Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Table of Contents
3 Project Modifications 3
TAP Project Modifications Overview 3 3.1.1 Presentation of Project Modifications 3 3.1.2 Rationale for Project Modifications 4
Modifications in Pipeline Route 5 3.2.1 Major Reroutings 5 3.2.1.1 Amfitriti rerouting 5 3.2.1.2 Kosmio rerouting 5 3.2.1.3 Nestos rerouting 6 3.2.1.4 Nea Karvali rerouting 7 3.2.1.5 Drymos rerouting 8 3.2.1.6 Pyrgoi rerouting 9 3.2.1.7 Foufas - Eordea rerouting 10 3.2.2 Minor Reroutings 11
Modifications in the Location or Design of Project Installations 11 3.3.1 Block-valve Stations (BVS) 11 3.3.1.1 BVS design 11 3.3.1.2 BVS location 12 3.3.2 Temporary Installations 13
Table of Tables
Table 3-1 BVS locations in ESIA Amendment 12 Table 3-2 Pipe Yards and Camp Sites Locations in ESIA Amendment 13
Table of Figures
Figure 3-1 Overview of Amfitriti Rerouting 5 Figure 3-2 Overview of Kosmio Rerouting 6 Figure 3-3 Overview of Nestos Rerouting 7 Figure 3-4 Overview of Nea Karvali Rerouting 8 Figure 3-5 Overview of Drymos Rerouting 9 Figure 3-6 Overview of Pyrgoi Rerouting 10 Figure 3-7 Overview of Foufas - Eordea Rerouting 11
E.ON Technologies GmbH
EXERGIA S.A.
Page 3 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
3 Project Modifications
TAP Project Modifications Overview
3.1.1 Presentation of Project Modifications
The present ESIA Amendment report introduces to the ESIA basecase 7 major reroutings and
around 110 minor reroutings. Major reroutings are considered those that extend beyond the
500m corridor studied during ESIA preparation. As such, they are subjected to thorough
investigation, at a level similar to the rest of the ESIA basecase route, in order to make sure that
likely environmental, socioeconomic and cultural heritage impacts associated with the proposed
reroutings are identified and mitigated as appropriate. The following major reroutings are
considered:
Amfitriti rerouting
Kosmio rerouting
Nestos rerouting
Nea Karvali rerouting
Drymos rerouting
Pyrgoi rerouting
Foufas – Eordea rerouting
A brief presentation of these reroutings is provided in this Section, while more details on the
environmental, socioeconomic and cultural heritage baseline of the rerouting areas are given in
Section 5.
A number of smaller changes to the pipeline route have been proposed as the engineering
design is advancing and the engineering team addresses local needs and requests. These
changes are small and lie within the ESIA basecase route corridor that was studied in detail in
the ESIA for the TAP Project. As a result these changes are not considered any further.
Additionally, the project team introduced an alternative method for representing the various points
of the pipeline than the one used in the ESIA which was based on kilometre points (KP). The
E.ON Technologies GmbH
EXERGIA S.A.
Page 4 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
reason is that the KP of a given point tends to change when a change in the route takes place
and this can lead to confusions when referring to the specific point. For this reason the use of
intersection points (IP) has been introduced. As its name suggests, an IP is inserted in every
point of the pipeline where its direction changes. IPs are given in a sequential order starting at IP
0-1 at the Greek – Turkish borders (identical to KP 0) to IP 728 in Nea Mesimvria, and from IP
1001 at the same point (Nea Mesimvria) to IP 1315 at the Greek – Albanian borders. The
relationship between IPs and KPs of the ESIA basecase is presented in detail in Annex 4.3 of this
ESIA Amendment Report.
3.1.2 Rationale for Project Modifications
As a result of the major or minor changes to the pipeline route the engineering team had to
reconsider the location of some of the permanent and temporary installations of the Project, i.e.
block-valve stations (BVS), pipe yards and camp sites. These changes are also described in this
Section.
It is important to note that the vast majority of the reroutings (both major and minor) presented in
this ESIA Amendment have emerged as a result of the extensive ESIA public disclosure
procedure and the ongoing stakeholder engagement that TAP is committed to. Stakeholders at
all levels (either as individuals or through their administrative bodies, institutions etc) expressed
their concerns or alternative proposals regarding the Project, which resulted in the reroutings that
have been assessed by TAP and implemented in the pipeline route and are described in detail
herein.
These were put forward through official communication with TAP or during the numerous
stakeholder private and public meetings organised by TAP during the stakeholder engagement
process or the ESIA Public Disclosure. It should be noted that TAP has already held more than
400 meetings at all levels. In line with the company’s commitment, TAP has considered
stakeholder concerns or proposals and, where reasonable and feasible, has accepted them for
implementation.
