COPYRIGHT WITH CMPDI A MINI RATNA ISO 9001 COMPANY Central Mine Planning & Design Institute Limited Regional Institute – V, CMPDI Complex, BILASPUR (C.G.) ENVIRONMENTAL MONITORING REPORT AIR, NOISE & EFFLUENT SOUTH EASTERN COALFIELDS LIMITED (A Mini Ratna Company) MARCH - 2021 (RAIGARH AREA)

ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

COPYRIGHT WITH

CMPDI

A MINI RATNA

ISO 9001 COMPANY

Central Mine Planning & Design Institute Limited Regional Institute – V, CMPDI Complex,

BILASPUR (C.G.)

ENVIRONMENTAL MONITORING REPORT

AIR, NOISE & EFFLUENT

SOUTH EASTERN COALFIELDS LIMITED

(A Mini Ratna Company)

MARCH - 2021

(RAIGARH AREA)

Page 2: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021

CONTENTS No. of

samples Page No.

Sl.No. Name of Air Sampling Station

CHHAL OC

1 Mine Office 9 1

2 Lat Village 9 1

3 Khedapali Village 9 2

4 Chhal Village 9 2

5 Quarry No.1(Coal loading Pt.) for fugitive dust 9 3

6 Quarry No.1(Weigh Bridge) for fugitive dust 9 3

7 SAM Office 9 4

8 Nawapara Colony 9 4

DHARAM INCLINE

9 Mine Office 2 5

10 Edu Village 2 5

11 Dharam Colony 2 5

12 In between tippler and workshop 2 5

BAROUD OC

13 500m from coal bench near barrier No.2 2 6

14 500m from coal stock near MPCC camp 2 6

15 500m from OB dump near main sump 2 6

16 500m from mine pit near workshop/substation 2 6

17 Kudumkela Camp 2 6

18 Baroud Colony 2 6

19 Bijari Village 2 6

20 Bulekaera Village 2 6

Page 3: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Sl.No. Name of Air Sampling Station No. of

samples Page No.

Jampali OC

21 Sub area manager office 2 7

22 Singmojhavillage 2 7

23 Kosamghat village 2 7

24 Posalda village 2 7

25 Kudumkela village 2 7

26 Saraipali village 2 7

27 Howramoda village 2 7

28 Jampali Village 2 7

Gare-Pelma IV/1 OC

29 Mine Office (DCPP office) 2 8

30 500m from Coal Bench Near Mine Boundary 2 8

31 500m from Coal stock near Diamond square 2 8

32 Dongamouha Village 2 8

33 Janjgir Village 2 8

34 Nagramuda Village 2 8

35 Tapranga Village 2 8

36 Dourabhatha Village 2 8

Gare-Pelma IV/2&3 OC

37 500m from OB dump near Switch Yard 2 9

38 500m from CoalBench Near KJS Camp 2 9

39 500m from OB dump near Lamp room 2 9

40 500m from Mine Pit 2 near mine boundary 2 9

41 Gare Village 2 9

42 Dongamouha Village 2 9

43 Kosampali Village 2 9

44 Libra Village 2 9

Page 4: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

BIJARI OC

45 Manager Office-Bijari OC 2 10

46 Check point-Barrier A 2 10

47 Check point-Barrier B 2 10

48 500 m From Mine Boundary at Mine dip direction 2 10

49 Rumkera 2 10

50 Khurmibhaona 2 10

51 Porda 2 10

52 Faguram 2 10

Total 160

Page 5: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Sl.No. Name of Noise Sampling Station No. of

samples Page No.

CHHALOC

1 Mine Office 2 11

2 Lat Village 2 11

3 Khedapali Village 2 11

4 Chhal Village 2 11

5 Quarry No.1(Coal loading Pt.) for fugitive dust 2 11

6 Quarry No.1(Weigh Bridge) for fugitive dust 2 11

7 SAM Office 2 11

8 Nawapara Colony 2 11

DHARAM INCLINE

9 Mine Office 2 12

10 Edu Village 2 12

11 Dharam Colony 2 12

12 In between tippler and workshop 2 12

BAROUD OC

13 500m from coal bench near barrier No.2 2 13

14 500m from coal stock near MPCC camp 2 13

15 500m from OB dump near main sump 2 13

16 500m from mine pit near workshop/substation 2 13

17 Kudumkela Camp 2 13

18 Baroud Colony 2 13

19 Bijari Village 2 13

20 Bulekaera Village 2 13

Page 6: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Sl.No. Name of Noise Sampling Station No. of

samples Page No.

