PRE FEASIBILITY REPORT OF KUPPAM ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 1.88.0Ha IN KUPPAM VILLAGE, ARAVAKURICHI TALUK, KARUR DISTRICT AND TAMILNADU OF P.MALLIKA,. (Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu minor mineral concession rules, 1959) 1.1 Executive summary of the project The total extent of the Area is 1.88.0 Ha, Patta land in Kuppam Village of Aravakurichi Taluk, Karur District. The category of project is B2; it is a new proposal Rough stone quarry in Kuppam village. The lease applied for Rough stone quarry is located in exhibits slightly undulated topography. The quarry operation is proposed to carry out with conventional open cast semi mechanized mining with 7.50 meter vertical bench with a bench width of 7.5 meter. Quarrying operation is carried out Splitting of rock mass of considerable volume from the parent rock mass by jackhammer drilling and blasting, hydraulic excavators are used for loading the Rough stone from pithead to needy Crusher sites. Occasionally hydraulic excavators are attached with rock breakers for fragmentation to avoid secondary blasting. The quarry operation is proposed up to depth for 22.5m from the below ground level. The Total Geological reserve is about 5,06,465m 3 (Rough Stone) and 2,800 m 3 (Top soil) for a period of Five Years only. The Mineable Reserves is about 1,74,585m 3 (Rough stone) for a period of Five Years. The proposed quantity of reserves (level of production) to be mined for Five Years is 90,668m 3 of Rough stone. Mining license applied for period of Five Years. Life of the quarry is Five Years. The Prefeasibility report preparing for following condition of Government of India Ministry of Environment and Forests (No.L-12011/47/2011 IA-II (M) Dated: 24th June, 2013) The project area does not fall in „HACA‟ region. There is no interstate boundary within the radius of 10Kms. The project area does not fall in CRZ zone within the radius of 10km from project area. There is no Western Ghats within the radius of 10Kms from project area. There are no Bird sanctuaries, wild life sanctuaries as per Wild life protection Act 1972, within the radius of 10Kms. There is no Habitation situated within 500mts in the project area. No Other existing pit situated within the radius of 500mts. 0.3KLD of water for labour drinking and domestic purpose will be available from nearby village through package drinking water vendors. 0.7KLD and 1.0KLD for dust suppression in haul roads and Green belt during the course of quarrying will be taken from the existing Borehole on near the quarry.

Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

PRE FEASIBILITY REPORT OF KUPPAM ROUGH STONE QUARRY LEASE APPLIED

AREA FOR OVER AN EXTENT OF 1.88.0Ha IN KUPPAM VILLAGE, ARAVAKURICHI

TALUK, KARUR DISTRICT AND TAMILNADU OF P.MALLIKA,.

(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1)

and 41 & 42 amendment under Tamil Nadu minor mineral concession rules, 1959)

1.1 Executive summary of the project

The total extent of the Area is 1.88.0 Ha, Patta land in Kuppam Village of Aravakurichi Taluk,

Karur District.

The category of project is B2; it is a new proposal Rough stone quarry in Kuppam village.

The lease applied for Rough stone quarry is located in exhibits slightly undulated topography.

The quarry operation is proposed to carry out with conventional open cast semi mechanized mining

with 7.50 meter vertical bench with a bench width of 7.5 meter.

Quarrying operation is carried out Splitting of rock mass of considerable volume from the parent

rock mass by jackhammer drilling and blasting, hydraulic excavators are used for loading the Rough

stone from pithead to needy Crusher sites. Occasionally hydraulic excavators are attached with rock

breakers for fragmentation to avoid secondary blasting.

The quarry operation is proposed up to depth for 22.5m from the below ground level.

The Total Geological reserve is about 5,06,465m3 (Rough Stone) and 2,800 m

3 (Top soil) for a period

of Five Years only.

The Mineable Reserves is about 1,74,585m3 (Rough stone) for a period of Five Years.

The proposed quantity of reserves (level of production) to be mined for Five Years is 90,668m3 of

Rough stone.

Mining license applied for period of Five Years.

Life of the quarry is Five Years.

The Prefeasibility report preparing for following condition of Government of India Ministry of

Environment and Forests (No.L-12011/47/2011 –IA-II (M) Dated: 24th June, 2013)

The project area does not fall in „HACA‟ region.

There is no interstate boundary within the radius of 10Kms.

The project area does not fall in CRZ zone within the radius of 10km from project area.

