Monitoring. The CCs were responsible for the day-to-day
environmental monitoring during the construction activities, in coordination with LCO. Usually,
they monitored the progress of infrastructure being built by visual inspection, and made some
documentation pictures of the progress (0%; 63% and 100%). The SFG-5 form, provided in
the Technical Guideline, was used to do the monitoring for both social and environmental
safeguard for each activity. The day-to-day monitoring during the construction activities should
be recorded in the logbook. However, reporting on the implementation of environmental
mitigation during and after the construction activities were not formally documented.
3.5. New Site Development Contracts
22. In 2017, the construction of infrastructure and facilities at the four NSD sites in
Kendari, Palopo, and Bima cities and Kapuas District have not been commenced and,
therefore no environmental mitigation and monitoring conducted. The Executing Agency
prepared the UKL-UPL and applied for the Environmental Permit as well as submitted the IEE
of NSD site in Kendari for ADB review. The status of UKL-UPL and Environmental Permit as
well IEE document prepared for the NSD is included in Appendix 3.
Annual Environmental Monitoring Report 2017
17
CHAPTER 4. PUBLIC CONSULTATION AND DISCUSSION
23. The NUSP-2 project conducted public consultation as an integral part of the
identification, selection and implementation of neighborhood infrastructure interventions. For
the community contract packages, several stages of neighborhood meetings were conducted
to openly discuss the whole process of development from assessing environmental and social
safeguard checklist, formulating and consolidating the investment plan into community action
plan (CAP), preparing the construction implementation and selecting the Implementing Unit
(Kelompok Swadaya Masyarakat). Through these meetings, all community members and
concerned stakeholders would have such forum to raise their complaints to be resolved. So
far, there is no report of any concerns or complaints addressed to the Implementing Units.
24. For the complex civil works, at the pre-construction phase, the City Coordinator (CC)
and City Satker conducted public consultation with the representatives of local communities,
head of Kelurahan, and the contractor firms to discuss the plan for the infrastructure and
identifying potential impacts by screening and reviewing the checklist forms and later
developed the UKL-UPL or SPPL documents based on the screening results. This event was
documented with the minutes of meetings, list of participants, and some pictures, and
uploaded unto the MIS website by the CC for public viewers. The community members and
concerned stakeholders could have used this forum to raise their complaints to be resolved.
So far, there is no report of any concerns or complaints addressed to the related City Satker.
25. As for the NSD sites, at the pre-construction phase, there would be two types of public
consultation. The first one is for disseminating information about the NSD project to the local
communities, potential beneficiaries, and job or business opportunities for the locals, as well
as seeking for local community’s perception on the NSD project. The second one is for
discussing and reviewing environmental and social screening checklists to prepare the UKL-
UPL document, which later to be further developed as IEE and social DDR documents. This
event would be attended by potential affected communities, the head of Kelurahan, related
agencies or stakeholders, the contractor firms, the CC and Sub-monev assistant, and
facilitated by the City Satker. During this reporting period, there is no public consultation yet
conducted for the NSD.
Annual Environmental Monitoring Report 2017
18
CHAPTER 5. INFORMATION DISCLOSURE
26. Information on public consultation, discussion, and neighborhood meetings related to
the the implementation of community and complex civil work contracts are documented and
uploaded into the NUSP-2’s website (www.nusp2.id). However, information related to
monitoring of environmental mitigation measures is lacking.
27. For the NSD, the IEE documents (including the EMP) and the annual environmental
monitoring report would be submitted to ADB for disclosure on ADB’s website. These IEE
documents would have versions in Bahasa Indonesia and would be made available to public
including the affected people and interested stakeholders. As the IEE of NSD is being
reviewed by ADB, no such document has been uploaded into ADB’s website.
Annual Environmental Monitoring Report 2017
19
CHAPTER 6. GRIEVANCE REDRESS MECHANISM
28. The NUSP-2 has established a grievance redress mechanism (GRM), which basically
consists of three levels, i.e. at the neighborhood, at the city/district, and at the national levels
as shown in Figure 6. This leveling system is expected to timely address any complaints
during project implementation. Local communities or affected people will have the right to file
complaints and/or queries related to disturbance/environmental impacts due to the project
activities.
