LAQ Consulting EIS Belleza Towers Page 1 EXECUTIVE SUMMARY 1. BASIC PROJECT INFORMATION Project Classification : Two 2) High-Rise Condominium Buildings Name of Project : DMCI-PDI (Belleza Towers) Location : McArthur Highway cor. Ma-a Road, Brgy. Ma-a, Talomo District, Davao City Land Area : 10,943.68 sq.m. Gross Floor Area : 157,473.29 sq. m. Total Building Footprint Area : 3,540.39 Open Space (for evacuation) : 1,427.53 Amenities : 10,353.23 sq.m. Project Cost : P2,918,430,992.00 Parking Allocation : Parking Slots Area No. of P. Slots Parking Ratio Area per P. Slot Covered Open IDEAL=375SQM LESS 8470 667 x 36.69% 43.98 (CAR SLOTS FOR BASEMENT PARKING ONLY)

EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 1

EXECUTIVE SUMMARY

1. BASIC PROJECT INFORMATION Project Classification : Two 2) High-Rise Condominium Buildings Name of Project : DMCI-PDI (Belleza Towers)

Location : McArthur Highway cor. Ma-a Road,

Brgy. Ma-a, Talomo District, Davao City

Land Area : 10,943.68 sq.m.

Gross Floor Area : 157,473.29 sq. m.

Total Building Footprint Area : 3,540.39

Open Space (for evacuation) : 1,427.53

Amenities : 10,353.23 sq.m.

Project Cost : P2,918,430,992.00

Parking Allocation :

Parking Slots Area No. of P. Slots

Parking Ratio Area per P. Slot

Covered Open IDEAL=375SQM LESS

8470 667 x 36.69% 43.98 (CAR SLOTS FOR BASEMENT PARKING ONLY)

Page 2: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 2

Project Rationale

The proposed project shall address the growing demand for residential condominium where urban

development and business are progressing due to the economic growth of the city in particular and the

country in general.

The project shall also generate revenue to the local and national government and shall similarly

generate employment.

Project Description

The Two (2) High-Rise Condominium Buildings Project with a Gross Floor Area equivalent to 157,473.29

is located in a 10,943.68 sq.m. lot area in Brgy. Ma-a, Talomo District, Davao City.

Goegraphic Coordinates

Page 3: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 3

The 10,943 sqm. lot area is situated at Macarthur Highway cor. Ma-a Road, Brgy. Ma-a, Talomo District,

Davao City. Currently, the lot is covered under TCT Nos. T-351503 and T-331698.

2. Brief Summary of Project’s EIA Process

The EIA Study is in reference to the Revised Procedural Manual for DENR Administrative Order No. 30 Series of 2003 (DAO 03-30), the Implementing Rules and Regulations of PD 1586, establishing the Philippine Environmental Impact System and DAO 2017-15, Guidelines on Public Participation Process.

The technical information provided by DMCI - PROJECT DEVELOPERS, INC. (DMCI-PDI) was also made as reference in the study.

Secondary data gathered from l field sampling and data gathering were considered in the environmental assessment of the project site and the impact area.

The EIA Team is composed of the following: Linda A. Quiocson-Borre as a Team Leader/Environmental Engineer and a team of technical experts from the DMCI - PROJECT DEVELOPERS, INC. (DMCI-PDI)

The EIA Study took about three (3) months considering the Public Participation Process that was conducted to generate issues relative to the project.

The environmental study followed the methods prescribed in the Revised Procedural Manual.

The Team Leader was in constant communication with the project proponent and its Team of Experts to ensure that environmental concerns are considered during the conduct of the study and design preparations.

Page 4: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 4

3. Summary of Baseline Characterization

The presentation below consists of secondary data and information derived from the Socio Economic Profile of Davao City, PAGASA, Philippine Statistics Office, DOH, including the water quality of the receiving stream that was derived from the EMB Monitoring Report and the air quality taken from the records of EMB-Reg XI. Davao City, reputedly the largest city in the world, has an area of 244,000 hectares, or 8% of the land

area of Southern Mindanao Region or Region XI. It is divided into 3 congressional districts and

furthermore divided into 11 administrative districts. Poblacion and Talomo Districts comprised District I,

meanwhile District II is composed of the following districts, namely: Agdao, Buhangin, Bunawan and

Paquibato, District III includes Toril, Tugbok, Calinan, Baguio and Marilog.

