 BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 1 User Manual Br ea kd ow n Ma in tenance P rocess (BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0)

ERP PM UM 05 Breakdown Maintenance Process V3

Embed Size (px)

Citation preview

Page 1: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 1/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 1

User Manual

Breakdown Maintenance Process(BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0)

Page 2: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 2/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 2

Contents

OVERVIEW ............................................................................................................................................. 5 Business Process Description Overview .............................. .......................... ........................... ........ 5

3(A): Breakdown Maintenance –Internal processing (No external services) .............................. ................ 8 1. Create Notification ........................................................................................................................ 8 2. Assign Notification – Assign to responsible person for maintenance .............................. .............. 11 3. Re-Assign to responsible person for maintenance. ............................. .......................... ............... 15 4. Acknowledge Notification and “Put in Process” Notification: ................................... ..................... 18 5) Decision on Maintenance Order Requirement .......................... ........................... ........................ 20 6) Create Maintenance Order from Notification ................................ ............................ ................... 21 7. Material Planning Against Order.................................................................................................. 28 9) Check of material availability in storage location ......................................................................... 34

10 A) Change in Material Requirement ........................................................................................... 44 11) Create Reservation for Return of Material to Store (if material issued is not consumed)............. 45 12) Order Confirmation ................................................................................................................... 46 13) Complete Order ........................................................................................................................ 50 14) Process Notification .................................................................................................................. 54 15) Process Notification .................................................................................................................. 57 16) Complete Notification .......................... .......................... .......................... ........................... ....... 59 17) Maintenance Order Settlement ................................................................................................. 64 18) Business Completion of Maintenance Order ...................................... .......................... ............. 66

3(B): Breakdown Maintenance by Vendor (Warranty/AMC is Available) ........... .......................... ............ 68 1. Create Notification ...................................................................................................................... 68 2. Assign Notification – Assign to responsible person for maintenance .............................. .............. 71 3. Re-Assign to responsible person for maintenance. ............................. .......................... ............... 75 4. Acknowledge Notification and “Put in Process” Notification: ................................... ..................... 78 5) Call the Warranty/AMC Vendor: .............................. .......................... ........................... ............... 79 5) Decision on Maintenance Order Requirement .......................... ........................... ........................ 81 6) Create Maintenance Order from Notification ................................ ............................ ................... 82 9) Check of material availability in storage location ................................ .......................... ............... 95 10) Change in Material Requirement ........................... .......................... .......................... .............. 104 11) Create Reservation for Return of Material to Store (if material issued is not consumed).......... 107 12) Order Confirmation ................................................................................................................. 108

13) Complete Order ...................................................................................................................... 111

14) Process Notification ................................................................................................................ 115 15) Process Notification ................................................................................................................ 118 16) Complete Notification .......................... .......................... .......................... ........................... ..... 120 17) Maintenance Order Settlement ............................................................................................... 124 KO88 ............................................................................................................................................ 124 18) Business Completion of Maintenance Order ...................................... .......................... ........... 126

3C: Breakdown Maintenance by Vendor (Need Based Service and APO is available) .......................... 128

Page 3: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 3/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 3

1. Create Notification .................................................................................................................... 128 2. Assign Notification – Assign to responsible person for maintenance .............................. ............ 131

3. Re-Assign to responsible person for maintenance. ............................. .......................... ............. 135

4. Acknowledge Notification and “Put in Process” Notification: ................................... ................... 138 5) Decision on Maintenance Order Requirement .......................... ........................... ...................... 139 6) Create Maintenance Order from Notification ................................ ............................ ................. 140 7A) Material Planning Against Order ............................................................................................. 145 8) Workflow for Maintenance Order Approval ........................... .......................... ........................... 160 8A) Order Approval ............................. ........................... .......................... ........................... ......... 160 9) Check of material availability in storage location ....................................................................... 163 10) Change in Material Requirement ........................... .......................... .......................... .............. 172 11) View Purchase Requisition number ........................... .......................... ........................... ......... 174 12) Purchase Order Process ......................... .......................... ........................... .......................... . 178

12B) Change Purchase Order ............................ .......................... .......................... ....................... 182 13) Post Down Payment (Optional) ............................. .......................... .......................... .............. 189 14) Call /inform the Vendor: .......................... .......................... ........................... .......................... . 191 15) Change in Service Planning against Order .............................. .......................... ...................... 193 16) Service procurement process for new requirement .......................... ........................... ............. 194 18) Order Confirmation ................................................................................................................. 194 19) Complete Order ...................................................................................................................... 197 20) Process Notification ................................................................................................................ 201 21) Process Notification ................................................................................................................ 204 22) Complete Notification .......................... .......................... .......................... ........................... ..... 205 23) Service Entry sheet Process ................................................................................................... 210 23A) Create Service entry sheet with reference to Purchase order ......................... ...................... 210 24) Maintenance Order Settlement ............................................................................................... 218 25) Business Completion of Maintenance Order ...................................... .......................... ........... 220 26) Accounting entry verification ................................................................................................... 221 27) Print SES Document ........................... .......................... .......................... ........................... ..... 223 28) Invoice verification Process..................................................................................................... 226 28A) Invoice Verification for Service Performed ....................................... ........................... .......... 226

3D: Breakdown Maintenance by Vendor (Need Based Service requirement) ........................... ............. 229 1. Create Notification .................................................................................................................... 229 2. Assign Notification – Assign to responsible person for maintenance .............................. ............ 232

3. Re-Assign to responsible person for maintenance. ............................. .......................... ............. 237 4. Acknowledge Notification and “Put in Process” Notification: ................................... ................... 239 5) Decision on Maintenance Order Requirement .......................... ........................... ...................... 241 6) Create Maintenance Order from Notification ................................ ............................ ................. 242 7A) Material Planning Against Order ............................................................................................. 247 8) Workflow for Maintenance Order Approval ........................... .......................... ........................... 255 8A) Order Approval ............................. ........................... .......................... ........................... ......... 255 9) Check of material availability in storage location ....................................................................... 257

Page 4: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 4/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 4

10) Change in Material Requirement ........................... .......................... .......................... .............. 267 11) View Purchase Requisition number ........................... .......................... ........................... ......... 270

13) Purchase Order Process ......................... .......................... ........................... .......................... . 273

13B) Change Purchase Order ............................ .......................... .......................... ....................... 277 14) Post Down Payment (Optional) ............................. .......................... .......................... .............. 284 15) Call /inform the Vendor: .......................... .......................... ........................... .......................... . 286 16) Change in Service Planning against Order .............................. .......................... ...................... 288 17) Service procurement process for new requirement .......................... ........................... ............. 292 19) Order Confirmation ................................................................................................................. 292 20) Complete Order ...................................................................................................................... 296 21) Process Notification ................................................................................................................ 300 22) Process Notification ................................................................................................................ 303 23) Complete Notification .......................... .......................... .......................... ........................... ..... 304

24) Service Entry sheet Process ................................................................................................... 309 24A) Create Service entry sheet with reference to Purchase order ......................... ...................... 309 25) Maintenance Order Settlement ............................................................................................... 317 26) Business Completion of Maintenance Order ...................................... .......................... ........... 319 27) Accounting entry verification ................................................................................................... 321 28) Print SES Document ........................... .......................... .......................... ........................... ..... 324 Work Certification Process ............................ ........................... .......................... .......................... . 327 29) Invoice verification Process..................................................................................................... 327 29A) Invoice Verification for Service Performed ....................................... ........................... .......... 327

Page 5: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 5/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 5

OVERVIEW

Business Process Description Overview

Process Overview: Breakdown maintenance

The Breakdown maintenance process shall consist of the following major activities:

1 Raising of breakdown notification with correct priority by operation group to notify

the responsible Maintenance department/ main work centre. Based on effect oncommunication, Breakdown notification shall need to be prioritized by assigning correct

priority.

a. Breakdown which directly affects the communication will be given ‘1’ priority

And required to be attended within 4 hours, it would require planning whatsoever

At site

b. Breakdowns which are related to equipments which are indirectly related to

Communication and do not cause immediate communication loss shall be given

Priority ‘2’, such jobs can be attended within 24 hours.

c. Breakdowns related to equipments which are not directly or indirectly related to

Communication but are important otherwise, shall be given priority ‘3’. Such jobs

Can be attended within 3 days

The breakdown notification will mostly be raised by operation group but at times it can

also be raised by maintenance personnel or planning personnel if required.

