INSTITUT TEKNOLOGI SEPU FAKULTAS TEKNO JURUSAN T Subject : Sheet No : Last Update : 12 Ja TUGAS RANCANG BESAR III PERHITUNGAN LOAD OUT PREPARED BY : DATE : 1 AHMAD SETIAWAN 4307 100 108 12 JANUARI 2012 2 SAADILLAH AKBAR 4308 100 097 3 BONDAN JANU K 4309 100 047 CHECKED BY : DATE : Dr. Eng. RUDI WALUJO PRASTIANTO, ST., MT. 12 JANUARI 2012 NIP. 197105081997031001 TRB III - AAB AHMAD AKBAR BONDAN Perhitungan Load Out

Excel Load Out TRB 3

Embed Size (px)

DESCRIPTION

excel load out dari tugas TRB 3

Citation preview

COVERINSTITUT TEKNOLOGI SEPULUH NOPEMBER

FAKULTAS TEKNOLOGI KELAUTAN JURUSAN TEKNIK KELAUTANSubject:TRB III - AAB AHMAD AKBAR BONDANSheet No:Perhitungan Load Out Last Update :12 January 2012

TUGAS RANCANG BESAR III

PERHITUNGAN LOAD OUT

PREPARED BY :DATE :1AHMAD SETIAWAN4307 100 10812 JANUARI 20122SAADILLAH AKBAR4308 100 0973BONDAN JANU K4309 100 047

CHECKED BY :DATE :Dr. Eng. RUDI WALUJO PRASTIANTO, ST., MT.12 JANUARI 2012NIP. 197105081997031001

SUPPORTED : EKO "PAKDHE" WP

1 UNITY CHECK MEMBER* * * M E M B E R G RO U P S U MM A R Y * * *API RP2A 20TH/AISC 9TH

GRUP IDCRITICAL MEMBERLOAD CONDMAX. UNITY CHECKDIST FROM END* APPLIED STRESSES **** ALLOWABLE STRESSES ***EFFECTIVECMCRITLENGTHS* VALUES *AXIALBEND-YBEND-ZAXIALEULERBEND-YBEND-ZCONDKLYKLZYZFTKSIKSIKSIKSIKSIKSIKSIFTFTDB1201L-6042LOS40.180-1.93-1.63-0.5116.6932.772727C