Jammu & Kashmir State Power Development Corporation Page 1
Implementation of Institutional Strengthening at JKSPDC Organization Structuring | Manpower Planning | Manpower Policy Version: 21-08-13
Ernst & Young | Performance Improvement | People & Organization
Jammu & Kashmir State Power Development Corporation Page 2
INTENTIONALLY LEFT BLANK
Jammu & Kashmir State Power Development Corporation Page 3
INTENTIONALLY LEFT BLANK
Jammu & Kashmir State Power Development Corporation Page 4
Contents 1 PART A: Organization Structuring
2 PART B: Manpower Planning
3 PART C: Manpower Policy
Jammu & Kashmir State Power Development Corporation Page 5
PART A: Organization Structuring
Jammu & Kashmir State Power Development Corporation Page 6
JKSPDC Business Plan
From existing installed O&M capacity of 759 MW,
JKSPDC plans to increase it by almost 5 times to
4488.5 MW by 2020
Upcoming Projects till 2020
S.No. Project Name Capacity (MW)
1. Sawalkote 1856 (1456 in Phase 1)
2. Kirthai II 930
3. BHEP II 450
4. Kirthai I 390
5. Barinium 230
6. Shous 215
7. Ujh 200
8. NGHEP 93
9. Parnai 37.5
10. Lower Kalnai 48
11. Karnah 12
12. Mohra 9
13. Hanu 9
14. Dah 9
Total Capacity Addition 4488.50 MW
Currently, JKSPDC has only 1 plant under O&M with
installed capacity above 200 MW (BHEP I)
By 2020, JKSPDC will have at least 8 plants under O&M
with installed capacity above 200 MW
To cater to this rapid growth in the next 7 years, JKSPDC should have effective project execution and proper operations & maintenance of its plants supported by functions like HR, Legal, IT, Finance, Commercial, Vigilance etc.
An Organization Structure aligned to its future needs, a phase-wise Manpower Plan as per the organization structure combined with an Manpower Policy to ensure skilled manpower is available for smooth project execution as well as operation & maintenance
Jammu & Kashmir State Power Development Corporation Page 7
Why Restructuring?
Business Imperatives Structural Implications
► Need to develop the capability of managing Large/Mega Projects (from Concept to Commissioning)
► Setting up Governance Mechanisms for maintaining checks & balances
► Ensuring funding for multiple project execution
► Ready for generating additional funds by external investment and getting listed
► Ensure high capacity index of all operational plants
► Manage multiple PPAs as JKSPDC moves from one customer model to multi-customer model
► Corporate structure should support field structure with overall policy guidance and support in day to day operations
► Structure needs to have a independent focus on identifying & developing new business opportunities
► Creation of structure to ensure timely completion of upcoming projects
► Need for strong focus on O&M for achieving and maintaining high capacity index for running plants
► Need for single point responsibility for managing commercial aspects
► Need to build synergy between various support functions in the organization and create single point responsibility for HR, IT, Finance etc.
Proposed Organization Structure for JKSPDC should take into account existing and future business imperatives and must be scalable in alignment with the organizational growth
Jammu & Kashmir State Power Development Corporation Page 8 Proposed Organization Structure
Jammu & Kashmir State Power Development Corporation Page 9
Existing Designations Proposed Designations NHPC Designations
Executive Director (ED) Director (D) Director (D)
- Executive Director (ED) Executive Director/General Manager (ED/GM)
Chief Engineer (CE) Chief General Manager (CGM) Chief Manager (CM)
Superintending Engineer (SE) General Manager (GM) Senior Manager (SM)
Executive Engineer (XEN) Sr. Deputy General Manager (SDGM)
Manager (M)
Assistant Executive Engineer (AEE) Deputy General Manager (DGM) Deputy Manager (DM)
Assistant Engineer (AE) Assistant General Manager (AGM) Assistant Manager Engineer/Officer (AM/E/O)
Junior Engineer (JE)
Manager (M)
Assistant Engineer/Assistant Officer (AE/AO) Supervisor/Supervisor Grade II/Supervisor Grade I (Supv.)
Proposed Designations With movement into Proposed Structure, JKSPDC will adopt new designations. Mapping of the existing designations to the new designations will be as shown below:
Jammu & Kashmir State Power Development Corporation Page 10 Corporate
Jammu & Kashmir State Power Development Corporation Page 11
Jammu & Kashmir State Power Development Corporation Page 12
Key Features of the Proposed Organization Structure
Provision of governance mechanism by creation of audit committee reporting to MD, with Internal Audit reporting to this committee. A strengthened vigilance function for additional checks and balances
1
Independent accountability for Pre-Execution phase including project identification, corporate planning, approvals and clearances, design etc.
2
Independent accountability for Execution phase including project execution, contracting, design support etc.
3
Independent accountability for Post Execution phase including operations & maintenance of plants
4
Creation of commercial function to support future aspirations of JKSPDC for multi consumer model 5
Strengthen Finance function to support organization’s growth 6
Creation of Human Resource Development function to aid organization’s capability building for growth 7
Strengthening of IT function 8
Jammu & Kashmir State Power Development Corporation Page 13
Proposed Structure: Corporate Top Level Board of Directors
Managing Director
Corporate Planning
Group Director (C)
Director Projects (C)
Director O&M (E)
Director Finance
Commercial CGM
Company Secretary*
GM
Legal GM
Human Resources CGM/GM
Audit Committee *Company Secretary to be the Secretary to the Audit Committee
Internal Audit CGM
Chief Vigilance
Officer GM
Pre Execution
Execution
Post Execution
Corporate Planning
IPP/Appraisal/Design/Clear
ances
Survey & Investigation
Information Technology
Environment
Geology
All Individual
Project Heads
Corporate Projects Support
Team
Region-wise Generation
Corporate O&M
Support Team
Trading
Regulatory
Billing
Project Finance
Financial Management
Accounting
Admin & Compliances
Human Resource
Development
IR & Welfare
Field Roles
Corporate Social
Responsibility
Director, Corporate Planning (Pre-execution), Director, Projects (Execution) and Director, O&M (Post-execution) will be functional Directors heading the specified wings of the corporation. They shall be appointed as Directors on the Board by the Government in accordance with the provisions of the Articles of Association
Jammu & Kashmir State Power Development Corporation Page 14
Proposed Structure: Corporate Planning Group Corporate
Planning Group 1 Director (C)
Corporate Planning 1 GM (C)
1 SDGM (C) 1 AGM
2 M
Design Support Cell
1 GM (C) 1 SDGM (C) 1 SDGM (E) 1 SDGM (M)
4 AGM 4 M
Information Technology
1 GM (IT) 2 SDGM (IT) 4 AGM (IT)
Survey & Investigation
1 GM (C) 1 SDGM (C) 1 AGM (C)
2 M (C)
S&I Jammu 1 SDGM (C) 2 AGM (C)
4 M (C)
S&I Kashmir 1 SDGM (C) 2 AGM (C)
4 M (C)
Mechanical Support for S&I
Machinery 1 SDGM (M)
2DGM/AGM(M) 4 M (M)
Field Roles
Environment (Forest/Environme
nt Officer) 1 AGM
1 Forest Official
Centralized Geology 1 GM (G)
1 DGM (G) 2 AGM (G)
Geology Jammu 1 SDGM (G) 2 AGM (G)
4 M (G)
Geology Kashmir
1 SDGM (G) 2 AGM (G)
4 M (G)
Geology Ladakh 1 SDGM (G) 2 AGM (G)
4 M (G
Field Roles
CPE Ladakh 1 GM (C)
Centralized focus on S&I from Corporate Office
Single Design Cell for JKSPDC, responsible for Design, IPPs and Appraisals
Additional Manpower for ERP might be provided as and when required
Jammu & Kashmir State Power Development Corporation Page 15
Proposed Structure: Corporate Planning Group