There is no Western Ghats within the radius of 10Kms from project area.

There are no Bird sanctuaries, wild life sanctuaries as per Wild life protection Act 1972, within the

radius of 10Kms.

There is no Habitation situated within 500mts in the project area.

No Other existing pit situated within the radius of 500mts.

0.3KLD of water for labour drinking and domestic purpose will be available from nearby village

through package drinking water vendors.

0.7KLD and 1.0KLD for dust suppression in haul roads and Green belt during the course of

quarrying will be taken from the existing Borehole on near the quarry.

Page 2: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

The project cost (Fixed assert cost + EMP cost + Operational cost) is about Rs. 61,74,000/-

(Rupees. Sixty one lakhs and seventy four only)

The EMP cost is around = Rs. 4,70,000/- (Rupees. Four Lakh Seventy thousand only))

2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION

The Rough stone is proposed to excavate by conventional opencast semi mechanized method in

Kuppam Village, Aravakurichi Taluk, Karur District over an extent of 1.88.0Ha. The Category of

project-‟B2‟

(i) Identification of project and project proponent: In case of mining project, a copy of mining

lease/letter of intent should be given

I. Precise area communication was issued by the District Collector, Karur District vide

339/Mines/2017 dated 31.07.2017.

II. The Mining Plan was approved by the Assistant Director, Department of Geology and

Mining, Karur vide Rc.No. 339/Mines/2017 dated 09.08.2017

III. Owner name and address of the Project Proponent:

Name of owner : P.Mallika

Address : W/o Periyasamy,

Old no. 10/2, New No.10/2,

Valluvar Nagar, 2nd Street

Punjai pugalur Vadakku Village,

Manmangalam Taluk

Karur District.

Pin code : 636 117.

Mobile No : 97879 11811.

Email Address : -

Owner Location of the Lease Applied Area:

Name of the quarry : Kuppam Rough stone quarry

S.F.No : 509/1 (P)

Extent : 1.88.0 Ha

Village : Kuppam

Taluk : Aravakurichi

District : Karur

State : Tamil Nadu

Ownership : Private individual

It is a Patta Land.

Page 3: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(ii) Brief description of nature of the project

The Rough stone quarrying operation is proposed to carry out by conventional opencast Semi

mechanized method by formation of benches. Benches are proposed with a height of 5mts on Rough

stone. The width of each bench is proposed not less than the height. The lease area applied for Rough

stone quarry is exhibits slightly undulated covered by Top soil. The massive Charnockite formation

followed by 1m Top soil and sloping towards Northern side of the area, the altitude of the area is

above 137m (maximum) from MSL.

The total quantity of Proposed reserve Rough stone is about 90,668m3 for a period of Five

Years only. The Excavated Rough stone will be directly loaded into tipper to the needy Crusher site

and Top soil will be directly loaded into tipper to the needy Crusher sites used for leveling and low

lying areas. The quarrying operation is proposed up to a depth of 22.5m from below ground level.

The quarrying Rough stone of irrespective of sizes has a good market at present scenario.

(iii) Need for the project and its importance to the country and or region

The Rough stone is important building material to our country and Region, it‟s a vital material for

construction industries and the Rough stone quarrying project falls in the area of Karur District,

where plenty of Road widening projects are been carried. Besides catering domestic construction

projects.

Other infrastructure projects like building, Bridges are also under progress hence there is a

huge demand of Rough stone for public sector companies and local private sector projects.

The earning source in the targeted area is limited, most of the people in and around the area depend

upon the seasonal agriculture and much of the people migrate to nearby towns where good industries

and factories are growing up. Through this project will give employment opportunities to 12

employees directly and 8 employees indirectly.

Mineral Industries of the state of Tamil Nadu provides employment opportunities for the people of

the state as well as in the specific project area. The Quarrying is one among the major core sector for

industries, which plays a vital process of country‟s economic development.

(iv) Demand and supply gap

There is a huge demand of Rough stone in Karur District as many construction project. There is a

huge demand of Rough stone for infrastructure development of the state; hence the project is

significant to the state. Rough stone is widely used for domestic construction project like Hospital,

School, Government Building and Housing, Construction. It is worth mentioning that the Rough

Stone of Karur District.

(v) Imports vs indigenous production

There is no import of Rough stone at present in India.

(vi) Export Possibility

There are no possibilities for export.