2. Receipt of Notification by planners for dates scheduling.

Page 6: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 6/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 6

3. Receipt of Breakdown Notifications by Maintenance department for processing.

4. Notification release (Put in process) by assigned person who acknowledges it.

5. Creation of Breakdown Maintenance order by maintenance Department if material or

external service (contractual job) is needed to carry out the maintenance.

Planning of operations (activities)

Planning of materials requiredPlanning of manpower required

Planning of external service quantity required

6. Release of order by authorized person in maintenance department

7. Issue of materials from store by MM department

8. Execution of work at site by internal manpower and/or external agency.

9. Time confirmation of order operations by maint. Department

10. Entry of technical findings (Damage, cause, activities etc.) and Malfunction end time

in the breakdown notification by maint. Department

11. Completion of tasks in notification and Notification completion (NOCO)

12. Creation of service entry sheet for the external operations (done by external agency)

by maint. Department

Page 7: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 7/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 7

13. Entry of consumed quantity of external services in the service entry sheet and

acceptance of service entry sheet. If service level agreement is breached then penalty

is to be imposed as per agreed terms and conditions.

14. Technical Completion (TECO) of order.

15. Month-end settlement of Maint. Order by Accounts department.

Page 8: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 8/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 8

Business Process Procedure: Breakdown maintenance.

3(A): Breakdown Maintenance –Internal processing

(No external services)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail description in subject long text and task required to

be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement foryour Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

Page 9: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 9/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 9

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu a) Logistics --- Plant maintenance--- Maintenance processing

--- Notification --- Create (General)

b) Logist ics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T CodeType IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

Enter Notification Type

Page 10: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 10/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 10

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

Plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

CLICK ON SAVE BUTTON

1. Enter short Text

2.Enter Equipmentcode (or)Func.Location

3. SelectBreakdown

4. Enter the appropriate text

Page 11: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 11/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 11

2. Assign Notification – Assign to responsib le person fo r maintenance

Partner Function “ Initiator ” is maintained manually by the Notification creator

.

“Person Responsible ” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “ Assigned ” is set by “ Initiator ”.

Information flow is triggered and information is sent to “ Person Responsib le ” via Email.

Notification can be assigned to multiple “ Person Responsible ”.

System will savethis notificationwith generating aninternal number

Page 12: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 12/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 12

Open the Notification in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Click hereto changethe staus

Page 13: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 13/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 13

Select Assignedand proceed.

5. Enter PartnerDetails

Page 14: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 14/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 14

CLICK ON SAVE BUTTON. MAIL/SAP MAIL IS SENT TO RESPONSIBLE PERSON

SEE IN BOX/ E-MAIL

1. Status updated to

ASGD

On saving a mail istriggered in SAP system.

Page 15: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 15/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 15

3. Re-Assign to responsib le person fo r maintenance.

The Mail carries the

following details

1.Change the Partner noand press Enter

Page 16: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 16/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 16

New PersonResponsible isassigned

Page 17: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 17/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 17

Click here tochange thestatus

Select RASG and pressENTER

Page 18: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 18/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 18

Information flow is triggered to all maintained “ New Personal Responsible ”, and“Initiator ” via Email.

4. Acknowledge Noti fication and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below

1. Check the status

2. Save

Page 19: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 19/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 19

User Status “ ACKD ” is set by “ Person Responsib le ”.

Notification is “ Put in Process ” by “Person Responsible ”.

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about status

update.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T Code Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

1. Click tochange the statusACKD

2. Click hereto put the

Notification in process

3. Click tosave the Notification.

Page 20: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 20/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 20

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

Page 21: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 21/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 21

6) Create Maintenance Order from Not ification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

Click here tocreate an order

Page 22: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 22/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 22

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

Check the Order type and proceed

Page 23: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 23/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 23

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

Page 24: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 24/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 24

For copying operation from the task list :

Go to Extras (from Menu bar) --- Task list selection --- General task list or To Referenceobject (If Equipment or function location task list exists) ---- Select the task list as shown

below If you will go for selection of a task list, then system will give a message first (as

shown below) that you want to delete the existing operations or want to keep them,

choose accordingly.

1. First operation getcopied from the orderheader, it can bereplaced if required

2. After enteringthe operation enter

the no of manpower in Nofield and enter the no ofproposed duration in theduration field, Based onthese entries system willcalculate the duration

Page 25: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 25/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 25

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipmenttask

Page 26: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 26/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 26

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

1. Selectthe task list

2. Click on thisbutton or doubleclick on the tasklist rou

Page 27: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 27/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 27

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

1. Enter your

work center ifrequired

2. Click onall tocopy this

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Page 28: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 28/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 28

7. Material Planning Against Order

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

Enter the material code / Qty /Store Location Etc., and proceed.

1. Select theOperation and proceed

2. Press afterselection ofoperation

Page 29: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 29/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 29

Click onGeneral

Page 30: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 30/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 30

On saving the order a message will be displayed.

Reservationcreated

Page 31: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 31/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 31

7A) Workflow for Maintenance Order Approval (IF REQUIRED)

Open the Order in change mode using any one navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

SelectEnhancementTab

Page 32: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 32/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 32

Approver received sap mail, he approved/not approved and sent back

Responsible person receive sap mail &released the maintainance order

Select Notesheet

1.Enter theSAPID of theApprover

2.Enter thetext andcontinue

3. Click send mail.

Page 33: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 33/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 33

8A) Order Release

Open the order in the change mode using Transaction code IW32 (or) as mentioned in

the earlier steps. Press to release the order and press to save the order.

In Maintenance order system status will be set REL

1. Releasethe order

2. Save theorder

Page 34: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 34/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 34

9) Check of material availability in sto rage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

Page 35: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 35/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 35

1. Enter the Plant /Storage Location, Etc

2. Execute

Page 36: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 36/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 36

Material Issue against Reservation (if the material is available in storage location)

Material Code / Qty can be checked here

Page 37: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 37/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 37

9A) Material Issue against Reservation (if the material is available in storage

location) Prerequisites - Reservation no

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---

Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservationno and pressENTER

Page 38: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 38/330

Page 39: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 39/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 39

Click on Quantity Taband check the details

Page 40: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 40/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 40

1. Enter theno if Qty to be posted

3. Click on Where Taband check the details

Page 41: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 41/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 41

2. Click onreservation tab to

check the details

1. Check the details likeMoment type / Stock typeStora e Location Etc.

Page 42: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 42/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 42

After checking all thedetails press AccountAssignment Tab.

Page 43: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 43/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 43

After Posting the material will be posted and document no will be generated.

9B) if the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21- CREAT RESERVATION UNDER MOVEMENT 913MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICHGIVES MATERIAL DOCUMENT NOMIGO-WITH RESPECT TO MATERIAL DOCUMENT FOR PLACE IN STORAGE

1.Click onCheck

2. Click on Post

Page 44: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 44/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 44

9C) Display Material DocumentPrerequisites – Material Document no (Obtained while posting a reservation).

Enter the Material Document no to display the material document.

10 A) Change in Material Requirement

Open the order in change mode

SAP Menu Logistics – Material Management ---Purchasing ---Purchase Order ---Follow on Fuctions ---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T CodeType IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Page 45: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 45/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 45

CREAT NEW OPERATION

ADD MATERIAL

APPROVAL CAN BE TAKEN FROM ENHANCEMENT TAB/NOTESHEET

10 B) Material Issue against Reservation

Please refer steps 9 to 9C.

