Upload
buituyen
View
226
Download
0
Embed Size (px)
Citation preview
EPPM C t R tEPPM C t R tEPPM Country ReportEPPM Country Report
ThailandThailand
EPPM P S i CCS A & N t ki fEPPM Program: Seminar on CCS Awareness & Networking of Petroleum Geoscience Institutes in the CCOP Region: Nov 16, 2009
Bangkok, Thailandg ,
National Energy Policy
lili T tT t
1.Enhance Energy
Energy PolicyEnergy Policy TargetTargetDMF StrategyDMF Strategy
1.Accelerate petroleum procurement from either
1.Increase domestic Oil and condensate production 1.Enhance Energy
Security
2.Consumer Protection
procurement from either domestic and oversea sources
2 R&D on Oil shale
200200,,000000 bpd to 250250,,000 000 bpd within 4 yr
2.Maintain gas reserve for Protection
3.Promote Renewable and Alternative Energy
2. R&D on Oil shale
3.Establish proactive international cooperation
g30 yr (R/P ratio)
3. Interconnection with Neighboring Countries and Be ond Bo deEnergy
4.Enhance Energy Efficiency
5 P t E
cooperation
4. Promote policy to prevent and minimize environmental impact
Beyond Border
1. Reduce GHG from flared gas by promoting flared gas utilization & CDM Project5. Promote Energy
Development with Environment Protection
environmental impact from E&P activities
utilization & CDM Project
2. Set standard for Emission and discharge volume to the environment
2
Protection
Thailand Half Year Thailand Half Year
E&P A ti itiE&P A ti itiE&P ActivitiesE&P Activities
January January –– June June 20092009
Seismic Survey (Jan-June 2009)
CHIANG MAI
2D Seismic9,000
Km.
7 981CHIANG MAI
OnshoreOnshore22DD 22 350350 kk
1280247
5,000
6,000
7,000
8,000
JSX Energy
PTTEP Siam
Pearl Oli
7,981
BANGKOK
NAKHON RATCHASIMA
22D D 22,,350 350 km.km.33D D 913 913 sq.km.sq.km. 6454
1400
500
1,000
2,000
3,000
4,000Pearl Oli
Carnavon Thailand Ltd.
Salamander Energy (E&P) Ltd.)
Adani Welspun Exploration Ltd.
2,350
GulfOf
ThailandOffshoreOffshore
Jan-June 2009
3D Seismic 3,000
Sq.Km.Jan-June 2008 3500
,
. . . . Salamander Energy (E&P) Ltd.)
Jan-June 2009Jan-June 2008
33DD 11,,520520 sq.kmsq.km..
1520
2,000
2,500 2,433
SONGKHLA
JDA
713
200
500
1,000
1,500Siam MOECO ( Northern Part))
Chevron Petroleum (Thailand) Ltd.
Salamander Energy (E&P) Ltd.)
Tatex Thailand LLC.360713
3600
. . . . . Jan-June 2008 Jan-June 2009
Drilling (Jan-June 2009)
CHIANG MAI
250No. of wells
240
NAKHON
OnshoreOnshore 4646 wellswells87 94
413
150
200
250224
BANGKOK
NAKHON RATCHASIMA
7 188 810
922
4627
212350
100
GulfOf
Thailand
OffshoreOffshore 194 194 wellswells
24 197 18
0
. . . .
Sirikit Pan Orient Resources
Jan-June 2008 Jan-June 2009
JDA
Pearl Oil ArthitChevron Offshore B8/32
Chevron Offshore G4/43 U1234U-Thong Chevron Thailand E&P B12/27
Bongkot
SONGKHLA
JDA
• 86 percent is the wells drilled for production
U Thong Chevron Thailand E&P B12/27
• 14 percent is the exploration and appraisal wells Onshore L21/43, L44/43, L53/43 Offshore G10/48, G2/48, G11/48, B15A, B16A, B15, B16, G4/43, U1234, B12/27
J t J 2009 th t l l i f ll d
Natural Gas Supply (Jan-June 2009)January to June 2009, the average natural gas supply is as followed• Domestic Production and JDA 2,657 MMSCFD• Imported from Myanmar 843 MMSCFD Imported from Myanmar 843 MMSCFD
4,000 ,3,665 3,500 (-4.5%)
73
620 496
389348
2 00
3,000
3,5003,500 ( 4.5%)
619
216
333
409171
174
25
18
1 500
2,000
2,500
772550
405
367
479
500
1,000
1,500
268 2330
500
U1 U23 U4 Bongkot A hi B8/32
Jan-June 2008 Jan-June 2009
U1 U23 U4 Bongkot Arthit B8/32
Sirikit Namphong Phuhorm MTJDA Yadana Yetagun
Condensate Production (Jan(Jan--June June 20092009))
Barrel/Day
11,90417,984
2,7644,035
70 000
80,000
90,000
100,000 92,184 88,125 (-4.4%)
23,93622,812
20,411
17,227
40,000
50,000
60,000
70,000
10,71212,905
22,008 12,690
22,812
10,000
20,000
30,000
,
449 3900
.Jan-June 2008 . Jan-June 2009
Phuhorm U1 U23 U4 Bongkot Arthit JDA
• January – June 2009 Average Domestic Condensate Production is is 8888,,125125 Barrels
77
• 55 percent of condensate produced comes from Ucomes from U1234 1234 gas sale contract operated gas sale contract operated by Chevron Thailand, Co.Ltd by Chevron Thailand, Co.Ltd
Crude Oil Production (Jan-June 2009)
Barrels/Day
17,399, 19,9118,6824,962
140,000
160,000
180,000
138,337
152,371 (+10%)
51,352 51,055
17,399, 19,911
80,000
100,000
120,000
1227220,840 21,369
38,105 34,918
20,000
40,000
60,000
10,641 12,2720
Jan-June 2008 Jan-June 2009
• During the first six months of 2009, daily average of domestic crude oil production is152,371 barrels
Other onshore Sirikit U23 B8/32 Jasmine SongklaBualuang
Royalty from E&P (Jan(Jan--June June 20092009))
OilOilGasCondensate
LPG21,702
Million Baht
25,000LPG
17,507(-19%)
15,000
20,000
10,000
,
0
5,000
2008 2009
Central Government Earned 16,580 million bahtCentral Government Earned 16,580 million baht
2008 2009
Local Administrative Earned 928 million bahtLocal Administrative Earned 928 million baht
Malaysia-Thailand Joint Development AreaJOINT DEVELOPMENT AREA
THAILANDJDA
The operation in the first six months (Jan-June) 2009Average Natural Gas Supply 856 mmscfd
MALAYSIA
Royalty Profit Petroleum Other Income
Average Condensate Production 8,138 barrels/day
32 20%36.86%.
