Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre BASARAN State Planning Organization

Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

  • Upload
    others

  • View
    7

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Experience of Turkey in Public Private

Partnerships for Infrastructure Development

by

Emre BASARAN

State Planning Organization

Page 2: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Motorways

Completed Projects

Service Areas on the existing motorways.

Göcek Tunnel

Bidding Stage

Bosphorus Highway Tunnel

Planned Projects

İstanbul – İzmir Motorway (including İzmit Bay Bridge)

Page 3: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Göcek Tunnel

Page 4: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Göcek Tunnel

Project Cost is 14 million dollars.

L=926 m.

Existing highway is 6.1 km. long with 29 curves.

It was constructed in 2 years.

The duration of contract is 26 years.

There is no minimum traffic guarantee.

Page 5: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Seaport Type Duration of Contract Cost ($)

Çanakkale Kepez Port 29 years 14.600.000

Güllük Pier 6 years 6 months 16.642.266

Muğla Turgutreis Marina 22 years 6 months 22.000.000

Bodrum Pier 12 years 9.660.000

Seaports (Completed Projects)

Page 6: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Seaport Type Duration of Contract Cost ($)

Didim Marina 22 years 6 months 12.000.000

Çeşme Marina 23 years 6 months 9.746.554

Sığacık Marina 23 years 6 months 5.296.960

Kaş Marina 23 years 6 months 11.607.480

Alanya Marina 23 years 6 months 5.302.474

Seaports (Ongoing Projects)

Page 7: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Çanakkale Kepez Port

Page 8: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Çanakkale Kepez Port

The substructure of the port was completed through

public procurement.

The Project Company constructed the superstructure

of the port in exchange for the operation revenues.

The construction cost is 14.6 million dollars.

Duration of contract is 29 years.

The Project Company pays a concession fee to the

government which is escalated at a constant annual rate.

Page 9: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Airports

Airport TerminalCapacitypass./yr

Duration of Contract

Start of Operation

EsenboğaDomestic& International 10.000.000

15 years 8 months October 13, 2006

Antalya 1 International 5.000.000 9 years April 1, 1998

Antalya 2 International 5.000.00045 months

26 days April 17, 2005

DalamanDomestic& International 5.000.000

77 months 20 days 2006

Adnan Menderes International 5.000.000

6 years 7 months N/A

Atatürk International 20.000.000 N/A January 10, 2000

Page 10: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Esenboğa Airport

Page 11: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Esenboğa Terminal

The total cost of the project is 189 million Euros.

The construction took 24 months.

The project includes the construction of the terminal

building, and a parking lot.

Duration of contract is 15 years and 8 months.

Page 12: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Natural Gas)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Natural

Gas İstanbul 20 May 22, 1999 158,1 180 1.400.000.000 Yes

Natural

Gas Tekirdağ 20 June 4, 1999 532,7 478 3.600.000.000 Yes

Natural

Gas Tekirdağ 20 June 12, 1999 560,8 478,2 3.600.300.364 Yes

Natural

Gas Sakarya 20 January 21, 1997 70,4 253,4 1.963.604.357 Yes

Page 13: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Natural Gas)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Natural

Gas İstanbul 20 May 22, 1999 158,1 180 1.400.000.000 Yes

Natural

Gas Tekirdağ 20 June 4, 1999 532,7 478 3.600.000.000 Yes

Natural

Gas Tekirdağ 20 June 12, 1999 560,8 478,2 3.600.300.364 Yes

Natural

Gas Sakarya 20 January 21, 1997 70,4 253,4 1.963.604.357 Yes

Page 14: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Hydro Power)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Hydro

(Run of river) Sivas 20

September

12, 1999 6,5 4,5 22.000.000 No

Hydro

(Run of river) Isparta 50

November

1, 1989 3,3 13 36.000.000 No

Hydro

(dam) Urfa 15

October 4,

2001 1776,4 672 2.500.000.000 Yes

Hydro

(Run of river) Denizli 20

January

12, 2001 2,3 2,2 11.750.000 No

Hydro

(Run of river) Afyon 15

December

1, 2000 3,3 3 16.260.000 No

Page 15: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Hydro Power)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Hydro

(Run of river) Muğla 15

December 1,

1999 17,7 16 90.000.000 Yes

Hydro

(Run of river) Erzincan 20

March 1,

2001 5,4 11,58 41.000.000 No

Hydro

(Run of river) Isparta 20

June 18,

1998 3,4 2 12.200.000 No

Hydro

(Run of river) Mersin 15

December

27, 1996 8,3 10 47.000.000 No

Hydro

(Run of river) Iğdır 20

November 7,

2002 7,6 11,1 50.600.000 No

Hydro

(Run of river) Çanakkale 20

March 7,

1998 5,9 10,6 47.191.400 Yes

Page 16: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Hydro Power)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million $

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Hydro

(Run of river) Düzce 20

May 17,

1991 5,6 9,35 41.600.000 No

Hydro

(Run of river) Kayseri 15

December

12, 1998 97,4 84 429.000.000 Yes

Hydro

(Run of river) Malatya 20

December

23, 1998 10,3 12,5 58.310.000 Yes

Hydro

(Run of river) K.Maraş 15

January 5,

1994 5,2 9,6 32.070.000 No

Hydro

(Run of river) K.Maraş 15

January

18, 2000 9,2 7 27.735.000 Yes

Page 17: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BOT Projects (Wind)

Type Location

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Wind İzmir 20,5

November

28, 1998 9 7,2 18.980.000 Yes

Wind Çanakkale 20,5

July 25,

2000 12 10,2 29.880.000 No

Page 18: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

O&M Contracts

Power

Plant Type Loctn.

