6
The goal aesthetic and infra THE OA Through e envisione by improv and drive Corrid natur resou Aesth conte of the susta REPOR We recei priorities 1 2 3 4 AND WE doing and WHAT Conti Refin Furth impac Wate Open CSS W C ls of Contex c, historic, a astructure. AK HILL P effective stak ed to be a saf ving traffic flo ers without sa dor improvem ral character urces, with pa hetic improv ext and enhan e roadway an ainable techn RTING BA ved great in we heard as 1. Pedestria (see next pag 2. Environme 3. Signage 4. Lighting STILL NEED d if we’re on S NEXT nue to listen e CSS Vision er refine Alte ct statement er Quality Wo House No. 6 Workshop No CONTEXT SENS CONT xt Sensitive nd environm PARKWAkeholder invo fe and attrac ow and capac acrificing qua ments will pr through care articular focu ements are i nce the qual nd right-of-wa nologies. ACK nput from th a result of y n and Bicycle ge for more inform ental Sustain D YOUR INP the right trac to and enga and ideas s ernatives A & t orkshop No. 1 6, Anticipated o. 3, Anticipa ITIVE SOLUTIO ENVISI TEXT S e Solutions mental resou Y CSS VIS olvement and ctive transpor city, and by p ality of life in reserve, to th eful stewards us on William intended to b ity of life for ay, improving he CSS onlin our input. e Access mation!) nability PUT. Be sure ck. You are sh ge the public hared tonigh & C, analyze t COM 1, Anticipate d to be sched ated to be sc ONS WORKSHO IONING GR SENSI (CSS) are t rces, while i SION STA d careful plan rtation corrid providing new Oak Hill. he highest de ship of its un son Creek an be cognizant residents an public safety ne survey fro 5. Enh 6. Lan 7. Stre 8. Use e to fill out a haping the O c ht hem and doc MING SOON d to be sche duled this su heduled this OP NO. 2 | APR REATER M TIVE S to preserve mproving tra ATEMENT nning and de dor that addre w mobility opt egree possibl ique environ nd the area’s and respectf d visitors by y, and utilizin om October hanced Wate ndscaping eetscape En e of Public Ar a survey toni Oak Hill Parkw cument findin duled later th mmer fall. RIL 7, 2015 MOBILITY SOLUT and enhan ansportation T esign, the Oa esses growth tions for ped e, Oak Hill’s mental, histo s cherished o ful of Oak Hi enriching the ng natural ma 2014, and er Quality hancements rt ght to let us way. ngs in the dra his spring TIONS nce local sc n safety, mob k Hill Parkwa h in Central T destrians, cyc highly valued oric, and cult oaks. ll’s existing e visual quali aterials and here are the s know how aft environm  S cenic, bility, ay is Texas clists, d tural ities e top we’re ental

ENVISIONING GREATER MOBILITY CONTEXT SENSITIVE …

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

The goalaestheticand infra

THE OAThrough eenvisioneby improvand drive

Corridnaturresou

Aesthconteof thesusta

REPORWe receipriorities

1

234

AND WEdoing and

WHAT’ Conti Refin Furth

impac

Wate Open CSS W

C

ls of Contexc, historic, aastructure.

AK HILL Peffective staked to be a safving traffic floers without sa

dor improvemral character urces, with pa

hetic improvext and enhane roadway anainable techn

RTING BAved great in we heard as

1. Pedestria(see next pag

2. Environme3. Signage 4. Lighting

STILL NEEDd if we’re on

’S NEXT nue to listen e CSS Visioner refine Altect statement

er Quality Wo House No. 6Workshop No

CONTEXT SENS

CONTxt Sensitivend environm

PARKWAYkeholder invofe and attracow and capacacrificing qua

ments will pr through carearticular focu

ements are ince the qual

nd right-of-wanologies.

