GOVERNMENT OF ANDHRA PRADESH ABSTRACT
Energy Department - Amendment to the Third Transfer Scheme for
transfer of Procurement and Bulk Supply of Electricity and Trading of Electricity and allocation of Power Purchase Agreements from Transmission Corporation of Andhra Pradesh Limited to Four Distribution Companies viz.
EPDCL, SPDCL, CPDCL, and NPDCL – Notification – Orders – Issued. --------------------------------------------------------------------------------------
ENERGY (POWER.III) DEPARTMENT
G.O.Ms.No.53 Dated.28-04-2008.
Read the following:-
1. G.O.Ms.No.58, Energy (Power.III) Department, Dated 7-6-2005. 2. G.O.Ms.No.101, Energy (Power.III) Department, Dated 31-10.2005.
3. G.O.Ms.No.24, Energy (Power.III) Department, Dated 08-03-2006.
4. G.O.Ms.No.78, Energy (Power.III) Department, Dated 3-8-2007. 5. G.O.Ms.No.3, Energy (Pr.III) Department, Dated 3-1-2008.
6. From the C&MD, APTRANSCO, Lr.No.CMD/CE/RAC & Reforms/ Third Tr.Scheme/D.No.33/2008, Dated 27-3-2008.
7. G.O.Ms.No.52,Energy (Pr.III) Department, Dated.28-04-2008.
-o0o- O R D E R:-
In G.O.1st read above, Government have issued orders publishing the Andhra Pradesh Electricity Reform (Transfer of Bulky Supply undertaking
from the Transmission Corporation of Andhra Pradesh Limited to Distribution Companies) Scheme, 2005.
2. The Government have also issued certain amendments to the aforesaid A.P. Electricity Reform Scheme, 2005 vide G.Os. 2nd to 5th read
above.
3. In the reference 6th read above, the Chairperson & Managing Director, APTRANSCO has finalized the final allocation of capacities of DISCOMs and requested to issue an amendment to Third Transfer Scheme to that effect.
4. The Government after careful consideration have decided to issue an
amendment to Third Transfer Scheme effecting final allocation of capacities.
5. The following notification will be published in the Extraordinary issue of Andhra Pradesh Gazette dated.28-04-2008.
NOTIFICATION
In exercise of the powers conferred by sections 23 and 24 of the Andhra Pradesh Electricity Reforms Act, 1998 (Andhra Pradesh Act No.30 of
1998) and section 131 of the Electricity Act, 2003 (Central Act 36 of 2003) read with clause 9 of Schedule 1 of the Provisional Third Transfer Scheme (Issued under G.O.Ms.No.58, Energy (Pr.III) Department, Dated 7-6-2005
and published in the Andhra Pradesh Gazette, Part-I, Extra-ordinary No.396, dated 9th June, 2005), the Governor of Andhra Pradesh hereby makes the
following amendments to the said Provisional Third Transfer Scheme issued under said G.O.Ms.No.58, Energy (Pr.III) Department, Dated the 7th June, 2005.
The amendment shall be deemed to have come into force with effect
from 9th June 2005. AMENDMENT
In the said provisional Third Transfer Scheme –
1. For Schedule I, sub clause (1) of clause (2), the following shall be
inserted.
The generation capacities and energy from generating stations will be
divided into two parts i.e allocated share and unallocated share.
“Allocated Share” means the generating capacity and energy of all
generating stations with fixed allocation ratios to each
APDISCOMs.
“Unallocated Share” means the generating capacity with out any fixed
allocation to any APDISCOMs but allocated to any of the APDISCOMs, at all
times, based on the requisition of APDISCOMs.
For Schedule 1 clause 3 (III), the following shall be substituted.
(III) The generation capacities, as on the Effective Date, allocated to and /or vested
with APTRANSCO under any PPA or otherwise, as provided in Schedule A,
including the generation capacities of the private and joint sector generating
stations, the AP Gas Power Corporation Limited (“APGCPL”) stations, NCEs,
allocations of the CGS stations (along with any allocations from the unallocated
quota therein) and APGENCO Hydel stations are considered fully (100%)
allocated whereas, for APGENCO thermal stations the capacity corresponding to
