EVERGLADES ECOSYSTEM RESTORATION PROGRAM PRESENTED TO SAME, JACKSONVILLE ERIC BUSH, CHIEF, PLANNING DIVISION U.S. ARMY CORPS OF ENGINEERS, JACKSONVILLE DISTRICT 24 SEPTEMBER 2014

EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

EVERGLADES ECOSYSTEM RESTORATION PROGRAMPRESENTED TO SAME, JACKSONVILLE

ERIC BUSH, CHIEF, PLANNING DIVISIONU.S. ARMY CORPS OF ENGINEERS, JACKSONVILLE DISTRICT

24 SEPTEMBER 2014

Page 2: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

WRDA 2000CERPAuthorized

Extensive Agricultural Development of

Muck Lands

Settlement ContinuesPre-development“River of Grass” Catastrophic

Hurricanes

Muck Fires

Extensive Floods

mid 1800s early 1900s

1926 & 1928

1930s

19471948

CHANGESC&SF Authorized

Everglades National Park Designated

2

Page 3: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

East Coast Canals/St. Lucie Canal 1905-24

Pre-Central & South Florida Projects Caloosahatchee/Kissimmee Rivers 1881-93

Lake Okeechobee HH Dike 1932-38

Tamiami Trail 1915-28

Everglades Construction Project

Stormwater Treatment Areas 1994-2003

Central & Southern Florida Project

South Dade System 1965-83

Everglades Agricultural Area 1954-59

Lake Okeechobee Levees 1960-64

Eastern Protective Levee System 1952-54

Water Conservation Area Levees 1960-63

Kissimmee River Channelization 1962-71

Lower East Coast Canals 1954-65

Biscayne Bay

CHRONOLOGY OF WATER MANAGEMENT CHANGES

3

Page 4: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®BUILDING STRONG®

THE C&SF PROJECT (1948)

One of the world’s largest and most complex water management systems

4

Page 5: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®

The Kissimmee River was turned into a canal

UNINTENDED CONSEQUENCES

Page 6: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

6 BUILDING STRONG®

Large freshwater discharges freshen estuaries

UNINTENDED CONSEQUENCES

Page 7: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

7 BUILDING STRONG®

Soil subsidence in theEverglades Agricultural Area

UNINTENDED CONSEQUENCES

Page 8: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

8 BUILDING STRONG®

The addition of phosphorus causes cattail problemsin Everglades marshes

UNINTENDED CONSEQUENCES

Page 9: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

9 BUILDING STRONG®

UNINTENDED CONSEQUENCES

Exotic and invasive species have altered the ecosystem

Page 10: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®BUILDING STRONG®

AN ECOSYSTEM IN TROUBLE….Too much or too little water for the

South Florida ecosystem 50 percent reduction in spatial extent

of natural systemDeclining estuary healthMassive reductions in wading bird populationsDegradation of water quality Loss of native habitat to invasive

exotic vegetation 68 Federally-listed threatened and

endangered speciesRepetitive water shortages

and salt water intrusion

10

Page 11: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

QUALITYQUANTITY

TIMING DISTRIBUTION

GETTING THE WATER RIGHT

WHAT WE ARE DOING ABOUT THE PROBLEM

11

Page 12: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

On December 11, 2000, the President signed the Water Resources Development Act of 2000 approving:

ComprehensiveEverglades Restoration Plan (CERP)A program providing for the restoration, preservation, and protection of the south Florida ecosystem while providing for other water-related needs of the region.

12 BUILDING STRONG®

Page 13: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®BUILDING STRONG®

CERP GOAL

13

Page 14: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

Orlando

Florida Bay

Big CypressNational Preserve

Ft. Myers

Miami

Fort Lauderdale

St. Lucie River

West Palm

Beach

OkeechobeeLake

68CERPComponents

EvergladesNational

Park

Operational Changes

WCAs

Seepage Management

Surface Water Storage Reservoirs – 180,000 acres

Aquifer Storage & Recovery – 330 wells

Stormwater Treatment Areas (STAs) – 36,000 acres

Reuse Wastewater – 2 Regional plants

Removing Barriers to Sheetflow – 240 miles

14

Page 15: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

FOUNDATION PROJECTS

LakeOkeechobee

BISCAYNE BAY COASTAL WETLANDS PHASE 1

BROWARD COUNTY WATER PRESERVE AREAS

C-43 RESERVOIR

C-111 SPREADER CANAL

FOUNDATION PROJECTS

1ST GENERATION CERP2ND GENERATION CERP

(awaiting authorization)CEPP: Central EvergladesPlanning Project

KISSIMMEE RIVER RESTORATION

C-51/STA-1E

C-111 SOUTH DADE

SEMINOLE BIG CYPRESS

MODIFIED WATER DELIVERIES

IRL-S C-44 RESERVOIR/STA

SITE 1 IMPOUNDMENT

PICAYUNE STRAND

MELA

LEUCA

ERADIC

ATIO

N

Current versusRestored Flows

WCA 1

WCA 2

WCA 3

ENP

CEPP

HERBERT HOOVER DIKE

y

H

15

Page 16: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

16

Increases water flow >20% to the Central Everglades

and Florida Bay

CENTRALEVERGLADESPLANNING PROJECT

CEPPAchieves ~ 70% of targets for

Central Everglades restoration

Reduces undesirable fresh water discharges > 20% to the Caloosahatchee and St. Lucie estuaries

Page 17: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®BUILDING STRONG®

CEPP RECOMMENDED PLAN

A flow equalization basin, or shallow reservoir, that will be integrated with the state’s water quality treatment facilities to increase the amount of clean water flow to the Everglades from Lake Okeechobee

DISTRIBUTION/CONVEYANCE

SEEPAGE MANAGEMENT

STORAGE AND TREATMENT

DISTRIBUTION/CONVEYANCE

Construction of 8 miles of new levee and removal of 12 miles of existing levees to create a flowway through WCA-3B; Two 500 cfs gated culvert structures will provide inflow to the flowway and an 1150 cfs

spillway will provide deliveries directly to eastern Shark River Slough; A 1,230 cfs spillway will maintain flow to the east of the flowway Additional 500 cfs gated culvert structure outside of the flowway to rehydrate the

eastern portions of WCA-3B Removal of 5.5 miles of the L-67 extension levee and canal; and 6 miles of the Old

Tamiami Trail within ENP

A 1,000 cfs pump station and 4.2 miles of seepage barrier wall along the protective levee south of Tamiami Trail

FEB Pump

Note: System wide operational changes and adaptive management considerations will be included in project

Gated StructureLevee Removal

STA

Backfill

Seepage Barrier Levee

Increasing the L-5 canal capacity and modification to the S-8 pump station to convey water west Construction of a 360 cfs pump station to maintain water supply to the Seminole Tribe

and western basin Removal of 2.9 miles of the L-4 levee to distribute inflow to WCA-3A and backfilling

13.5 miles of the Miami Canal

WCA3A

WCA1

I-75

S-333

L-30

L-33

C-2

L-28

S-356

S-335

EVERGLADESAGRICULTURAL

AREA

WCA3A

S-8L-5

NOT TO SCALE

L-4

Old Tamiami Trail Removal

WCA2

EVERGLADESNATIONAL

PARK

Tamiami Trail S-334

L-29

WCA3B

WATERCONSERVATION

AREAS

Canal Improvement

L.O. WATER FLOW

G-211L-67 Ext8.5

SMA

C-11

1 SD

A-1A-2

`

Page 18: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail

BUILDING STRONG®BUILDING STRONG®

Chief of Engineer’s Report Congressional Authorization Implementation Agreements Appropriations

► Fed, Non-Fed Construction

► 7 Years (unconstrained)www.evergladesplan.org/pm/projects/proj_51_cepp.aspx#final_eis

WHAT’S NEXT FOR CEPP?

Page 19: EVERGLADES ECOSYSTEM RESTORATION PROGRAM€¦ · EVERGLADES AGRICULTURAL AREA. S-8 L-5 NOT TO SCALE. L-4. Old Tamiami Trail Removal. WCA 2. EVERGLADES NATIONAL PARK. Tamiami Trail