29. The GRM should handle any complaints and/or queries which emerge during
construction process of the subprojects. Any affected people/party will have the right to file
complaints. It is anticipated that all grievances related to benefits and other assistance will be
resolved at the project level.
30. The procedure for filing complaints and/or grievance during construction is established
as follows:
(i) The complaint will be filed to the Community Implementing Organization (CIO) or Badan
Keswadayaan Masyarakat (BKM) members and local government at the neighborhood
level for an immediate solution when possible;
Figure 6. Grievance Redress Mechanism
Annual Environmental Monitoring Report 2017
20
(ii) If the problem cannot be solved, the BKM members and local government staff will
facilitate the APs (affected peoples) to submit their complaints to the Projects’s grievance redress committee (GRC) at the district level, and to the national level if needed.
Community advisor then will record the complaint and report it to the LCOs. The project
will dedicate a staff at city/district and national levels to be in charge of handling and
following up on AP’s complaints.
(iii) The members of the GRC should involve the representatives of vulnerable affected
people (i.e. affected women, poor and minority groups) and other affected people along
with relevant government officials who have functional and legal authority. The committee
will then review grievances involving all land acquisition benefits or issues, except for
disputes related to ownership.
(iv) Grievances will be addressed within 2 to 4 weeks from the date of filing the complaints at
the district level and within 8 weeks at the national levels.
Annual Environmental Monitoring Report 2017
21
CHAPTER 7. PROJECT STAFFING AND CAPACITY BUILDING
31. The consulting services are provided at the national, regional, city and kelurahan level.
At the national level, a team of consultants assist the CPMU, namely the National
Management Consultant (NMC) based in Jakarta. Part of this NMC, a safeguard specialist
and two technical assistants were recruited to assist the CPMU in preparing social and
environmental management guidelines, checking supporting data and documents from the
field in the project’s Management Information System (MIS) website, incorporating environmental monitoring in the quarterly progress reports and environmental survey results
in the monitoring and evaluation framework, prepare reports on annual environmental
monitoring and prepare the IEE for the NSD proposals.
32. At the regional level, a safeguard specialist was also recruited at each of three
regional management consultant (RMC) teams, based in Palembang (for West Region),
Semarang (Central) and Makassar (East). These RMC safeguard specialist are responsible
for assisting the NMC safeguard team in reviewing environmental monitoring management by
BKMs/CIOs, reviewing the completion of safeguard documents, preparing the environmental
monitoring reports, dissemination of the guidelines, assisting and training the city/district
coordinators and community advisors to review the environmental screening carried out by
BKMs/CIOs.
33. In addition to each NSD subproject, there are four technical assistants (called as “Sub-
monev” consultant) responsible to assist in day-to-day monitoring and evaluation for the
implementation of the NSD. This also includes assisting the City Satker, the LCO and the
related RMC Safeguard Specialist in collecting data for IEE preparation, and monitoring the
implementation of mitigation measures set forth in the EMP of the IEE. They are based in the
NSD sites of Kendari, Palopo, Bima, and Kapuas.
34. There are city/district coordinators (CCs) based in 20 cities/districts of the NUSP-2
project, responsible in assisting the city/district Satker (PIU), the LCOs, and the community
advisors. The CCs also responsible for conducting review and screening of the environmental
and social safeguard checklist using forms of SFG-1 till SFG-5 provided in the Technical
Guidelines of NUSP-2, both for community contracts and complex civil work packages.
Further, they review the completion of necessary safeguard documents, and review the
quality of documentations uploaded by CCs or CIOs/BKMs in the NUSP-2 MIS website.