ACK nput from th a result of y

n and Bicyclege for more inform

ental Sustain

D YOUR INPthe right trac

to and enga and ideas s

ernatives A &t

orkshop No. 16, Anticipatedo. 3, Anticipa

ITIVE SOLUTIO

ENVISI

TEXT Se Solutions

mental resou

Y CSS VISolvement andctive transporcity, and by p

ality of life in

reserve, to theful stewardsus on William

intended to bity of life for

ay, improving

he CSS onlinour input.

e Access mation!)

nability

PUT. Be sureck. You are sh

ge the publichared tonigh

& C, analyze t

COM1, Anticipated to be schedated to be sc

ONS WORKSHO

IONING GR

SENSI(CSS) are trces, while i

SION STAd careful planrtation corridproviding new Oak Hill.

he highest deship of its unson Creek an

be cognizant residents an public safety

ne survey fro

5. Enh6. Lan7. Stre8. Use

e to fill out ahaping the O

c ht hem and doc

MING SOONd to be scheduled this suheduled this

OP NO. 2 | APR

REATER M

TIVE Sto preserve mproving tra

ATEMENTnning and de

dor that addrew mobility opt

egree possiblique environnd the area’s

and respectfd visitors by y, and utilizin

om October

hanced Watendscaping eetscape Ene of Public Ar

a survey toniOak Hill Parkw

cument findin

duled later thmmer fall.

RIL 7, 2015

MOBILITY

SOLUT and enhanansportation

T esign, the Oaesses growthtions for ped

e, Oak Hill’s mental, histos cherished o

ful of Oak Hienriching the

ng natural ma

2014, and

er Quality

hancementsrt

ght to let usway.

ngs in the dra

his spring

TIONSnce local scn safety, mob

k Hill Parkwah in Central Tdestrians, cyc

highly valuedoric, and cultoaks.

ll’s existing e visual qualiaterials and

here are the

s know how

aft environm

 

S cenic, bility,

ay is Texas clists,

d tural

ities

e top

we’re

ental

ENVISIONI

PROP

The Oak H(do noththroughomore tha Shared U

Cross St

Sidewalk

ING GREATER

POSED B

Hill Parkway ing) Alternatut the corridn $3 million

Use Paths (S

Along US 2o Th

Joo Ad

WAlong SH 7290 and SThe SUPs The SUP iscity of Aus

treet Conne

Cross streacross USRM 1826.

ks

ApproximaIn order toproposed A propose

MOBILITY

BICYCL

project is evative. Both Aor to providewould be spe

SUP)

290, an apprhe 10-foot wide Tanner Ln.

djacent to Wiilliam Canon 71, an approSilvermine Dr would be sets proposed tostin

ctivity

eets along USS 290 at Circl. There would

ately 7 miles o create acco along the fro

ed sidewalk a

TYPI

LE & PE

aluating two Alternatives Ae safe conneent on these

roximately 5-de path will r. and on the slliamson Cre Dr., and US

oximately 2-mr. t back from to connect to

S 290 would e Dr., Scenic

d be a simila

of 6-foot, ADommodationsontage roadsalong RM 182

CAL SECTIOUS 290

DESTRI

Build AlternaA and C incctivity for bic improvemen

-mile SUP conrun on the nosouth side frek, the SUP w290 east of

mile SUP wou

the curb with the Y to Bart

include a strc Brook Dr., Cr bicycle lane

DA compliant s on both sid where a SUP26 will be 10

N FROM ALT0 near RM 18

IAN IMP

atives (A andclude Sharecyclists and pnts, and coul

nnecting MoPorth side of Uom Joe Tannwould go undWilliam Cannld run along

a buffer wheton Creek (YB

iped bicycle Convict Hill Re at SH 71 an

sidewalks aes of US 290P is currently

0-feet wide fo

TERNATIVE A826

WWW.OAKH

PROVEM

C), in additioed Use Pathpedestrians. d include:

Pac to Circle US 290 from ner Ln. to Moder Old Bee Cnon Dr. the west side

ere feasible BC) Trail und

lane to allowd., William Cnd Scenic Bro

re proposed 0 and SH 71,y not plannedor a future SU

A

HILLPARKWAY

MENTS

on to the No hs and sidew We estimate

Dr. the Circle DrPac Caves Rd.,

e between US

er study by t

w for safe travannon Dr., aook Dr.