80% of the generating capacity is considered as allocated share. The allocated
shares shall stand entirely allocated and transferred to the APDISCOMs, as on
the Effective Date, in the following fixed ratios:
APEPDCL - 15.80%
APSPDCL - 22.27%
APCPDCL - 46.06%
APNPDCL - 15.87%
The generating capacities of unallocated share of APGENCO thermal stations (20% unallocated share) will be allocated every month to Discoms based on the requisition by Discoms to APPCC. APPCC will allocate this generating capacity to discoms based on the seasonal variation and load growth of the discom. It is clarified that any increase or decrease in the existing capacities of the generating companies / stations which are presently allocated to or vested with APTRANSCO in terms of any PPA or otherwise, shall also be allocated and transferred to the APDISCOMs in the ratios provided herein above. Notwithstanding anything contained herein above, the PPAs between
APTRANSCO and M/s LVS Projects Limited and M/s Srivathsa Power
Projects Ltd. Shall stand allocated and transferred, as on the Effective
Date, in the manner as follows:
Sl.No Particulars Installed capacity (MW)
Allocated to
1 LVS Projects LImited 36.80 EPDCL
2 Sri Vathsa Power Projects Limited
17.20 EPDCL
2. For Schedule “A”, the following shall be substituted, namely -
Schedule “A”
A) Allocated Share:
Station wise Capacities of Central Generators (100% share) allocated to
APDISCOMs
Sl No Station Name
Total Capacity in
MW
Allocated
Capacity to
APDISCOMs
(100%) MW
1 NTPC Simhadri TPP 1000.00 1000.00
2 NTPC Ramagundam STPS 837.90 837.90
3
Neyveli Lignite Corporation Limited TPS-II,
Stage-I105.71
105.71
4
Neyveli Lignite Corporation Limited TPS-II,
Stage-II191.44
191.44
5 Madras Atomic Power Station 31.72 31.72
6 NTPC-Kaiga Atomic Power Station* --
7 Eastern Region** --
8 NTPC-Talcher - II, Stage I 120.65 120.65
9 NTPC-Talcher - II, Stage II 120.65 120.65
10 NTPC-Talcher - II, Stage III 120.65 120.65
11 NTPC-Talcher - II, Stage IV 120.65 120.65Total Central Generating Stations 2649.37 2649.37
Capacities of APGenco, Thermal ( 80% share) is allocated to APDISCOMs
Station NameInstalled
Capacity (MW)
Allocated Share
(80%) Capacity to
APDISCOMs
(MW)Kothegudem TPS "A" 240.00 192.00
kothegudem TPS "B" 240.00 192.00
Kothegudem TPS "C" 240.00 192.00
Kothegudem TPS Stage V - Unit 1 250.00 200.00
Kothegudem TPS Stage V - Unit 2 250.00 200.00
Vijayawada TPS-Stage I 420.00 336.00
Vijayawada TPS-Stage II 420.00 336.00
Vijayawada TPS-Stage III 420.00 336.00
Ramagundam Thermal Station-B 62.50 50.00
Rayalseema TPP-Stage I 420.00 336.00Total APGENCO (Thermal) 2962.50 2370.00
Capacities of APGENCO, Hydel ( 100% share ) allocated to APDISCOMs
Station NameInstalled
Capacity (MW)
Allocated Share
(100%) Capacity
to APDISCOMs
(MW)Total APGENCO (Hydel) 3588.36 3588.36
Capacities of Independent Power Producers ( 100% share )allocated to the
APDISCOMs
Station Name
Installed
Capacity
(MW)
Allocated
Share (100%)
Capacity to
APDISCOMs
(MW)
GVK-Jegrupadu 216.82 216.82
Spectrum Power Generation Limited 208.31 208.31
Lanco Kondapalli Power Private
Limited 351.49 351.49
Reliance Energy Limited 220 220.00
LVS Power Limited 36.8 36.80
Srivathsa Power Projects Limited 17.2 17.20
Total capacity 1050.62 1050.62
Capacities of Joint sector projects ( 100% share )allocated to the APDISCOMs
Station Name
Installed
Capacity
(MW)
Allocated
Share (100%)
Capacity to
APDISCOMs
(MW)
Andhra Pradesh Gas Power
Corporation Limited - Stage-I 16.00 16.00
Andhra Pradesh Gas Power
Corporation Limited - Stage-II 42.80 42.80
Total Andhra Pradesh Gas Power
Corporation Limited Capacity 58.80 58.80
NCL - Tungabhadra 6.60 6.60
Total capacity 65.40 65.40
Capacities of Non-Conventional Energy generators ( 100% share ) allocated to the
AP Distribution Companies ( Based on Geographical Location)
Sl. No.
