Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
EU-frågor, ekonomi-administrativ inriktning, vid LiU:s institutioner
30 januari 2014 Mårten Rosander
Financial Coordinator
Grants Office
Grants Office Supporting Researchers at LiU! (3 heltid)
Johan Åkerman Johan Åkerman, Head of Unit Research Coordinator. EUs Framework Programme, mainly towards the Faculty of Arts and Sciences and the Faculty of Educational Sciences. Expert on the FP7 jurisdiction.
Per Dannetun Research Director. National Research Coordinator. Rapporteur at Vice-Chancellors Council for Research and at the Council for Research Infrastructure.
Bohdan Sklepkovych Science writer. Strategic project/grant development for H2020 (ERC), national and international programmes.
Svjetlana Stekovic Research Coordinator. EUs Framework Programme, mainly towards the Institute of Technology and the Faculty of Health Sciences.EU FP7 Project Management
2
Linda Forssén (50% Maternity leave) Coordinator. Coordinates the follow up on LiU:s participation in FP7. Responsible for the homepage and information about calls Coordinates seminars and events at Grants Office. Contact for Research Professional.
Mårten Rosander Financial Coordinator. Support with budget and revision of research projects. Support with contract negotiations. Support concerning form templates.
Sara Strömberg (50% Maternity leave) Research Coordinator. EUs Framework Programme, mainly towards th Faculty of Health Sciences..
Michael Lögdlund Research Coordinator. National Research Coordinator, EUs Framework Programme. Mainly towards the Institute of Technology
Nytt i hos på LiU/GO 2020
• Grants Office Nya hemsida med Horizon 2020 handbok
• http://www.liu.se/go • LKP nu 51,25 % (2014), ifall någon
missat det? 3
4
5
LiU-id required
Nytt hem i Key huset
6
7
LiU slutade på 123 beviljade projekt inom FP7!
Evaluation Possible EC Audit
Grant Preparation (Application stands)
Project Duration
9 Months Max 60 Months 24 Months
Total Maximum Lifecycle is 104 months (≈8,5 years)!
Pre-Award Post-Award
Draft Proposal
From Call to Deadline
5 Months 3-4 Months
8-9 Months! Time Available to Write Proposals
Without EC audit the total max lifecycles is 78 months (6.5 yea
Max Lifecycle of an EU project (Horizon 2020)
8
GPF GA CA (Nu även i vissa MSCA) (Budget)
2-4 Financial and Scientific reports FP7 CFS Audit>=375 k€
Budget
CFS Audit >=325 k€ FP7>=375 k€
Upphandlingsenheten • Rut Jonsson • Öhrlings PricewaterhouseCoopers AB
(Linköpingskontoret) Revisionstjänster för forskningsprojekt
finansierade av svenska och EU finansiärer • Öhrlings PricewaterhouseCoopers AB
(Stockholmskontoret) Revisionstjänster för forskningsprojekt
finansierade av amerikanska finansiärer
10
Revisor för forskningsprojekt • Öhrlings PricewaterhouseCoopers AB
(Linköpingskontoret) • Eva Myrén
11
Horizon 2020
12
12
Top Priorities
Tackling Societal Challenges • Health, demographics changes and well-
being • Food security and sustainable bio-resources • Secure, clean and efficient energy • Smart, green and integrated transport • Resource efficiency and climate challenge • Secure, innovative and inclusive societies
Creating Industrial Leadership and Competitive Frameworks
• Leadership in enabling technologies ICT, nanotechnology, advanced
materials, advanced manufacturing and processing, biotechnology, space
• Access to risk finance • Innovation in SMEs
Excellence in the Science Base • Frontier research (ERC) • Future and Emerging Technologies (FET) • Skills, training and career development
(Marie Sklodowska Curie Actions) • Research infrastructure
Common rules, toolkit and funding schemes
Simplified access
Financial News in Horizon 2020 • CFS*: ”only for payment at the balance (final
payments), when total EU contribution claimed by the beneficiary on the basis of actual costs > 325 000 €“
• Only Actual cost (and unit cost) counts= 406 250 € according to the old rules
• This means only one audit certificate per Grant • CFS is a DIRECT COST and not subcontracting in
Horizon 2020 • In principle all subcontacting is a direct cost=
we get indirect cost (25 %) on those too. • Audit Rules for FP7 remains at 375 k€ or more
for each period. • 25 % coverage for indirect costs
13
*CFS=Certificate of Financial Statement=Revisionsintyg
News in Horizon 2020 • Exchange rate is euro at the
average of the daily exchange rates published on the European Central Bank website, calculated over the corresponding reporting period.
• http://www.ecb.europa.eu/stats/exchange/eurofxref/html/eurofxref-graph-sek.en.html
14
News in Horizon 2020 • 1720<90% hours is always allowed
to be used as productive hours • Maximum time for an EC Ex Post
Audit is up to 2 years after the payment of the balance
• No more negotiations: each proposal evaluated 'as it is', not as 'what could be';
• No more paper: e-communication & e-signature of grants.
15
Application/Budget • RTD (Research and Technical
Development) is now R&I (Research and Innovation)
• Types of actions: • Research and Innovation Actions (100 %) • Innovation actions (100/70 %) (produce
plans & arrangements or designs for new, altered or improved products, processes or services)
• Coordination and support actions (100 %) • MSCA (Marie Sklodowska Curie) (Unit
Cost) • ERC (100 %)
16
Application
• Place to find your calls, apply and report
Participant portal
• http://ec.europa.eu/research/participants/portal/desktop/en/home.html
17
18
19
20
21
SUMMARY Reporting • FSIGN for all grants signed after 1 January 2013,
amendment or paper for those prior to that date.
• Average exchange rate
• CFS*: ”only for payment at the balance (final payments), when total EU contribution claimed by the beneficiary on the basis of actual costs > 325 000 € “
22
Financial Statement Authorised Signatory (FSIGN)
• For grants signed after 1 January 2013 otherwise the current process of parallel electronic submission and paper signature will still be available.
• Organisations have to identify online the persons authorised to sign forms C
• The nomination of a LEAR for each participating organisation becomes thus mandatory. LEARs can register an unlimited number of FSIGNs for their organisation, can add comments to each name and can revoke or replace them at any time.
• The link between a particular FSIGN (from the list you have encoded) and a specific project will be made by one of the Participant Contacts (PaCo) (or Coordinator Contacts for the coordinating organisation) of the respective project.
• When a Form C is ready for submission a notification will be sent to the FSIGN
23
24
Budget PART A
Auto calculated at 25 % of your Total Eligible costs!
Only Totals in Part A
Usaully doesn’t apply at LiU!
Budget in PP
CFS • Öhrlings PricewaterhouseCoopers AB • Org.nr: 556029-6740 • Tel.nr: 010-212 40 00 • E-post: [email protected]
• Kontaktperson • Eva Myrén • PwC • 581 02 Linköping • Tel. 010-212 95 39 • E-post: [email protected] • Ca 3 500 € per revision i budget
(subcontracting under management)
25
www.liu.se