2.810 T. Gutowski
Defining the system
Value Stream Mapping (VSM)Example from Heidelberg Press
2.810 T. GutowskiFrom Whitney
2.810 T. Gutowski
Value Stream Mapping at Heidelberg Press, Dover New Hampshire, April 2001• assign ownership• identify part• gather information• walk the process• assemble players• draw map• design future• implementation plan
Applicationsexample-3 day workshop
2.810 T. Gutowski
“Cube” Parts
2.810 T. Gutowski
Heidelberg Printing Presses
2.810 T. Gutowski
FMS System
Maxim cell• 5 HM w/
pallets• 3 set ups
2.810 T. Gutowski
Cincinnati MAXIM Cell
2.810 T. Gutowski
Small Cubes Value Stream Mapping(VSM)
Introduction: A small cubes value stream mapping workshop is being conducted to develop future focus of the line and to focus attention on current manufacturing problems. You are invited as a subject matter expert or to offer input from a unique point of view.
Objective: Complete a current state map that highlights current opportunities. Build a future state map that helps to create long term vision for system redesign and develop short term goals for today's manufacturing problems. Layout implementation plan for addressing needs of the long term vision and short term improvements. Introduce Value Stream Mapping technique for future use on large cubes and rounds.
2.810 T. Gutowski
Teaming breakdownTeam Member
Value Stream Owner
Bruno Posset
Project Manager Bill McCormackProject Engineer Juergen KrebsProcess Engineer (Machinist)
Ken Wallace
Quality Mark CoulombeProcess Sheets Larrie UptonGroup Leader Leo PrestonDispatch Paul CarlMaintenance Bob LaMarqueCustomer Dewey MathewsMaterial Buyer Ray Tardif
2.810 T. Gutowski
Heidelberg VSM Team
2.810 T. Gutowski
Current State
2.810 T. Gutowski
2.810 T. Gutowski
Value Stream Mapping
• Stakeholders• Current State• Representation• Future State• Implementation• Evaluation Ref: “Learning to See”