Page 4: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(vii) Domestic/Export Markets

After obtaining the lease the applicant will fetch a domestic market as mentioned earlier. It is

propose to sell Rough stone to domestic needy Crusher sites for roads project and other infrastructure

development projects for public and private sector companies.

(viii) Employment Generation (Direct and Indirect) due to the project

It is proposed to deploy about 12 directly and 8 persons will be indirectly benefited. The tentative

man power required for the proposed Rough stone quarry shall be as follows.

Table-1

1. Skilled Mine foreman / Permit Mines

Manager

1 No.

Excavator operator 1 No.

Co- operator 1 No.

Jack hammer operator 2 Nos.

Blaster / Mat 1 No.

2. Semi – skilled Driver 3 No

3. Unskilled Musdoor / Labours 3Nos

Total = 12Nos

The above man power is adequate to meet out the production schedule and the machinery

strength envisaged in the mining plan and also to comply with the stationary provisions of quarry

safety regulation.

It is been ensured that the labours will not be deployed less than 21 years, No Child labours

will engaged or entertained for any kind of quarrying operations. All the labours engaged for

quarrying operations will be insured till the end of life of quarry.

3.0 PROJECT DESCRIPTION

(i) Type of project including interlinked and interdependent projects, if any

There is no interlinked & interdependent project. This is a quarrying project for production of Rough

stone at proposed for quantity of 90,668m3 of Rough Stone for the period of Five Years. The quarry

operation is proposed depth for 22.5m from below ground level. The project is site specific. The

entire Rough stone are transported to the needy crushing unit to reduce into desirable for

construction of Road projects and other infrastructure development project work.

(ii) Location (map showing general location, specific location, and project boundary & project

site layout) with coordinates

It is a Patta land.

The area is mentioned in GSI Topo sheet No. 58-F/13

The Latitude between of 11°00‟21.02”N to 11°00‟25.65”N

Longitude between of 77°56‟44.27”E to 77°56‟49.80”E WGS 1984 datum.

The Altitude is 137m (maximum) above MSL.

Page 5: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(iii) Details of alternate sites considered and the basis of selecting the proposed site,

particularly the environmental considerations gone into should be highlighted

There is no alternative sites are examined, the entire Rough stone will be transported to the

needy crushing site. This Rough stone quarry project is site specific.

(iv) Size or magnitude of operation

The total area of the project is about 1.88.0Ha. It is proposed to excavate Rough Stone

90,668m3 of Rough stone for a period of Five Years. The quarry proposed depth for 22.5m from

below ground level by manual quarrying by deploys jackhammer drilling and blasting, hydraulic

excavator attached with bucket are used for loading and unloading the Rough stone from pithead to

crushing site. Table-2:

Description Rough stone ( m3) Top soil in m

3

Geological Resources 5,06,465 2,800

Available Mineable reserves 1,74,585 Nil

Five Years plan period

As in the approved mining plan 90,668 Nil

(v)Project description with process details (a schematic diagram/flow chart showing the

project layout, components of the project etc. should be given):

The reserves and resource are arrived based upon the Geological investigation

Removal of rough stone is by excavators by drilling and blasting.

Shallow drilling with jackhammer 24mm dia.

Minimum blasting with class 2 explosives.

Loading of Rough stone by excavators into tippers.

Transportation by tippers to needy Crushers.

(vi) Raw material required along with estimated quantity, likely source, marketing area of

final products, Mode of transport of raw Material and Finished Products

This is a quarrying project for exploiting Rough stone; hence, there is no requirement for raw

material. The final product of Rough stone irrespective of sizes will be sold to needy Crusher sites.

(viii) Availability of water its source, Energy/power requirement and source should be given

This Rough stone quarry project does not require huge water and Electricity for the project.

WATER BALANCE CHART

Used only for drinking purpose for

operational workers

Dust Suppression in the Haul Roads to prevent

Dust emission and plantation.

0.3KLD of Drinking water & Domestic

purpose

0.7 KLD for Dust suppression

1.0 KLD for Green belt development

WATER

(2.0 KLD)

Page 6: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

Table-3;

Purpose Quantity Sources

Drinking & Domestic

Purpose

0.3KLD Approved Packaged Drinking water vendors

available in Kuppam village which is about

2.0km on NW side of the area.

Dust suppression 0.7KLD From Existing Borehole on nearby the quarry.

Green belt 1.0 KLD From Existing Borehole on nearby the quarry.

Total 2.0 KLD

Energy

Electricity for Mines office and Lights only at nights (working is restricted on day time only between

9Am to 5Pm with 1pm to 2pm as lunch break).

