International Paper CompanyCorporate Flight Department HangarMemphis, TN2009
Design / Builder for a corporate flight department facility comprised of a 20,000 SF hangar, a 10,000 SF office and shop area and a 3,000 SF storage area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot
support areas, shop space and catering area.
Sun Air JetsCorporate Storage HangarCamarillo, CA2010
Architecture master plan and architectural services for a new corporate storage hangar expansion to an existing FBO facility which includes one 30,000 SF hangar and one 18,000 SF hangar with support spaces. Utilities for the hangar support spaces are set
up to accommodate future tenant build-out.
Rare AirCorporate Storage HangarCentennial, CO2012
Design / Builder for a corporate flight department facility comprised of a 30,000 SF hangar and 9,900 SF office space/support area. The facility includes executive offices, conference room, waiting lounge, customer offices, pilot support areas, shop space and
an interior vehicle parking area.
Business Jet CenterHangar 9Corporate Storage HangarOakland, CA2013
Atlantic Aviation ServicesHangar Corporate Storage HangarRifle, CO2016Business Jet CenterCorporate Storage HangarDallas, TX2015
Architect for a renovation of an existing hangar for a corporate flight department facility comprised of a 26,500 SF hangar and 16,400 SF office space/support area. The facility includes executive offices, conference rooms, waiting lounge, pilot/mechanic offices,
pilot/mechanic support areas, and mechanic shop spaces.
Design and construction of a 30,000 SF Storage Hangar with a 6,000 SF Lean-to and a 1,250 SF GSE area. The Lean-to support space includes six storage suites with two
offices each. Additionally, there are three individual tenant offices.
Located at Dallas Love Field, the project included the design and construction of a new 27,500 SF Storage Hangar with a 2,800 SF Lean-to Storage area. The overall width of the hangar is 250’-0”. The Lean-to area includes two tenant office/storage suites, a new
Line Support office and a common rest room.
Stephens GroupCorporate HangarLittle Rock, AR2009
Design / Builder for a corporate flight department facility comprised of a 30,400 SF hangar with a 13,800 SF office and shop support area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot support areas, shop
space and an interior parking garage.
Stephens Inc.Corporate HangarLittle Rock, AR2009
Design / Builder for a corporate flight department facility comprised of a 30,400 SF hangar with a two-story, 19,000 SF office and shop support area. The facility includes executive offices, conference rooms, waiting lounge, customer offices, pilot support
areas, shop space and interior parking garage.
SupermarineStorage HangarLittle Rock, ARTBD
Design / Builder for a 45,600 SF storage hangar with 2,400 SF of leasable tenant space and 3,600 SF of support shops. The hangar was designed with flexible systems,
allowing the space to be divided into three separate, leasable hangars.
Skye GryphonStorage HangarRifle, CO2008
Design / Builder for a corporate storage hangar with a 12,470 SF aircraft storage hangar and 6,800 SF of office and shop support areas.
Experience: Flight Departments / Hangars
Architecture | Construction Management | General Contracting | 303.403.1228 | www.tectonicdesignbuild.com | Design/Build
Bohemian Real Estate II, LLCStorage Hangar
Loveland, CO2007
Design / Builder for a 19,500 SF storage hangar with over 13,000 SF of support shops, corporate offices, pilot offices and customer spaces. Additionally, up to four times per year, the hangar is set up to function as a banquet hall with capacity to serve and entertain up to 600 people.
Wyoming Dept. ofTransportation
Storage HangarCheyenne, WY
2007
Design / Builder for a 19,200 SF storage hangar including a 160’-0” free span hangar with in-floor radiant heat. The structure is designed to accommodate a future office addition.
Design/Build | www.tectonicdesignbuild.com | 303.403.1228 | General Contracting | Construction Management | Architecture
Experience: Flight Departments / Hangars
Architect for a 40,000 SF storage hangar over 30,000 SF of hangar space with support office and shop space. The design provides doors at each end of the hangar which allows for maximum aircraft movement flexibility.
Business Jet CenterStorage Hangar B
Dallas, TX2003
Construction Management services for a 31,000 SF storage hangar with over 7,000 SF of corporate office space.
Architect for an 18,000 SF hangar and a two story, 6,000 SF office / shop lean-to.
Atlantic AviationStorage Hangar
Teterboro, NJ2002
Business Jet CenterCorporate Hangar L
Dallas, TX2001
Construction Management service for a 17,000 SF Hangar with 5,000 SF of office space.