Geographical Location Davao City is located in the southeastern part of Mindanao, lying in the grid squares of 6 58’ to 7 34’ N latitude, and 125 14’ to 125 40’ E longitude. It is bounded on the north by Davao Province; on the east partly by Davao Province and Davao Gulf; on the South by Davao del Sur; and on the west by North Cotabato. Davao City Proper is approximately 946 aerial kilometers or 588 statute miles, southeast of Manila. Because of its strategic location, Davao City was developed as a regional trade center for Southern Mindanao; international trade center to the Southern Pacific; and Southern gateway more particularly to and from the neighboring countries like Indonesia, Malaysia, Brunei, Australia, among others. Climate Davao City enjoys a mild tropical climate. Compared with other parts of the Philippines in which there is a district hot and wet season. It enjoys the privilege of e climate where the days are always sunshiny and mild followed by nights of rain. The city is outside the typhoon belt and lacks major seasonal variations. The predominant wind direction is northward from the Davao Gulf where the cooler air of the sea replaces the warm air mass over the city. A surrounding mountain chain protects the city effectively from strong winds. Topography A substantial part of Davao City is mountainous characterized by extensive mountain ranges with uneven distribution of plateaus and lowlands. The mountain range that delimits the western boundary of the city extends as far down to South Cotabato. This mountain ranges nurse the highest peak in the Philippines, which is Mt. Apo located at the boundaries of North Cotabato, Davao del Sur and Davao City. Mt. Apo has an elevation of about 10.311 feet (3,144 meters) above sea level. It has been considered as semi-active volcano. The large, contiguous lowland areas of Davao City are coastal plains and valleys extending inland as greatly-rising valleys. These areas are found in the eastern part of the city in Paquibato district,

Page 5: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 5

which is an extension of vast lowland at the head of Davao Gulf. The other substantial lowland located in the southeastern part of the city along the western coast of the Gulf, and is in the districts of Bunawan, Buhangin, Agdao, Poblacion, Talomo, and Toril. These lowland areas are level to nearly land with slopes ranging from 0 to 3 percent. These are generally composed of recent alluvium consisting of clay, slit and some sand and gravel. Topographically, along the southeast quarter is plain and slightly hilly along the entire coast and uplands north and westward to Calinan, with slopes generally below four to five degrees. The plains and valleys merged gradually into the uplands, and the uplands in turn into the mountains. Although the eastern part of the city is a broad lowland belt, its surface is enterprise by low hill and knobs. The entire land area of Davao is drained towards the Gulf Davao River and its numerous tributaries are the main drainage system of the city. Davao River originates from Davao Province, flows towards the south meandering along the central part and finally flows eastward emptying into the gulf at the southern periphery of the City Proper. The secondary drainage outlet of the city is the Talomo River which is the drainage outlets of the eastern slopes of Mt. Apo. There are other small rivers and streams that drain the area, but Davao and Talomo Rivers are the important river basins. Local Geology The dominant rock types that comprise the geology of the metropolitan Davao City are the interbedded clastic sedimentary rocks belonging to the Masuhi Formation and Mandog Sandstone, fossiliferous Bunawan Limestone and Tigatto Terrace Gravel. The larger portion of the Davao City proper, including the location of the proposed Verdon Parc Residences in Ecoland area, Matina is underlain by Quaternary Alluvium. The following description of different lithology was referenced mainly from Aurelio and Peña (2004 and 2010).