35. Under the city/district coordinators (CCs), at the kelurahan level there are Community
Advisors (CAs) who may cover up to 3 kelurahans, and responsible for assisting each
BKM/CIO for day-to-day management of the community contract works; facilitating the
establishment of CIO/BKM and user groups; facilitating the preparation of CAPs; providing the
community with technical guidance in book-keeping, documentation and report preparation;
and assisting the user groups in formulating and implementing facility operation and
maintenance. Together with the CCs, the CAs assist the CIO/BKM in reviewing and screening
the environmental and social safeguard checklists. The CAs and CCs also responsible for the
preparation of documentation of each activity and supporting documents as the evidence,
such as minutes of meetings, notes, list of participants, pictures, other related documents. The
Annual Environmental Monitoring Report 2017
22
Technical Guidelines of NUSP-2 also provided various document templates for documentation
purposes. The CAs and CCs were responsible to assist the CIO/BKM to upload all of these
documents and pictures unto MIS website of the NUSP-2 project for further monitoring by the
RMC and NMC safeguard specialists for reporting and public disclosure.
36. The capacity building to enhance and refresh the knowledge and skill in managing the
safeguard requirements were done through events such as regional coordination meeting,
training for trainers and on-the-job trainings. These were held together joining the Capacity
Building Team at the NMC and RMC. The reports or proceedings of these events were
documented and compiled at PMU and NMC offices
Annual Environmental Monitoring Report 2017
23
CHAPTER 8. KEY ISSUES AND CORRECTIVE ACTIONS
37. Based on the information presented in this 2017 environmental monitoring report,
several key issues or gaps identified about the implementation of environmental mitigation
and monitoring against the requirements of EARF of the NUSP-2 (see Table 4). These issues
and gaps should be rectified by related executing and implementing agencies through
corrective actions and reported in the next annual monitoring report.
Table 4. Key Issues and the Corrective Actions
Key Issues / Gaps Corrective Actions Party to Implement Corrective Action
Due Date
Lacking documentation (e.g.
minutes of meeting) on the
monitoring and evaluation of
environmental safeguards
implementation at the
Executing Agency
Evaluate the environmental
safeguards implementation
on a regular basis and
document the results of this
implementation.
DGHS/NPMU
Evaluation to be
conducted
periodically.
The LCOs (local Public Work
office) have not monitored the
implementation of
Environmental Management
Plan (EMP) associated with
the community and complex
civil work contracts.
PMU (assisted by NMC) should conduct an empowering or capacity building event for the LCOs to remind them about this responsibility
LCO at respective local Public Work offices
During site visits, regional workshop or other ad-hoc events in Q4 of 2018 or Q1 of 2019
The Local Environmental
Agencies (BLH) have not yet
conducted random checking
during construction and after
completion to inspect
environmental procedures
and impacts.
The BLHs should undertake
random checking during
construction and after
completion of the construction
works.
PMU/DGHS
LCOs
BLHs
During site visits and
ad-hoc events in Q4
of 2018 and Q1 of
2019
There is no record or
documentation of the O&M
mechanism formula.
The CIO/BKM assisted by CC
and CA should make the
record or documentation of
the O&M mechanism formula.
BKM/CIO assisted by
CA/CC for community
contracts.
City/District Satker for
complex civil works
and for NSDs.
Q4 of 2018 for
community contracts
and complex civil
works.
Q4 of 2018 for
Kendari and Palopo
NSD.
Q1 of 2019 for Bima
and Kapuas NSD.
There is no environmental
safeguard monitoring report
from the RMC to be
incorporated to NMC annual
monitoring report.
The RMC Safeguard
specialists and the CCs in
coordination with City Satker
and LCO should prepare
regular environmental
monitoring reports including
any complaints raised before,
during and after
implementation of
construction works.
RMC Safeguard
Specialists, CCs in
coordination with City
Satker
Q4 of 2018 and Q1 of
2019
Incomplete SPPL, UKL-UPL
and Environmental Permit for
civil work packages in the
The RMC Safeguard
specialists and the CCs in
coordination with City Satker
RMC Safeguard
Specialists, related
CCs in coordination
Q4 of 2018
Annual Environmental Monitoring Report 2017
24
Key Issues / Gaps Corrective Actions Party to Implement Corrective Action
Due Date
Palembang City, Tanjung
Balai City, Sukabumi City,
Banjarmasin City and Kendari
City
should recheck the process of
and obtain the incomplete
SPPL and UKL-UPL
documents.
with respective City
Satker of Palembang,
Tanjung Balai,
Sukabumi,
Banjarmasin and
Kendari.