Manpower Numbers
Designation
Electrical Civil Mechanical Geology IT
Proposed
Sanctione
d
Additional Requirement
Proposed
Sanctione
d
Additional Requirement
Proposed
Sanctione
d
Additional Requirement
Proposed
Sanctione
d
Additional Requirement
Proposed
Sanctione
d
Additional Requirement
ED 1 0 1
CGM 1 3 -3
GM 3 0 3 1 1 0 1 0 1
SDGM 1 0 1 5 6 -1 2 2 0 3 3 0 2 0 2
DGM 0 32 -32 1 9 -8 1 0 1
AGM 2 0 2 7 3 4 2 1 1 8 7 1 4 0 4
Manager 2 0 2 13 61 -48 5 17 -12 12 14 -2 0 1 -1
Total 5 0 5 29 105 -76 10 29 -19 25 25 0 7 1 6
Jammu & Kashmir State Power Development Corporation Page 16
Proposed Structure: Projects (Corporate & Field Top Level) Director
Projects (C)
Project Head BHEP II 1 ED (C)
Project Head Sawalkote
1 ED (C)
Project Head Kirthai I & II
1 ED (C)
Project Head Barinium 1 CGM (C)
Project Head Shous
1 CGM (C)
Project Head Ujh
1 CGM (C)
Project Head Mohra
1 GM (C)
Project Head Lower Kalnai
1 CGM (C)
Project Head Parnai
1 CGM (C)
Project Head NGHEP
1 CGM (C)
Project Head Karnah
1 GM (C)
CPE Ladakh
(Dah/Hanu) 1 GM (C)
Field Roles
Project Management 1 SDGM (C)
3 AGM/DGM (C) 1 AGM/ DGM (E) 1 AGM/ DGM (M)
Contracts Policy & Project Contracts
1 GM (C) 1 SDGM (E) 1 SDGM (M)
2 AGM/DGM (C) 1 AGM/DGM (E) 1 AGM/DGM (M)
4 M
QA&I and SHE 1 SDGM (C)
Corporate Roles
Mega Projects (>350 MW)
Large (25-350 MW)
Small Projects (< 25 MW)
Expected Date of Commissioning
2015 2016 2017 2018 2019 2020 2021
Project Name BHEP II - Hanu Dah Lower Kalnai Parnai
NGHEP Kirthai I Karnah Mohra
Kirthai II Sawalkote Barinium Shous Ujh
Jammu & Kashmir State Power Development Corporation Page 17
Proposed Structure: O&M/Plants (Corporate & Field) Director O&M (E)
Field Roles
O&M Jammu
1 CGM (E)
O&M Kashmir
1 CGM (E)
O&M Ladakh
1 CGM (E)
O&M BHEP I
1 ED (E)
Maintenance / Gen. Planning/Monitoring
1 SDGM (E) 1 DGM (E)
1 DGM (M) 1 DGM (C)
3 M
Generation Jammu
1 GM (E)
Civil Mtc. Jammu
1 GM (C)
Generation Kashmir 1 GM (E)
Civil Mtc. Kashmir 1 GM (C)
RMU/O&M Contracts 1 GM (E)
1 SDGM (C) 1 DGM (E) 1 DGM (C) 1 DGM(M)
3 M
Tech. Documentation
1 DGM (E) 1 AGM (C)
2 M
2013
O&M Kirthai I & II
1 ED (E)
O&M Sawalkote
1 ED (E)
Corporate Roles
Director O&M (E)
Field Roles
O&M Jammu
1 CGM (E)
O&M Kashmir
1 CGM (E)
O&M Ladakh
1 CGM (E)
O&M BHEP I & II
1 ED (E)
Maintenance / Gen. Planning/Monitoring
1 SDGM (E) 1 DGM (E)
1 DGM (M) 1 DGM (C)
3 M
Generation Jammu
1 GM (E)
Civil Mtc. Jammu
1 GM (C)
Generation Kashmir 1 GM (E)
Civil Mtc. Kashmir 1 GM (C)
RMU/O&M Contracts 1 GM (E)
1 SDGM (C) 1 DGM (E) 1 DGM (C) 1 DGM(M)
3 M
Tech. Documentation
1 DGM (E) 1 AGM (C)
2 M
2021
Corporate Roles
Jammu & Kashmir State Power Development Corporation Page 18
Proposed Structure: Corporate Support for Projects and O&M
Manpower Numbers
Designation
Electrical Civil Mechanical
Proposed
Sanctioned
Additional
Requirement
Proposed
Sanctioned
Additional
Requirement
Proposed
Sanctioned
Additional
Requirement
Director 1 0 1 1 0 1
ED 1 -1 0 1 -1
CGM
GM 1 1 0 1 1 0
SDGM 1 1 0 3 0 3 1 0 1
DGM 5 0 5 4 0 4 4 0 4
AGM 1 0 1 5 0 5 1 0 1
Manager 3 0 3 4 0 4 1 0 1
Total 12 3 9 18 2 16 7 0 7
Jammu & Kashmir State Power Development Corporation Page 19
Proposed Structure: Commercial Commercial
1 CGM (C/E/M/Other)
Trading, PPA signing
1 DGM (C/E/M) 1AGM
1 M
Regulatory 1 DGM (E)
1AGM 2 M
Billing 1 DGM (C/E/M)
1 AGM 1 AGM
(Accounts) 1 M
Manpower Numbers
Designation
Electrical Accounts Any Cadre
Proposed
Sanctioned
Additional
Requirement
Proposed
Sanctioned
Additional
Requirement
Proposed
Sanctioned
Additional
Requirement
CGM 1 0 1
GM
SDGM 1 0 1 2 0 2
DGM
AGM 1 0 1 1 0 1 2 0 2
Manager 2 0 2 2 0 2
Total 4 0 4 1 0 1 7 0 7
Jammu & Kashmir State Power Development Corporation Page 20
Proposed Structure: Finance & HR
Director Finance
Project Finance 1 SDGM 1 AGM
Financial Management
1 SDGM
Accounting 1 SDGM
Working Capital
Management 1 AGM
Budgeting 1 AGM
Statutory Audit & Balance
Sheet 1 AGM
Pre-check 1 AGM
Human Resources
1 CGM
CSR 1 DGM
Admin & Compliances
1 DGM
IR & Welfare 1 DGM
Human Resource
Development 1 DGM
Finance Human Resources
Jammu & Kashmir State Power Development Corporation Page 21
Proposed Structure: Finance & HR
Manpower Numbers
Designation
HR Finance
Proposed Sanctioned Additional
Requirement Proposed Sanctioned
Additional Requirement
Director 1 1 0
CGM 1 0 1
GM 0 2 -2
SDGM 3 0 3
DGM 4 1 3 13 8 5
AGM 7 2 5
Total 5 1 4 14 3 11
The requirement of Posts to be reassessed
Jammu & Kashmir State Power Development Corporation Page 22
Proposed Structure: Internal Audit, CS, Legal, Vigilance
Internal Audit 1 CGM
Secretarial
1 AGM
Company Secy.
1 GM/DGM
Proprietary Audit
1 AGM
Financial Audit
1 AGM
Technical Audit
1 SDGM
Legal 1 GM
Contracts
1 DGM
1 AGM
Litigation
1 DGM
1 AGM
Arbitration
1 DGM
Internal Audit
Legal
Company Secy.
Vigilance
Chief Vigilance Officer 1 GM
Technical Vigilance Officer
1 SDGM (E)
Technical Vigilance Officer
1 SDGM (C)
Admin./Finance Support
1 DGM
CS will be inducted as DGM, will be promoted to GM subsequently
Jammu & Kashmir State Power Development Corporation Page 23
Proposed Structure: Internal Audit, CS, Legal, Vigilance
Manpower Numbers
Designation
(Electrical/Civil/Mechanical) Finance Other (Legal/
Company Secy.)
Proposed Sanctione
d
Additional Requireme
nt Proposed
Sanctioned
Additional Requireme
nt Proposed
Sanctioned
Additional Requireme
nt
Director
CGM 1 1 0
GM 1 0 1 1 0 1 2 2 0
SDGM 2 0 2
DGM 2 0 2 3 0 3
AGM 2 0 2 3 0 3
Total 3 0 3 5 0 5 8 2 6
Jammu & Kashmir State Power Development Corporation Page 24 Field
Jammu & Kashmir State Power Development Corporation Page 25
Projects & Plants Classification as per Capacity
Mega Plants Large Plants Medium Plants Small Plants Mini Plants
Capacity = > 350MW
Capacity (>100 MW – 350 MW)
Capacities (>25 MW – 100 MW)
Capacity (=>2 MW– 25 MW)
Capacity<2 MW
BHEP I LJHP USHP II
CHENANI I,II & III KARNAH SEWA III USHP – I GANDERBAL PAHALGAM STAKNA IQBAL IGO-MARCELLONG
BHADERWAH HAFTAL MARPACHOO BAZGO HUNDAR SUMOOR
Mega Projects Large Projects Small Projects
Capacity = > 350MW Capacity (25 MW – 350 MW) Capacity (2 MW– 25 MW)
SAWALKOTE, KIRTHAI II, BHEP II, KIRTHAI I
BARINIUM, SHOUS, UJH,NGHEP, PARNAI, LOWER KALNAI
KARNAH, MOHRA, HANU, DAH
Plants
Projects
Jammu & Kashmir State Power Development Corporation Page 26
Proposed Norms Manpower Norms
Component Executive Technical HR/Fin/Support Non-Executive
Technical Total
Projects
Mega-Peak 81 37 296 414
Mega-Initial 81 19 148 248
Large-Peak 81 19 296 396
Large-Initial 81 19 148 248
Small-Peak 40 - 186 226
Small-Initial 40 - 92 132
Plants
Mega 54 37 204 295 Large 25 19 188 232 Medium 15 4 121 140
Small 8 - 53 61
Mini 16
*shared between a cluster of 3 plants
- 40
*shared between a cluster of 3 plants
56 *shared between a cluster of 3 plants
Jammu & Kashmir State Power Development Corporation Page 27 Proposed Norms: Executive (Projects)
Jammu & Kashmir State Power Development Corporation Page 28
Proposed Norms: Projects- Mega
HR &
Administration
Finance /
Accounts and IT
Medical
Electromechanical Package 1 GM
(E)
Evacuation & Construction
Power
1 SDGM (E)
3 DGM (E)
12 Mgr. (E)
Project Head
1 ED (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)
HRT & Water Canal
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Infrastructure
(Access Road and Township)
1 SDGM (C)
2 DGM (C)
4 Mgr. (C)
Hydro mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)
Land Acquisition
1 Collector
Electrical Works
1 SGM (E)
2 DGM (E)
4 Mgr. (E)
DAM/ Intake
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Power House/TRT
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Geology
1 Geologist/1 Asst.
Geologist
2 Geology Assistants
Support Staff
Proposed Norms-Executive
CGM GM SDGM DGM AGM Mgr.
