Epping Services Facility
03ESF_1
Precinct Plans 03
03 Precinct Plans
Epping Services Facility Elevation. Source: HASSELL.
Epping Services Facility
03 Precinct PlansEpping Services Facility
03ESF_2Sydney Metro Northwest Urban Design and Corridor Landscape Plan
EHEH
CHE
CSH
SHW
NRW
BLVKVE
RSH
CUD
ESF
CSF
COR
Epping Services Facility
03ESF_3
Precinct Plans 03
Epping Services Facility is located above the rail alignment between Epping Station and the Cheltenham Services Facility. The building is oriented to face Beecroft Road with the Epping Traction Substation constructed adjacent to the service building within the same fenced enclosure. The purpose of the substation is to address existing ventilation issues at Epping Station and ventilate the 6 kilometres of tunnel from Epping to Cherrybrook Stations. There will be no exhaust stacks in this facility.
3.1.1 Purpose and ScopeThis section of the Urban Design and Landscape Corridor Plan (UDCLP) provides an overall description of the built elements, their context and the design drivers for the precinct at Epping Services Facility. This section should be read in conjunction with other sections of the UDCLP to gain an appreciation of the strategic context, design vision and system wide componentry of the project.
This section describes the following for Epping Service Facility:
_ Project context and vision _ Describes the local context _ Describes the urban design, landscaping
and architectural design approach _ Describes and details the proposed
buildings within the precinct site
3.1 Precinct Context3.1 Precinct ContextThe proposed facility include:
_ Access and egress from up and down tunnels
_ Maintenance access and egress stair and a passenger lift serving all levels
_ Tunnel ventilation fan equipment providing supply and exhaust ventilation to both tunnels
_ Two transformer substations and low voltage switchroom
_ Uninterruptible power supplies (UPS) rooms
_ Communication rooms _ Maintenance staff facilities (toilet, tea
point and cleaners cupboard) _ Supply, exhaust and stair pressurisation
fan rooms _ Heat rejection equipment.
03 Precinct PlansEpping Services Facility
03ESF_4Sydney Metro Northwest Urban Design and Corridor Landscape Plan
EHEH
CHE
CSH
SHW
NRW
BLVKVE
RSH
CUD
ESF
CSF
COR
TRACTION SUBSTATION
SERVICE FACILITY
BEECROFT ROAD
EXISTING DRAINAGE CHANNEL (DEVLINS CREEK TRIBUTARY)
NSW for NSWTransport
GOVERNMENT
N
0 5 10m
1:250
2.5 2.5 7.5
FULL SIZE A1
A1 Original Co-ordinate System: MGA Zone 56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing.
DESIGN MODEL FILE(S) USED FOR DOCUMENTATION OF THIS DRAWING
TEEHS:SUTATS
DRAWN
DESIGN CHECK
APPROVED REVDRG No
The information shown on this drawing is for the purposes of the North West Rail Link (NWRL) Project only. No warranty isgiven or implied as to its suitability for any other purpose. The Service Providers accept no liability arising from the use of thisdrawing and the information shown thereon for any purpose other than the North West Rail Link (NWRL) Project.
SERVICE PROVIDERS
DESIGNED
DRG CHECK
NOT FOR CONSTRUCTIONNORTH WEST RAIL LINK
C
CLIENTSCALES
100m
m A
T FU
LL S
IZE
Plo
t Dat
e:
OF
INDEPENDENT CERTIFIER CERTIFICATE
A
2/03
/201
6 2:
02:2
1 PM
C:\U
sers
\byr
px\D
ocum
ents
\NW
RLO
TS-N
RT-
ESF-
LA-M
OD
-616
510_
byrp
x.rv
t
02.03.2016
_STAGE 3
NWRLOTS-NRT-ESF-LA-DRG-616940
P.BYRNE
A. BRUCE
MATERIALS, FINISHES & PLANTING PLANA. CHARLESWORTH
A. LUCAS
EPPING SERVICE FACILITY
J. BOUSTEAD
LANDSCAPE ARCHITECTURE
1 1DPPANOITPIRCSEDETADYBVERA AC 02.03.2016 DESIGN PACKAGE 1701 STAGE 3 NRT SUBMISSION AB
2
1
4
4
4
3
5
Figure 3.1 ESF_Plan View of Epping Services Facility. Source: HASSELL.