, sidewalks ad UP connection

Y.COM

Build walks e that

r. to

S

he

vel nd

re

n

The Problem The intersection of US 290 and SH 71 in Oak Hill is a gateway to southwest Travis County and serves as a key route between Central Austin and fast-growing suburban and rural communities such as Lakeway, Bee Cave, Dripping Springs and Johnson City. US 290 is one of Texas’ most congested highway corridors with drivers wasting more than 340,000 hours per year stuck in traffic. Congestion has reduced mobility and the quality of life in Oak Hill and surrounding communities.

The missioN The Texas Department of Transportation (TxDOT) and the Central Texas Regional Mobility Authority (Mobility Authority) are working with the city of Austin, Travis County, Capital Metro and other local partners to improve long-term mobility in the region. These organizations will work with the community to develop a solution that effectively addresses congestion, respects the environment, and adds value to the Oak Hill community.

PO Box 15246 | Austin, TX 78761OakHillParkway.com

Envisioning grEatEr mobility

C E N T R A L T E X A S

Regional Mobility Authority

TRAVIS

290

290

McC

arty

Ln.

McCarty Ln.

Joe Tanner Ln.

Proposed Study Area

KEY TO LINES

NeeD: WhaT are We TryiNg To solve?• Traffic congestion related to population growth – Travis County has grown from 212,000 in 1960 to just

over 1 million in 2010 (US Census Data, 2013)

• Crashes on US 290/SH 71 West – 304 crashes occurred between 2009-2011, resulting in one fatality, nine incapacitating injuries, other injuries and property damage (TxDOT, 2013)

• Lost time – Drivers waste more than 340,000 hours per year stuck in traffic (Texas Transportation Institute, 2011)

• Lack of reliable connectivity• Unreliable route for transit and emergency vehicles

PUrPose: WhaT are We TryiNg To Do?• Improve mobility and operational efficiency• Promote long-term congestion management• Increase multimodal travel options for people and goods• Improve safety• Improve emergency response

PO Box 15246 | Austin, TX 78761OakHillParkway.com

Envisioning grEatEr mobility The Process The project team has initiated a comprehensive study to thoroughly analyze the corridor and determine the best approach for improving mobility. This study will identify a full range of alternatives, incorporate previous analyses, and through extensive analysis and community outreach, identify a recommended solution. Local and regional connectivity will be a key consideration. Throughout the process, the community will be consulted on a wide range of elements, such as bicycle and pedestrian accommodations, public transit, aesthetics, noise mitigation, environmental sustainability, neighborhood access and roadway design. While recognizing the input from previous efforts, the process encourages feedback and fresh ideas from the community.

iNNovaTive aPProach The project team will implement a number of innovative concepts as part of the study, including a Context Sensitive Solutions (CSS) process designed to identify community values and incorporate them into the project design. In July 2011, the Mobility Authority, in partnership with TxDOT, hosted the Green Mobility Challenge, a sustainable design competition that challenged Texas’ most creative landscape architects, planners and engineers to propose better ways of constructing, operating and maintaining future transportation projects, including the intersection of US 290 and SH 71. The project team has incorporated some of the design elements from the Green Mobility Challenge into the mobility concepts and will consider incorporating a number of the sustainable elements in the alternatives that move forward for further evaluation as we begin the CSS process. For more information about the Green Mobility Challenge, visit GreenMobilityChallenge.com.

commUNiTy oUTreach The first Open House Meeting was held in November 2012 to introduce the environmental process and need for public input. Since then, three additional Open Houses, concurrent Virtual Open Houses, and several public workshops covering topics including the environment, alternative design concepts, project financing and bicycle/pedestrian improvements have been held. In addition, the project team has met with dozens of stakeholders to answer questions and gather input. Public outreach is a critical component of the Oak Hill Parkway project and will continue throughout the remainder of the study.