CE SE EE AEE AE JE
Electrical 1 2 6 16
Mechanical 1 3 1 6
Civil 1 5 13 26
Total 1 1 8 22 1 48
81
Jammu & Kashmir State Power Development Corporation Page 29
Proposed Norms: Projects- Large
HR &
Administration
Finance /
Accounts and IT
Medical
Electromechanical Package 1 GM
(E)
Evacuation & Construction
Power
1 SDGM (E)
3 DGM (E)
12 Mgr. (E)
Project Head
1 CGM (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)
HRT & Water Canal
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Infrastructure
(Access Road and Township)
1 SDGM (C)
2 DGM (C)
4 Mgr. (C)
Hydro mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)
Land Acquisition
1 Collector
Electrical Works
1 SGM (E)
2 DGM (E)
4 Mgr. (E)
DAM/ Intake
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Power House/TRT
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Geology
1 Geologist/1 Asst.
Geologist
2 Geology Assistants
Support Staff
Proposed Norms-Executive
CGM GM SDGM DGM AGM Mgr.
CE SE EE AEE AE JE
Electrical 1 2 6 16
Mechanical 1 3 1 6
Civil 1 5 13 26
Total 1 1 8 22 1 48
81
Jammu & Kashmir State Power Development Corporation Page 30
Proposed Norms: Projects- Small
HR &
Administration
Finance /
Accounts and IT
Medical
Project Head
1 GM (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 DGM (C ), 2 Mgr. (C ), 1 Mgr. (M), 1 Mgr. (E)
Diversion/Water Conductor
1 SDGM (C)
Electromechanical Works
1 SDGM (E)
Hydro mechanical Works
1 SDGM (M)
Land Acquisition
1 Collector
Power House/TRT
1 SDGM (C)
Diversion Structure
1 DGM (C)
3 Mgr. (C)
Water Conductor
1 DGM (C)
3 Mgr. (C)
Power-House and Tail Race
1 DGM (C)
3 Mgr. (C)
Hydro mechanical 1 DGM (M) 2
Mgr. (M)
Workshop/Transport
1 DGM (M)
2 Mgr. (M)
Electrical Erection 1 DGM (E) 3
Mgr. (E)
Evacuation and Construction Power
1 DGM (E), 3 Mgr. (E)
Support Staff
Forebay/Penstock/Infrastructure and
Townships
1 DGM (C)
3 Mgr. (C)
Proposed Norms-Executive
GM SDGM DGM M
SE EE AEE JE
Electrical 1 2 7
Mechanical 1 2 5
Civil 1 2 5 14
Total 1 4 9 26
40
Jammu & Kashmir State Power Development Corporation Page 31 Proposed Norms: Technical Non-Executive (Projects)
Jammu & Kashmir State Power Development Corporation Page 32
Proposed Norms: Projects- Mega/Large
Area Sub-Area Peak Stage Initial Stage
Technician Operator Helper Technician Operator Helper
EM Construction
Evacuation & Construction Power
6 8 8 3 4 4
Electrical Works 2 28 1 14
Supervision 2 14 1 7
Civil Construction
HRT & Water Canal 12 12 24 6 6 12
Dam/Intake 12 12 24 6 6 12
Powerhouse/TRT 12 12 24 6 6 12
HM Construction
HM Works 12 12 24 6 6 12
Infrastructure
Construction Infrastructure Works 8 8 16 4 4 8
Support Services
Stores 4 2
Workshop 8 8 12 4 4 6
Total 66 64 166 33 32 83
296 148
Jammu & Kashmir State Power Development Corporation Page 33
Proposed Norms: Projects- Small
Area Sub-Area Peak Stage Initial Stage
Technician Operator Helper Technician Operator Helper
EM Construction
Evacuation & Construction
Power 6 1 1 3
Supervision 6 6 6 3 3 3
Civil Construction
Diversion Structure/Wate
r Conductor 12 12 24 6 6 12
Powerhouse/TRT
12 12 24 6 6 12
HM Construction
HM Works 8 8 16 4 4 8
Support Services
Stores 4 2
Workshop 8 8 12 4 4 6
Total 52 47 87 26 23 43
186 92
Jammu & Kashmir State Power Development Corporation Page 34
No. of Projects Phasing Type of Plant 2013 2015 2017 2019 2021
Mega Peak
2 4 3 2
BHEP-II, Kirthai-I BHEP-II, Kirthai-I,
Kirthai-II, Sawalkote Kirthai-I, Kirthai-II,
Sawalkote Kirthai-II, Sawalkote
Mega Initial
2
Kirthai-II, Sawalkote
Large Peak
3 3 4 3
Lower Kalnai, NGHEP, Parnai
Lower Kalnai, NGHEP, Parnai
NGHEP, Shous , Barinium, Ujh
Shous , Barinium, Ujh
Large Initial
3
Shous , Barinium, Ujh
Small Peak
2 2 2
Dah, Hanu Dah, Hanu Mohra, Karnah
Small Initial
2
Mohra, Karnah
Total Number 14
Remarks Peak Stage: 7 Projects Initial Stage: 2 Projects
Peak Stage: 9 Projects Initial Stage: 5 Projects
Peak Stage: 9 Projects
Peak Stage: 5 Projects
Jammu & Kashmir State Power Development Corporation Page 35
Non-Exec Phasing
Year-> 2013 2015 2017 2019 2021
Type of Plant T O H T O H T O H T O H T O H
Mega-Peak 132 128 332 264 256 664 198 192 498 132 128 332
Mega-Initial 66 64 166
Large-Peak 198 192 498 198 192 498 264 256 664 198 192 498
Large-Initial 99 96 249
Small-Peak 104 94 174 104 94 174 104 94 174
Small-Initial 52 46 86
Total 500 478 1170 717 684 1671 566 542 1336 330 320 830 0 0 0
T Technician
O Operator
H Helper
Jammu & Kashmir State Power Development Corporation Page 36 Proposed Norms: Executive Plants
Jammu & Kashmir State Power Development Corporation Page 37
Proposed Norms: Plants- Mega
Operation & Maintenance
1 SDGM (E)
HR &
Administration
Finance /
Accounts and IT
Medical
Operations
(For 4 Shifts)
4 DGM (E), 12 Mgr.(E)
4 Mgr. (M)
1 DGM ( C) – Dam and P/H
1 DGM ( C) – Roads, Colony
1 Mgr. ( C) – Dam
1 Mgr. (C) – Power House
1 Mgr. ( C) – Roads & Colony
Main Plant Maintenance
2 DGM (E) for E/M
1 DGM (E) – Automation
1 DGM (M) Turbine, Spiral casing
2 Mgr. (E) – Automation
1 Mgr. (E) – Generator Excitation/UAT
1 Mgr. (E) – Pothead/11 KV outdoor
1 Mgr. (E) – Transformation/GIS/AuxillarySupply, AC/DC
1 Mgr. (E) Instrumentation of Dam Control
1 Mgr. (M) – Turbines,
1 ED (E)
1 GM (E) Head Planning, Procurement, Scheduling & Billing
1 SDGM (E), 1 DGM (E) , 3 Mgr.
Civil (Maintenance)
1 SDGM (C)
1 DGM (M) – All Gates
1 DGM (M) – Workshop & Transport
1 Mgr. (M) – Transport
1 Mgr. (M) – Workshop
1 Mgr. (M) – Dam
1 Mgr. (M) – Elevators & Cranes
Mechanical (Maintenance)
1 SDGM (C)
1 DGM (E) – Stores
1 DGM(E) – Field
4 Mgr. (E) – Stores/Field
Line 400 KV
1 SDGM (E)
Proposed Norms-Exec
ED GM SDGM DGM Mgr.
ED SE EE AEE JE
Electrical 1 1 2 10 13
Mechanical
0 0 1 3 9
Civil 0 0 1 2 3
Total 1 1 4 15 25 + 8*
54
*Additional 8 JEs – Training/Reserve
Proposed Norms-Exec
Support Function
DGM AGM Mgr.