Jampali OC

21 Sub area manager office 2 14

22 Singmojha village 2 14

23 Kosamghat village 2 14

24 Posalda village 2 14

25 Kudumkela village 2 14

26 Saraipali village 2 14

27 Howramoda village 2 14

28 Jampali Village 2 14

Gare-Pelma IV/1 OC

29 Mine Office (DCPP office) 2 15

30 500m from Coal Bench Near Mine Boundary 2 15

31 500m from Coal stock near Diamond square 2 15

32 Dongamouha Village 2 15

33 Janjgir Village 2 15

34 Nagramuda Village 2 15

35 Tapranga Village 2 15

36 Dourabhatha Village 2 15

Gare-Pelma IV/2&3 OC

37 500m from OB dump near Switch Yard 2 16

38 500m from Coal Bench Near KJS Camp 2 16

39 500m from OB dump near Lamp room 2 16

40 500m from Mine Pit 2 near mine boundary 2 16

41 Gare Village 2 16

42 Dongamouha Village 2 16

43 Kosampali Village 2 16

44 Libra Village 2 16

Page 7: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

BIJARI OC

45 Manager Office-Bijari OC 2 17

46 Check point-Barrier A 2 17

47 Check point-Barrier B 2 17

48 500 m From Mine Boundary at Mine dip direction 2 17

49 Rumkera 2 17

50 Khurmibhaona 2 17

51 Porda 2 17

52 Faguram 2 17

Total 104

Sl.No. Name of Effluent Sampling Station No. of

samples Page No.

CHHAL OC

1 Water course before entering OB dump 2 18

2 Water course leaving the mine OB dump 2 18

3 Discharge at pumping station Qr.No- 2 2 18

DHARAM UG

4 Mine water sample at Discharge point 2 19

BAROUD OC

5 Mine sump water 2 20

6 Nalla water 2 20

7 Upstream of Kurket river 2 20

8 Downstreamof Kurket river 2 20

Jampali OC

9 Mine discharge water 2 21

10 At Kurket River 100m up stream 2 21

11 At Kurket River 100m down stream 2 21

Page 8: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Gare-PelmaIV/1 OC

12 Mine water discharge of Gare– Pelma IV/1 OC Mine 2 22

13 At Mixing point of Mine discharge and Pendra Nalla 2 22

14 100 m Upstream to mixing point in Upstream of Pendra Nalla 2 22

15 100 m Downstream to mixing point in Upstream of Pendra Nalla 2 22

Gare-PelmaIV/2&3 OC

16 Mine pit 1 sump water of Gare– Pelma IV/2&3 OC mine 2 23

17 Mine pit 2 sump water of Gare– Pelma IV/2&3 OC mine 2 23

18 Mine pit 1 discharge water after OB dump of Gare– Pelma IV/2&3

OC mine

2 23

19

Mine pit 2 discharge water after settling tank of Gare– Pelma IV/2&3

OC mine 2 23

BIJARI OC

20 Final Mine Discharge from Patch A 2 24

21 Final Mine Discharge from Patch B 2 24

Total 42

Page 9: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 1 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Chhal OC Sample Reference No. 1-2

Parameter PM100 PM10 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

1-Mine Office A-O

01.03.2021 08.03.2021 622 329 84 43 52

03.03.2021 08.03.2021 451 218 62 34 42

05.03.2021 08.03.2021 427 236 68 39 45

08.03.2021 17.03.2021 381 227 62 36 29

10.03.2021 17.03.2021 423 225 53 42 48

12.03.2021 17.03.2021 631 329 74 51 42

22.03.2021 04.04.2021 381 211 53 46 38

25.03.2021 04.04.2021 392 225 52 37 43

2-Lat Village B

01.03.2021 08.03.2021 217 105 61 31 45

03.03.2021 08.03.2021 188 94 43 44 38

05.03.2021 08.03.2021 191 91 46 35 43

08.03.2021 17.03.2021 184 96 48 38 31

10.03.2021 17.03.2021 197 89 52 42 39

12.03.2021 17.03.2021 186 87 49 36 42

22.03.2021 04.04.2021 193 84 53 41 49

25.03.2021 04.04.2021 229 93 57 39 46

Page 10: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 2 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Chhal OC Sample Reference No. 3-4

