Overview of Long-Term Plans for Dam Construction

Strategic Environmental Assessment

22

SEA of Long-Term Plans for Dam Construction

Overview of Plans for Water Resources

11

33

Conclusion44

Outline of presentation

Overview

Function

- Establish the Strategies for National Water Resource Management - Supervise Water Use and Flood Control

Legal Bases - Consist of 4 laws : River law, Stream Improvement law, Rural Improvement law, Dam Construction & Surrounding Area Support law - Includes 14 Administrative Plans

Target Area for Planning 1) Multi purpose Dam Construction 2) Dam Construction for Agriculture Use 3) River Maintenance 4) Stream Restoration

Overview of Plans for Water Resources11

System of Plans for Water ResourcesSystem of Plans for Water ResourcesSystem of Plans for Water ResourcesSystem of Plans for Water Resources

Longtime Master Plans for Water Resources

Master Plans for Stream

Improvement

Mid-Term Master Plans for Stream

Improvement

Basic Plans for River

Improvement

Long-Term Plan for Dam

construction

Master Plans for River Basin of Flood

Control

Basis Plans for Dam Construction

Implementation Plans for Dam Construction

Improvement Plans for Agriculture

Production

Master Plans for Rural

ImprovementFlood Control Water Utilization

DamRiver Maintenance

Implementation Plans for Stream

Improvement

Implementation Plans for River Improvement

Basic Plans for Improvement

Project

Implementation Plans for

Improvement Project

22

Longtime Master Plan for Water Resources

• Supreme Plan for Water Resource Management including Development, conservation maintenance• Formulate Every 20 Years• Establish Strategy for Water & Conservation Development

Long-Term Plan for Dam construction

• Establish Strategy for Environmental-friendly Dam Construction• Formulate Every 10 years

OverviewOverview

Overview of Long-Term Plans for Dam Overview of Long-Term Plans for Dam ConstructionConstruction

Longtime Master Plan for Water Resources

Water Shortage Regional

Regional Demand for Dam Construction

Review of Potential Dam Site

Flood Control Counter plan for Basin

Selection of Dam Site(1st)

Plan for Environmental friendly DevelopmentFinancial Plan

Selection of Dam Site(2nd)

Plan for regional Development

Long-Term Plan for Dam construction (Draft)

Confirmation of the plan

• Public Hearing• Consultation with Relative Agencies

Professional Consultation

Singular Purpose Dam: Household, Industry and etc.

Multi Purpose DamFlood Control Dam

Purpose of Flood Control Purpose of Water utilization

Site (Final)

Deliberation of Central River Council

Long-Term Plan for Dam constructionLong-Term Plan for Dam construction : Planning ProcedurePlanning ProcedureLong-Term Plan for Dam constructionLong-Term Plan for Dam construction : Planning ProcedurePlanning Procedure

SEA (Review of Possibility of Supplement Water Resources: Consider Alternatives)

SEA (Review of National Environmental Map)

SEA (Field Survey: Biodiversity,

Geology, Landscape, etc)

SEA (Technical Review : Amount of Water Supply and etc.)

Analysis of Alternatives for Water utilizationAnalysis of Alternatives for Water utilization

Water Shortage for useWater Shortage for use

Confirmation of Alternative Water Confirmation of Alternative Water UtilizationUtilization

NO

Reconstruction of Existing Dam

Review the Possibility of Additional Water Intake

Review the Possibility of Water Transfer

YES

Check the New Water Resource

Development (Underground

Dam, etc)