(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their

management/disposal

The entire quarried Rough stone of irrespective of sizes will be consumed in the needy Crusher sites.

Hence, there is no waste in this quarrying operation. There is no toxic effluent expected to generate

in the form of solid or liquid and gases and the no requirement of treatment of waste.

(x) Schematic representations of the feasibility drawing which give information of EIA purpose

4.0 SITE ANALYSIS

(i) Connectivity

There is an existing road from the area leads to Andisanglipalayam road on Southern side of the

area.

The Nearest Railway line is Kodumudi to Karur line which is about 6Km on Northeastern side of

the area.

The National Highway(NH-67) Trichy –Coimbatore 5.5km on Southern side of the area.

The State Highway (SH-84) Karur- Erode is about 2.2km on Northeastern side of the lease

applied area.

Form – 1

Along with pre-feasibility report

&

Approved Mining plan with Annexure

To Submit DEIAA

Final Presentation

Page 7: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(ii) Land Form, Land use and Land ownership

The entire project area is about 1.88.0Ha, which is Non irrigated and devoid of Vegetation and

Habitations.

Table-4

(iii)Topography (along with map)

The area applied for quarry lease is slightly undulated topography covered by Top soil. The

massive Charnockite formation is clearly inferred followed by the 1m (Avg) Top soil and sloping

towards Southeastern side of the area, the altitude of the area is above 137m (maximum) from MSL.

Water table is found at a depth of 45m in summer and 40m in rainy seasons. Average annual rainfall

is about 800mm to 900mm during NE & SW monsoon.

Peninsular Gneiss forms the oldest rock formations, in which the massive formation of

Charnockite lies over with rich accumulation of recent quaternary formation. On regional scale the

Charnockite body trends (strike) is N450E-S45

0W with dipping towards SE70

0.

(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area

under CRZ), shortest distances from the periphery of the project to periphery of the forests,

national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of

the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be

given.

The area applied for quarry lease is slightly undulated topography covered by Top soil. The

massive Charnockite formation is clearly inferred followed by the 1m (Avg) Top soil and sloping

towards Southeastern side of the area, the altitude of the area is above 137m (maximum) from MSL.

Water table is found at a depth of 45m BGL in summer and 40m BGL in rainy seasons.

The quarrying is restricted up to depth 22.5m from below ground level; hence the quarry operation

will not be affected by the ground water. The region experiences semi – humid climate and there is

scanty growth of vegetation in and around the lease applied area (seasonal vegetation is mostly

practiced).

No Major water bodies within the radius of 10km.

No CRZ within the radius of 10km

No Interstate boundary within the radius of 10km

No Western Ghats within the radius of 10km

No National park, wild life sanctuary, eco sensitive area within the radius of 10km

There is one Quarry situated within the radius of 500m Radius.

District Taluk Village S.F No Area (Ha) Classification

Karur Aravakurichi Kuppam 509/1 (P) 1.88.0Ha Patta land

Page 8: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(v) Existing Infrastructure

This is a Rough stone and weathered formation quarry project hence there is no existing

infrastructure in the proposed quarry area.

(vi) Soil Classification

The Rough stone is clearly visible below 1m Top soil. This land does not sustain any type of

vegetation or Agriculture

(vii) Climatic data form secondary sources

The area receives Rainfall of this area is about 800 mm to 900mm during the both NE monsoons.

The summer is hot with maximum temperature of 42C and winter encounters a minimum

temperature of 18C.

(viii) Social infrastructure available

There is no social infrastructure within the radius of 1Km like schools, universities, hospitals,

prisons and community housing etc.

5. PLANNING BRIEF

(i) Planning Concept (type of industries, facilities, transportation etc) Town and Country

Planning/Development authority Classification

Conventional Opencast Semi Mechanized mining is adapted to in the Rough stone .The

excavated Rough stone will be transported to Needy Crusher sites, Facilities such as power,

Transportation and commodities infrastructure facilities are locally available near the project site.

There are no habitations or villages en-route between the quarry and crushing site the loaded vehicles

are allowed to move only below 40Kms per hour on the roads. The haul roads are sprinkled

periodically to prevent dust.

There is an existing road from the area leads to Andisanglipalayam road on Southern side of the

area.

The Nearest Railway line is Kodumudi to Karur line which is about 6Km on Northeastern side of

the area.

The National Highway(NH-67) Trichy –Coimbatore 5.5km on Southern side of the area.