The People

Indicator Number Percentage

2010 Projected Population, OCPDC 1,464,301 -

Male 727,611 49.69

Female 736,690 50.31

2007, Total, Actual Survey, NSO 1,363,337

2000, Total, Actual Survey, NSO 1,147,116

1995, Total, Actual Survey, NSO 1,006,840

Average Annual Growth Rate, 2000-2007 - 2.41

Children Population (0 – 17 y.o.), 2007 Actual, NSO 532,854 -

Under 1 32,533 -

1-2 63,042 -

3-5 90,479 -

6-12 200,961 -

13-17 145,839 -

Working Age Population (18 – 64 y.o.), 2007 Actual, NSO 779,989

Page 6: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 6

Male 387,116 49.63

Female 392,873 50.37

Old Population (65-over), 2007, CPDO 48,335 -

Male 21,777 45.05

Female 26,558 54.95

Overall Dependency Ratio, 2007 Actual, NSO 74 -

Young (0 – 17 y.o.) 68 -

Old (65 – over) 6 -

Women of Reproductive Age (15 – 49 y.o.), 2007 Actual, NSO 372,931 -

Number of Household, 2007 Actual , NSO 300,141 -

2000 Actual, NSO 240,057 -

1995 Actual, NSO 198,668 -

Average Household Size, 2007, NSO 4.54 -

Density, persons per sq. km., 2010 600 -

2007 559 -

2000 470

1995 413 -

% of Population to Davao Region, (4,156,653), 2007 - 32.80

% of Population to Mindanao Figure, (21,582,540), 2007 - 6.32

% of Population to Philippine Total, (88,574,614), 2007 - 1.54

Page 7: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 7

4. Summary of Impacts & Mitigating Measures

Project Phase / Environmental

Aspect

Environmental

Component

Potential

Impact

Mitigating Measure

During Construction

A. The Land Localized

Flooding /

Erosion /

Siltation due to

excavation /

back filling and

other earth

moving

activities

Proper spoils

management

Timing of construction.

Provision of erosion

control measures such

as shoring for

basement.

Regular inspection of

surrounding drainage

canals to ensure that

these are free from

clogs.

Mud in the

street coming

from delivery

trucks

Trucks shall not be

allowed to leave with

tires full of mud. The

security guard shall be

assigned to impose this

policy.

Tires shall be washed

first with water before

leaving the compound.

Grease and oil

from equipment

Accidental oil

spillage

No change oil shall be

allowed inside the

construction site.

Equipment shall be

regularly checked to

avoid oil spill on the

ground.

The contaminated area

shall be covered with

sawdust/sand to

Page 8: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 8

absorb the oil and

arrest/prevent it from

moving furthermore.

The oil contaminated

area shall be scraped,

collected in drums, and

have it treated by DENR

Accredited Treater.

Improper

disposal of solid

waste (domestic

and toxic

wastes) /

indiscriminate

spills of

construction

spoils

Waste segregation,

recycling, and re-use

shall be practiced. Toxic

wastes shall be

collected and treated in

compliance with RA

6969 while the garbage

shall be handled and

managed in compliance

with RA 9003.

Collection, treatment,

and disposal of

hazardous wastes, like

busted lamps and used

oil must comply with

the provisions of RA

6969.

Ensure proper storage

of construction

materials to reduce

hauling schedules thus

reducing traffic

congestion

Page 9: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 9

Traffic

Congestion

Delivery of materials

during nighttime.

Delivery truck shall not

be allowed to park on

the sidewalk fronting

the project.

Staging station shall be

identified to

temporarily store the

materials.

Flooding

Regular clearing of

drainage canal,

waterways.

Geologic Hazard Implementation of

standard construction

procedures during

excavation e.g. shoring

section by section

excavation etc.

Ensure that damage to

life and property shall

be avoided.

Safety of

workers

Workers must be

required to wear safety

gadgets and must be

provided with

construction guidelines

B. The Water

Discharge of

generated

sewage

Provision of temporary

sanitary facilities for

construction workers.

Service provider should

secure permits to ensure

that proper handling,

collection, and disposal

are properly complied

with.

Washing from

concrete mixers

Washing of concrete

mixers shall not be

allowed inside the site.

Cleaning should be

done at the supplier’s

compound.

Page 10: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 10

Water resource

/supply

competition

resulting from

the demand of

the

building/project

The Project must have

a gadget installed to

regulate the flow of

supply without

disturbing the pressure

to ensure that the

pressure distributing

water to the Project’s

neighbors shall not be

affected.

C. The Air Increase TSP

and Noise level

in the area

Use of new and well

maintained

earthmoving

equipment.

Construction

equipment shall be

required to have an

installed muffler to

reduce noise when

operating.

Regular watering of TSP

sources fencing on the

construction site.

Regular spraying of

exposed areas.

Proper handling,

transport, and storage

of materials.

D. The People Impacts of

Project on

Existing

Facilities

Safety measures will be

implemented on the

construction to prevent

any damage on the

existing utilities such as

telephone lines, water

lines, & electrical lines.

A protective canopy

will be installed in front

of the proposed

building construction.

Page 11: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 11

Accidents that

may likely

happen to

passers-by due

to its proximity

to commercial

centers.

Notices shall be posted

to pedestrians and

passers- by on the

dangers that may be

present in certain

areas.

