Upload
buingoc
View
213
Download
1
Embed Size (px)
Citation preview
VESSEL DIMENSIONS Imperial Metric
Length Overall 771 ft [235 m]
Length Between Perpendiculars 748 ft [228 m]
Breadth Overall 138 ft [42 m]
Depth of hull (Side) 61.5 ft [18.75 m]
Transit Draft 30 ft [9 m]
Operating Draft 37 ft [11.25 m]
Operating Displacement 93,220 tonnes
STORAGE CAPACITIES Imperial Metric
Active Mud (4 independent systems) 24,316 bbls [3,866 m³]Reserve Mud (6 pits) 8,013 bbls [1,274 m³]Base Oil 10,298 bbls [1,637 m³]Freshwater 9,139 bbls [1,482 m³]Drill water 23,783 bbls [3,781 m³]Completion Fluids 10,298 bbls [1,637m³]P-Tanks 45,240 cu.ft [1,281 m³]Fuel Oil 77,357 bbls [12,299 m³]Urea 5,825 bbls [926 m³]Slops/Contaminated Storage 29,707 bbls [4,723 m³]Sack Stores 10,500 sacks
Laydown & Pipe racks 24,756 ft² [2,300 m²]
Total Service Deck Area 74,160 ft² [6,890 m²]
PROPULSION AND STATION-KEEPINGDynpos-Autro-ER station-keeping is provided by six (6) 5500kW vari-able speed, fixed pitch, VFD, azimuthing thrusters each located in a separate water-tight compartment with independent cooling systems and separate connections to six independent cable trunks. All 6 thrust-ers are under water dismountable with the (2) aft thrusters being above keel line allowing vessel to access dry dock or come along quay side. Optionally the 4 forward thrusters can be fully retractable.
● High Capacity
● Extended Remote Deployments
● Zero Discharge
GENERAL DESCRIPTION Imperial Metric
Operating Water Depth(equiped for 10,000 ft)
12,500 ft [3,810 m]
Drilling Depth 40,000 ft [12,192 m]
Max. Variable Deck Load 55,116 kips [25,000 te]
Max. Payload 81,570 kips [37,000 te]
Max. Hook Load 2,500 kips [1,134 te]
Quarters Capacity 210 persons (with possibility to expand to 250)
Helideck Sikorsky S-92 or Aerospitale AS 332L2
Transit Speed 11 knots
Transit Endurance 90 days
STATION-KEEPING Stand by Operating
Wind Speed 30.8 m/s 25.7 m/s
Significant Wave Height 8.5 m 7 m
Surface Current 0.6 m/s 0.6 m/s
7
F&G DS 3810 DRILLSHIPThe DS 3810 is a new drillship that can drill 40,000ft well in up to 12,500ft of water with limited support in remote environments. Ninety (90) days endurance means there will be fewer supply boat runs required. The dual derrick has a stand-building center for greater efficiency. High functional deck spaces with large pipe racks, a semi-enclosed deck area with an overhead gantry and subsea access. Ample below-deck workshops, warehouses, container storage with forklift and crane access are all designed for unprecedented mis-sion flexibility. Large slop tanks are provided to capture drains and storm water for zero discharge. Integrated Ballast Water Treatment and IMO Tier III gensets along with a dedicated Waste Management System and double-skin tanks minimize the environmental footprint for operation in sensitive areas.
Unit Classification 1A1 DNV Ship-shaped Drilling Unit, BIS, E0, BMW-T, DYNPOS-AUTRO-ER, DRILL,
CRANE, HELDK-S, CLEAN (other notations can be easily adapted)
POWER SYSTEMMain power is supplied by six (6) x 8500 eKW diesel gensets located by pairs in three (3) independent engine rooms each with separate cable trunks connections to each of the six independent main switchboard rooms in a ring bus configuration with Closed Bus-Ties. The system is designed to provide better fuel efficiency, more flexibility for power man-agement while maintaining an advanced protection, redundancy using independent systems, blackout prevention, quick recovery and reliable new technology such as energy storage and peak shaving system.
DECK CRANES Three (3) knuckle boom cranes with a 100 mt capacity @ 20m and 20 mt at 45m (sea lift)
One (1) AHC knuckle boom crane with a 165 mt capacity @ 16m to deploy Xmas Tree in 3000m water depth
One (1) pipe rack knuckle boom crane with a 24 mt capacity @ 17m for tubular handling
One (1) helideck service knuckle boom crane with a 3.9 mt capacity @ 20m
SUBSEA AND WELL CONTROL EQUIPMENT*Marine Riser -
Riser Tensioners
BOP/Xmas Tree Handling:
BOP Storage
BOP Trolley
Gantry Crane
Riser Hang Off Cart
Xmas Trolley
Xmas Gantry Crane
Xmas Tree storage carts
Diverter
BOP
Choke Manifold
*Note: Vessel can accommodate (8) ram 20K BOP
ACCOMMODATIONS AND LIFE SAVING EQUIPMENTThe quarters are designed to accommodate 210 people in comfort for an extended period of time and they meet last IMO requirements. There are 28 single-bed and 91 double-bed staterooms along with gal-ley, mess-room, library, gym, theater and internet rooms. A hospital is provided with an emergency sick-bay/training room next door. An entire floor on the upper level is dedicated to office space and Central Con-trol Room to ensure a good coordination of the critical operations and emergency response. Separate office space is provided for 3rd party services Companies in the mid-ship house nearby their respective op-eration areas.