The State Highway (SH-84) Karur- Erode is about 2.2km on Northeastern side of the lease

applied area.

The total area of the project is about 1.88.0Ha. Conventional Open cast manual quarrying by

deploys jackhammer drilling and blasting, air driven compressor are used for loading and unloading

the Rough stone from pithead to needy crushing site.

The project land is devoid of vegetation and lies in the backward town of Karur District. There are

no specific industries or factories in and around the project area. The available Mineable Reserves

are about 1,74,585 m3 (Rough stone) based on the existing pit the applicant proposed to carry out

90,668m3 (Rough stone) for the period of Five Years.

Page 9: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

(ii) Population projection

There are no habitations within 500m radius. There are few villages located in this area within 10 km

radius of quarry site; the approximate distance and population are given below.

Table – 5

S.No Name of the

Village

Approximate distance & Direction

from lease applied area Approximate population

1. Uppupalayam 2km-NE 700

2. Kuppam 2km-NW 500

3. Puliyampalayam 3km-SE 650

4. Andisangilipalayam 1km-SW 550

Basic human welfare Amenities such as Health Center, Schools, Communication Facilities, and

Commercial Centers etc are available at Koudumudi at a distance of 5kms on NW side of the area.

(iii) Land use planning (breakup along with green belt etc.)

The land use planning of the quarry area of the total extent of 1.88.0Ha is given below

Table-6

Sl.

No. Land Use

Present Area

(Hect)

Area in use during the quarrying

period (Hect)

1. Quarrying Pit 1.40.0 1.40.0

2. Infrastructure Nil 0.01.0

3. Roads 0.01.0 0.01.0

4. Green Belt Nil 0.15.0

5. Unutilized 0.38.0 0.21.0

Total = 1.88.0 1.88.0

(iv) Assessment of Infrastructure Demand (Physical & Social)

The existing road facilities are already available which shall be used and maintained. The

labors requirement is drawn from the nearest villages. The labors will be brought by jeeps and vans

to the quarry site, Medical facilities are available near the project site, Government and private

hospitals and other basic amenities and infrastructure facilities like communication center, school

supermarket, and bus stand are also available in Koudumudi at a distance of 5kms on NW side of the

area. This quarry project will provide employment for about 12 peoples directly and 8 peoples

indirectly.

(v) Amenities/Facilities

The simple methods adopted and the limited scale of activities involved in Rough stone quarrying

does not require High Tension Electric Power supply or huge worship facilities. The quarrying work

is restricted to one general shift during daytime 9.00am to 5.00pm with 1.00pm - 2.00pm lunch

break. Major Machinery repair works are attended at Kodumudi minor repairs are carried out by the

nearby mechanics. All facilities and amenities are available in Karur which is 12Km on the South

Eastern side of the area.. Packaged drinking water will be brought from approved vendors. Mine

office, storeroom, toilet and first-aid room will be provided on permanent structures within the lease

area after the grant of lease.

Page 10: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

6. PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing area)

There is no processing area proposed within the lease applied area.

(ii) Residential area (Non processing area)

There is no residential area within 500mts of the lease applied area.

(iii) Green Belt

All along the boundary barrier is selected for Green belt development by planting and maintaining

native species. The total area for proposed for Green belt is around 0.15.0Ha out of 1.88.0Ha.

(iv) Social infrastructure

About 13 employees will be directly benefited and 8 persons will be indirectly benefited, the lease

ensure to share all responsible for special benefits like water, health care, Education benefits, and

promotion of socio cultural activities of the nearby villages.

(v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.,)

There is an existing road from the area leads to Andisanglipalayam road on Southern side of the

area.

The Nearest Railway line is Kodumudi to Karur line which is about 6Km on Northeastern side of

the area.

The National Highway(NH-67) Trichy –Coimbatore 5.5km on Southern side of the area.

The State Highway (SH-84) Karur- Erode is about 2.2km on Northeastern side of the lease

applied area.

(vi) Drinking Water management (Source & Supply of water)

This proposed Rough stone quarry project does not require huge water either for

beneficiation or processing. Water required for domestic consumption for labors is around 1.0 KLD.

The packaged Drinking water for this will be brought from approved water vendors.

Drinking Water & Domestic purpose – 0.3 KLD (source: through approved packaged water vendors)

Dust Suppression – 0.7 KLD (source : from existing borehole on nearby the quarry)

Green belt – 1.0 KLD (source : from existing borehole on nearby the quarry)

(vii) Population Benefit

The social responsibilities like providing School Note books, Uniforms to the Students below

poverty level beside if the villages require any borehole for public use it will ensure to do so.