Construction of New Dam

Potential Site

YES

YES

NO

NO

1. Overview of Long-Term Plan

For Dam Construction

1.1 Background of Plan

1.2 Substance of the Plan

1.3 Implementation Strategy of the Plan

2. Overview of SEA for the Plan

2.1 Legal Basis for SEA Implementation

2.2 Procedures of SEA

2.3 Target Area

3. Determination of Alternatives and Environmental Indicators

3.1 Management of SEA Council

3.2 Scoping and Selection of Analyzing Methods

3.3 Confirmation of Alternatives

4. Prediction and Evaluation4.1 Appropriateness of the Plan

4.2 Adequacy of the Site

5. Collection of Opinion

5.1 Committee

5.2 Consultation

5.3 Public Hearing Meeting

6. Conclusion5.1 Evaluation

5.2 Monitoring

Contents of SEA ReportContents of SEA Report

33 SEA of Long-Term Plans for Dam ConstructionSEA of Long-Term Plans for Dam Construction

SEA ProcessSEA Process

Environmental Assessment

Conceptual Stage of Planning Process

Formation of PERS Committee

PERS Committee Consultation

Preparation of Alternative of Plan

Collection of Opinions

Final PERS Statement

Draft PERS Statement

Review and Consultation of PERS Statement

Conformation of the Plan by Reflection of the PERS results

Presidential decree, Article 8-2-Formulate the PERS Committee consist of Expert, NGO, Officials, Representative of Civil Group, Stakeholder, and etc.

Presidential decree, Article 8-2-Demonstrate the draft PERS statement for more than 20days- Public hearing should be hold upon request

FAEP, Article 25-3

Presidential decree, Article 8-2Consultation Periods should not exceed 30 days

- Scoping- Alternatives of Plan- Determine the Range of Public Participation

SEA Committee SEA Committee

Consist of 10 members including government officer, NGO, experts and etc

Formation of SEA Committee

Review of General Subjects for SEA

- Review of General Aspects of the Plan

- Review of Environmental Indicators for SEA

- Review of Alternatives

Confirmation for General Procedure for SEA

- Scoping

- Methods for Analysis

- Scope of Analysis, etc

Management SEA Committee

Indicators Assessment Area

◦ Policy for Dam Construction

∙ Analysis of the Background and Purpose of the Plan on Environmental Aspect

∙ Improvement of Policy for Dam Construction

∙ Correspondence with Environment Policy

∙ Sustainability

◦ Consistency of the Plan

∙ Consistency with Existing Plan relation & relation between relevant plans

◦ Dam Site ∙ Environmental Appropriateness of the Sites

Selection of Indications for the SEA Selection of Indications for the SEA (Scoping)-1(Scoping)-1 Selection of Indications for the SEA Selection of Indications for the SEA (Scoping)-1(Scoping)-1

Preparation of Check-Preparation of Check-ListList

Appropriateness of the PlanAppropriateness of the Plan

Environmental AdequacyEnvironmental Adequacy

Selection of Indications for the SEA Selection of Indications for the SEA (Scoping)-2(Scoping)-2 Selection of Indications for the SEA Selection of Indications for the SEA (Scoping)-2(Scoping)-2

Indicators Assessment Area

◦ Natural Environment

∙ Impacts to Ecological Soundness

∙ Impacts to the habitat (Flood, fauna)

∙ Impacts to the natural landscape

◦ Ambient Environment

∙ Impacts to the Environmental Standard

∙ Impacts to the Human

◦ Land use ∙ Impacts to the Conservation Area

∙ Possibility of Urban sprawl

Evaluation of Alternatives

Prediction and Evaluation-Appropriateness of Prediction and Evaluation-Appropriateness of the Sitesthe Sites Prediction and Evaluation-Appropriateness of Prediction and Evaluation-Appropriateness of the Sitesthe Sites

Selected Sites on 4 Major River Basin Where Water Shortage Happened

Compare the Sites with National Environmental Map

Exclusion of Sites (Environmentally Sensitive Area)

Selection of Sites through Field Survey

Selected 8 Sites from 4 Major River Basin

Assessment Methods for SEA & Assessment Methods for SEA & EIAEIA

PERS EIA

Environment

al Indicators

for natural

resources &

Local

environment

Geology & Topography

Biodiversity

Land use

Climate & Air Quality

Water

Soil

Waste

Noisy

Landscape

Environmental

indicators for

natural

resources

Geology & Topography

Marine Ecosystem

Hydrology

Land use

Air Quality

Water Quality

Soil

Waste

Climate

Flora & Fauna

Noisy

Odor

Electric Wave

Shading

Landscape

Health

Environmental

Indicators for

local

environment

Link of Assessment Items for SEA & EIA

Assessment Methods for Each Environmental Assessment Methods for Each Environmental IndicatorsIndicators

