Evaluating the Quality and Impact of Reproductive Health Research

Jane T. Bertrand

FRONTIERS/Tulane Southampton

Jan. 23, 2001

Why Evaluate?

To determine whether OR studies have the desired impact of changing service delivery or policy

To identify factors influencing utilization To highlight the importance of utilizing the

results to researchers involved To apply lessons learned to other OR studies To be accountable to donors

What are we evaluating?

Interventions:– What has been the impact of the intervention on the

target population?– Example: teen pregnancy program in England

Research:– what has been the impact of research on service

delivery and policy?

Advantages of op. research to government official/policy makers

Allows them to test out controversial interventions on a small scale at lower political risk

If successful, take credit and scale up.

If unsuccessful, “that was just a trial.”

Increased emphasis on evaluation in USAID-funded projects

The EVALUATION Project in 1991:– Improve state-of-the art in program evaluation

MEASURE Evaluation – 1997 to present:– Apply improved evaluation methods in the field

USAID switched from log frame approach to results framework:– Strategic objective, intermediate results– EMPHASIS ON RESULTS, not on ACTIVITIES– Based on a tracking of indicators

Evaluating Operations Research

In the past, process evaluation:

– How many projects? How well done?

– Qualitative assessments-short term impacts

Need to develop an assessment of impact:

– Has OR succeeded in changing service

delivery procedures or influencing policy?

Approach developed under FRONTIERS

Drew on indicators developed by an O.R. working group under the EVALUATION Project

Pre-tested methodology on completed projects in selected countries:– 1999: Peru, Kenya, Philippines– 2000: Honduras, Senegal, Bangladesh

Data collection process

Two person evaluation team:– FRONTIERS/Tulane staff, consultant

Duration of data collection: – one week in country

Sources of data– Project reports, other documentation– Key informant interviews using assessment form

Assessment forms: (see Appendix A)– used to guide discussion– used to present/document results

Types of indicators

Process

Impact

Contextual factors

Process Indicators

P-1. Implementing organization actively participated in study design

P-2. Implementing organization actively participated in conduct of OR project

P-3. Study accomplished its research objectives P-4. Intervention was implemented as planned P-5. Completed without delays that would

compromise validity of research design

Process indicators (cont’d)

P-6. Implementing agency participated in developing programmatic recommendations

P-7 Continuity in key personnel over the life of the project

P-8. TA judged sound; congenial manner P-9. Study design was technically sound P-10. Research design feasible in local context

Process indicators (cont’d)

P-11. Results judged credible/valid locally P-12. Research relevant to local program

managers P-13. Study included an assessment of costs P-14. Results disseminated to key audiences P-15. Results readily available in written form

Impact Indicators

I-1. Based on OR results, organization implemented activities to improve services

I-2. Improvements in service delivery were observable

I-3. Improvement still observable 24 months post-implementation.

I-4. Implementing agency conducted subsequent OR I-5. …conducted OR without PC assistance

Impact Indicators (cont’d)

I-6. Intervention scaled up - same organization I-7. Intervention adopted - another organization I-8. Intervention replicated in another country I-9. Change in national policy linked to OR study I-10. Original donors funded activities based on

results I-11. New donors funded activities based on OR

Contextual factors:

Factors that facilitated:– Conduct of study– Utilization- of results

Factors that impeded:– Conduct of study– Utilization of results

FINDINGS: THREE CASE STUDIES

Limited to intervention/evaluative studies Total number of projects: 28

Bangladesh: 10 Honduras: 10 Senegal: 8

Process Indicators: Three CountriesP 1 – P 7

0 10 20 30 40 50 60 70 80 90 100

P 7-Continuity inPersonnel

P 6-Participation inReccomendations

P 5-No Delays

P 4-Implemented asPlanned

P 3-ObjectivesAccomplished

P 2-Participation inImplementation

P 1-Participation inDesign

Ind

icat

ors

Percentage of Projects with Positive Score on Indicators

28/28

28/28

26/28

10/10

10/12

26/26

21/26

Process Indicators: Three CountriesP 8 - P 15

0 10 20 30 40 50 60 70 80 90 100

P 15-Written ResultsAvailable

P 14-Dissemination

P 12-ResearchRelevant

P 11-ResultsCredible/Valid

P 10-Feasible

P 9-Sound Design

P 8-TechnicalAssistance

28/28

21/24

27/27

26/27

28/28

27/27

28/28

Ind

icat

ors

Percentage of Projects with Positive Score on Indicators

Impact Indicators: Three CountriesI 1- I 6

0 20 40 60 80 100

I 6-Scaled-up inCountry

I 5-OR Studies withoutPC

I 4-Subsequent ORStudies

I 3-ObservableEffects, 24 months

I 2-ImprovementsObservable

I 1-Activities CarriedOut

25/27

21/21

19/21

13/18

2/3

18/22

Ind

icat

ors

Percentage of Projects with Positive Score on Indicators

Impact Indicators: Three CountriesI 7- I 11

0 10 20 30 40 50 60

I 11-New Funding-Others

I 10-New Funding-Donor

I 9-Policy Change

I 8-Other Country

I 7-Other Organization inCountry

9/17

2/13

10/27

5/23

7/23

Ind

icat

ors

Percentage of Projects with Positive Score on Indicators

Advantages of Methodology

Both quantitative and qualitative Summary table of data easily produced and

interpreted Concrete examples included Provides rich information on factors affecting

utilization

Limitations

Can not prove cause and effect Rather: “plausible attribution” if:

– change in service delivery occurred after intervention, and

– change is consistent with OR results Requires some subjective judgements; potential

for bias Staff turnover may affect quality of data

Next steps

Apply methodology to all FRONTIERS projects (n=75+)

Timing: – At end of project– 36 months later

Project monitor to report Subset (25%) to be verified by external team Compile results in ACCESS data base

Analyses to be Conducted at Close of FRONTIERS

Creation of scale for performance of each project on process and impact

Correlations and cluster analysis of different indicators in the data set

Determinants of impact: what indicators of process are significantly related to impact?

Meta-analyses: by country, region, topic

…wish us luck

Stay tuned for the results.