    PRESENTATION ON

    ERECTION OF BOILER

    KIRAN KUMAR ONI

  • 7/31/2019 Erection of Boiler

    3/40

    BOILER PACKAGES

    Structures

    Pressure partsNon pressure parts

    Ducting

    Rotating equipmentESP

  • 7/31/2019 Erection of Boiler

    4/40

    Structure for handling of Eco. Coils

    from Zero mtr. to 43.5 mtrs

  • 7/31/2019 Erection of Boiler

    5/40

    In order to have a strong and safestructural footing the columns are to beerected very carefully.

    It can not be transported and erected insingle piece.

    Utmost care is taken in the pre-assembly

    stage to maintain the matching of columnend faces & to achieve verticality with intolerance limits.

    COLUMN ERECTION

  • 7/31/2019 Erection of Boiler

    6/40

    COLUMN ERECTION

  • 7/31/2019 Erection of Boiler

    7/40

    Once the column erection is over up to the

    full height, the cross beams are placed

    securely over the columns which supports

    the main boiler.

    After that anchor point called ceiling girder

    on the top of the boiler is constructed on

    all the sides of the boiler so that loadtransfer could take place

    COLUMN ERECTION

  • 7/31/2019 Erection of Boiler

    8/40

    Heavy GirderHeavy Girder

    LiftingLifting

    S/S Heavy Girder installation

    (Using Crane)

    6 month after starting S/S

    In the process of Modulization of

    Boiler Furnace & Back Pass on the ground

    S/S Heavy Girder installation (Using Crane)

    2 month after Starting S/S

    Heavy Girder

    Installation

    Module Assy

    on the Ground

    ??

    Heavy Girder

    Installation??

    Typical Construction MethodModulization/Concurrent Erection Method

  • 7/31/2019 Erection of Boiler

    9/40

    Install Heavy

    Girder after

    Panel Erection

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    10/40

    BOILER DRUM ERECTION

    WORKS TO BE COMPLETED BEFORELIFTING THE BOILER DRUM

    AUXILARY PREPARATION WORK FOR DRUMLIFTING

    welding of cat head structure at roof level

    making ready of winches with anchoringarrangements

    fixing of main pulleys, auxiliary pulleys &guidepulleys

  • 7/31/2019 Erection of Boiler

    11/40

    TECHNICAL DETAILS DRUM

    over all length : 24.216m

    weight (with out internals) : 234MTElevation (drum center) : 72.508m

    No.of lifting lungs : 2 (for stage I lifting)

    : 2 (for stage II lifting)

    No.of suspension rod U-type : 2length&width of pulley blocks : 1700&700mm

  • 7/31/2019 Erection of Boiler

    12/40

    BOILER DRUM LIFTING

    Drum is to be lifted in horizontal position

    Initially drum is to be lifted at a height of68mtrs

    The level of the drum centre is to beverified by water level to ensure exactelevation of 72.511mtr

  • 7/31/2019 Erection of Boiler

    13/40

    PRESSURE PARTS

    Pressure parts is divided in to two passes

    Erection of headers and water wall panel One side of water wall require 35 to 40

    panels

    Boiler walls are checked verticality andaxially with respect to boiler drum position

  • 7/31/2019 Erection of Boiler

    14/40

    CONSTRUCTIONOF HEADERS

  • 7/31/2019 Erection of Boiler

    15/40

  • 7/31/2019 Erection of Boiler

    16/40

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    17/40

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    18/40

    Install Heavy

    Girder after

    Panel Erection

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    19/40

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    20/40

    Assemble RH Final &

    SH Final Tube Module

    Assemble RH Final &

    SH Final Tube Module

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    21/40

    InstallJack for

    Drum

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    22/40

    DRUM

    LIFTING

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    23/40

    Install

    Downcomer

    pipes (6ea)

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    24/40

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    25/40

    Assemble Back Pass Module

    (Hanger rods, roof panel, LTRH)Prepare the

    Assembling of

    SH DIV. Module

    Sequence of Modulization / Concurrent Installation

    S f M d li i / C I ll i

  • 7/31/2019 Erection of Boiler

    26/40

    Lift the Sub-

    assembled SH

    DIV. Module

    Sequence of Modulization / Concurrent Installation

    S f M d li i / C I ll i

  • 7/31/2019 Erection of Boiler

    27/40

    Install the Jack

    for SHP & RHP

    Sequence of Modulization / Concurrent Installation

    S f M d li ti / C t I t ll ti

  • 7/31/2019 Erection of Boiler

    28/40

    Sequence of Modulization / Concurrent Installation

    S f M d li ti / C t I t ll ti

  • 7/31/2019 Erection of Boiler

    29/40

    Sequence of Modulization / Concurrent Installation

    S f M d li ti / C t I t ll ti

  • 7/31/2019 Erection of Boiler

    30/40

    Install the Jack

    for Back Pass

    Module Lifting

    Sequence of Modulization / Concurrent Installation

    S f M d li ti / C t I t ll ti

  • 7/31/2019 Erection of Boiler

    31/40

    Install the Wire

    for Back Pass

    Module Lifting

    Sequence of Modulization / Concurrent Installation

    Seq ence of Mod li ation / Conc rrent Installation

  • 7/31/2019 Erection of Boiler

    32/40

    1st Lifting

    ofBack Pass

    Module

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    33/40

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    34/40

    Assemble the

    Back Pass

    Wall Panel

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    35/40

    SH tube

    bundle

    lifting

    Lower panel lifting

    Arch lifting

    Assemble BackPass LTRH

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    36/40

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    37/40

    Assemble Eco

    Tube, Eco Header

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    38/40

    Back Pass

    Module

    Final Lifting

    Sequence of Modulization / Concurrent Installation

    Sequence of Modulization / Concurrent Installation

  • 7/31/2019 Erection of Boiler

    39/40

    Install the

    Burner windbox,

    Low water panel,

    Hopper panel,Water inlet header,

    Suction inlet piping.

    Sequence of Modulization / Concurrent Installation