Parameter PM110 PM11 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

3-Khedapali

Village B

01.03.2021 08.03.2021 199 84 55 42 36

03.03.2021 08.03.2021 223 119 61 48 41

05.03.2021 08.03.2021 189 86 44 37 29

08.03.2021 17.03.2021 184 79 42 34 43

10.03.2021 17.03.2021 181 83 47 39 47

12.03.2021 17.03.2021 196 95 45 27 38

22.03.2021 04.04.2021 211 109 54 43 54

25.03.2021 04.04.2021 187 87 46 32 39

4-Chhal Village B

01.03.2021 08.03.2021 197 84 49 42 48

03.03.2021 08.03.2021 215 111 57 52 41

05.03.2021 08.03.2021 193 91 50 43 35

08.03.2021 17.03.2021 189 89 47 39 46

10.03.2021 17.03.2021 196 95 52 44 56

12.03.2021 17.03.2021 217 91 49 38 43

22.03.2021 04.04.2021 197 88 53 41 37

25.03.2021 04.04.2021 181 94 51 35 46

Page 11: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 3 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Chhal OC Sample Reference No. 5-6

Parameter PM110 PM11 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

5-Qr.No.1

(Coal loading Pt.)

for fugitive test

A-O

02.03.2021 08.03.2021 647 319 72 33 44

04.03.2021 08.03.2021 551 227 65 38 47

09.03.2021 17.03.2021 526 221 53 31 39

13.03.2021 17.03.2021 539 214 55 41 47

16.03.2021 22.03.2021 546 233 59 36 48

18.03.2021 22.03.2021 639 277 74 39 45

23.03.2021 04.04.2021 528 237 52 34 49

26.03.2021 04.04.2021 543 229 51 29 36

6-Qr.No.1

(Weigh Bridge)

for fugitive test

A-O

02.03.2021 08.03.2021 642 322 67 37 44

04.03.2021 08.03.2021 539 234 56 49 37

09.03.2021 17.03.2021 545 223 54 35 42

13.03.2021 17.03.2021 564 219 49 32 39

16.03.2021 22.03.2021 529 215 52 52 44

18.03.2021 22.03.2021 551 221 48 38 31

23.03.2021 04.04.2021 579 243 55 44 36

26.03.2021 04.04.2021 534 218 57 41 49

Page 12: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 4 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Chhal OC Sample Reference No. 7-8

Parameter PM110 PM11 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

7-SAM Office A-O

02.03.2021 08.03.2021 213 119 54 34 45

04.03.2021 08.03.2021 196 97 48 37 48

09.03.2021 17.03.2021 187 89 41 35 51

13.03.2021 17.03.2021 192 91 43 39 28

16.03.2021 22.03.2021 214 96 51 42 50

18.03.2021 22.03.2021 197 88 45 33 39

23.03.2021 04.04.2021 217 94 52 29 37

26.03.2021 04.04.2021 211 97 55 39 46

8-Nawapara

Colony B

02.03.2021 08.03.2021 196 85 46 44 49

04.03.2021 08.03.2021 217 88 53 37 44

09.03.2021 17.03.2021 189 82 42 31 43

13.03.2021 17.03.2021 177 79 48 48 55

16.03.2021 22.03.2021 191 81 45 42 34

18.03.2021 22.03.2021 188 78 47 47 39

23.03.2021 04.04.2021 215 84 49 28 34

26.03.2021 04.04.2021 179 75 44 39 46

Page 13: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 5 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Dharam Incline Sample Reference No. 58-61

Parameter PM110 PM11 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-I,

2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

9-Mine Office A-O 09.03.2021 12.03.2021 597 222 71 29 42

24.03.2021 04.04.2021 633 252 77 38 46

10-Edu Village B 09.03.2021 12.03.2021 195 89 46 33 41

24.03.2021 04.04.2021 188 97 41 21 32

11- Dharam Colony B 09.03.2021 12.03.2021 182 86 49 44 58

24.03.2021 04.04.2021 189 81 47 36 47

12-In between

tippler &

Workshop

A-O

09.03.2021 12.03.2021 547 223 68 38 42

24.03.2021 04.04.2021 561 217 74 41 55

Page 14: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 6 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Baroud OC Sample Reference No. 62-67,97,98