Company Name District Allocated Share(100%) Capacity in MW
1 M/s Shree Papers Ltd. * E.G.District 3.24
2 M/s Sri Kalyani Agro Products & Indus. Ltd. * W.G. District 3.2
3 M/s Varam power Projects (P) Ltd. Srikakulam 6
4 M/s Gowthami Solvent Oils Private Ltd. * W.G.District 1.85
5 M/s Manihamsa Power Projects Ltd. E.G.District 2.97
6 M/s Deccan Sugars E.G.District 2
7 M/s Perpetual Energy Systems Ltd. Vizianagaram 6
8 M/s Etikoppaka Co-operative Ltd. Vizag 1.5
9 M/s Chodavaram Co-operative Sugars Ltd. * Vizag 6.25
10 M/s Vamshi Industries Ltd. E.G.District 4
11 M/s Vensa Biotek Ltd. * E.G. District 2.45
12 M/s Sai Renewable Power Ltd. E.G. District 4.5
13 M/s. GMR Technologies & Industries Ltd.* Srikakulam 9.5
14 M/s The Jeypore Sugar Company Ltd. * W.G. District 9
15 M/s. Jocil Limited * Guntur 2.4
16 M/s Matrix Power Pvt. Ltd. Guntur 4.5
17 M/s Roshni Power Tech. Ltd. Krishna 6
18 M/s Satyakala Power projects (P) Ltd. Krishna 3.6
19 M/s Veeraiah Non-Conventional Power Projects Ltd.
Krishna 4
20 M/s Vijay Agro Products Pvt. Ltd. * Krishna 2.94
21 M/s SLS Power Ltd. Nellore 6
22 M/s Active Power Corporation Private Ltd. Krishna 1.4
23 M/s PMC Power Private Ltd. Guntur 0.65
24 M/s KMS Power Ltd. Guntur 6
25 M/s Rithwik Energy System Ltd. Chittoor 6
26 M/s Shree Vaani Sugars Ltd * Chittoor 5.52
27 M/s Balaji Agro Oils ltd. * Krishna 3.73
28 M/s Agri Gold Projects Ltd. Prakasham 4
29 M/s B.Seenaiah & Co. (projects) Ltd. Nellore 5.52
30 M/s Sri balaji Biomass Power Ltd. Cuddapah 5.4
31 M/s Jyothi bio Energy Ltd. Prakasham 5.4
32 M/s Om Shakti renergies Ltd. Chittoor 5.4
33 M/s Shriram energies Ltd. Krishna 5.25
34 M/s NEDCAP Nellore 2.48
35 M/s Sathya Maharshi Power Corporation Ltd. Guntur 5.52
36 M/s Bhavani Hydro Guntur 0.54
37 M/s Sagar Sugars & Allied Products Ltd * Chittoor 12.93
38 M/s Clarion Power Corp. Ltd. Prakasham 11.04
39 M/s Saro Power & Infrastructures Ltd. Mahaboobnagar
6
40 M/s Suchand Power Gen (P) Ltd. Kurnool 6
41 M/s IL & FS Wind Farms Ltd. Ananthapur 6.5
42 M/s NCL Energy Ltd. Kurnool 7.5
43 M/s NEDCAP Kurnool 2.75
44 M/s BHEL * Ananthapur 2.55
45 M/s BHEL Ananthapur 3
46 M/s Srinivasa Power Pvt Ltd., Nalgonda 0.55
47 M/s Janapadu Hydro Power Proejcts Pvt. Ltd., Nalgonda 1
48 M/s KM Power Ltd. Kurnool 4
49 M/s KM Power Ltd. Kurnool 3.3
50 M/s KM Power Ltd. Kurnool 4
51 M/s Veeramani Biscuit Ind Ltd. Ananthapur 1
52 M/s Gayatri Agro Ind Power Ltd. Nalgonda 6
53 M/s NILE Limited Ananthapur 2
54 M/s Selco International Ltd. Mahaboobnagar
5.94
55 M/s Sree Rayalaseema Hi-Strength Hypo Ltd. * Kurnool 5.75
56 M/s Nagarjuna Green Power Ltd.,(My Home Power Ltd.)
Hyderabad 8.19
57 M/s Ganapathi Sugar Ind Ltd.* Medak 10.69
58 M/s Rithwik Power Projects Ltd. Khammam 5.52
59 M/s Gowthami Bio- Energies Ltd. Khammam 5.52
60 M/s NCS Gayatri Sugars Ltd. Nizamabad 6
61 M/s Shalivahana Constructions Ltd. Adilabad 5.46
62 M/s Kallam Spinning Mills Ltd. * Khammam 0.72
63 M/s Saraswathi Power & IND Ltd. Karimnagar 2
64 M/s Indur Green Power Private Ltd. Nizambad 6
65 M/s Kakatiya Cements Ltd. * Khammam 7.44
Total Capacity 304.06
B) Unallocated Share
Capacities of APGenco, Thermal ( 20% share) allocated to APDISCOMs month to
month based on requisition by the APDISCOM
i. Existing Generation Capacity
Sl. No. Particulars
Installed
Capacity in
MW
Unallocated
Share (20%)
Capacity in
MW
1 KTPS "A" 240.00 48.00
2 KTPS "B" 240.00 48.00
3 KTPS "C" 240.00 48.00
4 KTPS V - Unit 1 250.00 50.00
5 KTPS V - Unit 2 250.00 50.00
6 VTPS I 420.00 84.00
7 VTPS II 420.00 84.00
8 VTPS III 420.00 84.00
9 Nellore 0.00 0.00
10 Ramagundam B 62.50 12.50
11 RTPP - Stage I 420.00 84.00
Total APGenco (Thermal) 2963.00 592.50
ii. New Generation Capacity
Sl. No. Particulars
Installed
Capacity in
MW
Unallocated
Share (20%)
Capacity in
1
Rayalaseema Thermal Power
Plant420.00 84.00
2
Vijayawada Thermal Power
Station660.00 132.00
Total APGenco (Thermal) 1080.00 216.00
3. For Schedule “B”, under Part – 1 for Para 1, the following shall be substituted,
namely -
Schedule “B”
BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APEPDCL
PART I
1. Bulk Supply Undertaking
Allocated Capacities
(i) Hydel energy from APGenco (including that from Jurala, at appropriate
time of commissioning) will be allocated to each APDISCOM, in
proportion to the capacities (in MW) allocated, as per the table set out
below.