Finance 1 2 4
HR 1 2 4
IT 1 2
Medical 1
Total 2 6 10
18
Jammu & Kashmir State Power Development Corporation Page 38
Proposed Norms: Plants- Large
Plant Head
1 SDGM (E)
Operations Head
1 DGM (E)
Shift In-Charge 1 AGM (E) & 4 Mgr. (E)
Electrical Maintenance Head
1 DGM (E)
Electrical Maintenance 2 Mgr. (E)
Mechanical Maintenance Head
1 DGM (M)
Mechanical Maintenance
2 Mgr.. (M)
Planning, Procurement , Stores and Scheduling
1 DGM (E) 2 Mgr. (E)
2 DGM (C) 1 AGM (C) 5 Mgr. (C)
Civil Maintenance Head
1 SDGM (C)
Civil Mech. Electrical Total
SDGM 1 0 1 2
DGM 2 1 3 6
AGM 1 0 1 2
Mgr. 5 2 8 15
25
Jammu & Kashmir State Power Development Corporation Page 39
Proposed Norms: Plants- Medium
Plant Head
1 SDGM (E)
Operations Head 1 DGM (E)
Shift In-Charge 4 Mgr. (E)
Electro-Mechanical Maintenance Head
1 DGM (E)
Electro-Mechanical Maintenance
1 Mgr. (E), 1 Mgr.(M)
Planning, Procurement, Stores and Scheduling
1 DGM (E) 1 Mgr. (E)
Civil Maintenance 1 DGM (C) 2 Mgr. (C)
Civil Maintenance Head
1 SDGM (C)
Civil Mech. Electrical Total
SDGM 1 0 0 1
DGM 1 0 1 2
AGM 0 0 3 3
Mgr. 2 1 6 9
15
Jammu & Kashmir State Power Development Corporation Page 40
Proposed Norms: Plants- Small
Plant Head
1 DGM (E)
Operations Head
1 Mgr. (E)
Electro-Mechanical Maintenance & Stores 1 Mgr. (E), 1 Mgr. (M)
CMD Head 1 SDGM (C)
Civil Maintenance
1 DGM (C) and 2 Mgr. (C)
Civil Mech. Electrical Total
SDGM 1 1
DGM 1 1 2
AGM
Mgr. 2 1 2 5
Total 4 1 3 8
8
Jammu & Kashmir State Power Development Corporation Page 41
Proposed Norms: Plants- Mini
Plant Head
1 SDGM (E)
Ops. Head
Mini Plant 1
1 AGM(E)
Ops Head
Mini Plant 2
1 AGM (E)
Ops. Head
Mini Plant 3
1 AGM(E)
Common Electro-Mechanical Maintenance 1 DGM (E), 2 Mgr. (E), 1 Mgr.(M)
Shift Incharge
1 Mgr. (E)
Shift Incharge
1 Mgr. (E)
Shift Incharge
4 Mgr. (E)
Civil Maintenance
1 Mgr.(C)
CMD MP1,2,3 1 SDGM (C)
Civil Maintenance
1 Mgr. (C)
Planning, Procurement, Scheduling & Stores
1 AGM (E) 1 Mgr. (E)
Civil Mech. Electrical Total
SDGM 1 1 2
DGM 1 1
AGM 4 4
Mgr. 2 1 6 9
Total 3 1 12 16
16
Manpower requirement for Mini Power Plants had been calculated basis the actual analysis of JKSPDC plants and their current context. Most of the Mini Plants are in Ladakh region and the norm has been provided keeping that in mind. In future, majority of the plants are either Large or Mega. However, as suggested, reporting of Mini Plants to SDGM (E) and SDGM (C) should be done on case to case basis considering practical and geographical constraints
Jammu & Kashmir State Power Development Corporation Page 42
Support to CGM and GM
CGM/GM Support Norms
Unit Total SDGM AGM Personal Assistant
Steno
CGM 4
2 (1
Electrical, 1 Civil)
1 1
GM 2 1 1
Jammu & Kashmir State Power Development Corporation Page 43 Proposed Norms: Technical Non-Executive Plants
Jammu & Kashmir State Power Development Corporation Page 44
Proposed Norms: Plants- Mega
Area Technicians Operators Helpers
Powerhouse Operations
32 (8 per shift X 4
shifts)
Electrical Maintenance
8 6 14
Civil Maintenance 20 12 20
Mechanical Maintenance
12 12 24
Switchyard Operations & Maintenance
8 6 6
Peripheral Services 16
Stores 8
Total 48 68 88
204
Jammu & Kashmir State Power Development Corporation Page 45
Proposed Norms: Plants- Large Area Sub-Area Technician Operator Helper
Hydro Works
Head Works Stage 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts)
Gate Operation 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts)
Forebay Tank/Balancing Reservoir
4 (1 per shift x 4 shifts)
Powerhouse
Control Room 8 ( 2 per shift x 4 shifts) 4 (1 per shift x 4 shifts) Machine Hall/UCB Floor 12 ( 3 per shift x 4 shifts)
Minus Floor 4 (1 per shift x 4 shifts)
Disc Valve floor 4 (1 per shift x 4 shifts)
Turbine/Compressors
Inside/Outside Dewatering
Switchyard Switchgears for Transformers 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts)
Receiving Station
Receiving Station33 KV 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts)
Auxiliary Services
LT Supplies Illuminations/11
KV/33KV/Telephone Lines/Erector
1 2
Water Supply DG Set 4 (1 per shift x 4 shifts) 4 (1 per shift x 4 shifts)
Peripheral Services
Sweepers 2
Gardener 4
Maintenance
Mechanical Maintenance 5 8
Electrical Maintenance 6 10
Civil Maintenance 9 29 18
Stores Stores 4
Total 65 53 70 188
Jammu & Kashmir State Power Development Corporation Page 46
Proposed Norms: Plants- Medium Area Sub-Area Technician Operator Helper
Hydro Works Head Works Stage 12 (3 per shift X 4 shifts)
Gate Operation 2
Forebay Tank/Balancing Reservoir 12 (3 per shift X 4 shifts)
Powerhouse
Control Room 4 (1 per shift X 4 shifts)
Machine Hall 8 (2 per shift X 4 shifts) 4 (1 per shift X 4 shifts)
Minus Floor/UCB Floor 4 (1 per shift X 4 shifts)
Disc Valve floor
turbine/Compressors
Inside/Outside Dewatering
Switchyard Switchgears for Transformers 4 (1 per shift X 4 shifts)
Receiving Station
Receiving Station33 KV
Auxiliary Services
LT Supplies Illuminations 3 Water Supply
DG Set
Peripheral Services
Sweepers 2
Gardener 1
Maintenance
Mechanical Maintenance 4 6
Electrical Maintenance 4 4
Civil Maintenance 5 20 18
Stores Stores 4
Total 36 50 35
121
Jammu & Kashmir State Power Development Corporation Page 47
Proposed Norms: Plants- Small Area Sub-Area Technician Operator Helper
Hydro Works Head Works Stage
Gate Operation 1 Forebay Tank/Balancing Reservoir 4 (1 per shift X 4 shifts)
Powerhouse
Control Room 4 (1 per shift X 4 shifts) Machine Hall 8 (2 per shift X 4 shifts)
Minus Floor/UCB Floor
Disc Valve floor
turbine/Compressors
Inside/Outside Dewatering
Switchyard Switchgears for Transformers
Receiving Station
Receiving Station 132/33/11 KV 1 1
Auxiliary Services
LT Supplies Illuminations Water Supply
DG Set
Peripheral Services
Sweepers 1
Gardener
Maintenance
Mechanical Maintenance 1 1
Electrical Maintenance 1 1
Civil Maintenance 3 16 6
Stores Stores 4
Total 18 22 13
53
Jammu & Kashmir State Power Development Corporation Page 48
Proposed Norms: Plants- Mini Area Sub-Area Technician Operator Helper
Hydro Works
Head Works Stage
Gate Operation 1
Forebay Tank/Balancing Reservoir 4 (1 per shift X 4 shifts)
Powerhouse
Control Room 4 (1 per shift X 4 shifts) Machine Hall 8 (2 per shift X 4 shifts)
Minus Floor/UCB Floor
Disc Valve floor
turbine/Compressors
Inside/Outside Dewatering Switchyard Switchgears for Transformers Receiving
Station Receiving Station 132/33/11 KV 1 1
Auxiliary Services
LT Supplies Illuminations Water Supply
DG Set
Peripheral Services
Sweepers 1
Gardener
Maintenance
Mechanical Maintenance 1 1
Electrical Maintenance 1 1
Civil Maintenance 2 4 6
Stores Stores 4
Total 17 10 13
40