Two (2) x 125 person lifeboats are provided on each side of the ac-commodation. Additionally, one (1) 42 person lifeboat is provided on each side aft.
For more information, contact:Friede & Goldman, Ltd.3151 Briarpark Drive, Suite 800Houston, Tx 77042Phone: (713) 952-3444 Fax: (713) 952-3443Email: [email protected]
144 joints 21” x 75 ft (or 90 ft) w/ 58” buoyancy elements
Eight(8) dual 250-kip wire line riser tensioners (4,000kips) with 50 ft stroke
2 x BOP stack w/t 7 rams (clearance for 20K 8 rams BOP)
650 mt SWL
2 x 300 mt SWL
1000 mt
200 mt SWL
200 mt SWL
4 x 200 mt SWL
KFDS or equivalent - 75 ½” ID
Six(6) ram 18 ¾” 15ksi (stack designed for 7 rams) , H2S trim, w/t multiplex electro-hydraulic BOP control system
15,000psi pressure choke & kill manifold with (4) chokes
DRILLING EQUIPMENT* Imperial Metric
Derrick 210 x 80 x 60 ft [64 X 24 X 18m]
AHC Drilling Draw-works 1,400 st [1,270 mt]
CMC (Main Well) 1,250 st [1,134 mt]
AHC Stand-building Draw-works 1,000 st [907 mt]
75 ½” through diameter rotary table on main well
1,375 st [1,247 mt]
60 ½” through diameter rotary table on aux. well
1,000 st [907 mt]
One(1) drilling top drive 1,250 st [1,134 mt]
One(1) stand-building (non-drilling) top drive
1,250 st [1,134 mt]
Setback Capacity 2,000 st [1,814 mt]
Drill String 6 5/8” and 5 7/8” drill pipe 330 stands (124 ft stands- quads)
Landing String 6 5/8” drill pipe 100 stands (124 ft stands- quads)
Drill collars 7” 13 stands (124 ft stands- quads)
Drill collars 8 ¼” 10 stands (124 ft- quads)
Drill collars 9 ¾” 10 stands (124 ft stands- quads)
Bottom hole assemblies 9 ½” 4 stands (124 ft stands)
Casing 13 3/8 “ 99 stands (135 ft stands – three)
Pipe Handling System Two (2) Vertical pipe racking and catwalk machine
Riser Handling System Catwalk machine & bridge crane for 75 or 90ft riser jts
Mud Pumps (space for 6) Four (4)x2200 HP triplex(AC), 7500 WP
THIRD PARTY EQUIPMENT INTEGRATED IN THE VESSEL AND EASY ACCESS FOR PROMPT MOB. & DEMOB.*
Cement Unit: dedicated cement unit room with built in utilities for (2) triplex cementing unit w/t 2 x 100bbls batch tanks
ROV: dedicated space with utilities for 2 independent work-class ROVS and related equipment
Wire line Unit: dedicated space and utilities for logging unit, generator and tool house
Mud Logging Unit: space and utilities for 30 ft long cabin nearby Mud process house
MWD/LWD cabin: space and utilities for 30 ft long cabin
Cuttings storage: space and utilities for 1000 Tons
Brine filtration: dedicated space and plumbing for two (2) stages filtra-tion modules
Well Testing equipment: flare boom Swan Neck type and reinforced well test area with utilities on aft end of the Vessel
Managed Pressure Drilling: MPD ready in moon pool area for mod-ules, tool container manifold and umbilical reels
Coil Tubing: dedicated space and utilities on pipe rack deck facing the V door.
*Note: The above specifications describe the standard unit and can be customized depending on customer special requirement.
*Note: Vessel can easily accommodate various drill floor configuration (Cylinder rig, Dual tower etc.) with a main hook load up to 2,000 st.
MUD SYSTEMTwo (2) parallel shaker lines. Each consisting of four (4) multi-deck shale shakers with a total capacity of 4,800 GPM working either in se-ries or parallel and two (2) distribution tanks. Two (2) degassers with a processing capacity of 1300 GPM each. Space for cuttings dryer, gumbo trap and three (3) third party centrifuges and pumps is reserved.
One (1) 22 GPM Hazardous Drains separation and treatment unit.
One(1) Cuttings Collection and transfer System