11) Create Reservation for Return o f Material t o Store (if material issued is notconsumed)

Please refer steps 10 to 10B with negative quantity. The quantity in the case of return

will be negative .

Add new componentand proceed.

Page 46: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 46/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 46

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion

Confirmation----Entry—IW41 Individual Time Confirmation

T Code Type IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

Page 47: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 47/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 47

Enter Order no.and pressENTER

Page 48: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 48/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 48

Check the details likeFinal Confirmation andother details and pressENTER

Page 49: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 49/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 49

Number of confirmation isdisplayed below.

Page 50: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 50/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 50

13) Complete Order

Open the order in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T CodeType IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Orderno and pressEnter

Page 51: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 51/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 51

Click on Flag

Page 52: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 52/330

Page 53: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 53/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 53

Order saved and message isdisplayed with respectivenumbers

Page 54: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 54/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 54

14) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification.

User Status “ Work Completed ” is set by “ Person Responsible ”.

Information flow is triggered to “ Initiator ” and all “ Person Responsible ” about status update viaEmail and SMS.

SAP Menu Logistics --- Plant maintenance --- Maintenanceprocessing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No. and proceed

Page 55: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 55/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 55

Click here to change thestatus to COMP

Page 56: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 56/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 56

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about status

update via Email and SMS.

Set the status toCOMP.

Page 57: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 57/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 57

15) Process Notification

Set user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

Click to change theUser Status

Page 58: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 58/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 58

If the user status is set as Rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “ Initiator ”.Information flow is triggered to all “ Person Responsib le ” about status update via

Email.

User Status “ Work Completed ” is set by “ Person Responsib le ”.

AFTER USER STATUS CONFIRM BY INITIATOR, RESPONSIBLE PERSON WILL

COMPLETE THE NOTIFICATION i.e. WILL FILL CATALOG/END TIME etc.

Status can either bechanged to1. REWK or2. CNFR

Page 59: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 59/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 59

16) Complete Notification

Open the Notification in change Mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Page 60: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 60/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 60

Fill up the all catalog data – Object Parts & Damage / Causes / Activities etc.

Click the Flag tocomplete the Notif.

Page 61: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 61/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 61

Page 62: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 62/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 62

CLICK ON BLACK FLAG FOR COMPLETION OF NOTIFICATION

Page 63: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 63/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 63

Status is updated to

NOCO. Check the sameand proceed

Page 64: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 64/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 64

17) Maintenance Order Settlement

Enter the following details in the Initial Screen:

Controlling Area

Maintenance Order Number

Settlement Period

Fiscal Year

Processing Type

SAP MenuLOGISTICS---PRODUCTION---SHOP FLOOR CONTROL---PERIOD

END CLOSING---SETTLEMENT---KO88 - INDIVIDUAL PROCESSING

T Code K088

User Menu Select corresponding Node for K088 / Settlement.

Page 65: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 65/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 65

EXECUTE

TEST RUN OK

1. EnterControlling are

2. Enter the followinga. Settlement period b. Fiscal Yearc. Processing Type

Page 66: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 66/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 66

18) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Select Complete (Business)

Page 67: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 67/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 67

Status is updated toCLSD

Page 68: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 68/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 68

3(B): Breakdown Maintenance by Vendor

(Warranty/AMC is Available)

Pre-requisite: In case of Breakdown Maintenance by the Vendor through AMC “Annual

Maintenance Contract”/P.O which is procured through MM procurement are to be

referred

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail. description in subject long text and task required to

be done.

Trigger

Perform this pocedure when there is a need for Manpower and material requirement for

your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

Page 69: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 69/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 69

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logist ics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logist ics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

Enter Notification Type

Page 70: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 70/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 70

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

1. Enter short Text

2.Enter Equipmentcode (or)Func.Location

3. SelectBreakdown

4. Enter the appropriate text

Page 71: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 71/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 71

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

2. Assign Notification – Assign to responsib le person fo r maintenance

Partner Function “ Initiator ” is maintained manually by the Notification creator.“Person Responsible ” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “ Assigned ” is set by “ Initiator ”.

Information flow is triggered and information is sent to “ Person Responsib le ” via Email.

System will savethis notificationwith generating aninternal number

Page 72: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 72/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 72

Notification can be assigned to multiple “ Person Responsible ”.

Open the Notification in change mode

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Partner details.

Page 73: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 73/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 73

Click hereto changethe staus

Select Assignedand proceed.

Page 74: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 74/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 74

SAVE &

Information flow is triggered and information is sent to “ Person Responsib le ” via Email.

1. Status updated toASGD

2. Save

On saving a mail istriggered in SAP system.

Page 75: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 75/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 75

3. Re-Assign to responsib le person fo r maintenance.

The Mail carries thefollowing details

1.Change the Partner noand press Enter

Page 76: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 76/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 76

New PersonResponsible isassigned

Click here tochange thestatus

Page 77: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 77/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 77

Information flow is triggered to all maintained “ New Personal Responsible ”, and

“Initiator ” via Email.

Select RASG and pressENTER

1. Check the status

2. Save

Page 78: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 78/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 78

4. Acknowledge Noti fication and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below

User Status “ ACKD ” is set by “ Person Responsib le ”.

Notification is “ Put in Process ” by “Person Responsible ”.

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about status

update.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

1. Click tochange the staustp ACKD

2. Click hereto put the Notif ication process

3. Click tosave the Notif.

Page 79: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 79/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 79

5) Call the Warranty/AMC Vendor:

Enter the Vendor Details in Vendor Docket Screen in Notification.

Enter all thevendordetails.

Page 80: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 80/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 80

1. EnterPurchasingDoc. No

2. CommunicationDetails (Filled toinform specific personfrom vendor side )

3. Click here tochange the staus toVEND

Page 81: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 81/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 81

SAVE & Information flow is triggered and information is sent to VENDER VIA MAIL.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 24

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

Select thestatus toVEND

Page 82: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 82/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 82

6) Create Maintenance Order from Not ification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

Click here tocreate an order

Page 83: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 83/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 83

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

Check the Order type and proceed

Page 84: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 84/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 84

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

1. First operation getcopied from the orderheader, it can be

replaced if required

2. After enteringthe operation enterthe no of manpower in Nofield and enter the no ofproposed duration in theduration field,Based onthese entries system willcalculate the duration

Page 85: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 85/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 85

For copying operation from the task list :

Go to Extras (from Menu bar)

Task list selection

General task list or To Reference

object (If Equipment or function location task list exists)

Select the task list as shown below If you will go for selection of a task list, then system

will give a message first (as shown below) that you want to delete the existing

operations or want to keep them, choose accordingly.

Page 86: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 86/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 86

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipmenttask

Page 87: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 87/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 87

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

1. Selectthe task list

2. Click on thisbutton or doubleclick on the tasklist rou

1. Enter yourwork center ifrequired

2. Click onall tocopy this

Page 88: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 88/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 88

7. Material Planning Against Order

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty /

Store Location Etc., and proceed.

Page 89: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 89/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 89

Click onGeneral

Select the relevant Operationand press

Page 90: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 90/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 90

On saving the order a message will be displayed.

Reservationcreated

Page 91: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 91/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 91

7A) Workf low for Maintenance Order Approval ( If Required )

It is before REL OF MAINTAINANCE ORDER

Open the Order in change mode using any one navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

SelectEnhancementTab

Page 92: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 92/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 92

Select Notesheet

Page 93: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 93/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 93

1.Enter theSAPID of theApprover

2.Enter thetext andcontinue

3. Click send mail.

Page 94: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 94/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 94

8A) Order Release

Open the order in any one navigation options shown below.

Open the order in the change mode using any one navigation option shown below

Press to release the order and press to save the order.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

1. Releasethe order 2. Save the

order

Page 95: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 95/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 95

9) Check of material availability in sto rage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant /Storage Location, Etc

2. Execute

Page 96: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 96/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 96

Material Issue against Reservation (if the material is available in storage location)

Material Code / Qty can be checked here

Page 97: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 97/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 97

9A ) Material Issue against Reservation (if the material is available in storage location)

Prerequisites - Reservation no.