Jammu & Kashmir State Power Development Corporation Page 49
Proposed Norms: Summary
Type of Plant Technician Operator Helper Total
Mega (>=350 MW)
48 68 88 204
NHPC Norms (>500 MW)
172 68 240
Large (100-350 MW)
65 53 70 188
NHPC Norms (100-500 MW)
140 60 200
Medium (25-100 MW)
36 50 35 121
NHPC Norms (11-100 MW)
106 42 148
Small (2-25 MW)
18 22 13 53
NHPC Norms (<10 MW)
36 18 54
Mini (<2 MW)
17 10 13 40
NHPC Norms NA NA NA NA
Jammu & Kashmir State Power Development Corporation Page 50
No. of Plants Phasing Type of Plant 2013 2015 2017 2019 2021
Mega 1 1 2 3 5
BHEP-I BHEP-I BHEP-I, BHEP-II BHEP-I, BHEP-II,
Kirthai-I
BHEP-I, BHEP-II, Kirthai-I, Kirthai-II,
Sawalkote
Large 2 2 2 2 5
LJHP, Kangan LJHP, Kangan LJHP, Kangan LJHP, Kangan LJHP, Kangan, Shous,
Barinium, Ujh
Medium 3 3 5 6 6
Chenani-I, Sumbal, Ganderbal
Chenani-I, Sumbal, Ganderbal
Chenani-I, Sumbal, Ganderbal, Lower
Kalnai, Parnai
Chenani-I, Sumbal, Ganderbal, Lower
Kalnai, Parnai, NGHEP
Chenani-I, Sumbal, Ganderbal, Lower
Kalnai, Parnai, NGHEP
Small 2 2 4 6 6
Chenani-II, Pahalgam Chenani-II, Pahalgam Chenani-II, Pahalgam,
Dah, Hanu
Chenani-II, Pahalgam, Dah, Hanu, Karnah,
Mohra
Chenani-II, Pahalgam, Dah, Hanu, Karnah,
Mohra
Mini 12 12 12 12 12
Bhaderwah, Karnah, Chenani-III, Sewa-III, Marpachoo, Stakna,
Iqbal, Igo, Bazgo, Sumoor, Hundar, Haftal
Bhaderwah, Karnah, Chenani-III, Sewa-III, Marpachoo, Stakna,
Iqbal, Igo, Bazgo, Sumoor, Hundar, Haftal
Bhaderwah, Karnah, Chenani-III, Sewa-III, Marpachoo, Stakna,
Iqbal, Igo, Bazgo, Sumoor, Hundar, Haftal
Bhaderwah, Karnah, Chenani-III, Sewa-III, Marpachoo, Stakna,
Iqbal, Igo, Bazgo, Sumoor, Hundar, Haftal
Bhaderwah, Karnah, Chenani-III, Sewa-III, Marpachoo, Stakna,
Iqbal, Igo, Bazgo, Sumoor, Hundar, Haftal
Total Number 20 20 25 29 34
Remarks Existing 20 Plants
No Addition BHEP-II will transition
from Project to Plant in this year
Addition of 5 Plants BHEP-II
Lower Kalnai Parnai
Dah Hanu
Addition of 4 Plants Kirthai-I NGHEP Karnah Mohra
Addition of 5 Plants Kirthai-II
Sawalkote Shous
Barinium Ujh
Jammu & Kashmir State Power Development Corporation Page 51
Technical Non-Exec Phasing
Year-> 2013 2015 2017 2019 2021
Type of Plant T O H T O H T O H T O H T O H
Mega 48 68 88 48 68 88 96 136 176 144 204 264 240 340 440
Large 130 106 140 130 106 140 130 106 140 130 106 140 325 265 350
Medium 108 150 105 108 150 105 180 250 175 216 300 210 216 300 210
Small 36 44 26 36 44 26 72 88 52 108 132 78 108 132 78
Mini 204 120 156 204 120 156 204 120 156 204 120 156 204 120 156
Total 526 488 515 526 488 515 682 700 699 802 862 848 1093 1157 1234
T Technician
O Operator
H Helper
Jammu & Kashmir State Power Development Corporation Page 52 Proposed Norms: Non Technical Non-Executive Corporate & Field
Jammu & Kashmir State Power Development Corporation Page 53
Proposed Norms Corporate: Administration & Finance
Administrative Staff Norms
Unit Total Supdt. Assistant
CSR 2 1 1
IR & Welfare 2 1 1
HRD 2 1 1
Administration & Compliances
2 1 1
Finance & Accounts Staff Norms
Unit Total Accountant
Project Finance 1 1
Financial Management 2 2
Accounting 2 2
Jammu & Kashmir State Power Development Corporation Page 54
Proposed Norms Field: Administration & Finance
Administrative Staff Norms
Unit Total Executive Circle Supdt./Personal
Officer Circle Assistant LDC/UDC
Mega Plants/Projects 15 7 - 4 4
Circle/Large Plants/Projects
9 - 1 4 4
Division/ Medium Plants 2 - 1 1
Finance & Accounts Staff Norms
Unit Total Accounts Officer Assistant Accounts
Officer Divisional Accountant Accounts Assistant
Mega Plants/Projects 10 1 3 - 3
Circle/Large Plants/Projects
10 1 3 - 3
Division/ Medium Plants 2 - - 1 1
No of Circle/Mega/Large/Medium Plants/Divisions
Unit 2013 2015 2017 2019 2021
Circle 6 6 6 6 6
Mega Plants 1 1 2 3 5
Large Plants 2 2 2 2 5
Medium Plants 3 3 5 6 6
Divisions 13 13 13 13 13
Jammu & Kashmir State Power Development Corporation Page 55
Non Technical Non-Exec Phasing
Year-> 2013 2015 2017 2019 2021
Type of Plant Admin Finance Admin Finance Admin Finance Admin Finance Admin Finance
Corporate 8 5 8 5 8 5 8 5 8 5
Circles 54 60 54 60 54 60 54 60 54 60
Mega Plants 9 10 9 10 18 20 27 30 45 50
Large Plants 18 20 18 20 18 20 18 20 45 50
Divisions 26 26 26 26 26 26 26 26 26 26
Medium Plants 6 6 6 6 10 10 12 12 12 12
Total 121 127 121 127 134 141 145 153 190 203
Jammu & Kashmir State Power Development Corporation Page 56 Projects
Jammu & Kashmir State Power Development Corporation Page 57
Proposed Structure: BHEP II, SAWALKOTE
HR &
Administration
Finance /
Accounts and IT
Medical
Electromechanical Package 1 GM
(E)
Evacuation & Construction
Power
1 SDGM (E)
3 DGM (E)
12 Mgr. (E)
Project Head
1 ED (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)
HRT & Water Canal
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Infrastructure
(Access Road and Township)
1 SDGM (C)
2 DGM (C)
4 Mgr. (C)
Hydro mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)
Land Acquisition
1 Collector
Electrical Works
1 SDGM (E)
2 DGM (E)
4 Mgr. (E)
DAM/ Intake
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Power House/TRT
1 SDGM (C)
3 DGM(C)
6 Mgr. (C)
Geology
1 Geologist/1 Asst.
Geologist
2 Geology Assistants
Support Staff
Jammu & Kashmir State Power Development Corporation Page 58
Proposed Structure: KIRTHAI I, KIRTHAI II (Common ED but separate staff below ED)
HR &
Administration
Finance /
Accounts and IT
Medical
Electromechanical Package 1 GM
(E)
Evacuation & Construction
Power
1 SDGM (E)
3 DGM (E)
12 Mgr. (E)
Project Head
1 ED (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)
HRT & Water Canal
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Infrastructure
(Access Road and Township)
1 SDGM (C)
2 DGM (C)
4 Mgr. (C)
Hydro mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)
Land Acquisition
1 Collector
Electrical Works
1 SDGM (E)
2 DGM (E)
4 Mgr. (E)
DAM/ Intake
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Power House/TRT
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Geology
1 Geologist/1 Asst.
Geologist
2 Geology Assistants
Support Staff
Jammu & Kashmir State Power Development Corporation Page 59
Proposed Structure: BARINIUM, SHOUS, UJH, NGHEP, PARNAI, LOWER KALNAI
HR &
Administration
Finance /
Accounts and IT
Medical
Electromechanical Package 1 GM
(E)
Evacuation & Construction
Power
1 SDGM (E)
3 DGM (E)
12 Mgr. (E)
Project Head
1 CGM (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)
HRT & Water Canal
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Infrastructure
(Access Road and Township)
1 SDGM (C)
2 DGM (C)
4 Mgr. (C)
Hydro mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)