In fewer cases, route changes have come as a result of more detailed engineering studies that
have necessitated alterations to the ESIA basecase.
In all cases, the proposed reroutings underwent thorough investigation to ensure that
environmental, socioeconomic and cultural heritage considerations are duly taken into account.
E.ON Technologies GmbH
EXERGIA S.A.
Page 5 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Modifications in Pipeline Route
3.2.1 Major Reroutings
3.2.1.1 Amfitriti rerouting
The proposed rerouting spans from IP109 to IP125. It was designed in order to take into
consideration the plans for the construction of a new hospital to the north of the ESIA basecase
and keep a greater safety distance (see Figure 3-1). The planned hospital is now over 650m
away from the proposed new route. The overall length of the rerouting is 3,730m, slightly longer
(374m) than the ESIA basecase.
Figure 3-1 Overview of Amfitriti Rerouting
Source: EXERGIA (2014)
3.2.1.2 Kosmio rerouting
Kosmio rerouting spans from IP251 to IP289 (Figure 3-2). It was proposed by the local
administration and concerned individuals as they argued that TAP would further hinder the
development of the area, taking into account the impact from the already existing DESFA pipeline
and the road infrastructure. The overall length of the proposed rerouting is 17,324m, 900m
shorter than the ESIA basecase.
Planned Hospital
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 6 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-2 Overview of Kosmio Rerouting
Source: EXERGIA (2014)
3.2.1.3 Nestos rerouting
Nestos rerouting spans from IP374 to IP387 (Figure 3-3) and lies to the south-southeast of the
ESIA basecase. The rerouting runs in parallel to an existing channel and gravel road in an area
of non-private land. It was put forward by the Mayor of Nestos and the Municipality’s technical
department of irrigation with the aim to minimise crossing of private land and damage of the
sensitive irrigation system installed there. The overall length of the rerouting is 14,878m, slightly
longer (700m) than the ESIA basecase.
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 7 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-3 Overview of Nestos Rerouting
Source: EXERGIA (2014)
3.2.1.4 Nea Karvali rerouting
The Nea Karvali rerouting spans from IP394 to IP405 (Figure 3-4). It was proposed by the local
Community (based upon a rerouting suggestion of the Technical Chamber of Greece – Branch of
East Macedonia and Thrace) with the aim to shift pipeline further away from the community of
Nea Karvali which is heavily affected by the existing infrastructure projects (gas pipeline,
tankfarms, Highway etc.). The overall length of the rerouting is 4,960m, approx. 1160m longer
than the ESIA basecase.
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 8 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-4 Overview of Nea Karvali Rerouting
Source: EXERGIA (2014)
3.2.1.5 Drymos rerouting
Drymos rerouting spans from IP677 to IP684 (Figure 3-5). The route was designed to avoid close
proximity to sports installations and to allow more area for future town expansion, following a
relevant request by the Municipality of Oreokastro. The overall length of the rerouting is 3,300m,
slightly longer (271m) than the ESIA basecase.
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 9 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-5 Overview of Drymos Rerouting
Source: EXERGIA (2014)
3.2.1.6 Pyrgoi rerouting
Pyrgoi rerouting spans from IP1136 to IP1144 (Figure 3-6). It was designed to optimise crossing
the apple plantations of the area and minimise damage to agricultural installations, i.e. trees
support, irrigation networks, crop protection netting, etc. The overall length of the rerouting is
4,710m, slightly longer (80m) than the ESIA basecase.
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 10 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-6 Overview of Pyrgoi Rerouting
Source: EXERGIA (2014)
3.2.1.7 Foufas - Eordea rerouting
Foufas – Eordea rerouting spans from IP1169 to IP1196 (Figure 3-7). It addresses requests by
the Municipality of Eordea to avoid crossing an area currently under development for
construction, it allows community plans for small hydropower development in the area and it
accommodates individual requests through route optimisation. The overall length of the rerouting
is 10,755m, slightly (25m) shorter than the ESIA basecase.
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 11 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
Figure 3-7 Overview of Foufas - Eordea Rerouting
Source: EXERGIA (2014)
3.2.2 Minor Reroutings
A number of other changes to the pipeline route have been introduced to the Project as the
engineering design is advancing and the engineering team addresses local needs and requests.
Their main goal is to optimise the pipeline route and minimise the impact on the affected land.
These changes are small and lie within the pipeline route corridor that was studied in detail in the
ESIA for the TAP project. They are presented in Annexes 4.1 and 4.2.
Modifications in the Location or Design of Project Installations
3.3.1 Block-valve Stations (BVS)
3.3.1.1 BVS design
As explained in the ESIA, BVS are installations that allow the operator of the pipeline to interrupt
the flow of gas in the pipeline in a safe and controllable way and thus to isolate sections of the
pipeline. The building structure of the BVS now comprise small buildings of a total building
surface of about 33 m². They are installed in fenced areas of approx. 700 m².