(ii) NCEs has been allocated based on their geographical location to the AP
Discom
(iii) The capacity allocation percentage of APEPDCL is 15.80%
Generating stations and their capacities, along with Power Purchase Agreements are as follows:
Station Name
Installed
Capacity
(MW)
Allocated
Share to
APDISCOMs
(MW)
Capacity
allocated to
EPDCL
(MW)
Summary
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to EPDCL
(MW)Kothegudem TPS "A" 240.00 192.00 30.34 APGENCO (Thermal) 2962.50 80% 374.46
kothegudem TPS "B" 240.00 192.00 30.34 APGENCO (Hydel) 3588.36 100% 566.96
Kothegudem TPS "C"240.00 192.00 30.34
Independent Power
Plants1050.62 100% 211.47
Kothegudem TPS Stage V - Unit 1250.00 200.00 31.60
Central Generating
Stations2649.37 100% 418.60
Kothegudem TPS Stage V - Unit 2 250.00 200.00 31.60 Joint Sector 58.80 100% 9.29
Vijayawada TPS-Stage I420.00 336.00 53.09
Non-Conventional
Energy #304.06 100% 62.46
Vijayawada TPS-Stage II 420.00 336.00 53.09 NCL Tungabadra 6.60 100% 1.04Vijayawada TPS-Stage III 420.00 336.00 53.09 Grand Total 10620.31 8496.25 1644.28
Ramagundam Thermal Station-B 62.50 50.00 7.90
Rayalseema TPP-Stage I 420.00 336.00 53.09Total APGENCO (Thermal) 2962.50 2370.00 374.46GVK-Jegrupadu 216.82 216.82 34.26
Spectrum Power Generation Limited
208.31 208.31 32.91 New Capacities
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to EPDCL
(MW)Lanco Kondapalli Power Private Limited @ 351.49 351.49 55.54
Reliance Energy Limited220.00 220.00 34.76
Konaseema EPS
Oakwell Power Limited445.00 100% 70.31
LVS Power Limited36.80 36.80 36.80
Gautami Power Private
Limited470.00 100% 74.26
Srivathsa Power Projects Limited17.20 17.20 17.20
Vemagiri Power
Generation Limited370.00 100% 58.46
Total Independent Power Plants1050.62 1050.62 211.47 GVK Power Pvt. Limited 220.00 100% 34.76
NTPC Simhadri TPP1000.00 1000.00 158.00
Rayalaseema Thermal
Power Plant420.00 80% 53.09
NTPC Ramagundam STPS837.90 837.90 132.39
Vijayawada Thermal
Power Station660.00 80% 83.42
Neyveli Lignite Corporation Limited TPS-II,
Stage-I
105.71 105.71 16.70Future Non-Conventional
Energy ***277.17 100% 42.19
Neyveli Lignite Corporation Limited TPS-II,
Stage-II191.44 191.44 30.25 Jurala 117.00 100% 18.49
Madras Atomic Power Station 31.72 31.72 5.01 Total New Capacities 2979.17 434.98
NTPC-Kaiga Atomic Power Station* -- -- --
Eastern Region** -- -- --
NTPC-Talcher - II, Stage I 120.65 120.65 19.06
NTPC-Talcher - II, Stage II 120.65 120.65 19.06
NTPC-Talcher - II, Stage III 120.65 120.65 19.06
NTPC-Talcher - II, Stage IV 120.65 120.65 19.06
Total Central Generating Stations 2649.37 2649.37 418.60
Andhra Pradesh Gas Power Corporation
Limited - Stage-I16.00 16.00 2.53
Andhra Pradesh Gas Power Corporation
Limited - Stage-II42.80 42.80 6.76
Total Joint Sector 58.80 58.80 9.29
* Through the agreement is in force, the share has been allocated to TNEB
**Subject to renewal of allocation by GoI
*** The extent of vesting of capacity of generating station is in accordance with AP
Transcos share under the agreement
# Aggregate capacity allocated to the Discoms
“@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli
Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no
24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India,
New Delhi,
APEPDCL:
NCE Capacities – Existing
NCE Capacities - Existing
Company Name District
Allocated
Capacity in
MWM/s Shree Papers Ltd. * E.G.District 3.24
M/s Sri Kalyani Agro Products & Indus. Ltd * W.G.District 3.20
M/s Varam Power Projects (P) Ltd. Srikakulam 6.00
M/s Gowthami Solvent Oils Private Ltd.* W.G.District 1.85
M/s Manihamsa Power Projects Ltd. E.G.District 2.97
M/s Deccan Sugars E.G.District 2.00
M/s Perpetual Energy Systems Ltd. Vizianagaram 6.00
M/s Etikoppaka Co-operative Ltd. Vizag. 1.50
M/s Chodavaram Co-operative Sugars Ltd.* Vizag. 6.25
M/s Vamshi Industries Ltd. E.G.District 4.00
M/s Vensa Biotek Ltd.* E.G.District 2.45
M/s Sai Renewable Power Ltd. E.G.District 4.50
M/s GMR Technologies & Industries Ltd.* Srikakulam 9.50
M/s The Jeypore Sugar Company Ltd.* W.G.District 9.00
Total Capacity 62.46
* The extent of vesting of capacity of the above generating stations to the Discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement
NCE Capacities – To be commissioned
Company Name District
Allocated
Capacity in
MWM/s Sri Sarvaraya Sugars Ltd E.G.District 10.00
M/s Nav Bharat Ferro Alloys Ltd. (Deccan
Suguars Ltd.) E.G.District 4.66
M/s Coastal Agro Industries Ltd. W.G.District 3.20
M/s R.R. Bio Energies Ltd. W.G.District 12.00
M/s Sardar Power Ltd. Vizianagaram 2.97
M/s Foods, Fats & Fertilisers Ltd. W.G.District 4.20
M/s Raus Power (P) Ltd. E.G.District 3.66
Manihamsa Power Projects Ltd. E.G.District 1.50
Total Capacity 42.19
* The extent of vesting of capacity of the above generating stations to the Discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement
4. For Schedule “C”, under Part – 1 for Para 1 the following shall be substituted,
namely -
Schedule “C”
PART-I
BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APSPDCL
1. Bulk Supply Undertaking
Allocated Capacities
(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or
primarily to the Bulk Supply Undertaking as segregated herein below, which shall
include but not be limited to the following:-
(i) Hydel energy from APGenco (including that from Jurala, at appropriate
time of commissioning) will be allocated to each APDISCOM, in
proportion to the capacities (in MW) allocated, as per the table set out
below.