Nets, skirts, and other

safety gadgets shall be

provided to catch

falling objects.

Workers shall be

recommended by the

Host Brgy.

Peace and Order

due to presence

of migrant

workers

No workers shall be

allowed to sleep inside

the site after

construction schedule.

No liquors and

gambling activities shall

be allowed inside the

site.

Page 12: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 12

Page 13: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 13

ENVIRONMENTAL MANAGEMENT PLAN

Impacts Management Plan

Project Phase / Environmental

Aspect

(Project Activity which will

likely Impact the Environmental

Component

Environmental

Component

Likely to be

Affected

Potential

Impact

Option for Prevention

or Mitigation or

Enhancement

Responsible Entity

Cost

Guarantee/

Financial

Arrangement

I. PRE-CONSTRUCTION PHASE

At this stage, the activity merely involves design outlaying, awarding of contracts, permit acquisition and other activities.

II. CONSTRUCTION PHASE

A. The Land Localized

Flooding /

Erosion /

Siltation due to

excavation /

back filling and

other earth

moving

activities

Proper spoils

management Timing of

construction.

Provision of erosion

control measures such

as shoring for

basement.

Regular inspection of

surrounding drainage

canals to ensure that

these are free from

clogs.

Owner/

Contractor/Project

Manager

Part of the

construction

management

cost.

Included in the

contractor TOR

Page 14: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 14

Mud in the

street coming

from delivery

trucks

Trucks shall not be

allowed to leave with

tires full of mud. The

security guard shall be

assigned to impose this

policy.

Tires shall be washed

first with water before

leaving the compound.

-same-

-same-

-same-

Grease and oil

from equipment

Accidental oil

spillage

No change oil shall be

allowed inside the

construction site.

Equipment shall be

regularly checked to

avoid oil spill on the

ground.

The contaminated area

shall be covered with

sawdust/sand to

absorb the oil and

arrest/prevent it from

moving furthermore.

The oil contaminated

area shall be scraped,

collected in drums, and

have it treated by

DENR Accredited

Treater.

-same-

-same-

-same-

Page 15: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 15

Improper

disposal of solid

waste (domestic

and toxic

wastes) /

indiscriminate

spills of

construction

spoils

Waste segregation,

recycling, and re-use

shall be practiced.

Toxic wastes shall be

collected and treated

in compliance with RA

6969 while the garbage

shall be handled and

managed in compliance

with RA 9003.

Wastes collection shall

the schedule being

imposed by Brgy. 45.

Immediate hauling of

spoils for disposal

(hauling and disposal

shall be made on a

daily basis).

Collection, treatment,

and disposal of

hazardous wastes, like

busted lamps and used

oil must comply with

the provisions of RA

6969.

Trucks hauling the solid

wastes shall be

provided with tarpaulin

cover to secure the

-same-

-same-

-same-

Page 16: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 16

wastes or the truck

itself must be covered

or has a cover. Only

compliant trucks shall

be allowed to haul the

waste to ensure that

no spills/litters shall be

committed while in

route to the dumping

site.

Traffic

Congestion

Delivery of materials

during nighttime.

Delivery truck shall not

be allowed to park on

the sidewalk fronting

the project.

Staging station shall be

identified to

temporarily store the

materials.

Contractor 500.00/day/

guard

-same-

Flooding

Regular clearing of

drainage canal,

waterways.

-same-

Part of

construction

cost

-same-

Geologic Hazard Implementation of

standard construction

procedures during

excavation e.g. shoring

section by section

excavation etc.

Ensure that damage to

life and property shall

be avoided.

Monitoring by

Construction

Management

Group

-same-

-same-

Page 17: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 17

Safety of

workers

Workers must be

required to wear safety

gadgets and must be

provide with

construction

guidelines.

B. The Water

Discharge of

generated

sewage

Provision of temporary

sanitary facilities for

construction workers.

Service provider should

secure permits to ensure

that proper handling,

collection, and disposal

are properly complied

with.

Proponent/

Contractor

P40,000.00

Committed in

the EIS and

inclusion in the

TOR to be

complied by

the Contractor

Washing from

concrete mixers

Washing of concrete

mixers shall not be

allowed inside the site.

-same- -same- Committed in

the EIS

Water resource

/supply

competition

resulting from

the demand of

the

building/project

The Project must have

a gadget installed to

regulate the flow of

supply without

disturbing the pressure

to ensure that the

pressure distributing

water to the Project’s

neighbors shall not be

affected.

-same- Part of Project

Cost

-same-

Page 18: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 18

C. The Air Increase TSP

and Noise level

in the area

Use of new and well

maintained

earthmoving

equipment.

Construction

equipment shall be

required to have an

installed muffler to

reduce noise when

operating.

Regular watering of

TSP sources fencing on

the construction site.

Regular spraying of

exposed areas.

Proper handling,

transport, and storage

of materials.

Project Manager

Included in

construction

cost

-same-

D. The People Impacts of

Project on

Existing

Facilities

Safety measures will be

implemented on the

construction to prevent

any damage on the

existing utilities such as

telephone lines, water

lines, & electrical lines.

A protective canopy

will be installed in front

of the proposed

building construction.

Project Manager

Included in

the TOR

-same-

Page 19: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 19

Accidents that

may likely

happen to

passers-by due

to its proximity

to commercial

centers.

Notices shall be posted

to pedestrians and

passers- by on the

dangers that may be

present in certain

areas.

Nets, skirts, and other

safety gadgets shall be

provided to catch

falling objects.

Workers shall be

recommended by the

Host Brgy.

-same-

-same-

-same-

Peace and

Order due to

presence of

migrant workers

No workers shall be

allowed to sleep inside

the site after

construction schedule.

No liquors and

gambling activities shall

be allowed inside the

site.

-same- -same- -same-

Page 20: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 20

III. OPERATION PHASE

A. The Land Indiscriminate

disposal of solid

waste

(Domestic and

Hazardous

wastes)

Implementation of a

waste management

plan in accordance with

MMDA and the Brgy.

Ordinance, such as

following the color

coding scheme of

collection.

Generation of

Solid Waste

(Domestic and

Hazardous

wastes both

liquid and

solids)

Proper up-keep of a

central solid waste

collection and storage

area.

Collection and Disposal

of solid wastes shall

follow RA 9003 and

RA6969.

B. The Water Generation of

wastewater

The Wastewater

Treatment Facility shall

be maintained and

operated to treat the

wastewater generated

from the operation of

the project.

PCO 30,000/mo. -same-

Chlorine usage

and chlorinated

water

generation

Chlorine is only applied

when needed. No

water shall be

discharged. The pool is

only augmented with

water when needed.

PCO

Page 21: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 21

C. The Air Additional

pollution load

resulting from

the operation of

generator set

and air

emissions from

the parking

area.

Proper operation and

maintenance of

generator set. Good

foundation design and

proper enclosures.

The parking space is

designed in such a way

that there is adequate

dispersal / ventilation

in the area.

The parking area of the

condominium only

allows cars with

stickers from the

Homeowners

Association (updated

registration is

required). These cars

must have passed

emission testing.

PCO Part of daily

maintenance

cost for the

project.

-same-

D. The People

Employment

Recruitment of local

labor

-

Increase

economy

activity

Increase in revenue for

the LGU. That would

finance LGU projects

that shall further boost

the local economy in

particular and the

national economy in

general.

-same-

Page 22: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 22

Increase in the

demand for

social services

LGU to provide basic

social services (as

enumerated in the

social infrastructure as

indicated in the Socio-

economic Profile) to be

derived from the taxes

and other gov’t

revenues.

Safety of

workers and

pedestrians

Proper traffic

management by

engaging personnel

with training on traffic

control and

management.

-construction safety

procedure should be

implemented.

Traffic

Congestion

Proper management of

parking area and flow

of traffic in

coordination with local

officials in manning or

directing the traffic in

the area.

Qualified personnel to

act as traffic enforcer.

Posting of traffic

signage in strategic

areas to impose

restrictions.

Proponent Part of the

operation cost

Commitment in

the EIS

Page 23: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 23

Traffic management

Plan outside the

premises of the Project

is already under the

responsibility of the

LGU. It should be

recognized that before

the Building Permit is

issued, a Traffic

Management Plan is

being required by the

LGU.

IV. ABANDONMENT PHASE The plan for this particular phase, if interpreted to be abandonment phase after the structural life of the project would

depend on the building regulation to be imposed by the local government, 50 years after this writing.

Although it should be pointed out that the project shall become a private property of different owners. Very likely though,

maintenance of the building shall be kept to sustain an extended life of the project as a legacy to the next generation.