Parameter PM110 PM11 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name (Code) Station

category

Date of

sampling

Date of

analysis

13-500m from coal

bench near barrier

No.2

A-O

02.03.2021 09.03.2021 525 247 60 34 43

17.03.2021 26.03.2021 541 229 64 36 48

14- 500m from coal

stock near MPCC

camp

A-O

02.03.2021 09.03.2021 637 329 85 39 42

17.03.2021 26.03.2021 588 265 68 42 34

15- 500m from OB

dump near main

sump

A-O

02.03.2021 09.03.2021 633 331 84 37 45

17.03.2021 26.03.2021 561 219 57 48 41

16-500m from mine

pit near

workshop/substation

A-O

02.03.2021 09.03.2021 642 324 82 39 52

17.03.2021 26.03.2021 597 273 63 46 54

17-Kudumkela Camp B

04.03.2021 09.03.2021 196 91 55 28 39

19.03.2021 26.03.2021 212 122 48 38 31

18-Baroud Colony B

04.03.2021 09.03.2021 194 94 54 36 42

19.03.2021 26.03.2021 217 109 47 32 45

19-Bijari Village B 04.03.2021 09.03.2021 189 85 39 29 37

19.03.2021 26.03.2021 192 118 51 36 48

20-Bulekaera Village B

04.03.2021 09.03.2021 187 89 43 41 53

19.03.2021 26.03.2021 183 85 46 45 49

Page 15: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 7 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Jampali OC Sample Reference No. 68-75

Parameter PM100 PM10 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

21-Sub area

manager office A-N

01.03.2021 08.03.2021 531 224 65 31 38

16.03.2021 22.03.2021 484 217 62 44 55

22-Singmojha

Village B

01.03.2021 08.03.2021 217 121 53 38 47

16.03.2021 22.03.2021 197 84 48 39 32

23-Kosamghat

Village B

01.03.2021 08.03.2021 219 109 52 29 36

16.03.2021 22.03.2021 188 94 44 33 42

24-Posalda Village B 01.03.2021 08.03.2021 213 97 60 35 44

16.03.2021 22.03.2021 182 84 44 37 49

25-Kudumkela

Village B

03.03.2021 08.03.2021 185 88 46 32 43

18.03.2021 22.03.2021 191 93 49 35 47

26-Saraipali

Village B

03.03.2021 08.03.2021 211 117 59 30 41

18.03.2021 22.03.2021 187 85 54 34 39

27-Howramoda

Village B

03.03.2021 08.03.2021 196 94 51 38 45

18.03.2021 22.03.2021 193 87 48 44 53

28-Jampali Village B 03.03.2021 08.03.2021 219 115 58 52 46

18.03.2021 22.03.2021 189 92 53 34 42

Page 16: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 8 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Gare-Pelma IV/1 OC Sample Reference No. 76-83

Parameter PM100 PM10 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

29-Mine Office

(DCPP office) A-N

08.03.2021 18.03.2021 549 248 61 51 47

22.03.2021 03.04.2021 486 227 65 32 38

30-500m from

Coal Bench

Near Mine

Boundary

A-N 08.03.2021

18.03.2021 567 266 62 37 45

22.03.2021 03.04.2021 488 232 59 31 39

31-500m from

Coal stock

near Diamond

square

A-N

08.03.2021 18.03.2021 541 238 72 27 37

22.03.2021 03.04.2021 469 227 67 35 48

32-Dongamouha

Village B

08.03.2021 18.03.2021 217 118 52 33 36

22.03.2021 03.04.2021 188 89 47 39 32

33-Janjgir Village B 10.03.2021 18.03.2021 181 85 43 42 51

24.03.2021 03.04.2021 185 90 49 39 45

34-Nagramuda

Village B

10.03.2021 18.03.2021 191 84 46 33 48

24.03.2021 04.04.2021 189 88 37 29 36

35-Tapranga

Village B

10.03.2021 18.03.2021 187 82 39 37 44

24.03.2021 04.04.2021 194 86 42 35 46

36-Dourabhatha

Village B

10.03.2021 18.03.2021 213 83 49 31 42

24.03.2021 04.04.2021 191

87 46 37 48

Page 17: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 9 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Gare-Pelma IV/2&3 OC Sample Reference No. 84-91

Parameter PM100 PM10 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

37-500m from OB

dump

near Switch Yard

A-N

09.03.2021 18.03.2021 522 263 69 44 49

23.03.2021 03.04.2021 459 247 57 37 44

38-500m from Coal

Bench Near KJS

Camp

A-N

09.03.2021 18.03.2021 535 252 72 43 53

23.03.2021 03.04.2021 461 228 60 39 41

39-500m from OB

dump

near Lamp room

A-N

09.03.2021 18.03.2021 443 219 61 37 41

23.03.2021 03.04.2021 448 242 58 32 47

40-500m from

Mine Pit 2

near mine

boundary

A-N

09.03.2021 18.03.2021 539 238 74 44 52

23.03.2021 03.04.2021 451 215 61 40 47

41-Gare Village B 12.03.2021 18.03.2021 199 95 47 36 44

25.03.2021 03.04.2021 191 89 55 29 38

42-Dongamouha

Village B

12.03.2021 18.03.2021 194 86 51 34 43

25.03.2021 03.04.2021 197 84 57 38 45

43-Kosampali

Village B

12.03.2021 18.03.2021 181 79 41 44 49

25.03.2021 03.04.2021 184 75 44 39 31

44-Libra Village B 12.03.2021 18.03.2021 217 93 59 35 42

25.03.2021 03.04.2021 183 85 51 41 36

Page 18: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 10 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