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---Follow On

Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservationno and pressENTER

Page 98: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 98/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 98

Click on MaterialTab

Page 99: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 99/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 99

Click on Quantity Taband check the details

Page 100: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 100/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 100

1. Enter theno if Qty to

be posted

3. Click on Where Taband check the details

Page 101: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 101/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 101

2. Click onreservation tab tocheck the details

1. Check the details likeMoment type / Stock typeStora e Location Etc.

Page 102: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 102/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 102

After checking all thedetails press AccountAssignment Tab.

Page 103: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 103/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 103

After Posting the material will be posted and document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21-UNDER MOV913

MIGO-UNDER913

MIGO-UNDER915

1.Click onCheck

2. Click on Post

Page 104: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 104/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 104

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

Enter the Material Document no to display the material document.

10) Change in Material Requirement

Open the order in change mode

SAP MenuLogistics---Material Management---Purchasing---Purchase Order---

Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Page 105: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 105/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 105

Add new componentand proceed.

Page 106: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 106/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 106

SelectEnhancement Tab

Select Notesheet

Page 107: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 107/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 107

SAVE& MAIL IS SENT TO APPROVER. HE WILL APPROVE/NOT APPROVE &SENT

BACK

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

11) Create Reservation fo r Return of Material to Store (if material issued is not

consumed)

Please refer steps 10 to 10C. The quantity in the case of return will be negative.

1.Enter theSAPID of theApprover

2.Enter thetext andcontinue

3. Click send mail.

Page 108: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 108/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 108

12) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---Completion

Confirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

Enter Order no.and pressENTER

Page 109: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 109/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 109

A pop window will open as mentioned below.

Check the details likeFinal Confirmation andother details and pressENTER

After entering thetime confirmationdetails ( ActualWork ) SAVE IT.

Page 110: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 110/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 110

Number of confirmation isdisplayed below.

Page 111: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 111/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 111

13) Complete Order

Open the order in change mode using any one navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Orderno and pressEnter

Click on Flag

Page 112: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 112/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 112

Page 113: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 113/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 113

Check the date andtime and pressENTER

Page 114: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 114/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 114

Order saved andmessage isdisplayed.

Page 115: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 115/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 115

14) Process Notification

Open the notification on change mode and set user status as Work Completed inNotification.

SAP Menu Logistics --- Plant maintenance --- Maintenanceprocessing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No and proceed

Page 116: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 116/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 116

SET USER STATUS COMPLETED BY RESPONSIBLE PERSON & SAVE.SAP MAIL

TO INITIATOR

1. Maintain“Vendor Docket

2. Click tochange theuser status

Page 117: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 117/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 117

User Status “ Work Completed ” is set by “ Person Responsib le ”.

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about status

update via Email.

Set thestatus toCNFR

Page 118: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 118/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 118

15) Process Notification

Set user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

Click to change theUser Status

Page 119: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 119/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 119

If the user status is set as Rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “ Initiator ”.

Information flow is triggered to all “ Person Respons ible ” about status update via

Email.

Status can either bechanged to1. REWK or2. CNFR

Page 120: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 120/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 120

16) Complete Notification

Open the Notification in the change mode using transaction code IW22 or from the SAP

menu as mentioned in the earlier steps.

Click the Flag to

complete the Notif.

Page 121: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 121/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 121

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

Page 122: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 122/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 122

Page 123: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 123/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 123

IW32

Maintenance order TECO

Status is updated to

NOCO. Check the sameand proceed

Page 124: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 124/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 124

17) Maintenance Order Settlement

Enter the following details in the next Pop-up window.

Controlling area

Settlement period

Fiscal Year

Processing Type

SAP Menu

T CodeKO88

User Menu Maintenance Order Settlement

Page 125: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 125/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 125

1. EnterControlling are

2. Enter the followinga. Settlement period b. Fiscal Yearc. Processing Type

Page 126: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 126/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 126

18) Business Completion of Maintenance Order

Open the Order in change mode using anyone of the navigation mode.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Select Complete (Business)

Page 127: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 127/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 127

19) PO Process

20) Service Entry Sheet

21) Account ing entry verification

22) Debit/ Credit Notes Refer Work MM Manuals

23) Vendor Payment

24) Display Accounting Document

Status is updated to

CLSD

Page 128: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 128/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 128

3C: Breakdown Maintenance by Vendor (Need Based Service

and APO is available)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect,

technical object (Functional Location / Equipment) on which defect has occurred,

optionally the detail

description in subject long text and task required to be done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for

your Breakdown

Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost CenterHR Employee List

Page 129: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 129/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 129

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logist ics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logist ics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

Enter Notification Type

Page 130: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 130/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 130

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list.

1. Enter short Text

2.Enter Equipmentcode (or)Func.Location

3. SelectBreakdown

4. Enter the appropriate text

Page 131: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 131/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 131

2. Assign Notification – Assign to responsib le person fo r maintenance

Partner Function “ Initiator ” is maintained manually by the Notification creator

.“Person Responsib le ” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “ Assigned ” is set by “ Initiator ”.

Information flow is triggered and information is sent to “ Person Responsib le ” via Email.

Notification can be assigned to multiple “ Person Responsible ”.Open the Notification in change mode using any one navigation options shown below.

System will savethis notificationwith generating aninternal number

Page 132: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 132/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 132

SAP Menu Logistics --- Plant maintenance --- Maintenanceprocessing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

5. Enter PartnerDetails

Page 133: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 133/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 133

Click hereto changethe staus

Select Assignedand proceed.

Page 134: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 134/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 134

SAVE & MAIL IS SENT TO ASGNED PERSON

1. Status updated toASGD

2. Save

On saving a mail istriggered in SAP system.

Page 135: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 135/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 135

3. Re-Assign to responsib le person fo r maintenance.

The Mail carries the

following details

1. Change the Partner noand press Enter

Page 136: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 136/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 136

New PersonResponsible isassigned

Click here tochange thestatus

Page 137: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 137/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 137

Information flow is triggered to all maintained “ New Personal Responsible ”, and

“Initiator ” via Email.

Select RASG and pressENTER

1. Check the status

2. Save

Page 138: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 138/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 138

4. Acknowledge Noti fication and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below.

Note:

User Status “ ACKD ” is set by “ Person Responsib le ”.

Notification is “ Put in Process ” by “Person Responsible ”.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Page 139: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 139/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 139

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about status

update.

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

1. Click to

change the staustp ACKD

2. Click hereto put the Notif ication process

3. Click to

save the Notif.

Page 140: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 140/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 140

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.

To create an Order directly from the notification screen click create order, as shown

in the above screen.

Click here tocreate an order

Page 141: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 141/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 141

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

Check the Order type and proceed

Page 142: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 142/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 142

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

1. First operation getcopied from the orderheader, it can be

replaced if required

2. After enteringthe operation enterthe no of manpower in Nofield and enter the no ofproposed duration in theduration field,Based onthese entries system willcalculate the duration

Page 143: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 143/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 143

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipmenttask

Page 144: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 144/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 144

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

1. Selectthe task list

2. Click on thisbutton or doubleclick on the tasklist rou

1. Enter yourwork center ifrequired

2. Click onall tocopy this

Page 145: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 145/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 145

7A) Material Planning Against Order

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty /Store Location Etc., and proceed.

Page 146: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 146/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 146

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

Select the relevantOperation and press

Page 147: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 147/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 147

Click onGeneral

Page 148: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 148/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 148

Reservationcreated

Page 149: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 149/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 149

7B) Service Planning against Order

Selectoperation Tab

Page 150: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 150/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 150

1. Change the controlKey to PM03directly(or) Press F4

2. ClickExternal

Page 151: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 151/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 151

Select the appropriate control key and select

Select thecontrol keyPM03

Page 152: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 152/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 152

Enter the Available APO ( Agreement ) in the field .The following data will becopied from the contract.