Incomplete SPPL, UKL-UPL
and Environmental Permit for
complex civil work packages
in Bengkulu City and Bone
City
The RMC Safeguard
specialists and the CCs in
coordination with City Satker
and LCO should recheck the
process of and obtain the
incomplete SPPL, UKL-UPL
and Environmental Permit
documents.
RMC Safeguard
Specialists, related
CCs in coordination
with respective City
Satker of Bengkulu
and Bone.
Q4 of 2018
Annual Environmental Monitoring Report 2017
25
CHAPTER 9. CONCLUSIONS AND RECOMMENDATIONS
38. Conclusions. In FY 2017, there were a total of 363 subprojects of NUSP-2 conducted
or being planned in 208 neighborhoods (kelurahan) located in 20 cities and districts. These
include 208 community contracts (skala lingkungan), 24 complex civil work contracts, and four
4 NSD (new site development) packages in Palopo, Kendari, Kapuas, and Bima cities.
39. As of end of December 2017, almost all of community contracts in the first cycle had
completed their SPPL documents, except those from the cities of Ambon and of Palembang,
which were still in the registration process at the BLH (Local Office of Environment). Whereas
for the complex civil work packages, only 3 of 24 kelurahans have not completed of UKL-UPL
documents yet.
40. The implementation of environmental management plan is either hardly implemented
or documented in the NUSP-2 implementation. This explains the low compliance level on
monitoring reports from the CIOs/BKMs, CAs, CCs and LCOs. Therefore, capacity building
activities through learning by doing and close assistance on safeguard compliance should be
conducted until the end of the project for the sake of sustainability.
41. Recommendations. As there are some incomplete data or supporting documents
required to comply with the Environmental Assessment and Review Framework, the
implementation and monitoring activities on this report are still not complied or partially
complied. To improve the compliance, in chapter 8 we already identified the pending issues or
gaps and the corrective actions that need to be done and reported in the next annual
environmental monitoring report. These are:
Ensure that the coordination, supervision and monitoring meetings of the DGHS
(Executing Agency) should be well-documented and recorded, supporting with list of
participants, notes, minutes and pictures of meeting.
PMU (assisted by NMC) should conduct an empowering or capacity building event for the
LCOs to remind them about their responsibility to monitor implementation of environmental
management plan associated with community contract and complex civil works.
The Local Environmental Agencies should undertake random checking during construction
and after completion of the construction works on the environmental impacts and
implementation of environmental management plan.
The CIO/BKM assisted by CC and CA should make the record or documentation of the
O&M mechanism formula.
The RMC Safeguard specialists and the CCs in coordination with City Satker and LCOs
should prepare regular environmental monitoring reports including any complaints raised
before, during and after implementation of construction works.
The RMC Safeguard specialists and the CCs in coordination with City Satker and LCO
should re-check and obtain the incomplete SPPL, UKL-UPL for Palembang, Tanjung
Balai, Sukabumi, Banjarmasin, Kendari; and Environmental Permit documents for
Bengkulu and Bone.