Land Acquisition
1 Collector
Electrical Works
1 SDGM (E)
2 DGM (E)
4 Mgr. (E)
DAM/ Intake
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Power House/TRT
1 SDGM (C)
3 DGM (C)
6 Mgr. (C)
Geology
1 Geologist/1 Asst.
Geologist
2 Geology Assistants
Support Staff
Jammu & Kashmir State Power Development Corporation Page 60
Proposed Structure: KARNAH, MOHRA
HR &
Administration
Finance /
Accounts and IT
Medical
Project Head
1 GM (C)
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 DGM (C ), 2 Mgr. (C ), 1 Mgr. (M), 1 Mgr. (E)
Diversion/Water Conductor
1 SDGM (C)
Electromechanical Works
1 SDGM (E)
Hydro mechanical Works
1 SDGM (M)
Land Acquisition
1 Collector
Power House/TRT
1 SDGM (C)
Diversion Structure
1 DGM (C)
3 Mgr. (C)
Water Conductor
1 DGM (C)
3 Mgr. (C)
Power-House and Tail Race
1 DGM (C)
3 Mgr. (C)
Hydro mechanical 1 DGM (M) 2
Mgr. (M)
Workshop/Transport
1 DGM (M)
2 Mgr. (M)
Electrical Erection 1 DGM (E) 3
Mgr. (E)
Evacuation and Construction Power
1 DGM (E), 3 Mgr. (E)
Support Staff
Forebay/Penstock/Infrastructure and
Townships
1 DGM (C)
3 Mgr. (C)
Jammu & Kashmir State Power Development Corporation Page 61
Proposed Structure: Ladakh Projects – Hanu, Dah
1 GM (C)
Ladakh
Contracts, Procurement, Planning, Billing & Workshop/Stores
1 AGM (C ), 1 Mgr. (C )
Civil Works (Common for all 3 projects)
1 SDGM (C)
Electromechanical Works
1 SDGM (E)
Hydro mechanical Works
1 SDGM (M)
Diversion Structure/Water Conductor upto
Power House
1 DGM (C)
3 Mgr. (C)
Power House and Tail
Race
1 DGM (C)
3 Mgr. (C)
Hydro mechanical 1 DGM (M) 2
Mgr. (M)
Workshop/Transport
1 DGM (M)
2 Mgr. (M)
Electrical Erection 1 DGM (E) 3
Mgr. (E)
Evacuation and Construction Power
1 DGM (E), 3 Mgr. (E)
Ladakh Generation
1 CGM (E)
Electromechanical Division for Projects (Dah/Hanu/Dumkhar, Rangdo,Bairas) will report to CGM (Electrical) and will Functionally support the SGM (C) Ladakh for these projects
Jammu & Kashmir State Power Development Corporation Page 62 Plants
Jammu & Kashmir State Power Development Corporation Page 63
Proposed Structure: BHEP-I
Operation & Maintenance
1 SDGM (E)
HR &
Administration
Finance /
Accounts and IT
Medical
Operations
(For 4 Shifts)
4 DGM (E), 12 Mgr.(E)
4 Mgr. (M)
1 DGM ( C) – Dam and P/H
1 DGM ( C) – Roads, Colony
1 Mgr. ( C) – Dam
1 Mgr. (C) – Power House
1 Mgr. ( C) – Roads & Colony
Main Plant Maintenance
2 DGM (E) for E/M
1 DGM (E) – Automation
1 DGM (M) Turbine, Spiral casing
2 Mgr. (E) – Automation
1 Mgr. (E) – Generator Excitation/UAT
1 Mgr. (E) – Pothead/11 KV outdoor
1 Mgr. (E) – Transformation/GIS/AuxillarySupply, AC/DC
1 Mgr. (E) Instrumentation of Dam Control
1 Mgr. (M) – Turbines,
(BHEP – I and II#)
1 ED (E)
1 GM (E) Head Planning, Procurement, Scheduling & Billing
1 SDGM (E), 1 DGM (E) , 3 Mgr.
Civil (Maintenance)
1 SDGM (C)
1 DGM (M) – All Gates
1 DGM (M) – Workshop & Transport
1 Mgr. (M) – Transport
1 Mgr. (M) – Workshop
1 Mgr. (M) – Dam
1 Mgr. (M) – Elevators & Cranes
Mechanical (Maintenance)
1 SDGM (C)
1 DGM (E) – Stores
1 DGM (E) – Field
4 Mgr. (E) – Stores/Field
Line 400 KV
1 SDGM (E)
*Common ED (E) for BHEP-I and II once BHEP II is commissioned
Jammu & Kashmir State Power Development Corporation Page 64
Proposed Structure: Jammu Generation (2013)
O&M Zone Jammu
1 CGM (E)
Generation Circle Jammu
1 GM (E)
Civil Mtc Circle. Jammu
1 GM (C)
Generation Division Chenani
1 SDGM (E)
Generation Division Bhaderwah + SewaIII
1 SDGM (E)
Plant Head Chenani III 1 AGM (E)
Plant Head Chenani I & II
1 DGM (E)
Plant Head Sewa III
1 DGM (E)
Plant Head Bhaderwah 1 AGM (E)
Civil Maintenance Division Jammu 1
1 SDGM (C)
Civil Maintenance Division Jammu 2
1 SDGM (C)
Civil Maintenance Bhaderwah 1 AGM (C)
Civil Maintenance Chenani
1 DGM (C)
Civil Maintenance Sewa-III
1 AGM (C)
Civil Maintenance
Chenani I 1 M (C)
Civil Maintenance
Chenani II 1 M (C)
Civil Maintenance
Chenani III 1 M (C)
Civil Maintenance Bhaderwah
1 M (C)
Jammu & Kashmir State Power Development Corporation Page 65
Proposed Structure: Kashmir Generation (2013)
O&M Zone Kashmir
1 CGM (E)
Generation Circle Kashmir 1 GM (E)
Civil Mtc Circle. Kashmir 1 GM (C)
Generation Division LJHP
1 SDGM (E)
Generation Division Kangan
1 SDGM (E)
Plant Head Karnah
1 AGM (E)
Plant Head LJHP
1 DGM (E)
Plant Head Sumbal
1 DGM (E)
Plant Head Kangan
1 AGM (E)
Civil Maintenance Division Kashmir 1
1 SDGM (C)
Civil Maintenance Division Kashmir 2
1 SDGM (C)
Civil Maintenance Karnah
1 AGM (C)
Civil Maintenance LJHP
1 DGM (C)
Civil Maintenance Ganderbal 1 DGM (C)
Civil Maintenance USHP I/II
1 DGM (C)
Civil Maintenance Pahalgam 1 AGM (C)
Generation Division Ganderbal 1 SDGM (E)
Plant Head Ganderbal 1 DGM (E)
Plant Head Pahlgam
1 DGM (E)
Plant Head Pampore Gas
Turbine 1 DGM (E)
Jammu & Kashmir State Power Development Corporation Page 66
Proposed Structure: Ladakh Generation & Projects
O&M Zone Ladakh
1 CGM (E)
Generation Circle Ladakh
1 GM (E)
CPE Ladakh 1 GM (C)
Generation Division Kargil
1 SDGM (E)
Projects (Dah & Hanu) Electrical
Projects (Dah & Hanu) Civil
Survey & Investigation
Ladakh 1 SDGM (C)
Generation Division Leh
1 SDGM (E)
CMD Leh 1 SDGM (C)
CMD Kargil 1 SDGM (C)
Jammu & Kashmir State Power Development Corporation Page 67
Plant- Generation- Ladakh (Iqbal – 3.75 MW, Hundar – 0.4 MW, Sumoor - .1 MW, Igo-Marcellong – 3 MW, Haftal – 1 MW, Marpachoo – 0.75 MW, Bazgo – 0.3 MW, Satkna – 4 MW)
Ladakh Generation
1 GM (E)
Plant Head – Leh
Plants
1 SDGM (E)
Plant Head – Kargil
Plants
1 SDGM (E)
Ops. Head
Marpachoo
1 AGM (E)
Operations
Head Stakna
1 AGM (E)
O&M Head
Bazgo
1 Mgr. (E)
Operations
Head Igo
Marcellong
1 AGM (E)
O&M
Head
Hundar
1 Mgr. (E)
Ops Head
Iqbal
1 AGM (E)
O&M Head
Haftal
1 AGM (E)
Planning, Procurement,
Scheduling & Stores
1 AGM.(E)
1 Mgr. (E)
Ops. Head
Sanjak
1 AGM (E)
Common Electro-
Mechanical Maintenance
1 AGM (E) 2 Mgr. (E)
1 Mgr. (M)
1 AGM (E) and 1 Mgr. (E)
O&M
Head
Sumur
1 Mgr. (E)
Common Electro-Mechanical
Maintenance
1 AGM (E), 2 Mgr. (E), 1 Mgr. (M)
Shift
Incharge
4 Mgr. (E)
Shift
Incharge
4 Mgr. (E)
Shift
Incharge
1 Mgr. (E)
Shift
Incharge
1 Mgr. (E)
Shift
Incharge
4 Mgr. (E)
Shift
Incharge
1 Mgr. (E),
1 Mgr.(M)
Civil
Maintenance –
Stakna
1 Mgr. (C)
Civil
Maintenance –
Igo Marcellong
1 Mgr. (C)
CMD LEH
1 DGM (C)
Civil
Maintenance
– Bazgo
1 Mgr. (C)
CMD Leh
1 DGM (C)
Civil
Maintenance –
Hundar/Sumur
1 Mgr. (C)
CMD LEH
1 DGM (C)
Civil Maintenance
Iqbal/Marpachoo
1 Mgr. (C)
CMD Kargil
1 DGM (C)
Civil Maintenance
Sanjak
1 Mgr. (C)
Civil
Maintenance
Haftal
1 Mgr. (C)
CMD Kargil
1 DGM (C)
Planning, Procurement,
Scheduling & Stores
1 AGM (E)
1 Mgr. (E)
Jammu & Kashmir State Power Development Corporation Page 68
PART B: Manpower Planning
Jammu & Kashmir State Power Development Corporation Page 69
Manpower Phasing 2013-2021
Phasing of Corporate, Projects and Plants is as follows:
Year -> 2013 2015 2017 2019 2021
Corporate
Commercial- 3 HR- 4 Finance -7 IT-1 Legal-4
Commercial- 3 HR- 4 Finance -7 IT-1 Legal-4
Commercial- 3 HR- 4 Finance -7 IT-1 Legal-4
Commercial- 3 HR- 4 Finance -7 IT-1 Legal-4
Commercial- 3 HR- 4 Finance -7 IT-1 Legal-4
Projects
Peak Stage
BHEP-II Hanu Dah Lower Kalnai NGHEP Kirthai-I Parnai
BHEP-II Hanu Dah Lower Kalnai NGHEP Kirthai-I Parnai Sawalkote Kirthai-II
NGHEP Kirthai-I Sawalkote Kirthai-II Mohra Karnah Shous Barinium Ujh
Sawalkote Kirthai-II Shous Barinium Ujh
Initial Stage
Sawalkote Kirthai-II
Mohra Karnah Shous Barinium Ujh
Plants
BHEP-II will transition from Project to Plant in this year
BHEP-II Hanu Dah Lower Kalnai Parnai
Kirthai-I NGHEP Mohra Karnah
Sawalkote Kirthai-II Shous Barinium Ujh
Jammu & Kashmir State Power Development Corporation Page 70
Manpower Plan: Executives 2013-2021
Total Manpower Requirements for Projects till year 2021 are as follows: (As per existing plans, no Projects planned in 2021) Assuming one ED for both Kirthai-I and Kirthai-II
Total 2013 2015 2017 2019