1. Material Group2. Purchasing Group:3. Purchasing Organization:4. Requisitioner:5. Tracking No:

Page 153: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 153/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 153

Page 154: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 154/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 154

After press ing the Continue check button , fol lowing message will get displayed

Page 155: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 155/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 155

Select the Operation with ( PM03 ) contol key , and Go to EXTERNAL but ton .

Then select the Services available in the APO , from “ service selection” button at

the bottom.

SelectEXTERNALBUTTON

Page 156: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 156/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 156

Select ServiceSelection

Page 157: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 157/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 157

CLICK on the SERVICES for ADOPT SERVICES.

Select ForAdopt servicesfrom APO

Page 158: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 158/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 158

Select ForEntering thecost centre

Page 159: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 159/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 159

Cost fo r the service will appear in the service , is PICKED from APO.On saving the order a message will be displayed .

Continue forservice selection

Page 160: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 160/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 160

8) Workf low for Maintenance Order Approval

Open the Order in change mode using any one navigation shown below

8A) Order Approval

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

SelectEnhancementTab

Page 161: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 161/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 161

APPROVER RECEIVED SAP MAIL.HE APPROVE/ NOTAPPROVE & SENT BACK

Select Notesheet

1.Enter theSAPID of theApprover

2.Enter thetext andcontinue

3. Click send mail.

Page 162: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 162/330

Page 163: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 163/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 163

9) Check of material availability in sto rage location

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequentSettlement ---Vendor Rebate Arrangement ---Environment ---Environment---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant /Storage Location, Etc

2. Execute

Page 164: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 164/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 164

Material Issue against Reservation (if the material is available in storage location)

9A) Material Issue agains t Reservation (if the material is available in sto rage

Material Code / Qty can be checked here

Page 165: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 165/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 165

location)

Prerequisites - Reservation no.

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservationno and pressENTER

Page 166: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 166/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 166

Click on MaterialTab

Page 167: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 167/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 167

Click on Quantity Taband check the details

Page 168: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 168/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 168

1. Enter theno if Qty to

be posted

3. Click on Where Taband check the details

Page 169: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 169/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 169

2. Click onreservation tab tocheck the details

1. Check the details likeMoment type / Stock typeStorage Location Etc.

Page 170: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 170/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 170

After checking all thedetails press AccountAssignment Tab.

Page 171: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 171/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 171

After Posting the material document no will be generated .

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

MB21- CREAT RESERVATION UNDER MOVEMENT 913MIGO- WITH RESPECT TO RESERVATION FOR TRANSFER & POSTING WHICHGIVES MATERIAL DOCUMENT NOMIGO-WITH RESPECT TO MATERIAL DOCUMENT FOR PLACE IN STORAGE

1.Click onCheck

2. Click on Post

Page 172: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 172/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 172

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

Enter the Material Document no to display the material document.

10) Change in Material Requirement

Open the order in change mode using any navigation option shown below.

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Page 173: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 173/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 173

SelectEnhancementTab

Page 174: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 174/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 174

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

10D) Create Reservation for Return of Material to Store

If material issued is not consumed, returning is done as per steps 10 to 10C.

The quantity in the case of return will be negative.

11) View Purchase Requis ition number

Select Notesheet

Page 175: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 175/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 175

Open the order in change mode using any one navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Page 176: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 176/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 176

Purchase.Requisition no can be viewed

Page 177: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 177/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 177

11A) Initiate and Release Purchase Requisition

SAP Menu Go to EASY ACCESS Screen by /n

T Code /n

Go to SAP BusinessWorkplace

Page 178: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 178/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 178

Now release the PR as per MM workflow procedure.

12) Purchase Order Process

12A Create Purchase Order.

Maintain Additional information required

Double click on INBOX – Itwill display the list ofMessages .

Open a notesheet for“Purchase.Requisition”

Page 179: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 179/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 179

Maintain Header text as per Requirement

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order ---

Create---ME21N – Vendor / Supplying Plant Known.

T Code ME21N

User Menu Select corresponding Node for ME21N / Create Purchasing Order.

Page 180: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 180/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 180

1. Enter thePurchase req. no

2. Execute

Page 181: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 181/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 181

SELECT PR & ADOPT

PO CREATED

Page 182: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 182/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 182

12B) Change Purchase Order

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order ---

Change---ME22N – Change.

T Code ME22N

User Menu Select corresponding Node for ME22N / Change Purchasing Order.

Page 183: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 183/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 183

Click here to changethe Purchase order no.

Eneter therelevantPurch.Order

Page 184: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 184/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 184

Change the Description (or) details you want to change and Save.

12C) Display Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order---Display---ME23N – Vendor / Supplying Plant Known.

T Code ME23N - Display

User Menu Select corresponding Node for ME23N / Display Purchase Order.

Page 185: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 185/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 185

All the required details can be viewed from this transaction

Click here toenter the Purchaseorder no.

Enter thePurchase order

Page 186: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 186/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 186

12D) Release Purchase Order. Initiate PO release for next level

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order

--- Release---.

T Code PO release work flow

Page 187: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 187/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 187

12E) Print PO

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order--- Messages---ME9F – Individual Release.

T Code Type ME9F and in Command Field and press

User Menu Select corresponding Node for ME9F / Release

1. Enter thePurchase Order no

2. Execute

Page 188: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 188/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 188

Work Order is printed. Please click the icon to view the format.

2.xps

Click TrialPrint Out

Select the no ofcopies req.

Presshere

Page 189: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 189/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 189

13) Post Down Payment (Optional)

This step is optional. Follow the steps in case down payment is requested.

SAP MenuLogistics---Accounts Payable---Document Entry---Down Payment-

--F-48-Down Payment

T Code Type F-48 in Command Field and press

User Menu Select corresponding Node for F-48 / Down Payment.

Page 190: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 190/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 190

Enter the following details

Company CodePosting dateCurrencyVendor CodeHeader TextPurchase orderBank NumberRequest no (Optional)

Page 191: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 191/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 191

14) Call /inform the Vendor:

Open the notification in change mode using any one of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenanceprocessing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Page 192: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 192/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 192

Enter all theCommunicationdetails

Click here tochange the statusto vend

Page 193: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 193/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 193

Service vendor details will be updated . Information to Vendor is sent to Vendor’s Email

ID thru SAP as per the details maintained in Vendor Docket Screen.

15) Change in Service Planning against Order

Open the Order in change mode using any one navigation option below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Set the status asVEND

Page 194: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 194/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 194

16) Service procurement process for new requirement

Please refer steps 11 to 13.

17)Create Reservation for Return of Material to Store (if material issued is not consumed

18) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---CompletionConfirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

Enter Order no.and pressENTER

Page 195: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 195/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 195

A pop window will open as mentioned below.

Check the details likeFinal Confirmation andother details and pressENTER

After entering thetime confirmationdetails ( ActualWork ) SAVE IT.

Page 196: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 196/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 196

Number of confirmation is

displayed below.

Page 197: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 197/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 197

19) Complete Order

Open the order in change mode using any navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Orderno and pressEnter

Page 198: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 198/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 198

Click on Flag

Page 199: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 199/330

Page 200: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 200/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 200

Order saved and message isdisplayed with respectivenumbers

Page 201: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 201/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 201

20) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T Code Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No and

proceed

Page 202: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 202/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 202

1. Maintain“Vendor Docket

2. Click tochange theuser status

Page 203: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 203/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 203

Set thestatus toCOMP

Page 204: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 204/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 204

21) Process NotificationSet user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

Click to change theUser Status

Page 205: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 205/330

Page 206: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 206/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 206

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

Click the Flag to

complete the Notif.