N
3.1.2 Overview of Precinct ProjectThe following are the key components of the Services Facility:1. Traction Substation2. Services Facility Building3. Fire Hydrant4. Landscape Screen Planting5. Maintenance Access Driveway
Refer Figure 3.1_Plan View of Epping Service Facility.
The key precinct principles developed for Epping Services Facility are summarised below:
_ Minimise the above ground building scale
_ Facilitate the integration of the adjacent traction substation
_ Create a neutral building expression to minimise the visual impact of the building on existing and future neighbours
_ Facilitate safe and efficient operation and maintenance of the services facility
_ Screen the bulk of the services facility through tree planting while considering natural surveillance at street level
Epping Services Facility
03ESF_5
Precinct Plans 03
3.1.3 Location
Regional Location
The Epping Services Facility is located on the new tunnel alignment, between Epping Station and Cheltenham Service Facility. It is located on Beecroft Road adjacent to Epping Station.
CUDGEGONG ROAD
SMTF
ROUSE HILL
KELLYVILLE
BELLA VISTA
NORWEST
Blacktown
Westlink M7
M2 MotorwaySeven Hills
SHOWGROUND
CASTLE HILL CHERRYBROOK
CHELTENHAMSERVICESFACILITY
Lane Cove National Park
EPPINGSERVICESFACILITY
Figure 3.2 ESF_Location of Epping Services Facility. Source: Google Maps.
03 Precinct PlansEpping Services Facility
03ESF_6Sydney Metro Northwest Urban Design and Corridor Landscape Plan
EHEH
CHE
CSH
SHW
NRW
BLVKVE
RSH
CUD
ESF
CSF
COR
Figure 3.3 ESF_Epping Precinct Context Plan. Source: HASSELL.
Local Context
The Epping service facility is located within an existing commercial development site, between Beecroft Road and Devlins Creek. The site is adjacent to residential and commercial uses with a distinctly low key, suburban street address.
Access to the proposed facility is from Beecroft Road; however, the facility will not be accessible to the public. The site designshould mitigate the visual impact of the services facility from the adjacent unit blocks on Edensor Street and Beecroft Road with a dense re-establishment of Sydney Turpentine Ironbark Forestplanting. The existing stand of vegetation to the north of the site will be protected from disturbance and retained.
The remainder of the facility construction site will provide a future development site that will contribute to the futuredevelopment of Epping Town Centre, which has been identified by the Department of Planning & Infrastructure as an UrbanActivation Precinct with potential to contribute to Sydney’s future urban growth needs.
3.1.4 Key Design DriversThe key design drivers informing Epping Service Facility are summarised below:
_ Mitigation of the visual impact of the service facility from the adjacent existing unit blocks on Edensor Street, Cheltenham and from Beecroft Road.
_ Integration and protection of the vegetation at the adjacent site to the north.
_ Maximise the opportunity for future development of the remaining site, which is nominated in the Epping Town Centre Study as a proposed high density mixed use/residential development.
_ Ensure the design of the facility does not detract from the amenity of future developments.
Existing Rail Tracks / Station
Epping Town Centre
Residential Development
Commercial Development
Site Location
Existing Landscape Buffer
T
N
Epping Services Facility
03ESF_7
TRAC
TION SU
BSTA
TION
SERVIC
E FAC
ILITY
BEECROFT ROAD
EXISTING DRAINAGE CHANNEL (DEVLINS CREEK TRIBUTARY)
NSWfo
r NSW
Tran
spor
t
GOVERNMEN
T
N
0
5
10m
1:2502.5
2.5
7.5FU
LL SIZ
E A1
A1 Origi
nal
Co-ordin
ate Sy
stem: M
GA Zon
e 56
Height D
atum: A
.H.D.Th
is she
et may
be pr
epare
d usin
g colo
ur and
may be
incom
plete i
f copie
d
NOTE: D
o not s
cale fr
om thi
s draw
ing.
DESIG
N MODEL
FILE
(S) U
SED F
OR DOCUMEN
TATI
ON OF
THIS
DRAW
ING
TEEHS
:SUTATS
DRAWN
DESIG
N CHEC
K
APPR
OVED
REV
DRG No
The i
nform
ation
show
n on t
his dr
awing
is fo
r the
purp
oses
of th
e Nor
th W
est R
ail Li
nk (N
WRL)
Pro
ject o
nly. N
o war
ranty
is
given
or im
plied
as to
its su
itabil
ity fo
r any
othe
r pur
pose
. The
Ser
vice P
rovid
ers a
ccep
t no l
iabilit
y aris
ing fr
om th
e use
of th
is
draw
ing an
d the
infor
mation
show
n the
reon
for a
ny pu
rpos
e othe
r tha
n the
Nor
th W
est R
ail Li
nk (N
WRL)
Pro
ject.