As a part of corporate social responsibility it is ensured to take part and contribute the native cultural

activities in the nearby villages. During summer seasons packaged drinking water will be kept will

be kept in the village for public and for tresspallers.

7. REHABILITATION AND RESETTLEMENT (R & R PLAN)

(i) Policy to be adopted (Central/State) in respect of the project affected persons including

home oustees, land oustees and landless laborers (a brief outline to be given):

There is no Rehabilitation and resettlement is involved.

Page 11: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

8.0 PROJECT COST:

A.Fixed Asset Cost:

1.Land Cost (800000/1Ha)= 1.88.0 Ha

2.First aid room and accessories

3.Labour Shed

4.Sanitary Facility

Total=

= Rs. 15,04,000/-

= Rs. 1,00,000/-

= Rs. 1,00,000/-

= Rs. 1,00,000/-

= Rs. 18,04,000/-

B.Operational Cost:

1. Machineries

2. Fencing cost

Total=

= Rs. 41,00,000/-

= Rs. 1,00,000/-

= Rs.42,00,000/-

C. EMP cost

1.Air Quality Sampling

2.Water Quality Sampling

3.Noise Monitoring

4.Ground vibration test

5.Drinking water facility for the laborers

6.Sanitary arrangement,

7.Safety kits

8.Water sprinkling

9.Afforestation etc.

10.Cost towards charity

Total EMP cost

= Rs. 40,000/-

= Rs. 40,000/-

= Rs. 20,000/-

= Rs. 20,000/-

=Rs. 50,000/-

=Rs. 25,000/-

=Rs. 50,000/-

=Rs.1,00,000/-

=Rs. 25,000/-

=Rs. 1,00,000/-

=Rs. 4,70,000/

D. Total Expected project cost

1.Fixed asset cost

2.Operation cost

3. EMP Cost

Total Expected Project Cost

= Rs. 15,04,000/-

= Rs. 42,00,000/-

= Rs. 4,70,000/-

= Rs.61,74,000/-

(The total cost of the project including EMP cost is about Rupees Sixty one lakhs

and seventy four only)

Page 12: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

8.0 MINE CLOSURE PLAN:

Steps proposed for phased restoration, reclamation of already mined out areas:

After the exploitation the Earth Bund and fencing will be constructed around the pit to prevent

inherent entry of public. The quarried pit will be allowed to collect rain and seepage water which will

act as a Reservoir which will enhance the Ground water level of the nearby wells.

There is no proposal for back filling, reclamation and re habitation. The quarry pit will be

fenced to prevent inherent entry of public. The green belt development will be maintained.

Measures to be under taken on mine closure as per Act & Rules:

Measure will be taken as per Act & Rules.

Mitigation measure to be undertaken for safety and restoration / reclamation of the already mined out

area:

Drilling will be carrying out by wet drilling to control the dust into the air. Blasting will be carrying

out on limited scale. Mist spray on haul road will be proposed to prevent the dust propagation into

the air.

The plantation will be carried out on the safety barriers to prevent Noise, besides wet drilling will

be practiced to prevent dust. All the machineries will be maintained in good conditions as per RTO

and TNPCB Norms to prevent Noise, Smoke and vibration.

Machineries will be periodically maintained by experienced mechanic to minimize noise, Smoke and

ground vibration.

Page 13: Executive summary of the project...(Prepared under rule 12 of draft minor mineral conservation and development rules, 2010& as per rule 19(1) and 41 & 42 amendment under Tamil Nadu

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

(i) Financial and social benefits with special emphasis on the benefit to the local people

including tribal population, if any, in the area

There are no tribal populations in and around the area about 12 persons directly and 8 persons

indirectly will be benefited by these projects, besides the government. Will get good revenue by

taxes, seinerage fees etc.The socio- Economic conditions of the village and distance will enhance due

to the project, hence, the project should be allowed after considering all the parameters.

Signature of the Proponent Signature of the Recognized Qualified Person

With Name and Full Address

P.Mallika, S.LAKSHMIKANTHAN M.Sc.,

W/o Periyasamy, RQP/MAS/262/2014/A

Old no. 10/2, New No.10/2,

Aravakurichi Taluk,

Karur District.

Pincode–636 117

Date:

Place: Salem