AIR QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Bijari OC Sample Reference No. 107-114

Parameter PM100 PM10 PM2.5 SO2 NO2

Remarks Lim

it (

in

µg

/m3)-

24

hrs

Industrial Zone -(G.S.R. 942(E),

dated 25.9.2000)

A-O 600 300 - 120 120

A-N 500 250 - 120 120

Residential Zone-(G.S.R. 926(E),

dated 16.11.2011 and GSR 196 (E),

02.04.1996)

B 200 100 60 90 90

Method of analysis IS-5192

PART

4:2005

IS-5192

PART

23:2006

CPCB Vol-

I, 2013

IS-5192

PART

2:2001

IS-5192

PART

6:2006

Uncertainty Range (in µg/m3)

±19.04

±0.0699 ±0.4420

Station Name

(Code)

Station

category

Date of

sampling

Date of

analysis

45-Manager Office-

Bijari OC A-N

04.03.2021 10.03.2021 462 242 66 32 44

18.03.2021 22.04.2021 485 238 71 36 41

46-Check point-

Barrier A A-N

04.03.2021 10.03.2021 489 243 62 38 32

18.03.2021 22.04.2021 477 229 53 42 54

47- Check point-

Barrier B A-N

04.03.2021 10.03.2021 481 240 56 31 45

18.03.2021 22.04.2021 485 245 61 41 35

48-500m from

Mine Boundary at

south West

direction

A-N 04.03.2021 10.03.2021

443 219 55 36 42

18.03.2021 22.04.2021 465 225 57 43 49

49-Rumkera Village B 10.03.2021 20.03.2021 196 84 45 37 46

24.03.2021 03.04.2021 187 87 43 43 52

50-Khurmibhaona B 10.03.2021 20.03.2021 191 82 36 39 46

24.03.2021 03.04.2021 184 85 39 37 49

51-Porda B 10.03.2021 20.03.2021 193 88 44 34 29

24.03.2021 03.04.2021 185 83 39 38 46

52-Faguram B 10.03.2021 20.03.2021 179 79 38 35 42

24.03.2021 03.04.2021 187 86 45 38 33

Page 19: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 11 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project CHHAL OC Sample Reference No. N63-N69 & N-72

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

1-Mine Office A 04.03.2021 53.2 43.4

17.03.2021 56.8 41.3

2-Lat Village C

04.03.2021 41.1 36.6

17.03.2021 43.8 35.4

3-Khedapali Village C

04.03.2021 43.5 38.2

17.03.2021 46.3 33.8

4-Chhal Village C

04.03.2021 45.7 34.3

17.03.2021 43.2 34.6

5-Quarry No.1 (Coal

loading Pt.) A

04.03.2021 55.3 42.1

17.03.2021 56.7 43.3

6-Quarry No.1(Weigh

Bridge) for fugitive test A

04.03.2021 58.4 44.7

17.03.2021 61.2 44.7

7-SAM Office A

04.03.2021 53.5 43.3

17.03.2021 52.6 44.2

8-Nawapara Colony C

04.03.2021 52.3 42.7

17.03.2021 51.4 34.5

Page 20: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 12 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Dharam Incline Sample Reference No. N73-N76

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A)

Value in

dB(A)

9-Mine Office A 04.03.2021 50.7 41.1

17.03.2021 55.3 42.4

10-Edu Village C

04.03.2021 44.6 38.3

17.03.2021 44.2 35.7

11-Dharam Colony C

04.03.2021 54.4 42.2

17.03.2021 46.1 36.3

12-In between tippler and

workshop A

04.03.2021 54.7 43.4

17.03.2021 55.3 45.9

Page 21: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 13 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Baroud OC Sample Reference No. N77-N82, N117,

