    EXPLANATORY DOCUMENT A Rationale for Policies in the Approved Source Protection Plan

    Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Region

    Explanatory

    Document: A Rationale for Policies in the

    Approved

    Source Protection Plan

     Saugeen Valley Source Protection Area

     Grey Sauble Source Protection Area

     Northern Bruce Peninsula Source Protection Area

  • Approved

    EXPLANATORY DOCUMENT A Rationale for Policies in the Approved Source Protection Plan

    Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Region

    Important Notice

    This document contains one Explanatory Document in support of one Source

    Protection Plan for the following Source Protection Areas:

     Saugeen Valley Source Protection Area;

     Grey Sauble Source Protection Area; and

     Northern Bruce Peninsula Source Protection Area.

    Information contained in this document generally applies to all three Source

    Protection Areas unless otherwise stated.

    PREFACE

    This document was prepared by the Source Protection Committee for the

    Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Region.

    The objective of this document is to provide the rationale for the policies that the

    Source Protection Committee has developed to protect municipal drinking water

    sources.

    If you have any questions about this document or the Saugeen, Grey Sauble,

    Northern Bruce Peninsula Source Protection Region, please contact the Source

    Protection office at:

    519-470-3000 or 877-470-3001

    [email protected]

    www.waterprotection.ca.

    Made possible through funding support from the Government of

    Ontario.

  • Approved

    EXPLANATORY DOCUMENT i A Rationale for Policies in the Approved Source Protection Plan

    Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Region

    Table of Contents

    1.0 Background ......................................................................................................................... 1

    1.1 Introduction ................................................................................................................ 1

    1.2 Source Protection Plan ............................................................................................... 1

    1.3 Policy Development ................................................................................................... 2

    1.4 Consultation Process .................................................................................................. 2

    2.0 Policy Tools .......................................................................................................................... 7

    2.1 Overview .................................................................................................................... 7

    2.2 Mission Statement and Guiding Principles of the Source Protection Committee ...... 7

    2.3 Terms of Reference .................................................................................................... 7

    2.4 Financial Implication Considerations ......................................................................... 8

    2.5 Climate Change Considerations ................................................................................. 9

    2.6 Policy Tools .............................................................................................................. 10

    3.0 Policies Applying to Prescribed Drinking Water Threat Categories ........................... 15

    3.1 Overview .................................................................................................................. 15

    3.15 General Risk Management Plan Policy Wording ………………………………… 15

    3.2 Policy Discussion by Prescribed Threat ................................................................... 15

    3.2.1 Threat 1. The establishment, operation or maintenance of a waste disposal

    site within the meaning of Part V of the Environmental Protection Act. ........... 15

    3.2.2 Threat 2. The establishment, operation or maintenance of a system that

    collects, stores, transmits, treats or disposes of sewage ..................................... 18

    3.2.3 Threat 3. The application of agricultural source material to land ...................... 23

    3.2.4 Threat 4. The storage of agricultural source material ........................................ 24

    3.2.5 Threat 5. The management of agricultural source material ................................ 26

    3.2.6 Threat 6. The application of non-agricultural source material to land. .............. 26

    3.2.7 Threat 7. The handling and storage of non-agricultural source material. .......... 27

    3.2.8 Threat 8. The application of commercial fertilizer to land ................................. 29

    3.2.9 Threat 9. The handling and storage of commercial fertilizer ............................. 30

    3.2.10 Threat 10. The application of pesticide to land. ................................................. 30

    3.2.11 Threat 11. The handling and storage of pesticide. ............................................. 31

    3.2.12 Threat 12. The application of road salt. .............................................................. 33

    3.2.13 Threat 13. The handling and storage of road salt ............................................... 34

    3.2.14 Threat 14. The storage of snow. ......................................................................... 35

    3.2.15 Threat 15. The handling and storage of fuel. ..................................................... 36

    3.2.16 Threat 16. The handling and storage of a dense non-aqueous phase liquid. ...... 38

    3.2.17 Threat 17. The handling and storage of an organic solvent ............................... 40

    3.2.18 Threat 18. The management of runoff that contains chemicals used in the

    de-icing of aircraft. ............................................................................................. 42

  • Approved

    EXPLANATORY DOCUMENT ii A Rationale for Policies in the Approved Source Protection Plan

    Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Region

    3.2.19 Threat 19. An activity that takes water from an aquifer or a surface water body

    without returning the water taken to the same aquifer or surface water body ... 43

    3.2.20 Threat 20. An activity that reduces the recharge of an aquifer .......................... 45

    3.2.21 Threat 21. The use of land as livestock grazing or pasturing land, an

    outdoor confinement area or a farm-animal yard ............................................... 45

    4.0 Policies Applying to Multiple Threat Categories ........................................................... 49

    4.1 Overview .................................................................................................................. 49

    4.2 Policy Discussion ..................................................................................................... 49

    5.0 Policies Applying to Transport Pathways....................................................................... 57

    5.1 Overview .................................................................................................................. 57

    5.2 Policy Discussion ..................................................................................................... 57

    6.0 Section 57 Prohibition for Existing Activities ................................................................ 65

    6.1 Agricultural Source Material – Handling and Storage ............................................. 65

    6.2 Non-agricultural Source Material – Application to Land ......................................... 66

    6.3 Non-agricultural Source Material – Handling and Storage ...................................... 66

    6.4 Handling and Storage of Road Salt .......................................................................... 67

    6.5 Snow Storage ............................................................................................................ 67

    7.0 Monitoring Policies .......................................................................................................... 71

    Appendix A

    A.1 Summary of Comments Received During Consultation on the Updated Proposed

    Source Protection Plan

    A.2 Implementers Updated Proposed Source Protection Plan Comment Chart

    A.3 Correspondence from Implementing Bodies and Public

    Appendix B

    B.1 Summary of Comments Received During Consultation on the Proposed Source

    Protection Plan

    B.2 Summary of Comments Received During Consultation on the Draft Proposed Source

    Protection Plan

    Appendix C

    C.1 Summary of Comments Received During Consultation on the Amendments to the

    Approved Source Protection Plan

    C.2 Summary of Comments Received During Consultation March 1 - April 7, 2017 on

    the Amendments to the Approved Source Protection Plan

  • Approved

    EXPLANATORY DOCUMENT iii A Rationale for Policies in the Approved Source Protection Plan

    Saugeen, Grey Sauble, Northern Bruc