12
1 Applied Science and Engineering Progress, 2021 Explicit Formulas of ARL on Double Moving Average Control Chart for Monitoring Process Mean of ZIPINAR(1) Model with an Excessive Number of Zeros Kobkun Raweesawat and Saowanit Sukparungsee* Department of Applied Statistics, Faculty of Applied Science, King Mongkut’s University of Technology North Bangkok, Bangkok, Thailand * Corresponding author. E-mail: [email protected] DOI: 10.14416/j.asep.2021.03.002 Received: 1 December 2020; Revised: 8 January 2021; Accepted: 13 January 2021; Published online: 1 March 2021 © 2021 King Mongkut’s University of Technology North Bangkok. All Rights Reserved. Abstract Usually, the performance of control charts are widely measured by average run length (ARL). In this paper, the derivative explicit formulas of the ARL for double moving average (DMA) control chart are proposed for monitoring the process mean of zero-inflated Poisson integer-valued autoregressive first-order (ZIPINAR(1)) model. This model is fit when there are an excessive number of zeros in the count data. The performance of the DMA control chart is compared with the results of moving average and Shewhart control charts by considering from out of control average run length (ARL 1 ). The numerical results found that the DMA control chart performed better than other control charts in order to detect mean shift in the process. In addition, the real-world application of the DMA control chart for ZIPINAR(1) process is addressed. Keywords: Average run length, Double moving average control chart, Zero-inflated Poisson Research Article 1 Introduction The Poisson distribution has often been used for analyzing related data, particularly in quality control studies for industries in which the number of defects or nonconformities in a unit is commonly modelled using the Poisson distribution. However, this model does not provide a good fit to actual data when they contain a frequent or excessive number of zeros. For example, in a near zero-defect manufacturing environment, there are many zero-defect counts, even for fairly large sample sizes, and in such situations, the zero-inflated Poisson (ZIP) distribution is more appropriate and has been considered by several authors, see details on [1], [2]. In many cases, the Poisson distribution is not a good fit when there is a large number of zero counts, and thus alternative models have been proposed [3], [4]. Most researchers have mainly conducted studies on independent countable data but sometimes the data can be autocorrelated. In 1987, Osh and Alzaid [5] developed the Poisson integer-valued autoregressive (PINAR(1)) model which has often been used for count-related data by using a binomial thinning operator [6], [7]. However, this model does not provide a good fit to actual data when there is a frequent or excessive number of zero counts. Therefore, Jazi et al. [8] introduced ZIP with the first-order integer-valued autoregressive model (ZIPINAR(1)). Statistical quality control is a statistical tool used in process control. Control charts are widely used in the quality control of the counting process for detecting changes in the process mean, thereby improving the quality of the process. It is a powerful tool with a clear purpose. A popular chart for detecting shifts in the process mean is the Shewhart control chart which Please cite this article in press as: K. Raweesawat and S. Sukparungsee, “Explicit formulas of ARL on double moving average control chart for monitoring process mean of ZIPINAR(1) model with an excessive number of zeros,” Applied Science and Engineering Progress, 2021, doi: 10.14416/j.asep.2021.03.002.

Explicit Formulas of ARL on Double Moving Average Control

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Explicit Formulas of ARL on Double Moving Average Control

1Applied Science and Engineering Progress, 2021

Explicit Formulas of ARL on Double Moving Average Control Chart for Monitoring Process Mean of ZIPINAR(1) Model with an Excessive Number of Zeros

Kobkun Raweesawat and Saowanit Sukparungsee*Department of Applied Statistics, Faculty of Applied Science, King Mongkut’s University of Technology North Bangkok, Bangkok, Thailand

* Corresponding author. E-mail: [email protected] DOI: 10.14416/j.asep.2021.03.002Received: 1 December 2020; Revised: 8 January 2021; Accepted: 13 January 2021; Published online: 1 March 2021© 2021 King Mongkut’s University of Technology North Bangkok. All Rights Reserved.

AbstractUsually, the performance of control charts are widely measured by average run length (ARL). In this paper, the derivative explicit formulas of the ARL for double moving average (DMA) control chart are proposed for monitoring the process mean of zero-inflated Poisson integer-valued autoregressive first-order (ZIPINAR(1)) model. This model is fit when there are an excessive number of zeros in the count data. The performance of the DMA control chart is compared with the results of moving average and Shewhart control charts by considering from out of control average run length (ARL1). The numerical results found that the DMA control chart performed better than other control charts in order to detect mean shift in the process. In addition, the real-world application of the DMA control chart for ZIPINAR(1) process is addressed.

Keywords: Average run length, Double moving average control chart, Zero-inflated Poisson

Research Article

1 Introduction

The Poisson distribution has often been used for analyzing related data, particularly in quality control studies for industries in which the number of defects or nonconformities in a unit is commonly modelled using the Poisson distribution. However, this model does not provide a good fit to actual data when they contain a frequent or excessive number of zeros. For example, in a near zero-defect manufacturing environment, there are many zero-defect counts, even for fairly large sample sizes, and in such situations, the zero-inflated Poisson (ZIP) distribution is more appropriate and has been considered by several authors, see details on [1], [2]. In many cases, the Poisson distribution is not a good fit when there is a large number of zero counts, and thus alternative models have been proposed [3],

[4]. Most researchers have mainly conducted studies on independent countable data but sometimes the data can be autocorrelated. In 1987, Osh and Alzaid [5] developed the Poisson integer-valued autoregressive (PINAR(1)) model which has often been used for count-related data by using a binomial thinning operator [6], [7]. However, this model does not provide a good fit to actual data when there is a frequent or excessive number of zero counts. Therefore, Jazi et al. [8] introduced ZIP with the first-order integer-valued autoregressive model (ZIPINAR(1)). Statistical quality control is a statistical tool used in process control. Control charts are widely used in the quality control of the counting process for detecting changes in the process mean, thereby improving the quality of the process. It is a powerful tool with a clear purpose. A popular chart for detecting shifts in the process mean is the Shewhart control chart which

Please cite this article in press as: K. Raweesawat and S. Sukparungsee, “Explicit formulas of ARL on double moving average control chart for monitoring process mean of ZIPINAR(1) model with an excessive number of zeros,” Applied Science and Engineering Progress, 2021, doi: 10.14416/j.asep.2021.03.002.

Page 2: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

2 Applied Science and Engineering Progress, 2021

uses only information in the last sample but ignores information available in the entire data sequence. Therefore, the Shewhart control chart performs poorly when detecting small process mean shifts [9]. In the past few decades, several control charts that can detect small process mean shifts have been proposed. For example, the cumulative sum (CUSUM) control chart based on the differences between sample values, and the average was introduced by Page [10]. Later, the exponentially weighted moving average (EWMA) control chart based on weighted previous information was proposed by Roberts [11]. Recently, Khoo [12] developed the moving average (MA) control chart based on the accumulative sum of information from the current and the previous sample. Meanwhile, Khoo and Wong [13] proposed the double moving average (DMA) control chart that can detect small changes and can be used with both continuous and discrete distributions. These are memory control charts that are superior to the Shewhart control chart for the detection of small to moderate shifts in the process mean. This is because they use information about the process available from the entire sequence of data points. The performance of a control chart is usually evaluated via average run length (ARL), which is the expected number of points plotted on the control chart until an out of control signal is triggered. The average run length of a control chart when the process is in control stage denoted by ARL0. The control chart is regarded as acceptable if ARL0 is sufficiently large. Conversely, another performance measure in the out of control state is the average of the delay time or the out of control average run length (ARL1), which is the expected number of observations from in control process until the control chart signals that the process is out of control. Ideally, the ARL1 should be minimal. There are several techniques to calculate the ARL. For example, a basic approach that is often used to test accuracy with other methods is Monte Carlo simulation which is simple for coding and testing the accuracy of the analytical approximation. However, it needed large number of observations, very time consuming, and difficult to obtain optimal values. The Markov chain approach is considered to be an effective alternative technique that approximates the performance measures using matrix inversion with Markov chain principles. Although there have not been any theoretical results

recently on the convergence of this technique, it has been tested by direct comparison with Monte Carlo simulation results. The integral equation approach is the most advanced method currently available because it uses a mathematical integral formula. In the literatures, several methods for evaluating ARL0 and ARL1 have been reported. Knoth [14] and Borror et al. [15] used the Markov chain approach for the ARL to examine the performance of the EWMA control chart for both skewed and heavy-tailed symmetric non-normal distributions. Sukparungsee [16] determined the performances of EWMA and CUSUM control charts with ARLs via the Markov chain approach for underlying ZIP processes. Crowder [17] used a numerical quadrature method to solve the exact integral equation for the ARL on an EWMA control chart for normally distributed data. Peerajit et al. [18] adopted the numerical integral equation method for the ARL on a CUSUM control chart. Suriyakat [19] applied the Fredholm integral equation for the ARL to detect the performance of EWMA control chart for an autoregressive model with exponential white noise. Areepong [20] studied explicit formulas for the ARL on an MA control chart for monitoring the number of defective products and showed that they were easy to use, calculate, and program. Areepong and Sukparungsee [21] analyzed closed-form formulas for the ARL on an MA control chart for a nonconforming ZIP and showed that it performs better as the value of the span (w) decreases. Chananet et al. [22] studied an approximate formula for the ARL on an MA control chart with zero-inflated negative binomial data and showed that the new formula is simple and easy to implement. Recently, Rakitzis et al. [23] studied ZIPINAR(1) processes via the CUSUM control chart which can track mean shift changes in manufacturing processes. They also discussed the influence of zero-inflated data on the control chart. Later, Areepong [24] studied explicit expressions for the ARL of an MA control chart for a ZIPINAR(1) model and showed that the performance of the MA control chart is better than the EWMA control chart. However, the numerical results for the ARL cannot usually be obtained analytically, and required intensively specialized software. In this paper, explicit formulas are proposed for the ARL on DMA control chart to detect shifts in the mean process for ZIPINAR(1) model, and its efficiency of change detection is compared with MA

Page 3: Explicit Formulas of ARL on Double Moving Average Control

3

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

Applied Science and Engineering Progress, 2021

and Shewhart control charts. The outline is organized as follows. Section 2 contains an overview of a ZIPINAR(1) model, the MA and DMA control charts for the ZIPINAR(1) model. Section 3 gives an overview of the derived explicit formulas of the ARL on a DMA control chart for the ZIPINAR(1) model. In Section 4, a comparison of the ARL performances of the DMA, MA, and Shewhart control charts is presented. Section 5 presents a real data application. Last, conclusions are provided in Section 6.

2 The ZIPINAR(1) Model

The first-order integer-valued autoregressive (INAR(1)) model is perfectly suited for modelling count data by making use of a thinning operator for the serially autocorrelated process. The thinning operator is generated by counting a series of Bernoulli distributed random variables. The INAR(1) model is defined as

where Nt is the observable count at the time t, α is an INAR(1) parameter, (°) is the thinning operation at the time (t) performed independently, and εt is an innovation. The ZIPINAR(1) model is the best fitting model for Poisson marginal distributions [24] and the innovation εt follows the ZIP distribution with mean

, then εt ~ distribution has zero-inflated parameter (ϕ), where ϕ ∈ [0,1). This can be modeled as an INAR(1) process, for which the respective expectation and variance of the ZIPINAR(1) model can be written as

and .

Generally, the ZIPINAR(1) model can be changed by any unexpected occurrence, then the change-point model of this process can be described as follows. Assume that λ0 and are the in control parameter and λ1 and are the out of control parameter.

2.1 The MA control chart for the ZIPINAR(1) model

An MA control chart is based on the unweighted moving average and its flexible and easy to practical implement. Khoo [12] proposed an MA control chart for

the number of nonconformities in a product inspection unit. Suppose individual observations, N1, N2,..., are collected from the ZIPINAR(1) model and follow an independent identically distributed (i.i.d.) sequence. The value of span w at the time i is defined as [12], then the MAi statistic can be written as Equation (1)

(1)

When the process is in control, the respective mean and variance of MAi are

and

The upper and lower control limits for the MAi control chart are given by Equation (2) as

(2)

where k is a coefficient of the control limit and is determined based on the desired ARL0. The ZIPINAR(1) process on an MA control chart will signal an out of control event when MAi < LCL or MAi > UCL

2.2 The DMA control chart for the ZIPINAR(1) model

The DMA control chart was proposed by Khoo and Wong [13]. The performance of DMA is better that the MA control chart when a magnitude of shifts is small. The observations of the DMA statistic are the collected double moving averages of the MA statistic. The DMA statistic is defined as Equation (3)

Page 4: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

4 Applied Science and Engineering Progress, 2021

(3)

where MAi is the statistic of the MA control chart and w is the span at the time i. Then, it can be rewritten as Equation (4)

(4)

Let observations N1,N2..., be i.i.d. random variables in the ZIPINAR(1) model from Equation (4) which are collected moving averages of span w at the time i. The respective expectation and variance of the DMA control chart are

and

The upper and lower control limits of the DMA control chart for the ZIPINAR(1) processes are given by Equation (5)

(5)

where H is a coefficient of the control limits of the DMA control chart for the ZIPINAR(1) process which is a constant that can be chosen.

3 An Explicit Formula for ARL of DMA Control Chart for ZIPINAR(1) Model

The performance for control charts is measured via the ARL comprising ARL0 and ARL1. The explicit formulas for evaluating these components can be analytically derived by the central limit theorem when given the out of control limit, see detail [12], [20]–[22], [24]. Let ARL = n then the analytical explicit formulas can show as Equation (6)

P(an out of control signal at the time i ≤ w)

P(an out of control signal at the time

P(the out of control signal at the time

(6)

According to Equation (6), the DMA statistics in terms of the out of control signals at the time i are replaced as Equation (7)

(7)

By substituting the control limit of the DMA statistic from Equation (5) into Equation (7), then it can be rewritten as

Page 5: Explicit Formulas of ARL on Double Moving Average Control

5

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

Applied Science and Engineering Progress, 2021

(8)

By applying the central limit theorem to derive the explicit formulas, Equation (8) can be rewritten as

(9)

where

and

According to Equation (9), let

Page 6: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

6 Applied Science and Engineering Progress, 2021

and

(10)

Subsequently, the explicit formula for the ARL on a DMA control chart can be rewritten by substituting A, B, and C from Equation (10) into Equation (9). Then, it can be written as

Since ARL = n the explicit formula of ARL can show as Equation (11)

(11)

Consequently, the fully explicit formula for ARL can be shown as Equation (12)

(12)

Proposition I. The in control process requires in control parameter λ = λ0, thus the explicit formula for the ARL0 on the DMA control chart is as following Equation (13)

Page 7: Explicit Formulas of ARL on Double Moving Average Control

7

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

Applied Science and Engineering Progress, 2021

(13)

Proposition II. The process in the out of control state requires out 0f control parameter λ = λ1 and λ1 = (1 + δ)λ0, where δ is the magnitude of the shift, thus the explicit formula for the ARL1 on the DMA control chart can be written as Equation (14)

(14)

4 Numerical Results

The explicit formulas for ARL0 and ARL1 on the DMA control chart for ZIPINAR(1) model were compared with the MA and Shewhart control charts. The numerical results for ARL0 and ARL1 on a DMA control chart were calculated via Equations (13) and (14), respectively, using the Mathematica® software [25]. For ARL0 on the DMA control chart, the MA of the width (w) was varied from 2, 5, 10, 15, and 20. When ARL0 was 370, the coefficient control limit (H) was equal to 3. The in-control parameter of the ZIPINAR(1) model, λ0, was set as 1 and 5; α0 as 0.1, 0.5, and 0.9, and ϕ as 0.5, 0.7, and 0.9. The out-of-control parameter of the ZIPINAR(1) model, λ1, was set as λ0(1 + δ), while the parameter magnitude value of δ was varied as 0.1, 0.3, 0.5, 0.7, 0.9, 1.0, 1.5, and 2.0. When λ0 = 1, the DMA control chart showed better performance than the MA and Shewhart control charts for every level change because of minimal ARL1 (Tables 1–3). We can see that for the DMA control chart, the optimal w value decreased when the change level increased. In contrast, when λ0 = 5, the DMA control chart performed better than the MA and Shewhart control charts for all levels of changes (Tables 4–6). These results show that the performance of the charts depends on the data characteristics or the in-control parameters (λ0, ϕ, α). 5 Real Application Data

Real world application of the Shewhart, MA, and DMA control charts in the monitoring of a ZIPINAR(1) model using the proposed method was conducted. The monthly animal submission numbers in animal health laboratories from a region in New Zealand and the number of sudden deaths in animal health laboratories during the period January 2003 to December 2009 [24] are studied. The graphical displays of these control charts along with the data are provided in Figure 1. The results show that the Shewhart and MA control charts did not trigger an alarm, while the DMA control chart triggered the out-of-control signal at sample 72 for the first time. Consequently, the DMA control chart is more effective at process monitoring than the Shewhart and MA control charts under these conditions.

Page 8: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

8 Applied Science and Engineering Progress, 2021

Table 1: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 1, ϕ = 0.5 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

229.9100.351.931.020.617.59.26.1

221.182.237.721.113.811.66.54.8

207.963.727.115.611.09.76.75.6

196.452.923.014.611.310.48.27.1

186.346.521.615.112.711.99.98.6

195.664.027.614.99.57.94.33.1

154.429.512.38.26.76.34.94.1

90.119.414.913.011.210.36.74.7

60.425.121.517.012.811.16.34.5

51.732.926.017.912.310.56.14.5

233.1108.259.637.325.621.811.87.9

0.5

0.10.30.50.70.91.01.52.0

227.293.946.126.517.214.37.44.9

214.871.830.716.710.89.15.34.0

197.152.221.312.49.18.26.05.1

182.342.218.412.310.09.47.56.4

169.836.918.113.511.711.19.07.4

196.360.825.013.28.36.93.82.8

141.823.710.47.46.25.94.63.7

73.317.714.312.09.88.65.23.7

49.224.319.613.99.78.34.93.6

45.331.721.813.59.17.84.93.7

231.7104.455.633.822.719.210.16.6

0.9

0.10.30.50.70.91.01.52.0

202.155.120.610.36.35.22.82.1

165.329.710.56.04.43.92.82.3

126.318.38.76.55.45.03.52.5

102.516.09.98.06.66.03.72.6

86.916.311.79.47.46.53.72.6

161.029.29.85.13.53.12.11.7

66.29.46.35.03.93.52.31.7

27.413.78.35.23.83.42.31.8

28.116.57.65.03.83.42.31.8

35.416.27.35.03.83.42.31.8

218.075.932.517.110.48.54.12.7

Table 2: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 1, ϕ = 0.7 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

232.9107.959.437.225.621.912.08.1

228.096.248.728.919.416.49.16.4

220.481.938.422.415.313.28.36.6

213.571.932.919.914.512.99.37.9

207.164.930.119.315.013.810.99.6

194.167.530.917.411.39.55.13.6

169.940.216.510.17.77.05.44.6

119.624.216.014.012.712.19.37.1

85.126.823.020.417.516.010.27.0

68.634.130.325.019.517.29.86.7

234.6112.564.241.429.125.114.19.6

0.5

0.10.30.50.70.91.01.52.0

231.3103.655.133.522.619.110.26.8

224.288.042.024.015.813.37.45.3

213.570.831.217.912.410.97.35.9

203.860.126.416.312.311.28.57.4

195.353.224.416.413.412.510.29.0

195.362.126.114.08.97.44.13.0

148.026.411.37.86.56.14.83.9

81.418.514.612.610.59.56.04.2

54.424.720.615.511.29.65.64.1

48.232.424.115.610.69.05.44.0

233.8110.161.639.027.023.112.78.5

0.9

0.10.30.50.70.91.01.52.0

216.273.731.416.610.38.54.43.0

191.746.517.49.36.35.53.73.0

161.129.712.38.26.66.24.83.9

139.123.912.29.58.27.75.74.3

122.922.113.511.39.89.26.34.4

177.741.414.97.75.04.22.62.1

96.413.17.46.05.04.73.22.4

40.515.311.67.95.64.93.12.4

32.921.312.37.45.34.73.12.4

37.524.411.47.15.34.73.12.4

225.990.943.724.715.813.16.54.3

Page 9: Explicit Formulas of ARL on Double Moving Average Control

9

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

Applied Science and Engineering Progress, 2021

Table 3: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 1, ϕ = 0.9 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

235.3114.566.543.531.026.815.410.6

233.8110.462.139.727.823.913.59.4

231.4104.356.335.124.421.012.28.9

229.199.152.132.322.619.712.29.4

226.894.748.930.621.919.312.910.5

192.970.734.320.113.411.36.24.3

185.158.125.714.910.49.15.94.8

162.640.020.415.413.512.911.09.7

137.734.924.622.020.620.016.813.9

117.137.832.130.027.926.720.715.8

235.8116.068.145.132.428.116.311.2

0.5

0.10.30.50.70.91.01.52.0

234.8113.064.841.929.625.514.49.8

232.5106.958.536.625.221.612.08.3

228.998.450.930.921.218.210.78.0

225.591.545.827.919.517.011.08.8

222.285.942.426.319.117.012.010.1

198.274.035.920.913.811.66.34.3

186.255.4523.813.89.88.65.94.9

154.434.918.915.113.513.011.09.5

123.331.724.222.120.519.715.411.9

101.236.332.129.626.624.917.212.1

235.6115.267.244.131.627.315.710.7

0.9

0.10.30.50.70.91.01.52.0

229.899.951.630.820.517.29.16.1

220.781.537.320.913.611.46.54.8

207.262.926.715.410.99.66.75.6

195.452.222.714.411.210.38.17.1

185.245.821.415.012.611.99.88.5

194.663.127.114.69.37.84.33.1

152.828.812.18.16.66.24.94.1

88.519.214.813.011.110.26.64.7

59.325.021.316.812.510.96.24.5

51.132.825.717.612.110.36.04.4

233.0108.059.437.125.421.711.77.8

Table 4: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 5, ϕ = 0.5 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

335.3273.7223.1182.3149.8136.187.058.8

333.9264.6205.8159.2123.7109.462.338.8

331.6250.9182.2131.495.982.5642.926.0

329.3238.6163.8112.379.067.134.321.7

327.1227.7149.198.768.057.630.220.5

312.9222.3158.5114.484.172.737.922.3

304.0181.2103.461.439.132.015.310.1

276.6110.649.929.621.919.915.814.1

241.973.037.528.926.125.322.619.6

208.159.139.535.533.933.228.422.0

335.8276.9229.5191.5161.0148.0100.171.0

0.5

0.10.30.50.70.91.01.52.0

334.7269.8215.4171.7137.4123.174.147.6

332.4255.7190.0139.9103.789.846.927.7

328.7235.2158.6106.673.561.830.018.1

325.1218.0136.486.657.848.324.116.0

321.6203.4120.173.849.041.122.216.3

313.9220.3153.0107.076.264.931.818.1

299.6161.383.046.128.423.211.68.3

258.783.836.423.218.617.514.813.0

212.454.431.426.624.924.220.515.8

173.247.936.834.432.531.323.315.7

335.5274.9225.4185.5153.6140.291.262.4

0.9

0.10.30.50.70.91.01.52.0

329.3238.0162.1109.475.062.828.715.6

319.3193.2107.761.938.030.513.07.6

304.0146.267.935.821.817.99.67.3

290.3117.650.427.117.915.510.68.8

277.998.841.624.017.716.012.310.4

305.6178.397.955.633.626.710.86.0

251.771.626.113.89.78.66.45.3

154.228.317.715.513.913.08.35.5

97.728.424.521.216.714.57.75.3

73.135.631.123.616.413.67.45.3

332.7257.5192.9143.1106.692.448.127.9

Page 10: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

10 Applied Science and Engineering Progress, 2021

Table 5: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 5, ϕ = 0.7 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

335.8277.1230.0192.2161.9149.0101.472.3

335.2272.7221.1179.6146.7132.984.056.4

334.0265.7207.9162.1127.1113.065.942.1

333.0259.2196.4148.0112.598.655.135.0

331.9253.1186.3136.5101.588.248.531.4

311.9223.7163.2121.492.180.845.127.9

307.7202.1130.085.257.948.423.514.4

293.9151.778.245.931.327.118.115.4

274.3111.154.636.429.728.024.322.5

252.187.448.738.935.734.832.129.0

336.0278.6233.1196.9167.7155.3108.979.80

0.5

0.10.30.50.70.91.01.52.0

335.5275.1225.9186.3154.6141.292.563.8

334.4268..0211.9167.2132.4118.269.944.6

332.6256.9192.2142.8107.093.150.330.9

330.8246.8176.1125.090.377.540.525.4

329.1237.7162.8111.778.967.335.523.4

313.2224.1161.8118.588.476.841.224.7

306.2190.4114.070.245.637.617.911.4

284.2125.358.834.324.521.816.414.6

255.085.042.230.827.026.023.320.9

224.967.241.836.4434.533.830.224.9

335.9277.6231.0193.7163.7151.0103.674.4

0.9

0.10.30.50.70.91.01.52.0

332.8258.1194.1144.6108.394.249.829.3

327.8230.7152.099.967.456.025.714.5

319.8195.7110.965.341.333.816.010.5

312.3170.187.749.531.526.214.511.1

305.2150.773.341.427.523.615.312.8

309.7201.8126.880.652.943.519.010.4

280.3113.547.724.515.312.97.96.5

209.946.922.717.615.815.212.49.2

150.635.326.524.422.320.913.68.7

113.438.534.431.226.323.612.88.2

334.5268.7213.2168.8134.1119.971.045.0

Table 6: Comparison of ARL of the Shewhart, MA and DMA charts for ZIPINAR(1) model given λ = 5, ϕ = 0.9 and ARL0 = 370

α δMA DMA Shewhart

w = 1w = 2 w = 5 w = 10 w = 15 w = 20 w = 2 w = 5 w = 10 w = 15 w = 20

0.1

0.10.30.50.70.91.01.52.0

336.2279.3234.6199.0170.5158.3112.783.8

335.9278.0232.0195.2165.6153.0106.277.2

335.6276.0227.8189.2158.3145.297.268.6

335.3274.0224.0183.7151.7138.390.162.3

335.0272.2220.3178.7145.9132.384.357.7

311.2224.6166.4126.498.187.151.433.3

310.1218.2155.4112.883.772.739.324.3

306.1198.8127.484.158.449.827.419.5

300.0174.9101.564.746.240.628.024.2

292.2152.484.656.544.441.134.131.9

336.2279.6235.4200.3172.1160.1115.086.3

0.5

0.10.30.50.70.91.01.52.0

336.0278.7233.3197.2168.1155.8109.580.4

335.7276.6229.0190.9160.3147.399.470.5

335.2273.3222.4181.4148.9135.286.658.9

334.7270.1216.2173.0139.3125.377.351.5

334.2267.0210.4165.6131.1117.270.446.6

312.6226.8168.3127.798.987.651.232.8

310.7216.1150.4106.276.865.934.120.7

304.1186.1111.069.647.240.123.017.6

294.1153.482.351.738.134.226.123.7

281.9127.267.947.539.737.733.531.6

336.1279.4234.8199.4171.0158.9113.484.5

0.9

0.10.30.50.70.91.01.52.0

335.3273.6222.9182.1149.5135.886.858.5

333.8264.4205.4158.8123.3109.061.938.5

331.4250.5181.7130.995.482.142.625.8

329.2238.2163.2111.778.466.634.021.5

326.9227.2148.498.067.557.130.020.3

312.6221.6157.7113.783.572.137.522.1

303.6180.3102.660.738.631.615.110.0

276.0109.649.429.321.719.815.714.1

241.072.337.228.826.025.222.619.4

207.058.739.335.433.833.128.221.8

335.7276.8229.4191.4160.8147.899.970.8

Page 11: Explicit Formulas of ARL on Double Moving Average Control

11

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

Applied Science and Engineering Progress, 2021

6 Conclusions

The explicit formulas for ARL0 and ARL1 on the DMA control chart were derived and their accuracy determined by comparison with the results obtained

by Monte Carlo simulation. The tables of ARL were constructed for various shifts in the process mean underlying a ZIPINAR(1) model. A comparison of the DMA control chart with MA and Shewhart control charts were made in terms of ARL, in which the performance of the DMA control chart is better than other benchmark control chart in the process mean. The explicit formulas for ARL0 and ARL1 on the DMA control chart are easy to calculate and implement for real-world applications.

Acknowledgments

The authors gratefully acknowledge the editor and referees for their valuable comments and suggestions which greatly improve this paper. Besides, we would like to express the gratitude to Thailand Science Research and Innovation via King Mongkut’s University of Technology North Bangkok, Thailand for supporting the research fund with Contract no. KMUTNB-BasicR-64-01.

References

[1] C. H. Sim and M. H. Lim, “Attribute charts for zero-inflated process,” Communications in Statistics-Simulation and Computation, vol. 37, pp. 1440–1452, 2008.

[2] M. Xie, B. He, and T. N. Goh, “Zero-inflated Poisson model in statistical process control,” Computational Statistics and Data Analysis, vol. 38, pp. 191–201, 2001.

[3] M. J. Campbell, D. Machin, and C. D'Arcangues, “Coping with extra-Poisson variability in the analysis of factors influencing vaginal ring expulsions,” Statistics in Medicine, vol. 10, pp. 241–251, 1991.

[4] D. A. Freund, T. J. Kniesner, and A. T. LoSasso, “Dealing with the common econometric problems of count data with excess zeros endogenous treatment effects and attrition bias,” Economics Letters, vol. 62, p. 62, 1999.

[5] M. A. AI-Osh and A. A. Alzaid, “First-order integer-valued autoregressive (INAR(1)) process,” Journal of Time Series Analysis, vol. 8, pp. 261– 275, 1987.

[6] V. Shankar, J, Milton, and F. Mannering, “Modeling accident frequencies as zero-altered probability

LCL = 0.00

UCL = 5.00

0

1

2

3

4

5

6

1 11 21 31 41 51 61 71 81

Sudd

en D

eath

Sample

Shewhart

LCL = 0.00

UCL = 5.00

0

1

2

3

4

5

6

1 11 21 31 41 51 61 71 81

Sudd

en D

eath

Sample

Shewhart

(a) Shewhart control chart

(b) MA control chart

(c) DMA control chartFigure 1: Performance comparisons of control charts for the monthly numbers of sudden death.

LCL = 0.00

UCL = 2.00

0

1

2

3

4

5

6

1 6 111621263136414651566166717681

Sudd

en D

eath

Sample

DMA

Page 12: Explicit Formulas of ARL on Double Moving Average Control

K. Raweesawat and S. Sukparungsee, “Explicit Formulas of ARL on double moving average control chart for monitoring process mean of ZIPNAR(1) process with an excessive number of zeros.”

12 Applied Science and Engineering Progress, 2021

processes: An empirical inquiry,” Accident Analysis and Prevention, vol. 29, pp. 829–837, 1997.

[7] S. P. Miaou, “The relationship between truck accidents and geometric design of road sections Poisson versus negative binomial regressions,” Accident Analysis and Prevention, vol. 26, pp. 471– 482, 1994.

[8] M. A. Jazi, G. Jones, and C. D. Lai, “First‐order integer-valued AR processes with zero-inflated Poisson innovations,” Journal of Time Series Analysis, vol. 33, pp. 954–963, 2012.

[9] M. Cardinal, R. Roy, and J. Lambert, “On the application of integer-valued time series models for the analysis of disease incidence,” Statistics in Medicine, vol.18, pp. 2025–2039, 1999.

[10] E. S. Page, “Continuous inspection schemes,” Biometrika, vol. 41, pp. 100–144, 1954.

[11] S. W. Roberts, “Control chart tests based on geometric moving average,” Technometrics, vol. 1, pp. 239– 250, 1959.

[12] M. B. C. Khoo, “A moving average control chart for monitoring the fraction nonconforming,” Quality and Reliability Engineering International, vol.20, pp. 617–635, 2004.

[13] M. B. C. Khoo and V. H. Wong, “A double moving average control chart,” Communication in Statistics – Simulation and Computation, vol. 37, pp. 1696–1708, 2008.

[14] S. Knoth, “Accurate ARL calculation for EWMA control charts monitoring normal mean and variance simultaneously,” Sequential Analysis, vol. 26, pp. 251–263, 2006.

[15] C. M. Borror, D. C. Montgomery, and G. C. Runger, “Robustness of the EWMA control chart to non-normality,” Journal of Quality Technology, vol. 31, pp. 309–316, 1999.

[16] S. Sukparungsee, “Average run length of Cumulative Sum control chart by Markov chain approach for zero-inflated Poisson processes,” Thailand Statistician, vol. 16, pp. 6–13, 2018.

[17] S. V. Crowder, “A simple method for studying run-length distributions of exponentially weighted moving average charts,” Technometrics, vol. 29, pp. 401–407, 1978.

[18] W. Peerajit, Y. Areepong, and S. Sukparungsee, “Analytical explicit formulas of average run length of long memory process with ARFIMA model on CUSUM control chart,” Songklanakarin Journal of Science and Technology, vol. 39, pp. 779–786, 2017.

[19] S. Suriyakat, “Performance of EWMA chart for trend autoregressive model with exponential white noise,” Silpakorn University Science and Technology Journal, vol. 11, pp. 16–22, 2017.

[20] Y. Areepong, “Explicit formulas of average run length for a moving average control chart for monitoring the number of a defective product,” International Journal of Pure and Applied Mathematics, vol. 3, pp. 331–343, 2012.

[21] Y. Areepong and S. Sukparungsee, “The closed-form formulas of average run length of moving average control chart for nonconforming for zero-inflated process,” Far East Journal of Mathematical Sciences, vol. 75, pp. 385–400, 2013.

[22] C. Chananet, Y. Areepong, and S. Sukparungsee, “An approximate formula for ARL in moving average chart with ZINB data,” Thailand Statistician, vol. 13, pp. 209–222 2015.

[23] A. C. Rakitzis, C. H. Weiβ, and P. Castagliola, “Control charts for monitoring correlated poisson counts with an excessive number of zeros,” Quality and Reliability Engineering International, vol. 33, pp. 413–430, 2017.

[24] Y. Areepong, “Moving average control chart for monitoring process mean in INAR(1) process with zero-inflated Poisson,” International Journal of Science and Technology, vol. 4, pp. 138–149, 2018.

[25] Mathematica, Mathematica Version 12.2, 2020.