& N118

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

13-500m from Coal Bench

near Barrier No.2 A

04.03.2021 55.2 45.6

18.03.2021 56.8 42.1

14-500m from Coal Stock

near MPCC camp A

04.03.2021 56.5 43.7

18.03.2021 57.2 42.3

15-500m from OB dump

near Main Sump A

04.03.2021 56.4 43.7

18.03.2021 55.1 44.5

16-500m from mine pit

near workshop /

Substation

A

04.03.2021 58.2 43.4

18.03.2021 54.7 42.2

17-Kudumkela Camp C 04.03.2021 48.4 42.5

18.03.2021 45.6 34.2

18-Baroud Colony C 04.03.2021 43.2 35.5

18.03.2021 45.6 36.1

19-Bijari Village C 04.03.2021 43.1 32.8

18.03.2021 45.7 35.2

20-Bulekaera Village C

04.03.2021 44.4 34.6

18.03.2021 44.5 33.3

Page 22: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 14 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project JAMPALI OC Sample Reference No. N83-N90

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

21-SAM Office-Jampali OC A 02.03.2021 57.1 44.7

17.03.2021 55.3 42.4

22-Singmojha Village C

02.03.2021 46.5 34.2

17.03.2021 44.4 32.6

23-Kosamghat Village C

02.03.2021 45.7 36.3

17.03.2021 46.5 35.1

24-Posalda Village C

02.03.2021 45.2 33.6

17.03.2021 42.4 34.8

25-Kudumkela Village C

02.03.2021 43.2 33.1

17.03.2021 41.4 33.5

26-Saraipali Village C

02.03.2021 44.8 34.2

17.03.2021 46.6 36.3

27-Howramoda Village C

02.03.2021 47.5 35.1

17.03.2021 45.1 36.4

28-Jampali Village C

02.03.2021 47.3 34.5

17.03.2021 45.2 35.5

Page 23: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 15 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Gare-Pelma IV/1 OC Sample Reference No. N91-N98

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

29-Mine Office

(DCPP office) A

10.03.2021 60.6 46.4

24.03.2021 54.1 45.9

30-500m from Coal Bench

Near Mine Boundary A

10.03.2021 57.8 44.2

24.03.2021 54.4 43.3

31-500m from Coal stock

near Diamond square A

10.03.2021 55.2 45.8

24.03.2021 54.3 44.7

32-Dongamouha Village C

10.03.2021 44.1 36.4

24.03.2021 46.6 35.2

33-Janjgir Village C

10.03.2021 45.8 34.5

24.03.2021 44.5 35.3

34-Nagramuda Village C

10.03.2021 45.7 34.1

24.03.2021 44.3 35.8

35-Tapranga Village C

10.03.2021 46.6 36.3

24.03.2021 44.2 33.5

36-Dourabhatha Village C

10.03.2021 45.5 36.9

24.03.2021 43.1 34.4

Page 24: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 16 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project Gare-Pelma IV/ 2& 3 OC Sample Reference No. N99-N106

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

37-500m from OB dump

near Switch Yard A

09.03.2021 55.8 44.5

25.03.2021 57.5 43.8

38-500m from Coal Bench

Near KJS Camp A

09.03.2021 56.7 44.3

25.03.2021 55.2 43.6

39-500m from OB dump

near Lamp room A

09.03.2021 57.2 44.2

25.03.2021 58.7 46.4

40-500m from Mine Pit 2

near mine boundary A

09.03.2021 56.4 45.2

25.03.2021 55.3 44.7

41-Gare Village C 09.03.2021 45.2 34.1

25.03.2021 46.3 35.4

42-Dongamouha Village C 09.03.2021 47.2 36.6

25.03.2021 44.3 32.5

43-Kosampali Village C 09.03.2021 46.9 36.7

25.03.2021 47.7 36.4

44-Libra Village C 09.03.2021 46.1 36.2

25.03.2021 44.3 35.7

Page 25: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 17 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

NOISE QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project BIJARI OC Sample Reference No. N107-N114

Parameter The Noise Pollution (R & C) rules, 2000

Remarks

Day Time Night Time

Limit (in dB(A)

Leq

Industrial area A 95 90

Commercial area B 65 55

Residential Area C 55 45

Silence Zone D 50 40

Method of analysis CPCB Protocol For Ambient Level Noise Monitoring

Station (Code) Station

Name

Station

category

Date of

measurement Value in dB(A) Value in dB(A)