If abandonment plan shall mean the stage after the construction and the start of the operation of the project, a Turn Over

compliance should be met by the contractor. This compliance shall include among others, clearing the area from

construction spoils and drainage canals to be free from wastes.

Page 24: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 24

5. Environmental Monitoring Plan

Key

Environmental

Aspects per

Project Phase

Potential

Impacts Per

Environmental

Sector

Parameter to be

Monitor

Sampling & Measurement Plan

Lead Person

Annual

Estimated Cost

EQPL MANAGEMENT SCHEME

NOT APPLICABLE (Please see notations below.)

Method Frequency Location EQPL RANGE MANAGEMENT MEASURES

ALERT ACTION LIMIT ALERT ACTION LIMIT

I. PRE-CONSTRUCTION PHASE

Not applicable since this particular stage does not involve impact that may require monitoring. Activities involved are merely procurement of necessary permits, design , and other documentary requirements

II. CONSTRUCTION PHASE

Various

Construction

Activity

Noise, TSP, 1 hour

sampling

High volume

and Noise

Volume

Semi-Annually or

as required by

DENR Regional

Office

Open Areas Contractor

/

Developer

18,000 per

sampling

Flooding Ocular inspection

of drainage system

NA During

inclement

weather or rainy

days to

determine if

drainage line

around the

project site are

clogged of

affected by the

project

Drainage line

around the

project

Developer/

Contractor

Domestic

Solid Waste

Generation

Hazwastes

both liquid and

solid

Monitoring of Solid

waste generation,

collection and

disposal for

domestic (garbage).

Monitoring,

collection and

storage labeled as

liquid wastes like

oil/ grease and

solid waste like

Visual

inspection to

ensure that

excessive

accumulation

of wastes is

avoided.

Daily Developer/

Contractor

Page 25: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 25

busted lamps,

electronic wastes ,

batteries and etc

Traffic Construction Area Daily

monitoring

Daily Project

Location

-do- Part of the

Terms and

reference as

agreed by the

contractor

III. OPERATION PHASE

Noise & Air

pollution

Noise, TSP, NOx,

S0x,CO

Stationary Sampling Annually PCO P20,000 Meet the

Air

Quality

Standards

Domestic

Solid Waste

Generation

Hazwastes

Monitoring of

garbage

generation,

collection and

disposal.

Monitoring the

collection, storage

as labelled and

disposal of liquid

wastes like

oil/grease and

solid wastes like

busted lamps,

electronic wastes,

batteries and etc.

Visual inspection Daily Refuse

Room

PCO Part of Good

housekeeping

practices.

Dependent on

the volume and

type of wastes

generated

Generation

of

Wastewater

BOD, TSS, oil &

grease, nitrate,

phosphate,

ammonia, fecal

coliform and

surfactants per

DAO 2016-08.

Quarterly End of the

pipe.

PCO Meet the

Effluent

Standards

Traffic Traffic flow

outside and flow

of vehicles from in

and out of the

premises.

Visual inspection Daily Entrance/

Exit Points,

Frontage,

and any

point where

Head

Security

Group

Minimum wage

for security

guards.

Page 26: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 26

vehicles

come in and

out.

IV. ABANDONMENT

PHASE

The plan for this particular phase, if interpreted to be abandonment phase after the structural life of the project would depend on the building regulation to be imposed by the local government, 25

years after this writing.

Although it should be pointed out that the project shall become a private property with different owners. Very likely though, maintenance of the building shall be kept to sustain an extended life of the

project as a legacy to the next generation.

If abandonment plan shall mean the stage after the construction and the start of the operation of the project, a Turn Over compliance should be met by the contractor. This compliance shall include

among others, clearing the area from construction spoils and drainage canals to be free from wastes.

Note: This scheme is applicable only to industries that are classified as Critical Project where extra judicial agreement outside environmental laws is arrived at, purposely to accommodate stakeholders. This scheme is not applicable to condominiums projects where the wastewater is domestic in character and shall be treated in its treatment facilities, and where the generator set shall only be used during power outages, where solid wastes are regulated by laws , and where EQPL is not prescribed.

Page 27: EXECUTIVE SUMMARYr11.emb.gov.ph/.../10/BELLEZA-EXECUTIVESUMMARY.pdf · Traffic Congestion Delivery of materials during nighttime. Delivery truck shall not be allowed to park on the

LAQ Consulting EIS

Belleza Towers Page 27

6. Schedule of Implementation