SERVI
CE PR
OVIDER
S
DESIG
NEDDRG C
HECK
NOT FOR C
ONSTRUCTIO
N
NORTH W
EST
RAIL L
INK C
CLIENT
SCAL
ES
100mm AT FULL SIZEPlot D
ate:
OF
INDEP
ENDEN
T CER
TIFI
ER C
ERTI
FICAT
E
A
2/03/2016 2:02:21 PMC:\U
sers\byrp
x\Documents\N
WRLOTS-NRT-ESF-LA-MOD-616510_byrp
x.rvt
02.03
.2016
_STA
GE 3
NWRLOTS
-NRT-ESF
-LA-DRG-61
6940
P.BY
RNE
A. B
RUCE
MATER
IALS
, FIN
ISHES
& P
LANTI
NG PLA
N
A. C
HARLE
SWORTH
A. LU
CAS
EPPI
NG SER
VICE
FACILI
TY
J. BO
USTEA
D
LANDSC
APE
ARCHIT
ECTU
RE 1
1
DPPA
NOITPIRCSED
ETAD
YBVERA
AC02
.03.20
16DES
IGN P
ACKA
GE 17
01 S
TAGE
3 NRT
SUBM
ISSI
ON
AB
3.2.1 Landscape Plan
The main landscape precinct elements below are located on the adjacent plan of Epping Services Facility. 1. Proposed Footpath2. Landscape Screen Planting
Refer Figure 3.4_Landscape Elements Plan.
3.2.2 Planting Design The landscape response is to provide maximum landscape screening of the Services Facility from all sides especially screening from the residential properties on the rear boundary and Beecroft Road. This planting includes trees and understorey planting. The tree and planting species have been selected to match in with the endemic species of the local area, which has been identified through an arboriculture assessment. Understorey planting has also been selected to not require irrigation beyond establishment period, and require minimal maintenance.
3.3.3 Fencing High security fencing extends around the boundary of the Services Facility. The fencing is set back from the street edge on Beecroft Road with buffer planting in front to minimise visual impact.
3.2 Urban Design and Landscape Plan
1
2
22
Figure 3.4 ESF_Landscape Elements Plan. Source: HASSELL.
N
Precinct Plans 03
Figure 3.5 ESF_Northern Facade of Epping Services Facility. Source: HASSELL.
03 Precinct PlansEpping Services Facility
03ESF_8Sydney Metro Northwest Urban Design and Corridor Landscape Plan
EHEH
CHE
CSH
SHW
NRW
BLVKVE
RSH
CUD
ESF
CSF
COR
Figure 3.7 ESF_Section B. Western Facade of Epping Services Facility looking from adjacent Residential Development Source: HASSELL.
Figure 3.6 ESF_Section A. East Facade of Epping Services Facility (Beecroft Road). Source: HASSELL.
B
A
Indicative existing vegetation of drainage culvert/ creek line shown in foreground
Epping Services Facility
03ESF_9
Precinct Plans 03
\\\\\\
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\\\\\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\\\\\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\\\\\\ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\\\\\\
\\\\\\
\\\\\\
\\\\\\
\\\\\\
\\\\\\
\\\\\\
\\\\\\
TO COUNTR
Y
TO CITY
72.0
72.0
73.0
74.0
75.0
76.0
77.0
78.0
79.0
80.0
81.0
82.0
70.0
71.0
72.0
73.0
74.0
75.0
76.0
77.0
78.0
79.0
80.0
81.0
82.0
83.0
84.0
85.0
79.0
80.0
81.0
82.0
83.0
84.0
83.0
84.0
85.0
86.0
87.0
TRACTION SUBSTATIONPACKAGE 502
SERVICE FACILITYPACKAGE 1701
B E E C R O F T R O A D
E D E N S O R R O A D
R A Y R O A D
HARDSTAND
D O W N M A I N L I N E
U P M A I N
L I N E
PROJECT SITE BOUNDARY
BOX EXCAVATION MINIMUMCLEARANCE LINEREFER NWRLOTS-NRT-ESF-AR-DRG-616602 FOR SET OURCOORDINATES AS TAKENFROMNWRLTSC-THY-ESF-DN-DRG-325011
EXISTING CAPPING BEAM
SITE PLAN LEGEND
NSW for NSWTransport
GOVERNMENTN
0 10 20m
1:500
5 5 15
FULL SIZE A1
A1 Original Co-ordinate System: MGA Zone 56 Height Datum: A.H.D. This sheet may be prepared using colour and may be incomplete if copied NOTE: Do not scale from this drawing.