(ii) NCE s have been allocated based on their geographical location to the
APDISCOM
(iii) The capacity allocation percentage of APSPDCL is 22.27%
Generating stations and their capacity, along with Power Purchase Agreements are
as follows:
Station Name
Installed
Capacity
(MW)
Allocated
Share to
APDISCOMs
(MW)
Capacity
allocated to
SPDCL
(MW)
Summary
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to SPDCL
(MW)Kothegudem TPS "A" 240.00 192.00 42.76 APGENCO (Thermal) 2962.50 80% 527.80
kothegudem TPS "B" 240.00 192.00 42.76 APGENCO (Hydel) 3588.36 100% 799.13
Kothegudem TPS "C"240.00 192.00 42.76
Independent Power
Plants1050.62 100% 221.95
Kothegudem TPS Stage V - Unit 1250.00 200.00 44.54
Central Generating
Stations2649.37 100% 590.01
Kothegudem TPS Stage V - Unit 2 250.00 200.00 44.54 Joint Sector 58.80 100% 13.09
Vijayawada TPS-Stage I420.00 336.00 74.83
Non-Conventional
Energy #304.06 100% 116.22
Vijayawada TPS-Stage II 420.00 336.00 74.83 NCL Tungabadra 6.60 100% 1.47Vijayawada TPS-Stage III 420.00 336.00 74.83 Grand Total 10620.31 8496.248 2269.67
Ramagundam Thermal Station-B 62.50 50.00 11.14
Rayalseema TPP-Stage I 420.00 336.00 74.83
Total APGENCO (Thermal) 2962.50 2370.00 527.80GVK-Jegrupadu 216.82 216.82 48.29
Spectrum Power Generation Limited
208.31 208.31 46.39 New Capacities
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to SPDCL
(MW)Lanco Kondapalli Power Private Limited @ 351.49 351.49 78.28
Reliance Energy Limited
220.00 220.00 48.99Konaseema EPS
Oakwell Power Limited445.00 100% 99.10
LVS Power Limited36.80 36.80 0.00
Gautami Power Private
Limited470.00 100% 104.67
Srivathsa Power Projects Limited17.20 17.20 0.00
Vemagiri Power
Generation Limited370.00 100% 82.40
Total Independent Power Plants1050.62 1050.62 221.95 GVK Power Pvt. Limited 220.00 100% 48.99
NTPC Simhadri TPP1000.00 1000.00 222.70
Rayalaseema Thermal
Power Plant420.00 80% 74.83
NTPC Ramagundam STPS837.90 837.90 186.60
Vijayawada Thermal
Power Station660.00 80% 117.59
Neyveli Lignite Corporation Limited TPS-II,
Stage-I
105.71 105.71 23.54Future Non-
Conventional Energy ***277.17 100% 94.66
Neyveli Lignite Corporation Limited TPS-II,
Stage-II191.44 191.44 42.63 Jurala 117.00 100% 26.06
Madras Atomic Power Station 31.72 31.72 7.06 Total New Capacities 2979.17 648.29
NTPC-Kaiga Atomic Power Station* -- -- --
Eastern Region** -- -- --
NTPC-Talcher - II, Stage I 120.65 120.65 26.87
NTPC-Talcher - II, Stage II 120.65 120.65 26.87
NTPC-Talcher - II, Stage III 120.65 120.65 26.87
NTPC-Talcher - II, Stage IV 120.65 120.65 26.87
Total Central Generating Stations 2649.37 2649.37 590.01
Andhra Pradesh Gas Power Corporation
Limited - Stage-I16.00
16.003.56
Andhra Pradesh Gas Power Corporation
Limited - Stage-II42.80
42.809.53
Total Joint Sector 58.80 58.80 13.09
* Through the agreement is in force, the share has been allocated to TNEB
**Subject to renewal of allocation by GoI
*** The extent of vesting of capacity of generating station is in accordance with AP
Transcos share under the agreement
# Aggregate capacity allocated to the Discoms
“@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli
Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no
24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of
India, New Delhi,
NCE Capacities – Existing
APSPDCL:
Company Name District
Allocated
Capacity in
MWM/s Jocil Limited* Guntur 2.40
M/s Matrix Power Pvt. Ltd Guntur 4.50
M/s Roshni Power Tech. Ltd. Krishna 6.00
M/s Satyakala Power Projects (P) Ltd. Krishna 3.60
M/s Veeraiah Non-Conventional Power Projects
Ltd. Krishna 4.00
M/s Vijay Agro Products Pvt. Ltd.* Krishna 2.94
M/s SLS Power Ltd. Nellore 6.00
M/s Active Power Corporation Private Ltd. Krishna 1.40
M/s PMC Power Private Ltd. Guntur 0.65
M/s KMS Power Ltd. Guntur 6.00
M/s Rithwik Energy System Ltd. Chittoor 6.00
M/s Shree Vaani Sugars Ltd.* Chittoor 5.52
M/s Balaji Agro Oils Ltd.* Krishna 3.73
M/s Agri Gold Projects Ltd. Prakasham 4.00
M/s B. Seenaiah & Co. (Projects) Ltd. Nellore 5.52
M/s Sri Balaji Biomass Power Ltd. Cuddapah 5.40
M/s Jyothi Bio Energy Ltd. Prakasham 5.40
M/s Om Shakti renergies Ltd Chittoor 5.40
M/s Shriram Energies Ltd. Krishna 5.25
M/s NEDCAP Nellore 2.48
M/s Sathya Maharshi Power Corporation Ltd. Guntur 5.52
M/s Bhavani Hydro Guntur 0.54
M/s Sagar Sugars & Allied Products Ltd.* Chittoor 12.93
M/s Clarion Powr Corp. Ltd. Prakasham 11.04
Total Capacity 116.22
* The extent of vesting of capacity of the above generating stations to the Discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement
NCE Capacity – To be commissioned
Company Name District
Allocated
Capacity in
MWM/s The Kovur Co-operative Sugar Factor Ltd. Nellore 3.00
M/s KCP Sugar & Industries Corporation Ltd. Krishna 10.11
M/s KCP Sugar & Industries Ltd. Krishna 2.40
M/s Vani Power Projects Pvt. Ltd., Hyd. Guntur 4.05