32.20%.
.3.56%.64.24% .62.89%0.25%
Government Earning during Jan-June 2008= 2,770 million baht
Government Earning during Jan-June 2009= 4,318 million baht
Government Income for the E&P business from petroleum concessionairesGovernment Income from petroleum concessionaires in
E&P business
2003 2004 2005 2006 2007 2008 2009 (Jan-June)
R lt 18 292 21 306 29 443 35 228 37 354 49 092 19 241
E&P business
Royalty 18,292 21,306 29,443 35,228 37,354 49,092 19,241
Income from MTJDA - - 771 2,742 2,407 5,650 4,317
SRB - 1,039 2,077 7,810 7,197 4,743 6,862
Petroleum Income Tax 19,183 27,318 38,992 46,104 62,639 65,767 -
Total 37,475 49,663 71,283 91,664 109,597 125,252 30,420
Unit: million baht
t 140 000MTJA
illio
n B
aht
100,000
120,000
140,000SRBPetroleum Income TaxRoyalty
M Cumulative Government Earning~ *588,000 million baht
Allocated to Local Administrative60,000
80,000
*13,450 million baht
0
20,000
40,000
past
-25
33
2534
2535
2536
2537
2538
2539
2540
2541
2542
2543
2544
2545
2546
2547
2548
2549
2550
2551
Start production in 2009
Chaba- B8/32 Chevron Offshore (Thailand)Chevron Offshore (Thailand) LimitedLimitedProduction Rate 5 000 barrels per day and
Yungtong- G4/48Chevron PattaniProduction Rate 1,200-5,000 barrels per Production Rate 5,000 barrels per day and
19 mmscfd, , p
day and 4-40 mmscfd
12Chaba 50 km
Start Production in 2009 Arunothai - L10/43Siam Moeco Co.LtdSiam Moeco Co.LtdMaximum production rate 2,000 barrels/day
Saothien - S1PTTEP Siam Co.LtdProduction rate 300 - 1,300 barrels/day, y
North Arthit - B14APTTEP Co.LtdPTTEP Co.LtdP d ti t 120 150 fdProduction rate 120 - 150 mmscfd
13
North Arthit
G8/50
DMF Strategic Plan for Flared Gas Utilization Projects
•• The primary target for flare gas utilization is for energy The primary target for flare gas utilization is for energy
efficiency and conservation, in addition with reducing efficiency and conservation, in addition with reducing
environment impact from gas flaring.environment impact from gas flaring.
•• Hence, none of the projects applied for Clean Hence, none of the projects applied for Clean
Development Mechanism (CDM)Development Mechanism (CDM)
•• DMF will support & encourage concessionaires to DMF will support & encourage concessionaires to pp gpp g
develop more flare gas utilization projects and apply for develop more flare gas utilization projects and apply for
CDM project in order to claim the reduction of GHG CDM project in order to claim the reduction of GHG p jp j
emission as carbon credits. emission as carbon credits.
Flared Gas Utilization Projects to apply for CDM
Offshore, Gulf of Thailand
I t ll V R U it (VRU) t fl dInstall Vapor Recovery Unit (VRU) to recover flared gas
back into gas processing
Install compressor/pump to recover vented gas from Well
Unloading Unit at wellhead platform back to the production
process
Onshore, Oil Field,
Flared gas to small power plant (1 MW)
CDM & CCS
DMF will promote E&P business along with prevent and
minimize environmental impact from E&P activitiesminimize environmental impact from E&P activities
1. Reduce GHG from flared gas by promoting flared gas
utilization & CDM Project
2 Set standard for Emission and discharge volume to the2. Set standard for Emission and discharge volume to the
environment
• Reduce the discharge volume of produce water
from petroleum production
• Study the feasibility of CCS project in Thailand
16
EPPM Project
• DMF set up the working group in order to
participate and work with the EPPM project (P1participate and work with the EPPM project (P1,
P2, P3)
• Continue to participate in the EPPM workshop
• Set up the knowledge sharing within DMF
through KM (Knowledge Management) Programthrough KM (Knowledge Management) Program
EPPM Project
• DMF will continue to support the information as much as
possible for the P1 & P3 project & will try to get collaboration
& support from the concessionaire
• Activity of the P2 is really benefit to DMF since we are
currently working & studying both CDM & CCScurrently working & studying both CDM & CCS
• To ask for more support especially funding & technology
transfer for the cooperating country for the CCS project
through CCOP (EPPM project)
• DMF offer our staffs to help in capacity building & knowledge
sharing for the member country in the area of geologysharing for the member country in the area of geology,
reservoir, production operation, etc.