Items SEA EIA

Geology, topography

o Description of geology & topography necessary to preserveo Characterization of geology & topography o Affected area and measures

o Loss prevention and use of surficial soil or fertile soilo Restoration or use plan of borrow pito Estimation & measures due to soil loss and sedimentation o Conservation of excessively slant area

Flora, Fauna

o Identification of species distribution, species diversity, and designation of conservation siteso Establishment of conservation measures 8th grade of degree of green naturalityo Establishment of conservation measures in 1st grade of ecologial degree of naturality

o Change estimation and measures of flora and faunao Estimation and measures due to hot water dischargeo Consideration of breeding season, habitat of migrant birds and so ono Effects and estimation due to habitat destruction of flora and faunao Measures of natural vegetation conservation and share of green zone 

Hydrology

o Status of water resource use and water supply plano Effect and measure of quantity on river network

o Effects and measures of river bed and watershedo Estimation and measures of rive maintenance flow

Assessment Methods for Each Environmental Assessment Methods for Each Environmental IndicatorsIndicators

Items SEA EIA

Land useo Analysis & evaluation of site selection considering near land use

 

Air Quality

o Investigation for sufficient distance from the project site to the impact area, and formation of buffer zoneo Identification the relationship between wind velocity and pollutant dispersion

o Identification emission sourceo Comparison of emission source and emission rate with national ambient levelso Identification of mitigation measureso Estimation effects of scattering dust at construction or operation o Review of fuel plan and heat supply process

Water

o Analysis of relationship between water supply plan and water consumptiono Relationship between master plan of sewer and wastewater treatment plano Analysis & measures of determining to meet the total water pollution load management standard

o Measure of wastewater treatmento Estimation of water quality and measure of water quality conservationo Mitigation measures of non-point source pollutiono Measure of leachate treatmento Conservation measures of ground water quality and quantity

Noise, Vibration

o Estimation & measures of mobile source (traffic, airplane and so on) noise levels

o Identification & measures of Noise sourceo Estimation & mitigation measures of noise and vibration due to explosive use and so ono Layout plan on fixed source pollution (Factory, facilities and so on)

Landscapeo Use of the existing landscape and making plan considering the characteristics of land use are

o Quantitative review and measures of effects due to change in main view points

Assessment Methods for Each Environmental Assessment Methods for Each Environmental IndicatorsIndicators

Items SEA EIA

Populationo Measures to densely in habitual districto Environmental effects & measures to densely in habitual district

 

Housingo Connection plan of road network in residential area

o Environmental effects estimation & measures of residential area

Industryo Estimate the change in industrial structure

o Estimation & measures to fishing right, farms, crop and so on

Public Facilities

 o Effects & measures of capacity topublic facilities

Education  o Effects & measures of capacity to education facilities

TrafficO Analysis & measure of relationship between change of traffic volume and transportation plan

o Review of the suitability of site, and capacity for parking lots and transfero Selection and adequate lay out of line of trees

Cultural properties

o Effects & measures of cultural or historic sites in relation to the project

o Identification of surficial geology in historic siteso Protection measure of any historical or cultural resources etc.

Implementation of SEA & Implementation of SEA & EIAEIA

Achieve systematical management of SEA and EIA Achieve systematical management of SEA and EIA • • Links between EIA & SEALinks between EIA & SEA

EIA

Policy

Plan

Program

Project

SEA Results

Plan Review

SEA Results

Public Consultation

Baseline Study

ProgramReview

SEA Results

Policy Review

SEAResults

SEA Results

SEA Results

Possible to skip

Simplification

SEA

EIA

Government established policy direction for implementation of the SEA by enhancing the PERS

The new PERS has been implemented by June, 2006

Established the implementation methods for SEA and EIA to cope with the dispute associated with implementation of the two EA system

Developed assessment methods for the SEA and EIA based on the characteristics and data availability at the stage of policy, plan, program, and project-established tiering system

SEA Guideline for water resources is under developing

Conclusion44