M/s Velagapudi Power Generation Pvt. Ltd.,
Vijayawada Guntur 3.76
M/s CRST Powergen Pvt. Ltd Cuddapah 6.00
M/s Anatha Lakshmi Biomass Power Projects
(P) Ltd. Guntur 6.00
M/s Hari Sai Biomass Power Projects Pvt. Ltd Chittoor 3.50
M/s Pinakini Power Projects (P) Ltd. Nellore 5.40
M/s Singaraya Hills Green Power Genco (P) Ltd. Prakasham 5.52
M/s Balaji Energy Ltd. Nellore 9.90
M/s Delta Agro Power Ltd. Krishna 2.50
M/s Vijayawada Municipal Corporation ** Krishna 2755 KWH
Gayatri Sugar Complex Ltd Nellore 14.92
M/s Empee Power Company (India) Ltd. * Nellore 17.60
Total Capacity # 94.66
* The extent of vesting of capacity of the above generating stations to the Discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement
** Installed Capacity is 0.143MW, sales to Discoms is 2755KWhrs as per the PPA
# Total Capacity does not include units purchased from M/s Vijayawada Muncipal
Corporation
5. For Schedule “D”, under Part – 1 for Para 1 the following shall be substituted,
namely -
Schedule “D”
PART-I
BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO
APCPDCL
1. Bulk Supply Undertaking
Allocated Capacities
(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or
primarily to the Bulk Supply Undertaking, as segregated herein below, which
shall include but not be limited to the following:-
(i) Hydel energy from APGenco (including that from Jurala, at appropriate time
of commissioning) will be allocated to each APDISCOM, in proportion to the
capacities (in MW) allocated, as per the table set out below.
(ii) NCEs have been allocated based on their geographical location to the
APDISCOM
(iii) The capacity allocation percentage of APCPDCL is 46.06%
Generating stations and their capacity, along with Power Purchase Agreements are
as follows:
Station Name
Installed
Capacity
(MW)
Allocated
Share to
APDISCOMs
(MW)
Capacity
allocated to
CPDCL
(MW)
Summary
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to CPDCL
(MW)Kothegudem TPS "A" 240.00 192.00 88.44 APGENCO (Thermal) 2962.50 80% 1091.62
kothegudem TPS "B" 240.00 192.00 88.44 APGENCO (Hydel) 3588.36 100% 1652.80
Kothegudem TPS "C"240.00 192.00 88.44
Independent Power
Plants1050.62 100% 459.04
Kothegudem TPS Stage V - Unit 1250.00 200.00 92.12
Central Generating
Stations2649.37 100% 1220.30
Kothegudem TPS Stage V - Unit 2 250.00 200.00 92.12 Joint Sector 58.80 100% 27.08
Vijayawada TPS-Stage I420.00 336.00 154.76
Non-Conventional
Energy #304.06 100% 86.72
Vijayawada TPS-Stage II 420.00 336.00 154.76 NCL Tungabadra 6.60 100% 3.04Vijayawada TPS-Stage III 420.00 336.00 154.76 Grand Total 10620.31 8496.248 4540.61
Ramagundam Thermal Station-B 62.50 50.00 23.03
Rayalseema TPP-Stage I 420.00 336.00 154.76Total APGENCO (Thermal) 2962.50 2370.00 1091.62GVK-Jegrupadu 216.82 216.82 99.87
Spectrum Power Generation Limited
208.31 208.31 95.95 New Capacities
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to CPDCL
(MW)Lanco Kondapalli Power Private Limited @ 351.49 351.49 161.90
Reliance Energy Limited
220.00 220.00 101.33Konaseema EPS
Oakwell Power Limited445.00 100% 204.97
LVS Power Limited36.80 36.80 0.00
Gautami Power Private
Limited470.00 100% 216.48
Srivathsa Power Projects Limited17.20 17.20 0.00
Vemagiri Power
Generation Limited370.00 100% 170.42
Total Independent Power Plants1050.62 1050.62 459.04 GVK Power Pvt. Limited 220.00 100% 101.33
NTPC Simhadri TPP1000.00 1000.00 460.60
Rayalaseema Thermal
Power Plant420.00 80% 154.76
NTPC Ramagundam STPS837.90 837.90 385.94
Vijayawada Thermal
Power Station660.00 80% 243.20
Neyveli Lignite Corporation Limited TPS-II,
Stage-I
105.71 105.71 48.69Future Non-
Conventional Energy ***277.17 100% 115.02
Neyveli Lignite Corporation Limited TPS-II,
Stage-II191.44 191.44 88.18 Jurala 117.00 100% 53.89
Madras Atomic Power Station 31.72 31.72 14.61 Total New Capacities 2979.17 1260.07
NTPC-Kaiga Atomic Power Station* -- -- --
Eastern Region** -- -- --
NTPC-Talcher - II, Stage I 120.65 120.65 55.57
NTPC-Talcher - II, Stage II 120.65 120.65 55.57
NTPC-Talcher - II, Stage III 120.65 120.65 55.57
NTPC-Talcher - II, Stage IV 120.65 120.65 55.57
Total Central Generating Stations 2649.37 2649.37 1220.30
Andhra Pradesh Gas Power Corporation
Limited - Stage-I16.00 16.00 7.37
Andhra Pradesh Gas Power Corporation
Limited - Stage-II42.80 42.80 19.71
Total Joint Sector 58.80 58.80 27.08
* Through the agreement is in force, the share has been allocated to TNEB
**Subject to renewal of allocation by GoI
*** The extent of vesting of capacity of generating station is in accordance with AP
Transcos share under the agreement
# Aggregate capacity allocated to the Discoms
“@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli
Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no
24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India,
New Delhi.
