20
The European Organisation for the Safety of Air Navigation EUROCONTROL approach to the execution of the PBN IR Mandate ICAO EUR APV Workshop 25-27th of May 2011 Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL

EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

The European Organisation for the Safety of Air Navigation

EUROCONTROL approach to the execution of the PBN IR Mandate

ICAO EUR APV Workshop – 25-27th of May 2011

Sylvie GRAND-PERRET

DSS/SES Unit, EUROCONTROL

Page 2: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

2

Status of the PBN IR mandate

PBN IR mandate issued by EC ECTL acceptance of the mandate PBN IR development from May 2011 – May 2013

Page 3: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

3

Work Plan Overview

EC D2 acceptance

RA Consultation

& Comments

Review

Aug 2011- Nov 2011

Proposed

Support to

regulated partiesNM and

SAF OVS

review

Draft

Regulatory

Approach

Impact

Assessment

Draft PBN IR

Justification

Material

Summary of

Responses

ECTL support

to Regulated

Parties

MOC needs

Nov

2012

Apr

2013

IR

Consultation

& comments

review

Feb 2012May 2011

Regulatory

Approach

D2

Draft

Initial Plan

D1

Phase I

EASA

Validation

Initial Safety

Assessment

EASA

Validation

PBN IR

Safety

Assessment

EASA

coordination

May

2013

Draft Final

Report

D3

Final

Report

D4

Phase II

Feb

2012

Page 4: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

4

Phase I : Regulatory Approach

Regulatory Approach

• Assessment of PBN IR context

• Identification of different possible regulatory approach scenarios to be considered

• Development of an impact assessment, in particular cost-benefit analysis for each scenario

• Recommendation of the most suitable regulatory approach based on impact assessment results

Submitted to formal consultation

Page 5: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

5

RNP APCH relevant questions to be

addressed in PBN IR activity ? (1/2)

• Do we need to regulate RNP APCH?

• Would this stimulate implementation of ICAO resolution A37-11?

• Should there be a mandate on the ANSP to publish and/or on the aircraft to equip with RNP APCH capability?

• What could be the options for publication by an ANSP?

Any combination of RNP APCH types : LNAV, LNAV/VNAV, LPV?

• Would this depend on the context? (TMA, Airport location, infrastructure…)

• Should this depend on the aircraft operator capability at a given airport? (e.g. should we assume that SBAS capable aircraft would be allowed to perform LNAV/VNAV approaches?)

Page 6: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

6

• Are GNSS system performances required for each RNP APCH type met everywhere in the area to be regulated?

• Should a stepped approach be adopted for implementation (one option before another)?

• Should we include LPV 200 in the mandate?

• Are there any other constraints to consider that would prevent any of the implementation options?

• What are the benefits/drawbacks of each option on each actor?

• Are all options safe?

• How to ensure the civil/military interroperability for each option?

RNP APCH relevant questions to be

addressed in PBN IR activity ?(2/2)

Page 7: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

7

Phase II: Implementing Rule Development

Draft Final Report

(Based on the scenario selected following the Regulatory Approach consultation):

includes

• Proposed Draft Implementing Rule

• Draft Justification Material

• Detailed impact assessment (safety summary, civil/military organisation, efficiency and economic aspects)

• Current and desired regulatory situation

Draft IR submitted to formal consultation (ENPRM)

Page 8: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

8

Final Deliverable

Final Report

• Draft Implementing Rule (including safety requirements)

• Justification Material

• Impact assessment (safety summary, civil/military organisation, efficiency and economic aspects)

• Current and desired regulatory situation

• Identification of Means of Compliance

• EUROCONTROL Support to Regulated Parties

Page 9: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

9

Work Organisation

Mandate

Director

Luc Tytgat

Mandate

Manager

Peter Green

Mandate

Activity

Manager

Sasho

Neshevski

Review

Group

Implementing

Rule Drafting

Group (IRDG)

Justification

Drafting Group

(JDG)

Safety Focus

Group

(SFG)