Signature Flight SupportStorage Hangar A
Dallas, TX2001
Architecture, Construction Management, and Development of a 12,000 SF storage hangar facility including 3,400 SF of office and maintenance space.
Richards AviationCorporate Hangar
Memphis, TN2000
Architecture and Construction Management for a 17,000 SF corporate aircraft storage hangar and 5,00 SF of offices.
Signature Flight SupportStorage Hangar 4
Dallas, TX1999
Architecture and Construction Management for a 21,000 SF corporate aircraft storage hangar and 5,500 SF of offices.
AMR CombsStorage HangarIndianapolis, IN
1998
Appearance ManagementGroup, Inc.
Storage HangarLocation TBD
2006 proposal
Prepared in coordination with Appearance Management, Inc., the proposal entails a series of new hangar facilities comprised of separate leasable 5,600 SF hangars with shop/office support spaces, with an overall square footage of 36,750 SF. The facility also includes a club house for all tenants.
Architecture | Construction Management | General Contracting | 303.403.1228 | www.tectonicdesignbuild.com | Design/Build
SupermarineFixed Base OperationLittle Rock, AR2009
Design / Build for a fixed base operation comprised of a 20,000 SF storage hangar and a 15,000 SF office area. Spaces within the office area include a customer lobby, corporate offices, conference rooms, customer office space, shop space, storage
space and break room.
Atlantic Aviation ServicesFixed Base OperationCasper, WY2013
Renovation and addition to an existing FBO facility including customer lobby expansion, corporate offices, conference rooms, pilot’s lounge, line support spaces
and mechanics shop/parts storage spaces.
MeridianFixed Base OperationHayward, CA2016
Atlantic Aviation ServicesFixed Base OperationRifle, CO2016
Design / Build for a Fixed Base Operator comprised of a 30,100 SF storage hangar, with a 6,300 SF office space. Spaces within the office area include a customer lobby,
corporate offices, conference room, pilot’s lounge, storage space and a break room.
Renovation and expansion of an existing Fixed Base Operation in Rifle, CO. Renovated and expanded spaces include: customer lobby, customer break area, reception desk, conference room, corporate office spaces, pilot’s lounge, ramp agents
support space, and line support spaces.
Experience: Fixed Base Operations
Dassault Falcon JetFixed Base OperationWilmington, DE2007 proposal
Architecture master plan for a new FBO facility which includes an Executive Terminal to support the existing campus.
Sun Valley AviationFixed Base OperationHailey, ID2005
This FBO is comprised of a 25,600 SF hangar, a 9,000 SF office area and a 3,000 SF GSE/Vehicle maintenance shop. The FBO incorporates executive office spaces, a
conference room, waiting lounge, pilot support areas and catering area.
ACM AviationFixed Base OperationSan Jose, CA2002 proposal
The proposed Fixed Base Operator includes three main components: 1) a two story, 25,000 SF executive terminal building; 2) a two story, 150 stall parking structure; and
3) a 60,000 SF service / storage hangar with shop support space. The ramp area includes over four acres of concrete paving with a full service fuel farm.
Signature Flight SupportExecutive TerminalMemphis, TN2000
Architecture and Construction Management for the renovation of an 11,000 SF executive terminal providing both cosmetic and room modifications to create a more
efficient plan.
AMR CombsFBO FacilityDenver, CO1998
Construction Manager for American Airlines for the entire AMR Combs Campus including a maintenance hangar, executive terminal, vehicle maintenance facility and
overall site development.
AMR CombsFBO FacilitySan Francisco, CA1998
Project Management / Owner's Representative for American Airlines for the entire AMR Combs Campus including a maintenance hangar, aircraft storage hangar,
executive terminal, vehicle maintenance facility and overall site development.
Tac AirFixed Base OperatorSan Francisco, CA2006 proposal
Prepared in coordination with TAC Air, the proposal entails the renovation and expan-sion of an existing executive terminal and the addition of a new 20,000 SF hangar
located on an adjacent site.
Completion & Maintenance Centers
Design / Builder for a renovation and new addition to an existing facility encompassing a final build-out totaling over 350,000 SF. The project also included the construction of a new paint hangar / storage facility and master planning for the entire maintenance and modifications campus.
Duncan AviationMaintenance & Modifications Facility
Battle Creek, MI2008
Design / Builder for a renovation and new addition to an existing facility encompassing a final build-out totaling over 350,000 SF. The project also included the construction of a new paint hangar and master planning for the entire maintenance and modifications campus.
