ESA UNCLASSIFIED – For Official Use
IWG, New Delhi, India, 05 Feb 2014
European GNSS Evolution Programme 2013-15
ESA UNCLASSIFIED – For Official Use 2
OVERVIEW
• Initiated 2013 in EGEP
• EGEP Workplan 2014
ESA UNCLASSIFIED – For Official Use 3
G2G DEVELOPMENTS STARTED 1
ELECTRICAL PROPULSION SUBSYSTEM INDUSTRIALIZATION AND THRUSTER OPERATIONAL CHARACTERISATION
• Prerequisite for G2G to keep launch costs of larger platforms in present launch cost envelope
• E. g. 3 sats in Soyuz ST or 1 sat in VEGA
• Transfer time of 12 months requires new launch strategy
• First contract kicked-off Dec. 2013, second one follows in Feb. 2014
ESA UNCLASSIFIED – For Official Use 4
G2G DEVELOPMENTS STARTED 2
GALILEO 2nd GENERATION SPACE SEGMENT PHASE A/B1
• Follows Galileo-1 after 2021• Flexibility to replenish in different
planes w/ one single launch• Increasing Galileo payload capability
(ISL, increased signal power levels, upgraded PRS, more robustness, etc.)
• Two parallel contracts kicked off in Dec. 2013, third one follows
ESA UNCLASSIFIED – For Official Use 5
G2G DEVELOPMENTS STARTED 3
INTER-SATELLITE LINK PRE-DEVELOPMENT
• Improved Security− Less dependence on ground segment− Lower number of GDDN connections− Improved command capabilities within
seconds• Improved Accuracy Performance
− Smaller ODTS UERE, faster convergence after maneuvers, improves integrity/RAIM, AUTONAV
• Additional Benefits− Sounding of atmosphere
• Activity kicked off in Dec. 2013
ESA UNCLASSIFIED – For Official Use 6
G2G DEVELOPMENTS STARTED 4
G2G SUPPORTING ACTIVITIES
• Development of Advanced Multi- constellation Signal & Interference Testbed
• Enhancement of Orbit Determination & Time Synchronisation
• PRS Signal Robustness
• KO in Sept 2013, currently at PDR
• ODTS using ISL and G1G lessons learnt• Negotiations w/ selected bidder
presently
• Improved PRS (classified activity)• Evaluation presently going-on
ESA UNCLASSIFIED – For Official Use 7
G2G DEVELOPMENTS STARTED 5
CLOCK DEVELOPMENTS
• Miniaturized low-maintenance PHM
• Robust RAFS
• Caesium clock
• Ends Q2/2014 (cont’d in 2014)
• Ends Q2 /2014 (cont’d in 2014)
• Finished Q4/2013 (cont’d in 2014)
ESA UNCLASSIFIED – For Official Use 8
G2G DEVELOPMENTS STARTED 6
G2G SYSTEM ENGINEERING STARTED
Joint G2G System Engineering Office established
System Support from Industry under negotiation
ESA UNCLASSIFIED – For Official Use 9
EGNOS NEXT GENERATION V3 1
• EGNOS V3 Phase A/B1/B2(2 parallel contracts)
• RIMS V3 Prototype(2 parallel contracts)
• ARAIM(2 parallel contracts)
• Thales-F: Phase B2 started• Astrium-D: Phase B2 starts end of Jan.
2014
• Proposals presently evaluated / clarified
• Parallel activities w/ IFEN and GMV Skysoft end Q1/2014
ESA UNCLASSIFIED – For Official Use 10
EGNOS NEXT GENERATION V3 2
SUPPORTING ACTIVITIES
• Standardization
• Ionosphere characterization
• Two parallel Testbeds on V3 Integrity
• Q1/2014
• KO Jan 2014
• HISTB KO Jan 2014• NISTB KO Jan 2014
ESA UNCLASSIFIED – For Official Use 11
AO SCIENCE & TECHNOLOGY
• Scientific applications of Galileo (GNSS) and EGNOS• Innovative proposals on technology for the evolution of Galileo and
EGNOS• Two step procedure: First extended abstracts, then pre-selection of
invited bidders and submission of full proposals
• Submitted abstracts: 29 science, 41 technology• Pre-selection took place• Requests for full proposals in preparation
ESA UNCLASSIFIED – For Official Use 12
EGEP WORKPLAN 2014
EGNOS NEXT GENERATION V3• Continuation of EGNOS V3 Testbeds (Part 3)
- HISTB Q3/2014- NISTB Q3/2014
GALILEO NEXT GENERATION (G2G)• On-board Clock Ensemble CMCU new• Miniaturised low-maintenance PHM (cont’d)• ARAIM Detailed Threat Allocation and Barriers Q2/2014• Next Generation Signal Generator (cont’d for PRS)• Robust RAFS (cont’d)• On-board Caesium Clock Design Consolidation• Ground Caesium Development Prop. under evaluation• 2nd Call AO Science and Technology Q2/2014