15
eRA@TU Users Group February 17, 2012

ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

Embed Size (px)

Citation preview

Page 1: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU Users Group

February 17, 2012

Page 2: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU Users Group Meeting Agenda

• Agenda– January Paperless Recap (New non S2S eSPAF)– Proposed changes to system configuration and documentation

• Open for discussion and input– Non S2S Checklist– Review of current system advisories– Presentation from CHP on Best Practices– Open Forum

• What works or doesn’t work for you• Open issues and questions

Page 3: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Metrics January 2012• Proposals submitted to sponsors: 110• Proposals created in PD: 85• Proposals NOT created in PD: 25

– 6 CST– 2 Education– 3 Engineering– 7 SoM (mostly clinical trials)

• Proposals submitted via S2S: 27– NIH– DHS– EPA– Dept of Energy– Office of Naval Research

• Proposals submitted via Adobe Forms: 2• Proposals routed with eSPAF: 85• Average time in preliminary review:

Page 4: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Metrics January 2012• Proposals submitted via Adobe Forms: 2• Proposals submitted via NSF Fastlane: 23• Proposals routed with eSPAF: 85• Review and Approvals

– Average time in preliminary review:– Longest time for preliminary review:– Shortest time for preliminary review:

Page 5: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Proposed Changes• Improved Setup Questions

Page 6: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Proposed Changes• Improved Communications in Event of Non-Approval• Also goes to the Pis Admin (Departmental Administrator)

Page 7: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Proposed Changes• More Budget Categories

– Original 6 Budget Categories:• Supplies • Other Costs • Travel Domestic • Travel Foreign • Purchased Equipment• Non-MTDC

– Still offer users the ability to use one, two or more budget categories for their proposal but many have asked for the basic budget categories used by the Federal sponsors.

– Original 6 are sorted to the top of the drop down list. – Your non-Federal budget can be as simple or as complex as you want to provide. – Of course, we expect that your detailed budget will be attached in the Temple

Documents section of the proposal.

Page 8: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Proposed Changes• New and Better Ways to Calculate F&A:

– This method is based on standard MTDC Bases and allows you to simply enter the rate you want to use.

• We have been using the manual lump sum by period method for ease of use. – Users have asked to use more budget categories than the 6 we originally rolled out for

more refinement in the F&A calculations and more importantly, visibility for their reviewers.

Page 9: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Proposed Changes• Simpler budgeting for subcontracts

– eRA@TU software provides 2 ways to enter subcontract budget data, Open Budget and Detailed Budget.

– We have been using the Detailed Budget option for some time now because it requires the detail that our Federal sponsors require, however for non S2S submissions that much detail is not required.

– The Open Budget option is currently not used at Temple because of our Federal sponsors and the fact that you can not “mix and match” using the two options so this is currently turned off.

Page 10: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Current Advisories• Uploading Spreadsheets.

• Be sure to save your spreadsheets in either .xls or .xlsx format before uploading to eRA@TU.

• Spreadsheets with macros will cause issues viewing during the routing process.

Page 11: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Advisory• FedNonFederalBudget form for some Non-NIH submissions

– If you find a proposal using this form, you must submit using Adobe Forms and a paper SPAF.

Page 12: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Advisory• Cost Sharing

Page 13: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Open Forum• Discussion Agenda

– NSF & PD– email notifications, how much is too much and how often is too often?– Dealing with college internal deadlines– Finalize button: Who, what, where, when and how?– Supporting vs Temple Documents: Whats the difference?

Page 14: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Q & A

Questions/Concerns/Issues?

Page 15: ERA@TU Users Group February 17, 2012. eRA@TU Users Group Meeting Agenda Agenda – January Paperless Recap (New non S2S eSPAF) – Proposed changes to system

eRA@TU UGM: Next Meeting

Look for the eRA Listserv for information on the next UGM meeting.

Send and email to [email protected] In the body of the email enter

Subscribe era yourfirstname yourlastname