Contract

Duration

Start of

Operation

Project

Cost

Million

$

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Çayırhan

Thermal

(Coal) Ankara 20

June 30,

2000 275 620 3.632.000.000 Yes

Hazar

Hydro

(Run of

river) Elazığ 22

December

9, 1996 11,1 29,8 56.000.000 No

Page 19: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Power Plants

BO Projects

Type Location

Contract

Duration

Start of

Operation

Capacity

MW

Annual

Generation

kWH

Treasury

Guarantee

Thermal

(Coal) Hatay 16 June 1, 2003 1210 9.133.467.500 Yes

Natural Gas Ankara 16

January 1,

2003 770 6.167.133.687 Yes

Natural Gas Sakarya 16

October 10,

2002 770 6.424.023.125 Yes

Natural Gas Kocaeli 16

October 26,

2002 1540 12.885.766.625 Yes

Natural Gas İzmir 16

March 28,

2003 1520 12.682.715.000 Yes

Page 20: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Birecik Dam and Hydropower Plant

Page 21: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Birecik Dam and Hyrdopower Plant

The sponsors offered to implement the project with

BOT model in 1986.

The project and the contract were modified several

times.

The project company was established in 1993. 30% of

the shares were owned by a State Enterprise.

The project company borrowed 416 million DM of

commercial credit and 1,266 million DM of export

credit. The repayment of both credits were guaranteed

by Treasury.

Page 22: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Birecik Dam and Hyrdopower Plant

The construction was initiated in 1996, and took five

years.

Duration of contract is 15 years.

Every 6 months, the expected flow is determined by

taking the average of the past 3 years. According to that

flow, the amount of electricity to be produced is

calculated.

The tariff is calculated by dividing the predetermined

revenue of the company by the electricity produced.

Page 23: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Customs Service

Border Gates

İpsala

Gürbulak

Habur

Cilvegözü (under construction)

Sarp

Kapıkule

in operation

in planning stage

Page 24: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Gürbulak Border Gate

Page 25: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Gürbulak Border Gate

Page 26: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Gürbulak Border Gate

The gate and the customs office have been renovated by

International Freight Companies Association in exchange

for operation revenues.

The duration of contract is 15 years.

The construction cost is 7.5 million dollars.

Page 27: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Yuvacık Dam

1st PPP Project in Turkey

Page 28: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Purpose of Project

Page 29: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Project History (1)

General Directorate of State Water Works (SWW)

completed its feasibility study about the water demand

in Izmit Bay Area in 1983.

Yuvacik Dam is designed to provide 142 million cubic

meter of water annually.

The construction was initiated in 1987.

A group of sponsor companies offered to implement

the project with BOT in 1989.

Page 30: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Project History (2)

In 1995, a Project Company was established, the

project was transferred to the Izmit Municipality, and

the contract between the Municipality and the Project

Company came into effect.

BOT Law was enacted in 1994 in order to encompass

the project in legal aspects.

In 1999, the operation was initiated.

Page 31: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Conditions of Contract

The duration of contract is 15 years.

Take or Pay Contract: The Municipality pledged to pay

for 142 million cubic meter of water each year whether

it took delivery or not.

Treasury provided guarantee for the payment in case

the municipality was not able to purchase.

The tariff would be determined by the Project

Company each year regarding a certain level of revenue.

Page 32: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Financial Arrangements

The total cost is 890 million dollars.

757.7 million dollars of syndicated loan was borrowed

by the Project Company.

The Municipality borrowed from the international loan

market in order to contribute to the equity of the

Project Company. The repayment of the loan was

guaranteed by Treasury.

Page 33: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Risk Allocation

Risk Party

Public Private

Availability ✔

Completion (construction&design) ✔ ✔

Financial ✔

Force Majeure ✔

Demand ✔

Operating ✔

Revenue ✔

Technical (engineering&design) ✔ ✔

Page 34: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Project Results (1)

Due to escalated cost of construction and devaluation

of Turkish Lira, the unit price of water is set very high.

Istanbul Municipality and industrial organizations

renounced consuming water of Yuvacik Dam due to

high tariff.

Izmit Municipality was obliged to pay for the amount

of water which was not completely delivered according

to the off-take agreement.

Page 35: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Project Results (2)

Izmit Municipality fell into financial difficulties.

Treasury, the guarantor of the last resort, paid for the

water which was not being consumed.

Since 1999, Treasury paid around 1.5 billion dollars to

the Project Company in accordance with the off-take

agreement.

Due the drought in the region, the dam cannot provide

142 million cubic meter of water annually.

The Municipality is seeking new resources.

Page 36: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No:

Lessons

A consistent, well-defined legal framework is a must.

Public Sector Comparator should be applied.

There must be a thorough definition of risks and well-

defined scheme for risk allocation.

The bidding process should be transparent and

competitive.

The institutional capacity must be at adequate level for

managing PPP projects.

Page 37: Experience of Turkey in Public Private Partnerships for Infrastructure Development by Emre … · Emre BAŞARAN T.R. PRIME MINISTRY STATE PLANNING ORGANIZATION Necatibey Cad. No: