13
Evosys’ VCP Implementation at Kellogg’s India Pvt Ltd. Case Study

Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Evosys’ VCP Implementation at

Kellogg’s India Pvt Ltd.

Case Study

Page 2: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Background

Kellogg’s began with only 44 employees in Battle Creek, Michigan, in 1906 & today manufacturesin 18 countries and sells products in more than 180 countries around the world. For more than100 years, innovation and commitment to being the best in the categories in which Kelloggcompetes has guided the Company. From being the first company to offer premiums in cerealboxes to being the first to fortify cereals, Kellogg has historically been a leader in industry,innovation and marketing.

Kellogg India is planning to Implement Oracle Demantra & Advanced Supply Chain Planning toenable a system to forecast the demand by interactively retrieving the required data from thedepartments instead of manually retrieving it. The modules seamlessly integrate with the OracleE-Business suite already implemented at Kellogg India.

Kellogg’s has one Manufacturing Plant at Taloja, and many distribution centers at various citieslike Ahmedabad, Bangalore, Chennai, Goa, Hyderabad, Kanpur, Mumbai, Pune etc. Demandsfrom each distribution center collected at HO Mumbai by the Demand Manager. In an S&OPmeeting the Supply Plans are frozen for the next month. The Procurement Manager plans theMaterials Plan based on the Demand input and keeps the cover of long lead time items. Thedistribution plan is derived based on the production output from the Plan. For distributionplanning, the planner also considers the safety stock to be maintained.

Page 3: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Project Details

Number of Employees: 300Number of Users: 40

Module: Advance Supply Chain Management (CBO)

Integration with DISHA (Secondary Sales System)

Operating System: HPUXITANIUM

Hardware Platform: ASCP - HP INTEGRITY RX2800 I2

Project Kick off Date : 15-May-2012

Page 4: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Project Resources

Evosys Resource Details :

• Project Manager - 1• ASCP Functional Consultant - 1• Demantra Functional Consultant- 1• Technical Consultant -1

Kellogg’s Resource Details:

• Project Manager -1• Technical Manager – 1• Demand Planning Manager – 1• Materials Manager – 1• Distribution Manager – 1• Logistic Head – 1• External SCM Consultant - 1

Page 5: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Generate the Sales forecast baselines and align it with the sales and marketing activities to

generate the final forecast.

Derive Plan directly from approved Sales and Operation Plan (S&OP meeting).

Understanding the purchase and Plant capacity.

Revise the sales forecast based on the inputs from the S&OP discussion.

Consolidate the number of (20 CFA’s + 1 Plant) forecasts (Sales Estimates) to single master

forecast. This Consolidated Forecast will be integrated with this ASCP Plan.

There would be only one single consolidated ASCP Plan defined in the system which will

suggests the Supplies for Production Plan (Packing and Process), Procurement plan

(Purchasing Requisition) & Dispatch Plan (Internal Sales Orders).

To replace the existing complex XL sheet based planning which is used by CFAs and Plant.

Real time data visibility through the system.

Business Problem/Need

Page 6: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Reduce Planning cycle time with holistic planning and optimization and Achieve higher

inventory turns.

Drive decisions directly into execution i.e. Releasing the Planned Orders (Batches, Internal

Requisitions & Purchase Requisitions) directly from the Plan.

Provide Supply chain Planning workbench for the Planner.

Bring the forecast/estimate closer to the consumption point (Secondary Sales numbers).

Ability to expand the aggregated plans to detailed executable plans (In terms of time

buckets, the monthly plan needs to be segregated to detailed weekly plans).

Consolidated Demand & Supply view.

Ability to validate the Available to Promise for all the Distributor Sales Orders.

Generate the dispatch plan by prioritizing requirement v/s availability including planned

quantity.

Business Problem/Need (Contd.)

Page 7: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Generate Demand

Plan in Demantra

ASM validate Demand

Plan

ASM can optionally correct the forecast

by entering the ASM override field

RSM validate Demand

Plan

RSM can optionally correct the forecast

by entering the RSM override field

SCM Head validate Demand Plan

On-hand stockTotal outstanding supplies

WIP Batches

SCM Head can optionally correct the forecast by

entering the SCM- Head override field

ASCP PlanningMaterial MasterSupply Master

Inventory Rules

Material Plan Production PlanDistributionPlan

Purchase Reqs. Internal Reqs. Prod Batches

The Solution

Page 8: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

This solution will improve the overall efficiency of the supply chain by a Gross Margin

enhancement of 1% and reduce decision making latency.

Kellogg’s will achieve a customer service level of 90% on-time fill rate.

Help reduce supply chain planning time to 30% and make optimal supply chain

decisions in real time.

It will enable transition from supply chain based on inventory to supply chain based

on information by improving inventory turns by 50%.

This solution will help in providing centralized, holistic and optimal planning solution

and analysis tools.

Kellogg’s will get a comprehensive distribution planning and replenishment solution.

With this solution, Kellogg’s can achieve a forecast accuracy of 70%.

Expected Benefits for Kellogg’s

Page 9: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Involvement of the Senior Management throughout the implementation process.

Custom development of promotions as causal factors and improving the quality of

forecasting and forecast accuracy.

Supporting the implementation with the right set of reports.

Identifying the product issues at the earliest and involving Oracle Support for early

fixes.

Critical Success Factors

Page 10: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Why Evosys

• Leaders to Implement ASCP & Demantra along with other Edge Products in ME Region.

• VCP team consists of SCM and Materials Management Domain Experts.

• Resources with Multiple Implementations Expertise in different business verticals.

• Dedicated Practice specially to take care of customers of VCP and to bring in the right focus

of VCP Practice.

• Offers services Not only in VCP space but also ERP & EPM and hence we specialize in

integration and end to end solution.

Page 11: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Hea

lth

care

• KFSH & RC,KSA

• SEHA,UAE

• NGHA,KSA

• NEP(NHS),UK

• KHUH, Bahrain

• KKESH, KSAP

ub

lic S

ecto

r

• MOH,UAE

• SCT,KSA

• Musanada, UAE

• Dubai Government, UAE

Rea

l Est

ate

• Ezdan, Qatar

Man

ufa

ctu

rin

g, R

etai

l &

Dis

trib

uti

on

• Zams (Global Export Marketing Co.), UAE

• ATE, India

• AQESA, KSA

• Riyadh Cement, KSA

• Shalina, India

• Sanipex, Dubai

• SAMCO Farm Superstores, KSA

Div

ersi

fied

Gro

up

s

• SAAD,KSA

• Ali Bin Ali, Qatar

• Corodex, UAE

Tele

com

• Etisalat, UAE

• Nawras, Oman

• Vodafone, EgyptLo

gist

ics

& T

ran

spo

rtat

ion

• Qatar Navigation & Qatar Shipping (Milaha)

• Al Theyab Transportation Co. Riyadh

• Arabian Hala, KSA

Foo

d In

du

stry

• Kellogg's, India

• Depco, Bahrain

• Dudhsagar, India

Evosys Industry Bandwidth at a Glance

Page 12: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Questions?

Page 13: Evosys’ V P Implementation at Kellogg’s India Pvt Ltd ... · Case Study. Background Kellogg’sbegan with only 44 employees in Battle Creek, Michigan, in 1906 & today manufactures

Thank You

Global Headquarter

Evolutionary Systems Pvt Ltd.4th Floor, Drive In Cinema BuildingDrive In Road, Ahmedabad, IndiaBoard: +91 79 4005 3350,Fax: +91 79 4005 3349,

Follow us on -

ME Headquarter

Evolutionary Systems FZ Arabia LLCBldg No. 11, DIC, Dubai, UAETele: +9714 4380181,Fax: +9714 4380180

U.K./ Europe Headquarter

Evolutionary Systems Company Ltd. 344-354,Gray’s Inn Road King’s Cross, London United Kingdom WCIX 8BP Tele : +44 (0) 207 1642255Fax : +44 (0) 207 1642001

E-mail us at:

[email protected]

[email protected]

www.evosys.co.in

http://www.facebook.com/Evosys

http://www.linkedin.com/company/evosys

http://twitter.com/evosysoracle