sTay iNFormeD aND geT iNvolveD

C E N T R A L T E X A S

Regional Mobility Authority

There are several ways to learn more about the project and get involved:• Visit us online at OakHillParkway.com • Contact us by phone at 512-996-9778• Attend Open Houses, Virtual Open Houses, workshops and other public

meetings that will be held throughout the study• Submit your comments and questions• Invite the project team to meet with your neighborhood or organization

iNTerim iNTersecTioN imProvemeNTsCurrent efforts are being implemented to improve five US 290 intersections (Joe Tanner, William Cannon, SH 71, Convict Hill and RM 1826). These proposed intersection improvements will help reduce traffic delays for the next few years. However, more work is needed to address the mobility needs twenty years into the future. Oak Hill and the region need a long-term solution.

CONSTRUCTIONTO Be DeTeRMINeD

If Build Alternative Advances, Firm Selected to Build Project

OctOber 2012New Environmental Study Launched

nOvember 2012First Open House

OAk HILL PARkWAy TIMeLIne

2013 – 2015Ongoing Public Involvement, Open Houses, Workgroup Meetings

2014 – 2016Development of Environmental Study

eArLY-2016Public Hearing onEnvironmental Study

mID-2016EnvironmentalStudy FindingAnticipated

mAY 2013Open House, Virtual Open House

ENVISIONI

1. Pleasus kn

ThPgro •

2. Are th

track 1234

ING GREATER

se read the Onow if it’s on

hrough effecarkway is enrowth in Centptions for pe

Corridor impvalued natuand culturaloaks. Aesthetic imcontext and qualities of tmaterials an

he communik? Is anything

1. Pedestria2. Environme3. Signage 4. Lighting

MOBILITY

CONTEX

AROak Hill Park the right tra

tive stakehovisioned to btral Texas by

edestrians, cy

provements wral character resources, w

mprovements enhance thethe roadway nd sustainab

ty priorities g missing?

n and Bicycleental Sustain

XT SENSITIVE

COMRE WE kway Contexack. What do

lder involvembe a safe andy improving tryclists, and d

will preserve,r through carwith particula

s are intendede quality of lif and right-of-

ble technolog

reflected in

e Access nability

SOLUTIONS W

MUNION THE

xt Sensitive So you like ab

ment and card attractive trraffic flow anrivers withou

, to the highereful stewardar focus on W

d to be cognife for residenway, improviies.

the October

5. Enh6. Lan7. Stre8. Use

WORKSHOP N

ITY SUE RIGHTSolutions (CSout it? What

eful planningransportationd capacity, a

ut sacrificing

est degree poship of its un

Williamson Cr

izant and resnts and visitong public saf

r 2014 CSS S

hanced Watendscaping eetscape Ene of Public Ar

WWW.OAKH

NO. 2 | APRIL

URVEYT TRACSS) Vision Stt’s missing?

g and designn corridor thaand by provid quality of life

ossible, Oak Hnique environreek and the

spectful of Oaors by enrichifety, and utili

Survey Resul

er Quality

hancementsrt

HILLPARKWAY

L 7, 2015

Y K?

tatement and

, the Oak Hillat addresses ing new mob

e in Oak Hill.

Hill’s highly nmental, hist area’s cheris

ak Hill’s existing the visuaizing natural

lt on the righ

 

Y.COM

d let

l bility

toric, shed

ting l

ht

ENVISIONING GREATER MOBILITY WWW.OAKHILLPARKWAY.COM

3. Check out our exhibits on the following community priorities and tell us what you think.

What do you like? Is anything missing?

i. COMMUNITY PRIORITY #1 BICYCLE AND PEDESTRIAN ACCESS

ii. COMMUNITY PRIORITY #2 ENVIRONMENTALLY SUSTAINABLE

iii. COMMUNITY PRIORITY #3 SIGNAGE

iv. COMMUNITY PRIORITY #4 LIGHTING 4. Check out the Preliminary Design Concepts. What do you like? What’s missing?

5. What else? Did we miss anything that is important to you?