45-Manager Office- Bijari

OC A

03.03.2021 55.8 42.2

23.03.2021 57.5 42.8

46-Check point-

Barrier A A

03.03.2021 54.1 43.3

23.03.2021 61.8 46.8

47- Check point-

Barrier B A

03.03.2021 57.1 46.4

23.03.2021 56.6 44.2

48-500m from Mine

Boundary at south West

direction

A

03.03.2021 58.8 43.5

23.03.2021 56.7 45.7

49-Rumkera Village C 03.03.2021 43.4 38.3

23.03.2021 45.2 37.9

50-Khurmibhaona C 03.03.2021 38.5 33.2

23.03.2021 45.1 37.6

51-Porda C 03.03.2021 41.8 33.1

23.03.2021 47.2 36.4

52-Faguram C 03.03.2021 48.7 40.7

23.03.2021 48.6 36.2

Page 26: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 18 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur

Date of Issue 13.04.2021 Name of the Project Chhal OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil &

Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part 08):2083, (RA

:2096), Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096), Gravimetric Method

APHA, 23rd Edition, 2018,

5200C, Closed Reflux, Titration

Method

IS 3025 (Part 39):2091,(RA :

2003), Partition Gravimetric

Method

Uncertainty of Measurement (at

95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

sampling Date of analysis

1. Water

course before

entering O.B

dump

1st 04.03.2021

06.03.2021 to

17.03.2021 7.42 16 8 BDL

2nd 18.03.2021

20.03.2021 to

25.03.2021 7.35 18 16 BDL

2. Water course

leaving

the mine O.B.

Dump

1st 04.03.2021 06.03.2021 to

17.03.2021 7.64 12 16 BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.44 26 8 BDL

3. Discharge

at pumping station Quarry

No.2

1st 04.03.2021 06.03.2021 to

17.03.2021 7.76 10 16 BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.31 31 8 BDL

Page 27: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 19 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project DHARAM UG

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part 08):2083, (RA :

2096), Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096), Gravimetric Method

APHA, 23rd Edition, 2018,

5200C, Closed Reflux, Titration

Method

IS 3025 (Part 39):2091,(RA :

2003), Partition Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

sampling Date of analysis

4. Mine water

sample at

discharge

point

1st 04.03.2021 06.03.2021 to

17.03.2021 7.88 30 24 BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.42 12 16 BDL

Page 28: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 20 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project BAROUD OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part 08):2083, (RA :

2096), Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096), Gravimetric Method

APHA, 23rd Edition, 2018,

5200C, Closed Reflux, Titration

Method

IS 3025 (Part 39):2091,(RA :

2003), Partition Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

sampling Date of analysis

5. Mine sump

water

1st 04.03.2021

06.03.2021 to

17.03.2021 7.81 86 40 BDL

2nd 18.03.2021

20.03.2021 to

25.03.2021 7.69 BDL 24 BDL

6. Nalla Water

1st 04.03.2021

06.03.2021 to

17.03.2021 7.78 54 32 BDL

2nd

18.03.2021 20.03.2021 to

25.03.2021 7.91 BDL 16 BDL

7. U/S of Kurket

River

1st 04.03.2021

06.03.2021 to

17.03.2021 7.86 BDL 32 BDL

2nd

18.03.2021 20.03.2021 to

25.03.2021 7.86 BDL 16 BDL

8. D/S of Kurket

River

1st 04.03.2021

06.03.2021 to

17.03.2021 7.90 BDL 16 BDL

2nd

18.03.2021 20.03.2021 to

25.03.2021 7.28 BDL 8 BDL

Page 29: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 21 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project JAMPALI OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part 08):2083, (RA :

2096), Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096), Gravimetric Method

APHA, 23rd Edition, 2018,

5200C, Closed Reflux, Titration

Method

IS 3025 (Part 39):2091,(RA :

2003), Partition Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

Sampling Date of analysis

9. Mine

discharge

water

1st 04.03.2021 06.03.2021 to

01.04.2021 7.72 BDL 8 BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.41 BDL 16 BDL

10. At Kurket

river 100m up

stream

1st 04.03.2021 06.03.2021 to

01.04.2021 7.74 10 BDL BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.49 14 8 BDL

11. At Kurket

river 100m

down stream

1st 04.03.2021 06.03.2021 to

01.04.2021 7.82 BDL 8 BDL

2nd 18.03.2021 20.03.2021 to

25.03.2021 7.60 BDL 16 BDL

Page 30: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 22 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project GARE-PELMA IV/1 OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part 08):2083, (RA :

2096), Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096), Gravimetric Method

APHA, 23rd Edition, 2018,

5200C, Closed Reflux, Titration

Method

IS 3025 (Part 39):2091,(RA :

2003), Partition Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

Sampling Date of analysis

12.Mine

water

discharge of

Gare-Pelma

IV/1 OC mine

1st 10.03.2021 12.03.2021 to

13.03.2021 7.92 18 8 BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.65 BDL 8 BDL