APCPDCL:
NCE Capacities – Existing
Company Name District
Allocated
Capacity in
MWM/s Saro Power & Infrastructures Ltd. Mahaboobnagar 6.00
M/s Suchand Power Gen (P) Ltd. Kurnool 6.00
M/s IL & FS Wind Farms Ltd. Ananthapur 6.50
M/s NCL Energy Ltd. Kurnool 7.50
M/s NEDCAP Kurnool 2.75
M/s BHEL * Ananthapur 2.55
M/s BHEL Ananthapur 3.00
M/s Srinivasa Power Pvt Ltd., Nalgonda 0.55
M/s Janapadu Hydro Power Projects Pvt. Ltd., Nalgonda 1.00
M/s KM Power Ltd. Kurnool 4.00
M/s KM Power Ltd. Kurnool 3.30
M/s KM Power Ltd. Kurnool 4.00
M/s Veeramani Biscuit Ind Ltd. Ananthapur 1.00
M/s Gayatri Agro Ind Power Ltd. Nalgonda 6.00
M/s NILE Limited Ananthapur 2.00
M/s Selco International Ltd. Mahaboobnagar 5.94
M/s Sree Rayalaseema Hi-Strength Hypo Ltd.* Kurnool 5.75
M/s Nagarjuna Green Power Ltd., (My Home
Power Ltd.) Hyderabad 8.19
M/s Ganapathi Sugar Ind Ltd.* Medak 10.69
Total Capacity 86.72
* The extent of vesting of capacity of the above generating stations to the discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement.
NCE Capacities – To be commissioned
Company Name District
Allocated
Capacity in
MWM/s Lepakshi Power Projects Ltd. Anantapur 5.50
M/s Sri Power Company Ltd. Kurnool 6.00
M/s B.S.R. Bio-Energy (P) Ltd. Nalgonda 4.50
M/s Mata Energy Ltd., (M/s Mata Cements Ltd.) Nalgonda 5.40
M/s Venkatraya Fibres (P) Ltd. Mahaboobnagar 5.52
M/s AP Power Projects (P) Ltd Anantapur 2.00
M/s Fivess Ltd. Anantapur 6.00
M/s Mahitha Power Projects Pvt. Ltd Nalgonda 0.40
M/s Kakitiya Alloys Ltd. Medak 6.00
M/s Shravana Power Projects Ltd. Mahaboobnagar 5.40
M/s PSR Green Power Projects (P) Ltd. Mahaboobnagar 5.70
M/s SLT Power & Infrastructure Projects (P) Ltd. Nalgonda 2.70
M/s Alpha Energy Systems Ltd., Hyd, CPDCL Medak 40.00
M/s RDF Power Projects Ltd, CPDCL Hyderabad 9.90
M/s Budhadeva Power Ltd. * Nalgonda 6.00
M/s Usha Gowthami Industries Ltd.* Anantapur 4.00
Total Capacity 115.02
* The extent of vesting of capacity of the above generating stations to the discoms
is restricted to the share of AP Transco under the applicable Power Purchase
Agreement
6. For Schedule “E”, under Part – 1 for Para 1 the following shall be substituted,
namely -
Schedule “E”
BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO
APNPDCL
1. Bulk Supply Undertaking
(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or
primarily to the Bulk Supply Undertaking, as segregated herein below, which
shall include but not be limited to the following:-
Allocated Capacities
(i) Hydel energy from APGenco (including that from Jurala, at appropriate time
of commissioning) will be allocated to each APDISCOM, in proportion to the
capacities (in MW) allocated, as per the table set out below.