Details on the building structure of the BVS are provided in Annex 4.4
ESIA basecase: blue line Proposed rerouting: red line
E.ON Technologies GmbH
EXERGIA S.A.
Page 12 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
3.3.1.2 BVS location
The installation of 23 Block-valve Stations is considered under the updated project design. The
locations for many of them are the same as presented in the ESIA basecase, but few needed to
be relocated in order to accommodate the modifications to the pipeline route as described in
earlier sections. The updated BVS locations are given in Annex 4.1, while an overview of the
changes is presented in
Table 3-1 below.
Table 3-1 BVS locations in ESIA Amendment
Block-valve Stations in ESIA Amendment
Relation with BVS locations in ESIA Basecase
BVS01 ESIA basecase BVS01
BVS02 Moved to new location due to rerouting
BVS03 ESIA basecase BVS03
BVS04 ESIA basecase BVS04
BVS05 ESIA basecase BVS05
BVS06 ESIA basecase BVS06 – slightly larger plot
BVS07 ESIA basecase BVS07 –larger plot
BVS08 Moved to new location due to rerouting
BVS09 Moved to new location due to rerouting
BVS10 Moved to new location due to rerouting
BVS11 Installed in the area of the future GCS01
BVS12 Moved to new location due to rerouting
BVS13 Moved to new location due to rerouting
BVS14 Moved to new location due to rerouting
BVS15 ESIA basecase BVS14
BVS16 ESIA basecase BVS15
BVS17 ESIA basecase BVS16
BVS18 ESIA basecase BVS17 – slightly shifted
BVS19 ESIA basecase BVS18
BVS20 ESIA basecase BVS19 – slightly reduced in plot size
BVS21 ESIA basecase BVS20 – slightly shifted
BVS22 ESIA basecase BVS21 – change of plot shape
BVS23 New location Source: EXERGIA (2014)
E.ON Technologies GmbH
EXERGIA S.A.
Page 13 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
3.3.2 Temporary Installations
Similarly to the BVS, changes have occurred as a result of the reroutings or the advances of the
engineering design to the temporary project installations, i.e. the pipe yards (PY) and the camp
sites (CAMP). The updated locations of these installations are given in Annex 4.1 while an
overview of the changes is given in
Table 3-2 below. For many of them alternative locations have been proposed in order to address
likely availability issues, i.e. cases where the land plot cannot be made available to the project.
Table 3-2 Pipe Yards and Camp Sites Locations in ESIA Amendment
PY and CAMP in ESIA Amendment
Relation with PY and CAMP locations in ESIA Basecase
PY01 New location
PY02 New location (with 5 alternatives)
PY03 Same as ESIA (with 1 alternative)
PY04 New location (with 4 alternatives)
PY05 Same as ESIA (double in size with 4 alternatives)
PY06 Same as ESIA (bigger in size with 3 alternatives)
PY07 New location (with 2 alternatives)
PY08 Same as ESIA (double in size with 2 alternatives)
PY09 Same as ESIA (double in size with 3 alternatives)
PY10 Same as ESIA (bigger in size with 1 alternative)
PY11 New location (with 2 alternatives)
PY12 Same as ESIA (bigger in size with 1 alternative)
PY13 Same as ESIA (with 1 alternative)
PY14 Same as ESIA (with 2 alternatives)
PY15 Same as ESIA (with 4 alternatives)
PY16 Same as ESIA (with 2 alternatives)
PY17 Same as ESIA (slightly bigger in size with 1 alternative)
CAMP01 Same as ESIA (slightly bigger)
CAMP02 New location (with 1 alternative)
CAMP03 Same as ESIA (slightly bigger)
CAMP04 New location (with 1 alternative)
CAMP05 New location
CAMP06 Same as ESIA
E.ON Technologies GmbH
EXERGIA S.A.
Page 14 of 14 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GPL00-EXG-642-Y-TAE-1004 Rev.: 00 Document Title: Section 3 - Project modification
PY and CAMP in ESIA Amendment
Relation with PY and CAMP locations in ESIA Basecase
CAMP07 New location
CAMP08 Same as ESIA Source: EXERGIA (2014)
Trans Adriatic Pipeline AG-Greece (Branch Office)
21st floor, Athens Tower, 2-4 Mesogion Ave.
11527 Athens, Greece
Phone: +30 210 745613
Fax: +30 210 745300
www.tap-ag.com
Date 12/2014
Copyright Reserved: This document may not be copied, shown to or placed at disposal of third parties without prior consent of TAP AG. The latest version of the document is registered in the TAP Project’s Database.