Page 207: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 207/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 207

Page 208: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 208/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 208

Page 209: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 209/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 209

Status is updated to

NOCO. Check the sameand proceed

Page 210: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 210/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 210

23) Service Entry sheet Process

Please refer P.O. issued for this maintenance

23A) Create Service entry sheet with reference to Purchase order

Use any one of the navigation mode to create the Service Entry Sheet with Reference

to Purchase Order

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Page 211: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 211/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 211

Enter Purchase

order no.

Page 212: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 212/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 212

After saving a message is displayed as shown below.

Press

create.

1. Enter theservice details

2. Save

Page 213: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 213/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 213

Creation of ServiceEntry Sheet triggers aauto generated mail

Enter the Mai Id ofthe Approver.

Page 214: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 214/330

Page 215: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 215/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 215

1. Enter theservice EntrySheet no

2. Execute

Page 216: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 216/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 216

On Saving following Message is displayed

1.Select theRelevant Doc.

2. Release

3. Save

Page 217: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 217/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 217

1. Enter the ServiceEntry Sheet no

2. Execute

Page 218: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 218/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 218

On saving, the following document is displayed.

24) Maintenance Order Settlement

Use any one of the navigation mode to release the Service Entry Sheet.

1. Select theRelevant Doc.

2. Release

3. Save

Enter Doc. HeaderText and press

Page 219: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 219/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 219

SAP Menu

Logistics---Plant Maintenance----Maintenance Processing---

Notification---Maintennace Processing---Completion Confimration----

Entry---IW41---Individual Time Confirmation

T Code K088

User Menu Select corresponding Node for K088 / Individual Time Confirmation

1. EnterControlling area

2. Enter the followinga. Settlement period b. Fiscal Yearc. Processing Type

Page 220: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 220/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 220

25) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Select Complete (Business)

Page 221: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 221/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 221

26) Account ing entry verification

Prerequisite

Service Entry Sheet no

Use any one of the Navigation option

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Status is updated to

CLSD

Page 222: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 222/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 222

Click here toenter Servicesheet no

Enter Service sheetno and press

Page 223: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 223/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 223

27) Print SES Document

Prerequisite

Service Entry Sheet no.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML83 Print / Transmit.

T Code ML83

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Page 224: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 224/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 224

1. Enter Entrysheet no

2. EnterPurchaseorder no

3. Execute

Page 225: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 225/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 225

The Doc. Gets printed. Printed copy can be viewed by clicking the icon.

3.xps

1. Select therelevant field

2. SelectTrial PrintOut

Select Print

Page 226: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 226/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 226

28) Invoice verification Process

28A) Invoice Verification for Service Performed

Use any one of the navigation mode.

SAP Menu Logistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code MIRO

User Menu Select corresponding Node for SBWP / Workplace

1. Enter Purchaseorder no.

2. Enter Refno

3. Enter Date

4. Press ENTER afterfilling all the details

Page 227: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 227/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 227

28C) Adjustment of down payment.

Since, Adjustment of down payment is done already follow the next step

28D) Vendor Payment

Use any one of the Navigation option.

In the Initial screen, plz enter the following datas.

Enter Document Date

Enter Posting Date

Enter Bank Account Enter Amount

Select Invoice

An accounting document is generated.

SAP MenuLogistics---Accounting---Financial Accounting---Accounts Payable---

Document Entry---Outgoing Payment---F-53

T Code Type F-53 in Command Field and press

User Menu Select corresponding Node for F-53 / Outgoing Payment

Page 228: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 228/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 228

28E) Display Accounting Document

Use any one of the navigation mode.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code Type MIRO in Command Field and press

User Menu Select corresponding Node for MIRO / Logistics Invoice Verification.

1. Enter Purchaseorder no.

2. Enter Refno

3. Enter Date

4. Press ENTER afterfilling all the details

Page 229: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 229/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 229

3D: Breakdown Maintenance by Vendor (Need Based

Service requirement)

1. Create Notification

Purpose

A defect has occurred and you create a Breakdown Notification. You enter a brief

description of defect, technical object (Functional Location / Equipment) on which defect

has occurred, optionally the detail description in subject long text and task required tobe done.

Trigger

Perform this procedure when there is a need for Manpower and material requirement for

your Breakdown Maintenance Activities

Prerequisites

Technical Object ( Functional Location / Equipment)

Main Work Center

Cost Center

HR Employee List

Page 230: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 230/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 230

Procedure

1. Access the transaction choosing one of the following navigation options:

SAP Menu

a) Logist ics --- Plant maintenance--- Maintenance

processing --- Notification --- Create (General)

b) Logist ics --- Plant maintenance --- Maintenance

processing --- Notification --- Create (Special) ---

Malfunction Report

T Code Type IW21 / IW24 in Command Field and press

User Menu Select corresponding Node for IW21 / IW24 / Notification

Enter Notification Type

Page 231: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 231/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 231

Note :

If known, the equipment no. can directly be entered or equipment can be selected from

Equipment field F4 help by giving proper selection criteria like equipment description,

plant, plant section, planner group, Main work center etc. in selection option ‘Equipment

by equipment list’.

1. Enter short Text

2.Enter Equipmentcode (or)Func.Location

3. SelectBreakdown

4. Enter the appropriate text

Page 232: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 232/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 232

2. Assign Notification – Assign to responsib le person fo r maintenance

Partner Function “ Initiator ” is maintained manually by the Notification creator

.“Person Responsib le ” is either picked from master data (if maintained) or can be

maintained manually by Notification creator.

User Status “ Assigned ” is set by “ Initiator ”.Information flow is triggered and information is sent to “ Person Responsib le ” via Email.

Notification can be assigned to multiple “ Person Responsible ”.

Open the Notification in change mode using any one navigation options shown below.

System will savethis notificationwith generating aninternal number

Page 233: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 233/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 233

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

5. Enter PartnerDetails

Page 234: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 234/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 234

Click hereto changethe staus

Page 235: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 235/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 235

SAVE & MAIL IS SENT TO RESPONSIBLE PERSON

Select Assignedand proceed.

1. Status updated toASGD

2. Save

Page 236: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 236/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 236

On saving a mail istriggered in SAP system.

The Mail carries thefollowing details

Page 237: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 237/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 237

3. Re-Assign to responsib le person fo r maintenance.1. Change the Partner no

and press Enter

New PersonResponsible isassigned

Page 238: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 238/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 238

Click here tochange thestatus

Select RASG and pressENTER

Page 239: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 239/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 239

Information flow is triggered to all maintained “ New Personal Responsible ”, and“Initiator ” via Email.

4. Acknowledge Noti fication and “Put in Process” Notification:

Open the Notification in change mode using any one navigation option shown below.

SAP Menu Logistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

1. Check the status

2. Save

Page 240: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 240/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 240

Note:

User Status “ ACKD ” is set by “ Person Responsib le ”.

Notification is “ Put in Process ” by “Person Responsible ”.

Information flow is triggered to “ Initiator ” and all “ Person Responsib le ” about statusupdate.

1. Click tochange the staus

tp ACKD

2. Click hereto put the Notif ication process

3. Click tosave the Notif.

Page 241: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 241/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 241

5) Decision on Maintenance Order Requirement

Decide on the requirement of Maintenance order, based on material to be consumed

from stores

5A) Maintenance Order for material to be consumed from stores

Follow steps from 6 to 18

5B) Maintenance Order not required as no material consumed/services used

Follow steps from 14 to 16

Page 242: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 242/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 242

6) Create Maintenance Order from Notification

1. An Order can be created directly from the Notification screen.To create an Order directly from the notification screen click create order, as shown

in the above screen.

Click here tocreate an order

Page 243: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 243/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 243

2. On the Create Breakdown order: Central Header Data will get copied from the

Notification e.g. Order Header, Planner Group, Maint work center, Reference object etc.

If any changes are required it can be done.

Check the Order type and proceed

Page 244: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 244/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 244

3. According to the planning assign the operations which need to be carried out.

The first operation in the operations screen gets copied from the order header as default

by the system as shown below. It can be replaced with some other operation, or if some

similar operations are there in some task list then those operations can also be copied

directly to the order.