DESIGN MODEL FILE(S) USED FOR DOCUMENTATION OF THIS DRAWING
STATUS: SHEET
DRAWN
DESIGN CHECK
APPROVED REVDRG No
The information shown on this drawing is for the purposes of the North West Rail Link (NWRL) Project only. No warranty isgiven or implied as to its suitability for any other purpose. The Service Providers accept no liability arising from the use of thisdrawing and the information shown thereon for any purpose other than the North West Rail Link (NWRL) Project.
SERVICE PROVIDERS
DESIGNED
DRG CHECK
NOT FOR CONSTRUCTIONNORTH WEST RAIL LINK
C
CLIENTSCALES
100m
m A
T FU
LL S
IZE
Plot
Dat
e:
OF
INDEPENDENT CERTIFIER CERTIFICATE
L
29/0
2/20
16 3
:22:
23 P
MC
:\Use
rs\d
anua
\Doc
umen
ts\N
WR
LOTS
-NR
T-ES
F-AR
-MO
D-6
1650
1_da
nua.
rvt
STAGE 3
NWRLOTS-NRT-ESF-AR-DRG-616600
H. JENNINGS
PRECINCT PLANL.CARSON
S.HUNTER
EPPING SERVICE FACILITY
G.CROWE
OVERALL ARRANGEMENTARCHITECTURE
1 1
NWRLOTS-NRT-ESF-AR-MOD-616501.RVT
1 : 5001 PRECINCT PLAN
REV BY DATE DESCRIPTION APPDC 29/10/15 ISSUED FOR STAGE 2 COORDINATION WEEK 7D 04/11/15 ISSUED FOR STAGE 2 IDC SUBMISSIONE 20/11/15 ISSUED FOR STAGE 2 COORDINATION WEEK 10F 24/11/15 ISSUED FOR STAGE 2 NRT SUBMISSIONG LC 15/12/15 ISSUED FOR STAGE 2 IC SUBMISSION RDH 21/01/16 ISSUED FOR STAGE 3 COORDINATION WEEK 3J 05/02/16 ISSUED FOR STAGE 3 COORDINATION WEEK 5K 10/02/16 ISSUED FOR STAGE 3 IDC SUBMISSIONL 02/03/16 ISSUED FOR STAGE 3 NRT SUBMISSION
Figure 3.8 ESF_Epping Services Facility Plan. Source: HASSELL.
The Epping Services Facility design is based on a suite of components and systems that form part of the system wide approach to design, as well as site specific responses to the precinct.
3.3.1 Key Design DriversThe main function of Epping Services Facility is to:
_ House the ventilation fans that assist with the air movement through the tunnel;
_ Contain rail systems rooms supporting the operation of the railway.
The design drivers for the facility include: _ Provide a quiet and unobtrusive building
that is sympathetic to its surroundings _ Create a functional platform for all
service and maintenance requirements within the service facility compound
_ Provide a durable, low maintenance building within the service facility compound
_ Be grounded and integrated into its landscape setting.
3.3 Architectural Design3.3.2 Built Elements DesignThe Epping Services Building provides housing for the impulse fans. The building contains rail systems rooms supporting the operation of the railway and the facility itself. The building consists of a small above ground structure sitting over a significant underground structure.
The service facility will read as a single rectangular form clad in grey metallic panels, similar to the finish of the existing ECRL service buildings at Epping Station. A single large louvre panel on the east elevation provides ventilation to the tunnel vent shaft and exhaust ducts. On the west elevation, louvre panels serve the substations and supply air intakes and the stair pressurisation intake.The traction substation will sit adjacent to the service facility with both the east and west facades aligning with the Services Facility facades.
Generous hard stand areas accessible from Beecroft Road provide maintenance access to both the service facility and traction substation and emergency vehicle access. A free-standing hydrant booster station enclosure is located adjacent to the hard stand, ensuring the required separation distance from the openings in the building façade.
Figure 3.9 ESF_Section through Epping Service Facility. Source: HASSELL.