13. At mixing

point of mine

discharge and

Pendra Nalla

1st 10.03.2021 12.03.2021 to

13.03.2021 7.95 26 BDL BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.79 BDL 8 BDL

14. 100m upstream to mixing point in upstream

of Pendra Nalla

1st 10.03.2021 12.03.2021 to

13.03.2021 8.26 BDL 8 BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.85 BDL 8 BDL

15.100m

downstream

to mixing

point in

upstream of

Pendra Nalla

1st 10.03.2021 12.03.2021 to

13.03.2021 8.10 BDL BDL BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.96 BDL 8 BDL

Page 31: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 23 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project GARE-PELMA IV/2&3 OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part

08):2083, (RA :

2096),

Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096),

Gravimetric Method

APHA, 23rd

Edition, 2018,

5200C, Closed

Reflux, Titration

Method

IS 3025 (Part

39):2091,(RA :

2003), Partition

Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

Sampling Date of analysis

16. Main pit

1 sump water

of Gare-

Pelma IV/2&3

OC Mine

1st 10.03.2021 12.03.2021 to

13.03.2021 7.84 12 8 BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.96 BDL 8 BDL

17. Main pit 2

sump water of

Gare-Pelma

IV/2&3 OC

Mine

1st 10.03.2021 12.03.2021 to

13.03.2021 7.66 BDL BDL BDL

2nd

26.03.2021 30.03.2021 to

04.04.2021 7.98 BDL 8 BDL

18. Main pit

1 discharge

water after

OB dump of

Gare-Pelma

IV/2&3 OC

mine.

1st 10.03.2021

12.03.2021 to

13.03.2021 8.14 20 16 BDL

2nd 26.03.2021

30.03.2021 to

04.04.2021 7.97 BDL 8 BDL

19. Main pit

2 discharge

water after

OB dump of

Gare-Pelma

IV/2&3 OC

mine

1st 10.03.2021

12.03.2021 to

13.03.2021 7.72 16 8 BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.92 BDL 8 BDL

Page 32: ENVIRONMENTAL MONITORING REPORTsecl-cil.in/writereaddata/EMR_RGH_MARCH2021_AIR_NOISE... · 2021. 7. 22. · ENVIRONMENTAL MONITORING REPORT RAIGARH AREA –‘MARCH’ 2021 CONTENTS

Analyzed by Dy.Manager-Environment

Page 24 of 24

Note: 1) The results above relate to the samples tested.

2) This report cannot be reproduced in part or full without the written permission of the HOD (Env), CMPDI Bilaspur, RI-V.

CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED

Environment Laboratory, Regional Institute-V, Phone: (07815) 271646, email: [email protected],

website: www.cmpdi.co.in

cmpdi

A Mini-Ratna Company

EFFLUENT WATER QUALITY REPORT

Month MARCH Area RAIGARH Report No BSP/2021/03/05

Name of the Customer South Eastern Coalfields Ltd, Bilaspur Date of Issue 13.04.2021

Name of the Project BIJARI OC

Parameter pH Value Total suspended

Solids, mg/l C.O.D, mg/l

Oil & Grease,

mg/l

Lower Detection Limit 1.00 10 8 4

General Standards for Discharge of Environmental

Pollution (Part A: Effluent) as per Schedule VI,

Environment (Protection) Rules (max)

5.5 to 9.0

100

250

10

Method of Analysis

IS 3025 (Part

08):2083, (RA :

2096),

Electrometric

Method

IS 3025 (Part

18):2084, (RA: 2096),

Gravimetric Method

APHA, 23rd

Edition, 2018,

5200C, Closed

Reflux, Titration

Method

IS 3025 (Part

39):2091,(RA :

2003), Partition

Gravimetric

Method

Uncertainty of Measurement

(at 95% C.L & K= 1.96) ±0.0884

at 4.025

±0.445mg/l

at 24.429 mg/l

±6.209 mg/l

at 247.427 mg/l

±1.81 mg/l

at 9.94 mg/l

Station

Station Name FN

Date of

Sampling Date of analysis

20. Final

Mine

Discharge

from Patch A

1st 04.03.2021 06.03.2021 to

01.04.2021 7.76 BDL BDL BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.94 BDL 8 BDL

21. Final Mine Discharge from

Patch B

1st 04.03.2021 06.03.2021 to

01.04.2021 7.81 BDL BDL BDL

2nd 26.03.2021 30.03.2021 to

04.04.2021 7.93 BDL 8 BDL