1. First operation getcopied from the orderheader, it can be

replaced if required

2. After enteringthe operation enterthe no of manpower in Nofield and enter the no ofproposed duration in theduration field,Based onthese entries system willcalculate the duration

Page 245: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 245/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 245

Click - execute button at top left of the screen.

You will get the list of Task lists fulfilling the above selection criteria.

Select your Task list and click button at top of the page or alternatively you can

double click on the task list group.

These fields will becomegray based on the selectioncriteria, either Gen task list orfunction loc. Or equipmenttask

Page 246: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 246/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 246

Now system will ask you weather you want to copy the work center from the task list or

some other work center you want to choose, if you want to change the work center

according to your notification then change it accordingly.

Now System will ask you weather you want to select all the operations of the task list or

only some selected operations you want to select, choose accordingly.

1. Selectthe task list

2. Click on thisbutton or doubleclick on the tasklist rou

1. Enter yourwork center ifrequired

2. Click onall tocopy this

Page 247: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 247/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 247

7A) Material Planning Against Order

If you want to select allthe operations then clickon all, otherwise if youwant to select someselected operations thenselect those operations

Enter the material code / Qty /Store Location Etc., and proceed.

Page 248: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 248/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 248

Enter the material code no if known or select the material from the drop down, and enter

the required quantity as per the requirement. Then press enter; now system will ask you

for which operation you want to assign this material as shown below, either enter the

operation no or click on operation list and select the desired operation.

Select the relevantOperation and press

Page 249: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 249/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 249

Click onGeneral

Page 250: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 250/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 250

Reservationcreated

Page 251: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 251/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 251

7B) Service Planning against Order

Selectoperation Tab

Page 252: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 252/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 252

1. Change the controlKey to PM03directly(or) Press F4

2. ClickExternal

Maintain the following:

1. Material Group2. Purchasing Group:3. Purchasing Organization:4. Requisitioner:5. Tracking No:

Page 253: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 253/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 253

Select the appropriate control key and select

Select thecontrol keyPM03

Page 254: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 254/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 254

On saving the order a message will be displayed.

Select the following

1. Service from drop down2. Maintain quantity3. Gross Price and4. Cost Element.

Page 255: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 255/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 255

8) Workf low for Maintenance Order Approval

Open the Order in change mode using any one navigation shown below

8A) Order Approval

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

SelectEnhancementTab

Page 256: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 256/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 256

Select Notesheet

1.Enter theSAPID of theApprover

2.Enter thetext andcontinue

3. Click send mail.

Page 257: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 257/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 257

8B) Order Release

Open the order in the change mode using any one navigation option shown below

Press to release the order and press to save the order.

9) Check of material availability in storage location

1. Releasethe order 2. Save the

order

Page 258: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 258/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 258

SAP Menu

Materials Management ---Purchasing ---Mater Data ---SUbsequent Settlement ---Vendor Rebate Arrangement ---Environment ---Environment ---Condition/Arrangement ---Environment ---Pricing ---Environment ---Value Assignment ---Inventory Management ---Environment ---Stock ---MB52 --- Warehouse Stock.

T Code Type MB52 in Command Field and press

User Menu Select corresponding Node for MB52 / Ware house stock

1. Enter the Plant /Storage Location, Etc

2. Execute

Page 259: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 259/330

Page 260: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 260/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 260

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow On Functions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

Enter Reservationno and pressENTER

Page 261: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 261/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 261

Click on MaterialTab

Page 262: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 262/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 262

Click on Quantity Taband check the details

Page 263: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 263/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 263

1. Enter theno if Qty to

be posted

3. Click on Where Taband check the details

Page 264: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 264/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 264

2. Click onreservation tab tocheck the details

1. Check the details likeMoment type / Stock typeStorage Location Etc.

Page 265: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 265/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 265

After checking all thedetails press AccountAssignment Tab.

Page 266: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 266/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 266

After Posting the material will be posted and document no will be generated.

9B) If the material is not available in storage location

Please refer MM Script of Material Stock transfer or Material Procurement.

1.Click onCheck

2. Click on Post

Page 267: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 267/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 267

9C) Display Material Document

Prerequisites – Material Document no (Obtained while posting a reservation).

Enter the Material Document no to display the material document.

10) Change in Material RequirementOpen the order in change mode using any navigation option shown below.

SAP Menu Logistics---Material Management---Purchasing---Purchase Order---Follow OnFunctions---MIGO

T Code Type MIGO in Command Field and press

User Menu Select corresponding Node for MIGO / Goods Issue

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Add new componentand proceed.

Page 268: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 268/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 268

SelectEnhancementTab

Select Notesheet

Page 269: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 269/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 269

10B) Material Requirement change

10C) Material Issue against Reservation

Please refer steps 9 to 9C.

10D) Create Reservation for Return of Material to Sto re

If material issued is not consumed, returning is done as per steps 10 to 10C.

The quantity in the case of return will be negative.

1. Enter theSAP ID of theApprover

2. Enter thetext andcontinue

3. Click send mail.

Page 270: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 270/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 270

11) View Purchase Requis ition number

Open the order in change mode using any one navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Page 271: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 271/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 271

Purchase.Requisition no can be viewed

Page 272: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 272/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 272

11A) Initiate and Release Purchase Requisition

SAP Menu Go to EASY ACCESS Screen by /n

T Code /n

Go to SAP BusinessWorkplace

Page 273: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 273/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 273

Now release the PR as per workflow procedure.

13) Purchase Order Process

13)A Create Purchase Order.

Maintain Additional information required

Double click on INBOX – Itwill display the list ofMessages .

Open a notesheet for“Purchase.Requisition”

Page 274: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 274/330

Page 275: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 275/330

Page 276: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 276/330

Page 277: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 277/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 277

13B) Change Purchase Order

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order ---

Change---ME22N – Change.

T Code ME22N

User Menu Select corresponding Node for ME22N / Change Purchasing Order.

Page 278: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 278/330

Page 279: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 279/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 279

Change the Description (or) details you want to change and Save.

13C) Display Purchase Order

SAP Menu Logistics---Materials Management---Purchasing---Purchase Order---Display---ME23N – Vendor / Supplying Plant Known.

T Code ME23N - Display

User Menu Select corresponding Node for ME23N / Display Purchase Order.

Page 280: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 280/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 280

All the required details can be viewed from this transactions.

Click here toenter the Purchaseorder no.

Enter thePurchase order

Page 281: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 281/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 281

13D) Release Purchase Order. Initiate PO release for next level

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order

--- Release---ME29N – Vendor / Supplying Plant Known.

T Code ME29N

User Menu Select corresponding Node for ME29N /Individual Release

Page 282: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 282/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 282

13E) Print PO

SAP MenuLogistics---Materials Management---Purchasing---Purchase Order

--- Messages---ME9F – Individual Release.

T Code Type ME9F and in Command Field and press

User Menu Select corresponding Node for ME9F / Release

1. Enter thePurchase Order no

2. Execute

Page 283: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 283/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 283

Work Order is printed. Plz click the icon to view the format.

2.xps

Click TrialPrint Out

Select the no ofcopies req.

Presshere

Page 284: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 284/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 284

14) Post Down Payment (Optional)

This step is optional. Follow the steps in case down payment is requested.

SAP MenuLogistics---Accounts Payable---Document Entry---Down Payment-

--F-48-Down Payment

T Code Type F-48 in Command Field and press

User Menu Select corresponding Node for F-48 / Down Payment.

Page 285: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 285/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 285

Enter the following details

Company CodePosting dateCurrencyVendor CodeHeader TextPurchase orderBank NumberRequest no (Optional)

Page 286: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 286/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 286

15) Call /inform the Vendor:

Open the notification in change mode using any one of the Navigation option.