Annual Environmental Monitoring Report 2017
26
APPENDICES
Annual Environmental Monitoring Report 2017
27
Appendix 1. SPPL of Community Contracts
No City / District (Province)
Number of
Neighborhoods
Involved
List of SPPL* for Community Contracts
1 Tanjung Balai city, North
Sumatera
15 Semua SPPL diterima pada tanggal 3 July 2017
(siklus 1)
Semua SPPL diterima pada tanggal 18 October 2017
(siklus 2)
2 Tanjung Jabung Barat
District (Jambi Province)
9 Semua SPPL diterima pada tanggal 20 June 2017
(siklus 1)
3 Palembang City (South
Sumatra Province)
20 13/20 kelurahan, SPPL telah diterima oleh BLH pada
December 2017
4 Bengkulu City (Bengkulu
Province)
9 8/9 kelurahan, SPPL telah diterima oleh BLH pada
bulan October 2017 (siklus 1)
SPPL untuk siklus 2 telah diterima oleh BLH pada
bulan October dan November 2017
5 Bandar Lampung City
(Lampung Province)
17 Semua SPPL diterima pada tanggal 22 August 2017
(siklus 1)
Semua SPPL diterima pada tanggal 7 October 2017
(siklus 2)
7 Batam City (Riau Islands
Province)
7 Semua SPPL diterima pada tanggal 19 July 2017
(siklus 1)
Semua SPPL diterima pada tanggal 29 September
2017 (siklus 2)
7 Sukabumi City (West
Java Province)
12 Semua SPPL diterima pada tanggal 19 May 2017
(siklus 1)
Semua SPPL diterima pada tanggal 4 September
2017 (siklus 2)
8 Semarang City (Central
Java Province)
17 Semua SPPL diterima pada tanggal 7 November 2017
(siklus 1)
Semua SPPL diterima pada tanggal 8 November 2017
(siklus 2)
9 Pekalongan City (Central
Java Province)
7 Semua SPPL diterima pada tanggal 12 June 2017
(siklus 1)
Semua SPPL diterima pada tanggal 5 September
2017 (siklus 2)
10 Pasuruan City (East Java
Province)
11 Semua SPPL diterima pada July 2017 (siklus 1)
Semua SPPL diterima pada October 2017 (siklus 2)
11 Serang City (Banten
Province)
7 Semua SPPL diterima pada tanggal 9 November 2017
(siklus 1 dan siklus 2)
12 Kapuas District (Central
Kalimantan Province)
10 Semua SPPL diterima pada tanggal 5 June 2017
13 Palangkaraya City
(Central Kalimantan
Province)
8 Semua SPPL diterima pada Juny 2017 (siklus 1)
Semua SPPL diterima pada 11 October 2017 (siklus
2)
14 Banjarmasin City (South
Kalimantan Province)
11 Semua SPPL diterima pada tanggal 27 September
2017
15 Bima City (West Nusa
Tenggara Province)
9 Semua SPPL diterima pada tanggal 7 July 2017
(siklus 1)
Semua SPPL diterima pada tanggal 13 September
2017 (siklus 2)
Annual Environmental Monitoring Report 2017
28
No City / District (Province)
Number of
Neighborhoods
Involved
List of SPPL* for Community Contracts
17 Bone City (South
Sulawesi Province)
4 Semua SPPL diterima pada tanggal 25 July 2017
17 Makassar City (South
Sulawesi Province)
12 Semua SPPL diterima pada tanggal 19 July 2017
18 Palopo City (South
Sulawesi Province)
9 Semua SPPL diterima pada tanggal 7 July 2017
(siklus 1)
Semua SPPL diterima pada tanggal 1 September
2017 (siklus 2)
19 Kendari City (South East
Sulawesi)
10 Semua SPPL diterima pada May 2018
20 Ambon City (Maluku
Province)
7 Semua SPPL diterima pada 11 August 2017
Note: *SPPL – statement letter to conduct environmental management and monitoring.
Annual Environmental Monitoring Report 2017
29
Appendix 2. UKL-UPL and SPPL of Complex Civil Work Contract
No Neighborhood Construction/
Installation Works Environmental Documents and Permits
1 Kelurahan Sungai
Pelenggut, Batam City
(Kepulauan Riau)
Concrete road and
drainage system
SPPL receipt No. 679/DLH/SPPL/XI/2017
(dated 24 November 2017) issued by the
DLH of Batam City
2 Kelurahan Gunung Sulah,
Bandar Lampung City,
Lampung.
Asphalt road and drainage
system
UKL-UPL Recommendation No.
660.i/995/III.10/2017 (dated 19 October
2017) issued by the DLH of Bandar
Lampung City.
No evidence indicating whether the
corresponding Environmental Permit has
been secured for this construction work.
3 Kelurahan Panorama,
Bengkulu City, Bengkulu
Concrete road and
drainage system
SPPL receipt No. 660.1/27/KK.SPPL/DLH-
II/IX/2017 (dated 11 September 2017)
issued by the DLH of Bengkulu City.
4 Kelurahan Beting Kuala
Kapias, Tanjung Balai City,
North Sumatra
Concrete road and bridge
(made of reinforced
concrete)
SPPL receipt No.