Dassault Falcon JetMaintenance & Modifications Facility
Wilmington, DE2003-2007
Design / Builder for a 48,000 SF completions facility including a strip hangar, detail hangar, and a complete state of the art downdraft paint hangar. A design center and shop spaces are also provided.
Elliott AviationPaint & Completions Hangar
Moline, IL2003
Design / Builder for a 130,000 SF completions and maintenance facility including a 60,000 SF hangar and over 70,000 SF of support spaces.
Duncan AviationMaintenance & Modifications Hangar
Lincoln, NE2000
Located at Denver International Airport; work includes a 30,000 SF aircraft storage facility with support spaces.
Bombardier / Lear Jet DIACompletions & Maintenance Hangar
Denver, CO1996
Master planning for a multi-building facility to accommodate the client’s future growth necessities comprising of new paint facilities, hangar facilities and support spaces.
Western Aircraft CompanyMaintenance & Modifications Facility
Boise, IDproposal 2009
Master planning for a new maintenance and modifications facility, comprising a final build-out totaling over 300,000 SF. The project includes corporate offices, shops, paint hangars, maintenance hangars, and associated ramp construction.
Duncan AviationMaintenance & Modifications Facility
Provo, UTproposal 2009
Master planning and renovation of an existing maintenance and modifications facility totaling over 300,000 SF. Current work includes a 9,950 SF Cold Storage Facility and Conceptual Design for a proposed 44,600 SF Maintenance Hangar with Paint Bay and Support Shops and Offices.
Summit Aviation, Inc.Maintenance & Modifications Facility
Middletown, DE2010
Design/Builder for a 175,000 SF Maintenance Hangar. The facility includes two 40,000 SF maintenance hangar bays with aircraft drive-thru capability. Directly adjacent to the hangar spaces on the first floor are maintenance shops, parts, and storage areas totaling over 47,000 SF. Additionally, second floor space totaling over 47,000 SF includes maintenance storage spaces, future shops and corporate offices.
Design/Builder of a new 175,000 SF Completions Center. The new facility includes access road, aircraft ramp, truck dock area, parking lot, and the extension of site utilities to service the building. The building includes a large completions hangar and separate delivery hangar including shop and warehouse areas. Also included are large corporate office areas with conference rooms and support spaces.
Duncan AviationMaintenance Hangar
Lincoln, NE2014
PilatusCompletions Center
Broomfield, COunder construction 2016
The project includes the renovation of an existing storage area, allowing for an expansion of the existing Accessories Shop. The total project area is over 11,500 SF and includes a multi-phased construction approach to allow for the shop to remain in use as the renovation work occurs. The shop will include a new paint booth and curing room.
Duncan AviationAccessories Shop Expansion
Lincoln, NE2013
Design/Build | www.tectonicdesignbuild.com | 303.403.1228 | General Contracting | Construction Management | Architecture
Architecture | Construction Management | General Contracting | 303.403.1228 | www.tectonicdesignbuild.com | Design/Build
Duncan AviationPaint HangarBattle Creek, MI2007
This Paint Hangar facility is comprised of a 20,800 SF Paint Bay and 8,500 SF of support space; including a locker room, small parts paint booth, storage space with separate
hazardous storage area and a loading dock. Total build-out equals 29,300 SF.
Duncan AviationPaint HangarProvo, UT2009 proposal
Master planning for a new maintenance and modifications facility, comprising a final build-out totaling over 300,000 SF. The project includes corporate offices, shops, paint
hangars, maintenance hangars, and associated ramp construction.
Western Aircraft CompanyPaint HangarBoise, ID2009 proposal
Master planning and renovation of an existing maintenance and modifications facility; the project includes major additions to the campus including a new Down Draft and Cross Draft Paint Hangar. The campus will also see the addition of a 40,000 SF Maintenance and Completions Hangar. Renovation work includes
office, shop, and general renovations of the facility.
Atlantic AeroPaint HangarGreensboro, NC2008 proposal
Master planning for an existing maintenance and modifications facility. The project includes the addition of a new Down Draft and Cross Draft Paint Hangar and a 40,000 SF
Maintenance and Completions Hangar.