E C M E C M E C M E C M
ED 0 3 0 0 3 0 0 2 0 0 1 0
CGM 0 3 0 0 6 0 0 4 0 0 3 0
GM 7 3 0 10 6 0 7 4 0 5 3 0
SDGM 13 41 8 20 62 10 18 43 11 13 31 8
DGM 36 106 21 48 160 27 50 111 29 36 80 21
AGM 0 0 7 0 0 10 0 0 7 0 0 5
Manager 101 224 45 133 344 57 140 238 62 101 172 45
Total 157 380 81 211 581 104 215 402 109 155 290 79
Jammu & Kashmir State Power Development Corporation Page 71
Manpower Plan: Executives 2013-2021
Total Manpower Requirements for O&M till year 2021 are as follows:
Total 2013 2015 2017 2019 2021
E C M E C M E C M E C M E C M
ED 1 0 0 1 0 0 2 0 0 3 0 0 5 0 0
CGM 2 1 0 2 1 0 2 1 0 2 1 0 2 1 0
GM 2 2 0 2 2 0 3 2 0 4 2 0 6 2 0
SDGM 8 12 1 8 12 1 10 13 2 12 14 3 20 16 9
DGM 26 22 7 26 22 7 40 25 13 53 28 18 85 38 30
AGM 20 11 1 20 11 1 20 11 4 20 11 7 24 11 17
Manager 111 73 24 111 73 24 134 86 32 154 98 38 212 124 58
Total 170 121 33 170 121 33 211 138 51 248 155 66 354 192 114
Jammu & Kashmir State Power Development Corporation Page 72
Manpower Plan: Executives 2013-2021
Total Manpower Requirements for Corporate till year 2021 are as follows:
Total
2013 2015 2017 2019 2021
E C M Other Cadre
s E C M
Other Cadre
s E C M
Other Cadre
s E C M
Other Cadre
s E C M
Other Cadre
s
ED 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1
CGM 1 2 1 2 1 2 1 2 1 2
GM 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4
SDGM 5 7 2 3 5 7 2 4 5 7 2 4 5 7 2 4 5 7 2 4
DGM 6 5 5 8 6 5 5 8 6 5 5 8 6 5 5 11 6 5 5 11
AGM 6 13 2 5 6 13 2 5 6 13 2 11 6 13 2 14 6 13 2 14 Manag
er 14 27 14 2 14 27 14 2 14 27 14 2 14 27 14 2 14 27 14 2
Total 34 56 23 25 34 56 23 26 34 56 23 32 34 56 23 38 34 56 23 38
Jammu & Kashmir State Power Development Corporation Page 73
Manpower Plan: Executives 2013-2021
Total Manpower Requirements for ENTIRE JKSPDC till year 2021 are as follows:
Total
2013 2015 2017 2019 2021
E C M Other
Cadres E C M
Other Cadres
E C M Other
Cadres E C M
Other Cadres
E C M Other
Cadres
ED 2 5 0 1 2 5 0 1 3 4 0 1 4 3 0 1 6 2 0 1
CGM 3 4 0 2 3 7 0 2 3 5 0 2 3 4 0 2 3 1 0 2
GM 10 7 0 4 13 10 0 4 11 8 0 4 10 7 0 4 7 4 0 4
SDGM 26 60 11 3 33 81 13 4 33 63 15 4 30 52 13 4 25 23 11 4
DGM 68 133 33 8 80 187 39 8 96 141 47 8 95 113 44 11 91 43 35 11
AGM 26 24 10 5 26 24 13 5 26 24 13 11 26 24 14 14 30 24 19 14
Manager
226 324 83 2 258 444 95 2 288 351 108 2 269 297 97 2 226 151 72 2
Total 361 557 137 25 415 758 160 26 460 596 183 32 437 500 168 38 388 248 137 38
Grand Total 1080 1359 1271 1143 811
Jammu & Kashmir State Power Development Corporation Page 74
Manpower Plan: Non Executives 2013-2021 Total Manpower Requirements for Non Executive for O&M and Projects till year 2021 are as follows:
T Technician
O Operator
H Helper
Year-> 2013 2015 2017 2019 2021
Area T O H T O H T O H T O H T O H
Projects 500 478 1170 717 684 1671 566 542 1336 330 320 830 - - -
Plants (O&M)
526 488 515 526 488 515 682 700 699 802 862 848 1093 1157 1234
S&I & MID 66 212 194 66 212 194 66 212 194 66 212 194 66 212 194
Sub-Total 1092 1178 1879 1309 1384 2380 1314 1454 2229 1198 1394 1872 1159 1369 1428
Total 4149 5073 4997 4464 3956
Non Tech 248 248 275 298 393
Non-Exec Total 4397 5321 5272 4762 4349
Jammu & Kashmir State Power Development Corporation Page 75
Consolidated Manpower Plan: 2013-2021 Consolidated Manpower Phasing is as follows
Year-> 2013 2015 2017 2019 2021
Exec Total 1080 1359 1271 1143 811
Non-Exec Total 4397 5321 5272 4762 4349
Organization Total 5477 6680 6543 5905 5160
Jammu & Kashmir State Power Development Corporation Page 76
PART C: Manpower Policy
Jammu & Kashmir State Power Development Corporation Page 77
Manpower Policy: Overview
Basis the Manpower Projections for the next few years, JKSPDC needs to fill manpower gaps through the following modes:
Absorption
Deputation
Recruitment
Short Term Contracts
Absorb existing personnel working on deputation in JKSPDC based on a selection criteria
Deputation from other State Govt./Central Govt. Departments to JKSPDC
Direct recruitment at entry level as well as lateral recruitment*
Short term contracts (1-2 years) based on JKSPDC’s requirement
JSKPDC needs to have a manpower policy to make it an attractive employer
Jammu & Kashmir State Power Development Corporation Page 78 Absorption Criteria
Jammu & Kashmir State Power Development Corporation Page 79
Absorption Selection Criteria We can divide Designations applying for Absorption into 3 groups with corresponding Selection Criteria Component:
Group Existing Designation Selection Criteria
Component
Senior Management SE, CE (or equivalent) APR, Seniority, Education, Behavioral
Assessment, Interview
Middle Management XEN, AEE (or equivalent) APR, Seniority, Education, Behavioral
Assessment, Interview
Junior Management AE, JE (or equivalent) APR, Education, Technical
Assessment, Behavioral Assessment, Interview
Jammu & Kashmir State Power Development Corporation Page 80
Absorption Selection Criteria: Senior & Middle Management
For selection of employees for Absorption, a balanced and objective selection criteria should be utilized as shown below:
Selection Criteria Component Weightage Marks (Maximum Marks 50)
Annual Performance Report 20%
10 marks- Outstanding 8 marks- Very Good 6 marks- Good 4 marks- Satisfactory
Seniority 10%
5 marks- > 20 years of experience 3 marks- 15-20 years of experience 2 marks- 10-15 years of experience 1 mark- < 10 years of experience
Education 10% 5 marks- Post Grad 3 marks- Grad 2 marks- Diploma
Behavioral Assessment 30%
15 marks- Rating 5 12 marks- Rating 4 10 marks- Rating 3 8 marks- Rating 2 5 marks- Rating 1
Interview 30% 15 marks
Jammu & Kashmir State Power Development Corporation Page 81
Absorption Selection Criteria: Junior Management
For selection of employees for Absorption, a balanced and objective selection criteria should be utilized as shown below:
Selection Criteria Component Weightage Marks (Maximum Marks 50)
Annual Performance Report 20%
10 marks- Outstanding 8 marks- Very Good 6 marks- Good 4 marks- Satisfactory
Education 10% 5 marks- Post Grad 3 marks- Grad 2 marks- Diploma
Technical Assessment 30% 15 marks
Behavioral Assessment 20%
10 marks- Rating 5 8 marks- Rating 4 6 marks- Rating 3 4 marks- Rating 2 2 marks- Rating 1
Interview 20% 10 marks
Jammu & Kashmir State Power Development Corporation Page 82
Absorption Selection Method Absorption Selection Methods are detailed out below:
Selection Criteria Component Method
Annual Performance Report Basis the certificates/records supplied by the candidate with the Absorption Option Form
Seniority
Education
Technical Assessment
A technical test related to the technical area of the applicant 75 question of 4 mark each and negative marking of 1 mark. Candidate’s score will be divided by 20 to scale it down to maximum 10 marks
Behavioral Assessment
Behavioral Assessment exercise could be conducted by independent consultants, comprising of 3-4 exercises like Psychometric Tests, Case Studies, Role Plays, Simulations to asses the candidate on behavioral competencies. A rating on a scale of 1 to 5 is given to each candidate
Interview
Interview committee can decide on the interview weightage. As a guidelines, 50% weightage can be given to assess the Technical Skills and its application, candidate will be asked 10-12 technical questions on his experience and application of technical skills. 30% weightage can be given to assess the Managerial Skills and its application will be asked 8-10 managerial questions on his experience and application of managerial skills. 20% weightage can be given to assess exceptional performance in the past, any accomplishment
Jammu & Kashmir State Power Development Corporation Page 83
Making JKSPDC an Attractive Employer JKSPDC needs to be an attractive employer to attract employees for Absorption or Deputation through incentivizing in 3 main areas:
Project Allowance House Rent Allowance or Free Bachelor Accommodation
Deputation Allowance Performance Related Pay Health & Accident Insurance
Career Progression
Benefits & Allowances
Terminal Benefits
Promotion on Absorption for Engineers, Workmen as well as Administration Staff
Career Progression Assurance
Option for VRS
Jammu & Kashmir State Power Development Corporation Page 84 Career Progression
Jammu & Kashmir State Power Development Corporation Page 85
Promotion on Absorption for Engineers
► For lateral movement, years already spent in a current designation will be carried forward
Existing Position Total Years of Experience Eligibility for One Step Up
Promotion
Years Spent in Current Designation
Offered Position if Eligibility is met
JE (Diploma)
NA Less than 8 Years
8 Years +
Manager Assistant General
Manager
JE (Degree)
NA Less than 4 Years
4 Years +
Manager Assistant General
Manager
AE 10 NA Deputy General Manager
AEE 15 NA Sr. Deputy General
Manager
EE 17 NA General Manager
SE 20 NA Chief General Manager
Jammu & Kashmir State Power Development Corporation Page 86
At Junior and Middle Management levels, the current designations would be classified into clusters as shown below:
Assured Career Progression for Engineers
► The vacancies will based on defined clusters ensuring intra-cluster promotability
► The intra-cluster promotability will provide for an assured career path to an employee subject to meeting a minimum benchmark performance criteria
► Eligibility for promotion as per government rules and regulations
► Sanction of posts will not be a limiting factor for promotions within a cluster. For example, if you are an DGM, you can reach up-to an SDGM level without any vacancy limitation
► For Engineering Cadre, movement from Manager to AGM, there would be a defined quota for promotion. This is in alignment with the practices followed in other organizations
► Inter-cluster promotions will be based on availability of vacancies and performance for all cadres
► An officer could be given a maximum of two higher pay scales (assuming a service of 36 years)
► First higher pay scale on completion of 12 years of service
► Second higher pay scale on completion of 24 years of service
Sample Cluster for Engineers
Cluster Designation
Cluster 1 Manager and AGM
Cluster 2 SDGM and DGM
Sample Cluster for Other Cadres like Accounts, Legal etc.
Cluster Designation
Cluster 1 Manager
Cluster 2 SDGM, DGM and AGM
Jammu & Kashmir State Power Development Corporation Page 87
Skill Up-Gradation exercise for Workmen
Workers working at a higher grade job
Training Assessment Fitment
► 3-6 months training in batches
► ITI equivalent training to be provided
► Skill assessment exercise in batches will be conducted
► Fitment of workers into appropriate designations based on assessment outcomes
► Skill up-gradation exercise
► The motive of the exercise will be to build and assess capabilities at the worker level and provide appropriate designations and pay scales to deserving workers
► The exercise may be conducted by an external agency to ensure fairness & transparency
► The employees will be provided with a certificate of training
► The exercise will be repeated for rest of the workers to provide them a chance to upgrade their skills and move into higher designation & pay scale
Jammu & Kashmir State Power Development Corporation Page 88
Career Path for Workmen
Skilled Workmen Unskilled Workmen
Ministerial Technical Ministerial Technical
► Technician 2 ► Technician 3 ► Technician 4
► Head Assistant ► Senior Assistant ► Junior Assistant
Technician 1 Office Superintendent
► Peon ► Sweeper ► Dak Runner ► Diman ► Chowkidar
► Helper ► Asstt. Storekeeper ► Store Helper ► Store Khalasi
► Career growth for skilled workmen
► Eligibility period for movement within grade could be 8 years
► Three level of growth without vacancy consideration
► Promotion will be based on a clearly defined criteria
► Career growth for un-skilled workmen
► Skill up-gradation to move into the skilled workmen cadre
Jammu & Kashmir State Power Development Corporation Page 89
Jammu & Kashmir State Power Development Corporation Page 90
Promotion on Absorption for Ministerial Staff
Existing Position Years spent in current designation
Offered Position
Junior Assistant Less than 12 years
12 yr +
Junior Assistant/SDC
Senior Assistant
Senior Assistant Less than 8 years
8 yr+
Senior Assistant
Head Assistant
Head Assistant Less than 8 years
8 yr+
Head Assistant
Office Superintendent
► For lateral movement, years already spent in a current designation will be carried forward
Jammu & Kashmir State Power Development Corporation Page 91 Benefits & Allowances
Jammu & Kashmir State Power Development Corporation Page 92
How employees can join JKSPDC after taking VRS
►Employees may take Voluntary Retirement from parent department in accordance with the provisions of the JKCSR.
►Parent department may pay all terminal benefits due to service rendered.
►Employees join JKSPDC afresh and can be covered by EPF/NPS as the case may be.
Jammu & Kashmir State Power Development Corporation Page 93
Proposed Benefits & Allowances: JKSPDC
► For lateral movement, years already spent in a current designation will be carried forward
Benefit/ Allowance Details
Project Allowance
Project Allowance will be given to employees based on Hard and Soft Locations for Projects & Plants Projects Hard Location- 20% of Basic Pay Soft Location- 15% of Basic Pay Plants Hard Location- 10% of Basic Pay Soft Location- 7% of Basic Pay Hard and Soft Locations will be notified by JKSPDC from time to time
House Rent Allowance
Employee to be given an option to keep the family at hometown and the HRA to be provided of that location Bachelor Accommodation to be provided rent free at project site
Performance Related Bonus
A certain defined percentage will be decided by JKPSDC for calculating Performance Related Bonus. Maximum of 5% of the PBT is the government guidelines. This defined percentage will be used to calculate Performance Related Bonus corpus. Out of this PRB Corpus:
a) 50% of the PRB will be given to the employees of the operational Plants where the capacity index is equal to or more than 85%
b) 30% of the PRB will be given to the employees working in the Projects which have achieved the milestones in the year
c) 20% of the PRB will be given to other employees of the Corporate/Regional offices
Health & Accident Insurance
All employees to be covered under Group Accident Insurance Scheme All employees to be covered under Hospitalization Insurance Cover – Empanelled Hospitals upto Rs 1 Lakh
Facilities Entertainment and recreational facilities to be provided at each location
Extension of Service For good performing employees, an employee may be retained in service for two years beyond the age of superannuation to be evaluated through an objective and transparent evaluation system.
Government rules as applicable for deputation will be followed. Employees on deputation to JKSPDC shall, however, be governed by other corporation related allowances.
Jammu & Kashmir State Power Development Corporation Page 94
► For lateral movement, years already spent in a current designation will be carried forward
INTENTIONALLY LEFT BLANK
Jammu & Kashmir State Power Development Corporation Page 95
Thank You
©Enst & Young Private Limited, India
The information in this presentation pack is confidential and contains proprietary information of EY. It should not be provided to anyone other that the intended recipients without our written consent. Anyone who receives a copy of this presentation pack other than in the context of our oral presentation/ communication should note that we do not have any responsibility to anyone other than our client in respect of the information contained in this document.