CRONOGRAMA VALORIZADO DE AVANCE DE OBRA OBRA “MANTENIMIENTO PERIODICO DE LA CARRETERA CINCOESQUINAS-EL TIGRE-ROLDAN, DISTRITO DE QUILMANA-CAÑETE-LIMA" ” UBICACIÓN DISTRITO :QUILMANA PROVINCIA :CAÑETE DEPARTAMENTO :LIMA FECHA FEBRERO 2015 ITEM DESCRIPCION UND METRADO COSTO 30 DIAS CALENDARIOS TOTAL UNITARIO PARCIAL 1° MES 01 TRABAJOS PROVISIONALES 01.01 OFICINA, CASETA DE GUARDIANIA Y ALMACEN DE OBRA mes 1.00 400.00 400.00 400.00 400.00 01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE (3.60m x 2.40m) und 1.00 1,082.49 1,082.49 1,082.49 1,082.49 01.03 MOVILIZACION Y DESMOVILIZACION DE MATERIALES, EQUIPOS Y HERRAMIENTAS PARA GLB 1.00 6,000.00 6,000.00 6,000.00 6,000.00 01.04 MANTENIMIENTO DE TRANSITO est 1.00 3,330.92 3,330.92 3,330.92 3,330.92 01.05 SERVICIOS HIGIENICOS PARA LA OBRA mes 1.00 1,170.00 1,170.00 1,170.00 1,170.00 02 TRABAJOS PRELIMINARES 02.01 LIMPIEZA DE TERRENO MANUAL m2 17,930.78 0.50 8,965.39 8,965.39 8,965.39 02.02 TRAZO, NIVELACION Y REPLANTEO m2 17,930.78 0.40 7,172.31 7,172.31 7,172.31 02.03 RIEGO DE ZONA A TRABAJAR PARA MITIGAR LA CONTAMINACION POR POLVO m2 17,930.78 0.91 16,317.01 16,317.01 16,317.01 03 CARPETA DE RODADURA 03.01 BACHEO, NIVELACION Y COMPACTACION DE SUPERFICIE m2 17,930.78 2.27 40,702.87 40,702.87 40,702.87 03.02 IMPRIMADO ASFALTICO m2 17,930.78 3.42 61,323.27 61,323.27 61,323.27 03.03 RIEGO CON ARENA GRUESA m2 17,930.78 0.47 8,427.47 8,427.47 8,427.47 COSTO DIRECTO 154,891.73 ### GASTOS GENERALES 3.00% 4,646.75 4,646.75 UTILIDADES 5.00% 7,744.59 7,744.59 SUB TOTAL S/. 167,283.07 ### I.G.V. 18.00% 30,110.95 ### PRESUPUESTO TOTAL S/. 197,394.02 ### SON: CIENTO NOVENTA Y SIETE MIL TRESCIENTOS NOVENTA Y CUATRO CON 02/100 NUEVOS SOLES

Errr

Embed Size (px)

Citation preview

VALORIZADOCRONOGRAMA VALORIZADO DE AVANCE DE OBRA

OBRAMANTENIMIENTO PERIODICO DE LA CARRETERA CINCOESQUINAS-EL TIGRE-ROLDAN, DISTRITO DE QUILMANA-CAETE-LIMA"

UBICACINDISTRITO :QUILMANAPROVINCIA :CAETEDEPARTAMENTO :LIMAFECHAFEBRERO 2015

ITEMDESCRIPCIONUNDMETRADOCOSTO30 DIAS CALENDARIOSTOTAL180 DIAS CALENDARIOSTOTALUNITARIOPARCIAL1 MES1 MES

01TRABAJOS PROVISIONALES01.01 OFICINA, CASETA DE GUARDIANIA Y ALMACEN DE OBRAmes1.00400.00400.00400.00400.00100%01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE (3.60m x 2.40m)und1.001,082.491,082.491,082.491,082.49100%100%01.03 MOVILIZACION Y DESMOVILIZACION DE MATERIALES, EQUIPOS Y HERRAMIENTAS PARA LA OBRAGLB1.006,000.006,000.006,000.006,000.00100%100%01.04 MANTENIMIENTO DE TRANSITOest1.003,330.923,330.923,330.923,330.92100%100%01.05 SERVICIOS HIGIENICOS PARA LA OBRAmes1.001,170.001,170.001,170.001,170.00100%100%02 TRABAJOS PRELIMINARES100%100%02.01 LIMPIEZA DE TERRENO MANUALm217,930.780.508,965.398,965.398,965.39100%02.02 TRAZO, NIVELACION Y REPLANTEOm217,930.780.407,172.317,172.317,172.31100%100%02.03 RIEGO DE ZONA A TRABAJAR PARA MITIGAR LA CONTAMINACION POR POLVOm217,930.780.9116,317.0116,317.0116,317.01100%100%03 CARPETA DE RODADURA100%100%03.01 BACHEO, NIVELACION Y COMPACTACION DE SUPERFICIEm217,930.782.2740,702.8740,702.8740,702.87100%100%03.02 IMPRIMADO ASFALTICOm217,930.783.4261,323.2761,323.2761,323.27100%03.03 RIEGO CON ARENA GRUESAm217,930.780.478,427.478,427.478,427.47100%100%COSTO DIRECTO154,891.73154,891.73GASTOS GENERALES3.00%4,646.754,646.75UTILIDADES 5.00%7,744.597,744.59SUB TOTAL S/.167,283.07167,283.07I.G.V. 18.00%30,110.9530,110.95PRESUPUESTO TOTAL S/.197,394.02197,394.02SON: CIENTO NOVENTA Y SIETE MIL TRESCIENTOS NOVENTA Y CUATRO CON 02/100 NUEVOS SOLES

DESEMBOLSOCRONOGRAMA DE DESEMBOLSO

PROYECTOMANTENIMIENTO PERIODICO DE LA CARRETERA CINCOESQUINAS-EL TIGRE-ROLDAN, DISTRITO DE QUILMANA-CAETE-LIMA" UBICACINDISTRITO :QUILMANAPROVINCIA :CAETEDEPARTAMENTO :LIMAFECHA FEBRERO 2015

TEMDESCRIPCIN%Adelantos30 DAS CALENDARIOSTOTALVALORIZACION N 0130 DIAS1.00ADELANTOS154,891.73

1.01Adelanto Directo20.00%30,978.3530,978.3561,956.69

1.02Adelanto para Materiales (relacion de insumos)40.00%61,956.6961,956.6992,935.04

2.00VALORIZACIN2.011ra. Valorizacin Amortizacin de Adelantos61,956.6961,956.69

PORCENTAJE60.00%40.00%100.00%PORCENTAJE ACUMULADO60.00%100.00%100.00%COSTO TOTAL92,935.0461,956.69154,891.73GASTOS GENERALES3.00%2,788.051,858.704,646.75UTILIDADES5.00%4,646.753,097.837,744.59SUB - TOTAL100,369.8466,913.23167,283.07I.G.V. 18%18.00%18,066.5712,044.3830,110.95TOTAL DEL PRESUPUESTO118,436.4178,957.61197,394.02