SAP Menu Logistics --- Plant maintenance --- Maintenanceprocessing --- Notification --- Change

T CodeType IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Page 287: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 287/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 287

Enter all theCommunicationdetails

Click here tochange the statusto vend

Page 288: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 288/330

Page 289: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 289/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 289

SelectOperations

Maintain newOperation withControl Key “PM03”.

Page 290: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 290/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 290

1. Select theO eration

2. Select External

Page 291: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 291/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 291

On saving the order following message will be displayed.

Select the following

1. Service from drop down2. Maintain quantity3. Gross Price and4. Cost Element.

Maintain the following:

1. Material Group2. Purchasing Group:3. PurchasingOrganization:4. Requisitioner:5. Tracking No

Maintain APO noand continue

Page 292: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 292/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 292

17) Service procurement process for new requirement

Please refer steps 11 to 13.

18) Create Reservation for Return of Material to Store

19) Order Confirmation

SAP Menu Logistics----Plant Maintenance---Maintenance Processing---CompletionConfirmation----Entry—IW41 Individual Time Confirmation

T CodeType IW41 in Command Field and press

User Menu Select corresponding Node for IW41 / Completion Confirmation

Page 293: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 293/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 293

Enter Order no.and pressENTER

Page 294: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 294/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 294

A pop window will open as mentioned below.

Check the details likeFinal Confirmation andother details and pressENTER

After entering thetime confirmationdetails ( ActualWork ) SAVE IT.

Page 295: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 295/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 295

Number of confirmation isdisplayed below.

Page 296: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 296/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 296

20) Complete Order

Open the order in change mode using any navigation option shown below.

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Enter the Orderno and pressEnter

Page 297: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 297/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 297

Click on Flag

Page 298: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 298/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 298

Check the date andtime and pressENTER

Page 299: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 299/330

Page 300: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 300/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 300

21) Process Notification

Open the notification on change mode and set user status as Work Completed in

Notification

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Notification --- Change

T Code Type IW22 in Command Field and press

User Menu Select corresponding Node for IW22 / Notification

Enter the Notification No and

proceed

Page 301: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 301/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 301

1. Maintain“Vendor Docket

2. Click tochange theuser status

Page 302: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 302/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 302

Set thestatus toCOMP

Page 303: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 303/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 303

22) Process Notification

Set user status as Confirmed Or Set user status as Rework

(follow all the Steps from 3 to 15)

Click to change the

User Status

Page 304: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 304/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 304

If the user status is set as rework (follow all the Steps from 3 to 15)

User Status “Confirmed” or “Rework” is set by “ Initiator ”.Information flow is triggered to all “ Person Respons ible ” about status update via

Email.

23) Complete Notif ication

Open the Notification in the change mode using transaction code IW22 or from the SAP

menu as mentioned in the earlier steps.

Status can either bechanged to1. REWK or2. CNFR

Page 305: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 305/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 305

Fiiup the all catalog data – Object Parts & Damage / Causes / Activities etc.

Click the Flag tocomplete the Notif.

Page 306: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 306/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 306

Page 307: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 307/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 307

Page 308: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 308/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 308

Status is updated to

NOCO. Check the sameand proceed

Page 309: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 309/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 309

24) Service Entry sheet Process

Please refer P.O. issued for this maintenance

24A) Create Service entry sheet with reference to Purchase order

Use any one of the navigation mode to create the Service Entry Sheet with Reference

to Purchase Order

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Page 310: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 310/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 310

Enter Purchase

order no.

Page 311: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 311/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 311

After saving a message is displayed as shown below.

Press

create.

1. Enter theservice details

2. Save

Page 312: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 312/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 312

Creation of ServiceEntry Sheet triggers aauto generated mail

Enter the Mai Id ofthe Approver.

Page 313: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 313/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 313

24B) Release Service entry sheet Initiate SES release for next l evel.

Prerequisites

Service Entry Sheet no.

Use any one of the navigation mode to release the Service Entry Sheet.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML81N-Maintain

T Code ML81N

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Page 314: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 314/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 314

1. Enter theservice EntrySheet no

2. Execute

Page 315: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 315/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 315

On Saving following Message is displayed

1.Select theRelevant Doc.

2. Release

3. Save

Page 316: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 316/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 316

1. Enter the ServiceEntry Sheet no

2. Execute

Page 317: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 317/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 317

On saving, the following document is displayed.

25) Maintenance Order Settlement

Use any one of the navigation mode to release the Service Entry Sheet.

1. Select theRelevant Doc.

2. Release

3. Save

Enter Doc. HeaderText and press

Page 318: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 318/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 318

SAP Menu

Logistics---Plant Maintenance----Maintenance Processing---

Notification---Maintennace Processing---Completion Confimration----

Entry---IW41---Individual Time Confirmation

T Code K088

User Menu Select corresponding Node for K088 / Individual Time Confirmation

Page 319: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 319/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 319

26) Business Completion of Maintenance Order

Open the order in change mode using anyone of the Navigation option.

1. EnterControlling area

2. Enter the followinga. Settlement period b. Fiscal Yearc. Processing Type

Page 320: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 320/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 320

SAP MenuLogistics --- Plant maintenance --- Maintenance

processing --- Order--- Change

T Code Type IW32 in Command Field and press

User Menu Select corresponding Node for IW32 / Order

Select Complete (Business)

Page 321: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 321/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 321

27) Account ing entry verification

Prerequisite

Service Entry Sheet no

Use any one of the Navigation option

Status is updated toCLSD

Page 322: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 322/330

Page 323: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 323/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 323

Enter Service sheetno and ress

Page 324: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 324/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 324

28) Print SES Document

Prerequisite

Service Entry Sheet no.

SAP MenuLogistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---Service Entry Sheet---ML83 Print / Transmit.

T Code ML83

User Menu Select corresponding Node for ML81N / Service Entry Sheet.

Page 325: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 325/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 325

1. Enter Entrysheet no

2. EnterPurchaseorder no

3. Execute

Page 326: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 326/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 326

1. Select therelevant field

2. SelectTrial PrintOut

Select Print

Page 327: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 327/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 327

The Doc. Gets printed. Printed copy can be viewed by clicking the icon.

3.xps

Work Certif ication Process

Please refer to work certification Manual

29) Invoice verification Process

29A) Invoice Verification for Service Performed

Use any one of the navigation mode.

SAP Menu Logistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code MIRO

User Menu Select corresponding Node for SBWP / Workplace

Page 328: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 328/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 328

29B) Debit/ Credit Notes

29C) Adjustment of down payment.

Since, Adjustment of down payment is done already follow the next step

29D) Vendor Payment

Use any one of the Navigation option.

1. Enter Purchaseorder no.

2. Enter Refno

3. Enter Date

4. Press ENTER afterfilling all the details

Page 329: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 329/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 329

In the Initial screen, plz enter the following datas.

Enter Document Date

Enter Posting Date

Enter Bank Account

Enter Amount

Select Invoice

An accounting document is generated.

29E) Display Accounting Document

Use any one of the navigation mode.

SAP Menu

Logistics---Accounting---Financial Accounting---Accounts Payable---

Document Entry---Outgoing Payment---F-53

T Code Type F-53 in Command Field and press

User Menu Select corresponding Node for F-53 / Outgoing Payment

Page 330: ERP PM UM 05 Breakdown Maintenance Process V3

8/17/2019 ERP PM UM 05 Breakdown Maintenance Process V3

http://slidepdf.com/reader/full/erp-pm-um-05-breakdown-maintenance-process-v3 330/330

BSNL_PM_UM_05_Breakdown_Maintenance_Process_V3.0 Page | 330

SAP Menu

Logistics---Material Management---Purchasing---Purchasing Order---

Follow On Functions---MIRO Logistics Invoice Verification

T Code Type MIRO in Command Field and press

User Menu Select corresponding Node for MIRO / Logistics Invoice Verification.

1. Enter Purchaseorder no.

2. Enter Refno

3. Enter Date

4. Press ENTER afterfilling all the details