660/002/VII/DokLH/DISLH/2017 (dated 3
July 2017) issued by the DLH of Tanjung
Balai City
5 Kelurahan Tungkal II,
Tanjung Jabung Barat
District, Jambi
Drainage system UKL-UPL Recommendation No.
660.4/28/DLH/IX/2017 (dated 13 September
2017) and Environmental Permit No.
660.4/29/DLH/IX/2017 (dated 13 September
2017) by DLH of Tanjung Jabung Barat
District
6 Kelurahan Kaligawe and
Meteseh, Semarang,
Central Java.
Paved road, asphalt road
and drainage system
SPPL receipt No. 658.31/443/DPM-
PTSP/R/XII/2017 (dated 29 December
2017) issued by the Dinas Penanaman
Modal Terpadu Satu Pintu of Semarang City
7 Kelurahan Sukakarya,
Sukabumi, West Java.
Asphalt road, drainage
system, communal IPAL
and public toilet
SPPL receipt No. No 660.1/46/SPPL/BID 1-
DLH/2017 (dated 16 May 2017) issued by
DLH of Sukabumi City
8 Kelurahan Mandanrejo and
Ngemplakrejo and
Pasuruan, East Java.
Drainage system
Ground Reservoir
SPPL receipt No.210/423.110/2017
(dated 25 July 2017) issued by DLHKP of
Pasuruan City
SPPL receipt No.211/423.110/2017
(dated 25 July 2017) issued by DLHKP of
Pasuruan City
9 Kelurahan Bandengan and
Kandang Panjang,
Pekalongan City, Central
Java
Drainage system, asphalt
road, and pump house
Concrete road, street
lighting and pump house
SPPL receipt by BLH of Pekalongan City
(dated 20 July 2017).
10 Kelurahan Selat Dalam,
Kapuas District, Central
Kalimantan
Draiange system, 3R
integrated waste
management site and
purchasing of waste
containers
SPPL receipt No. 660/007/Reg/DLH/I/2018
(dated 23 January 2018) issued by DLH of
Kapuas District
11 Kelurahan Dara, Bima City,
West Nusa Tenggara
Draianage system and
asphalt road
SPPL receipt No. 800/60/DLH/XII/2017
(dated 7 July 2017) issued by DLH of Bima
City
12 Kelurahan Lette,
Tamarunang and Bunga
Paved road and drainage
system
SPPL receipt No.428, 429 and 431 (dated 6
March 2017) issued by BLH of Makassar
Annual Environmental Monitoring Report 2017
30
No Neighborhood Construction/
Installation Works Environmental Documents and Permits
Eja Beru, Makassar, South
Sulawesi
Paved road, drainage
system and perimeter fence
City
SPPL receipt No. 430 by BLH of Makassar
City, dated 6 March 2017
13 Kelurahan Ponjalae,
Palopo, South Sulawesi
Drainage system and
installation of plat deucker
SPPL receipt No. 012/DLH-SPPL/VIII/2017
14 Kelurahan Lalolara,
Kendari, South East
Sulawesi
Asphalt road, drainage and
public open space
There is no evidence indicating whether
SPPL has been prepared or submitted to
the Environmental Agency for this
construction work.
15 Kelurahan Karang Panjang
and Rijali, Ambon, Maluku.
Concrete road, pedestrian
and drainage system
SPPL receipt No. 660/276/DLHP (dated 31
August 2017) issued by the DLHP of Ambon
City dated
Reinforce bridge, Retaining
Wall, Landscape,
Communal IPAL, and
Passive Hydrant
There is no evidence indicating whether
SPPL or UKL-UPL and Environmental
Permit have been prepared or submitted to
the Environmental Agency.
16 Kelurahan Lonrae, Bone
City, South Sulawesi.
Concrete Bridge/Road There is no evidence indicating whether
SPPL has been prepared or submitted to
the Environmental Agency.
Note: DLH – Local Environmental Agency (Dinas Lingkungan Hidup)
Annual Environmental Monitoring Report 2017
31
Appendix 3. UKL-UPL and Environmental Permit for the New Site Development
No NSD Sites* UKL-UPL IEE
1 Purirano NSD – Kendari
City (Southeast Sulawesi
Province)
UKL-UPL approval No. 191 year 2016
(dated 29 December 2016), issued by the
Environmental Agency of Kendari City.
Environmental Permit No. 192 year 2016
(dated 29 December 2016) issued by the
same environmental agency.
Submitted to ADB for
review in November 2017.
2 Sampoddo NSD – Palopo
City (South Sulawesi
Province)
UKL-UPL approval No.
660/047/DLH/XII/2017 (dated 16
December 2017) issued by the
Environmental Agency of Palopo City
Environmental Permit No.
660/48/DLH/XII/2017 (dated 16
December 2017) issued by the same
environmental agency.
Being prepared for
submission to ADB in
2018.
3 Handil Jaya NSD, Kapuas
District (Central
Kalimantan Province)
UKL-UPL approval No.
660/364/DLH/X/2017 (dated 18 October
2017) issued by the Environmental
Agency of Kapuas District
Environmental Permit No.
627/DPMPTSP/ year 2017 (dated 29
December 2017) issued by the Head
(Bupati) of Kapuas District.
Not yet developed.
4 Jatiwangi NSD, Bima City
(West Nusa Tenggara
Province)
UKL-UPL recommendation No
880/32/DLH/XII/2017 (dated 21
December 2017) issued by the
Environmental Agency of Bima City.
Environmental Permit No. 435/2018
(dated 15 May 2018) issued by the Major
(Walikota) of Bima City.
Not yet developed.
Source: NSD Technical proposals and copies of UKL-UPL documents from NUSP-2 subprojects 2017.
Note: * Construction of neighborhood road, drainage system, clean water supply, solid waste management system, landscape, and street lighting.
Annual Environmental Monitoring Report 2017
32
Appendix 4. Environmental Mitigation and Monitoring Implementation - Bugul Lor
Neighborhood, Pasuruan City
4.A. Use of Form SG-1 to Screen Out Negative Investment List Activities
Annual Environmental Monitoring Report 2017
33
Annual Environmental Monitoring Report 2017
34
Annual Environmental Monitoring Report 2017
35
Annual Environmental Monitoring Report 2017
36
Appendix 4.B. SPPL of Kelurahan Bugul Lor, Pasuruan City
Annual Environmental Monitoring Report 2017
37
Annual Environmental Monitoring Report 2017
38
Annual Environmental Monitoring Report 2017
39
Annual Environmental Monitoring Report 2017
40
4.C. Minutes of Meeting on the Project’s Screening Result
Annual Environmental Monitoring Report 2017
41
Annual Environmental Monitoring Report 2017
42
4.D. Community Meeting in Bugul Lor Neighborhood
Annual Environmental Monitoring Report 2017
43
4.E. Monitoring of Construction Progress
Documentation pictures
LOCATION 2
Construction Work : Paving
Location : RW IV /RT 07
Longitude : 112°55'11.35"E
Latitute : 7°38'17.85"S
0%
LOCATION 2
Construction Work : Paving
Location : RW IV /RT 07
Longitude : 112°55'11.35"E
Latitute : 7°38'17.85"S
25%
Annual Environmental Monitoring Report 2017
44
LOCATION 2
Construction Work : Paving
Location : RW IV /RT 07
Longitude : 112°55'11.35"E
Latitute : 7°38'17.85"S
50 %
LOCATION 2
Construction Work : Paving
Location : RW IV /RT 07
Longitude : 112°55'11.35"E
Latitute : 7°38'17.85"S
75 %
Annual Environmental Monitoring Report 2017
45
LOCATION 2
Construction Work : Paving
Location : RW IV /RT 07
Longitude : 112°55'11.35"E
Latitute : 7°38'17.85"S
100 %
Annual Environmental Monitoring Report 2017
46
4.F. Use of Safety Signage during Construction
Annual Environmental Monitoring Report 2017
47
4.G. Minutes of Meeting on Final Inspection upon Completion of Construction Works (100% Progress)
Annual Environmental Monitoring Report 2017
48
Annual Environmental Monitoring Report 2017
49
Annual Environmental Monitoring Report 2017
50
4.H. Form SFG-5 Potential Impact and Mitigation Matrix
Annual Environmental Monitoring Report 2017
51