Duncan AviationPaint FacilityLincoln, NE2009
Renovations at this existing maintenance and modifications facility include new paint booth installations and upgrades to the existing shop infrastructure
Duncan AviationPaint FacilityLincoln, NE2013
Design/Builder for a 53,000 SF paint hangar that includes a downdraft bay for aircraft paint jobs and a cross draft bay for sanding, striping and priming. The structure of the building is set up to accommodate a future cross draft paint bay for more flexibility in the painting process. The attached office spaces provide areas for shop managers, shops and storage.
West Star AviationPaint FacilityGrand Junction, CO2014
This 41,900 SF paint hangar includes a downdraft bay for aircraft paint jobs and a cross draft bay for sanding, striping and priming. The attached office spaces provide areas for
shop managers, shops and storage.
Experience: Aviation Paint Hangars
Design / Build for a 38,000 SF paint facility including a state of the art, dual-flow balanced, downdraft paint hangar, a sand/strip hangar bay, and a cross flow priming/striping hangar
bay. Two story support spaces are centrally located within the building.
This Paint and Completions facility is comprised of an 8,840 SF drive through downdraft Paint Bay, a 9,950 SF Sand/Strip Bay, a 17,120 SF Completions Bay and
23,400 SF of shop/office/storage space. Total build-out equals 59,310 SF.
Dassault Falcon JetPaint HangarWilmington, DE2004
Elliott AviationPaint HangarMoline, IL2003
Design/Build | www.tectonicdesignbuild.com | 303.403.1228 | General Contracting | Construction Management | Architecture
Experience: Commercial Facilities
Code analysis and conceptual design for proposed expansion to an existing bar in downtown Denver.
Architect for a converted office building to an eight classroom Charter School.
Architect and General Contractor for a three story office building in downtown Golden, CO.
Architect for a 21,000 SF office / retail center for a free-standing facility housing corporate and medical offices in conjunction with retail outlets.
This facility is designed to accommodate the vehicle maintenance needs for the City of Blackhawk, CO. The 14,350 SF building houses a vehicle wash bay, 10 vehicle mainte-nance bays including a vehicle lift bay, and shop spaces. The floor plan incorporates a mezzanine level with additional office and mechanical spaces.
Code analysis, regulatory permit and building department permit acquisition for an existing green energy industrial research campus.
Architect for a Commercial Office Building.
The Ginn MillBar
Denver, CO2009
Architect for a 32,000 SF office addition and renovation of an existing 13,000 SF office building. Spaces include open office areas, conference rooms, corporate offices, customer reception lounge, and an employee break room. The office space provides support for adjacent shop fabrication/production campus facilities.
Global Finishing SolutionsOffice Expansion
Osseo, WI2012
Rocky Mountain AcademyCharter SchoolEvergreen, CO
2002
Sucia CorporationFrontier Office Building
Golden, CO2001
Faestel PropertiesParker Valley Center - Lot 3
Parker, CO1999
City of BlackhawkVehicle Maintenance Facility
Blackhawk, CO2008
RentechGreen Energy Research Campus
Denver, CO2008
745 Sherman St.Commercial Office Building
Denver, CO2008
Faestel PropertiesParker Valley Center - Lot 4
Parker, CO1999
Architect for a 25,000 SF office / retail center for a free-standing facility comprised of corporate and medical offices in conjunction with retail outlets.
Faestel PropertiesTransmission Center
Parker, CO1999
Architect for a 4,500 SF transmission shop with multiple bays.
Architecture | Construction Management | General Contracting | 303.403.1228 | www.tectonicdesignbuild.com | Design/Build
K.R.C.A.Elderly Care FacilityKimball, NE1999
Architect and Construction Management for a 43,000 SF, 30-unit congregate care facility.
Experience: Commercial Facilities
Mall of AmericaCamp Snoopy Amusement ParkMinneapolis, MN1995
Design and construction management services with consultant/developer/ contractor for a $60 million amusement park within the $625 million Mall of
America, for Knotts Berry Farm.
TexacoAuto Service CenterLittleton, CO1993
Design / Build of entire development including conditional use approvals, design, code and regulatory coordination, architecture and construction.
American AirlinesAdmiral’s ClubDenver, CO1993
Denver International Airport - Design and construction management for the tenant finish construction of an addition doubling the size of the luxury traveller’s club room.
Denver International AirportAircraft De-icing SystemDenver, CO1992
Project management for the finance for the finance, design / build and operation of the entire airport glycol application, collection and recycling system.
Construction Manager for an upgrade to an existing facility including drive-thru lanes and canopy.
First State BankBank FacilityThornton, CO1991