(ii) NCEs have been allocated based on their geographical location to the
APDISCOM
(iii) The capacity allocation percentage of APNPDCL is 15.87%
Generating stations and their capacity, alongwith Power Purchase Agreements are
as follows:
Station Name
Installed
Capacity
(MW)
Allocated
Share to
APDISCOMs
(MW)
Capacity
allocated to
NPDCL
(MW)
Summary
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to NPDCL
(MW)Kothegudem TPS "A" 240.00 192.00 30.47 APGENCO (Thermal) 2962.50 80% 376.12
kothegudem TPS "B" 240.00 192.00 30.47 APGENCO (Hydel) 3588.36 100% 569.47
Kothegudem TPS "C"240.00 192.00 30.47
Independent Power
Plants1050.62 100% 158.16
Kothegudem TPS Stage V - Unit 1250.00 200.00 31.74
Central Generating
Stations2649.37 100% 420.46
Kothegudem TPS Stage V - Unit 2 250.00 200.00 31.74 Joint Sector 58.80 100% 9.33
Vijayawada TPS-Stage I420.00 336.00 53.32
Non-Conventional
Energy #304.06 100% 38.66
Vijayawada TPS-Stage II 420.00 336.00 53.32 NCL Tungabadra 6.60 100% 1.05Vijayawada TPS-Stage III 420.00 336.00 53.32 Grand Total 10620.31 8496.248 1573.25
Ramagundam Thermal Station-B 62.50 50.00 7.94
Rayalseema TPP-Stage I 420.00 336.00 53.32Total APGENCO (Thermal) 2962.50 2370.00 376.12GVK-Jegrupadu 216.82 216.82 34.41
Spectrum Power Generation Limited
208.31 208.31 33.06 New Capacities
Installed
Capacity
(MW)
%
Allocated
Share
Capacity
allocated
to NPDCL
(MW)Lanco Kondapalli Power Private Limited @ 351.49 351.49 55.78
Reliance Energy Limited
220.00 220.00 34.91Konaseema EPS
Oakwell Power Limited445.00 100% 70.62
LVS Power Limited36.80 36.80 0.00
Gautami Power Private
Limited470.00 100% 74.59
Srivathsa Power Projects Limited17.20 17.20 0.00
Vemagiri Power
Generation Limited370.00 100% 58.72
Total Independent Power Plants1050.62 1050.62 158.16 GVK Power Pvt. Limited 220.00 100% 34.91
NTPC Simhadri TPP1000.00 1000.00 158.70
Rayalaseema Thermal
Power Plant420.00 80% 53.32
NTPC Ramagundam STPS837.90 837.90 132.97
Vijayawada Thermal
Power Station660.00 80% 83.79
Neyveli Lignite Corporation Limited TPS-II,
Stage-I
105.71 105.71 16.78Future Non-
Conventional Energy ***277.17 100% 25.30
Neyveli Lignite Corporation Limited TPS-II,
Stage-II191.44 191.44 30.38 Jurala 117.00 100% 18.57
Madras Atomic Power Station 31.72 31.72 5.03 Total New Capacities 2979.17 419.83
NTPC-Kaiga Atomic Power Station* -- -- --
Eastern Region** -- -- --
NTPC-Talcher - II, Stage I 120.65 120.65 19.15
NTPC-Talcher - II, Stage II 120.65 120.65 19.15
NTPC-Talcher - II, Stage III 120.65 120.65 19.15
NTPC-Talcher - II, Stage IV 120.65 120.65 19.15
Total Central Generating Stations 2649.37 2649.37 420.46
Andhra Pradesh Gas Power Corporation
Limited - Stage-I16.00
16.00 2.54
Andhra Pradesh Gas Power Corporation
Limited - Stage-II42.80
42.80 6.79
Total Joint Sector 58.80 58.80 9.33
* Through the agreement is in force, the share has been allocated to TNEB
**Subject to renewal of allocation by GoI
*** The extent of vesting of capacity of generating station is in accordance with AP
Transcos share under the agreement
# Aggregate capacity allocated to the Discoms
“@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli
Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no
24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India,
New Delhi,
NCE Capacities – Existing
Company Name District
Allocated
Capacity in
MWM/s Rithwik Power Projects Ltd. Khammam 5.52
M/s Gowthami Bio-Energies Ltd. Khammam 5.52
M/s NCS Gayatri Sugars Ltd. Nizamabad 6.00
M/sShalivahana Constructions Ltd. Adilabad 5.46
M/s Kallam Spinning Mills Ltd.* Khammam 0.72
M/s Saraswathi Power & IND Ltd. Karimnagar 2.00
M/s Indur Green Power Private Ltd. Nizamabad 6.00
M/s Kakatiya Cements Ltd.* Khammam 7.44
Total Capacity 38.66
* The extent of vesting of capacity of the above generating stations to the discoms is
restricted to the share of AP Transco under the applicable Power Purchase Agreement
NCE Capacities – To be commissioned
Company Name District
Allocated
Capacity in
MWM/s Sainath Power Concepts (P) Ltd Adilabad 6.00
M/s Krishna Priya Power Projects Ltd. Khammam 3.96
Nizam Deccan Sugars Ltd Nizamabad 13.89
Saraswati Power & Industries (P) Ltd Karimnagar 0.99
Kallam Spinning Mills Limited Khammam 0.46
Total Capacity 25.30
* The extent of vesting of capacity of the above generating stations to the discoms is
restricted to the share of AP Transco under the applicable Power Purchase Agreement
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHA PRADESH)
A.K. GOYAL
SPECIAL CHIEF SECRETARY TO GOVERNMENT
To
The Commissioner,
Printing & Stationery Department, Chenchalguda, Hyderabad (with a request
to Publish the Notification in the Extra-ordinary Andhra Pradesh Gazette,
dated.28-04-2008 and supply 2000 copies to this Department immediately)
//Forwarded:: By Order//
SECTION OFFICER