Page 10: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

10

Consultations/Involvement of Stakeholders

• Coordination and cooperation with EASA• EASA expert participation in IRDG and SFG

• Validation of safety risk assessment and safety requirements

• Coordination of MOC needs

• Formal consultation• Written consultations (2)

• Stakeholder consultation workshops (2)

• Informal consultation through Focal Points• Bilateral meeting to capture specific stakeholder requirements

• Direct involvement in Implementing Rule Drafting Group and Safety Focus Group

• ECTL participation in ICAO PBNSG and ICAO EUR PBN TF• Alignment with ICAO PBN Manual update

Page 11: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

11

Key material to be considered

• PBN implementation plans

• FAB policies

• European ATM master Plan & Next Gen

• ICAO PBN Manual

• ICAO Assembly resolutions, notably A37-11

• Free Route Airspace/ Fixed Routes

• European fleet capability

• Existing EASA certification and operational standards notably

OPS IR & AMC 20xxx & future CS ACNS

Page 12: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

12

PBN IR

OPS IR

SPA – PBN

AMC & GM

AMC 20xx

CS ACNS

« PBN «

AMC & GM

ADQ IR

73/2010

ADQ 2 IR

EASA

EURCONTROL

PBN Regulatory Context

PBN Regulatory Context will be analysed in the early stages of the mandate work

Principles:

1. Ensure consistency with existing & under development regulatory Material

2. Avoid duplication

Other IR?

Page 13: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

13

Conclusion

Overall Goal of the PBN Mandate:

To ensure harmonised and coordinated implementation of ICAO Assembly Resolution A37-11 within the EATM Network.

Page 14: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

14

Q&A

More questions on PBN IR after the workshop?

Sasho NeshevskiPBN Mandate Activity Manager

Senior Expert – RegulationDSS/SES Unit, EUROCONTROL

[email protected]

Page 15: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

The European Organisation for the Safety of Air Navigation

ADQ & ADQ2

Status Briefing

ICAO EUR APV workshop 25-27th May 2011

Prepared by Manfred UNTEREINER

Presented by Sylvie GRAND-PERRET

Eurocontrol

DSS/REG/SES unit

Page 16: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

16

Data Supply Chain (ADQ versus ADQ-2)

Reg (EC)

73/2010ADQ-2

Page 17: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

17

What is ADQ?

Article 1 – Subject matter

This Regulation lays down the requirements on the quality of aeronautical data and aeronautical information in terms of accuracy, resolution and integrity.

Article 2– Scope

ADQ functions

Data and Information

Regulated parties

(ANSPs, Originators and providers of survey data, Operators of aerodromes and heliports with IFR, procedure design services, providers of electronic terrain data, providers of electronic obstacle data)

.

Page 18: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

18

Key Timeline

27th January

2010

Publication

in OJEU

1st July

2013

Entry into

force

1st July

2014

Derogation: Data Set

and Exchange format

30th June

2017

Latest compliance:

Data published

before 1 July 2013

ECTL specs & guidance

(eAIP, DQR, DAL, DO, AIX)

Page 19: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

19

ADQ Implementation Support Cell(ADQ-ISC)

ADQ ISC provides support on the following number:

+32 2 729 98 18or email

[email protected]

For additional information: e.g. FAQs, Best Practices, Library:

www.eurocontrol.int/adq

Page 20: EUROCONTROL approach to the execution of the PBN IR Mandate Meetings Seminars and Worksho… · Aug 2011- Nov 2011 Proposed Support to regulated parties NM and SAF OVS review Draft

20

The ADQ-2 EUROCONTROL task

• “Mandate to Eurocontrol to assist the European Commission in the development of an interoperability draft IR on:

• Aeronautical Data and Aeronautical Information Quality for the post-publication phase (ADQ-2).

• Purpose:

• ‘…provide the data quality required to meet specific applications such as Performance Based Navigation (PBN)’

• Common quality measures throughout the data supply chain

• Mandate development: Jun 2010 – Oct 2012• Draft RAD to be issued in the coming days for consultation

• Draft RAD workshop planned end Sept (date to be confirmed)