Ezi Cut Tree Services Pty Ltd
Quality Assurance Manual
Table of Contents
Quality Manual Series 4Introduction 5Definitions 7Quality Policy 9
Quality Manual 11Quality Management System 12Management Responsibility 16Resource Management 21Product Realisation 23Customer-Related Processes 25Product Design and Development 27Purchasing 29Production and Service Provision 31Control of Monitoring and Measuring Equipment 34Measurement, Analysis and Improvement 36Monitoring and Measurement 38Control of Non-conforming Product 40Analysis of Data 41Improvement 42
Quality Procedures 44Quality Management System 1 45Document & Data Control 48Document Control Example 51Control of Critical Records 54Control of Quality Records 57Management Responsibility 61Resource Management 64Customer Related Processes 67Design and Development Management 71Design and Development Example 2 73Purchasing 76Control of Production 79Monitoring and Measurement 82Product Identification 85Control of Customer Property 87Preservation and Handling 89Control of Monitoring and Measuring Equipment. 91Internal Quality Audits 94Control of Non-Conformances 97Data Analysis 99Corrective & Preventive Action 101Servicing 103
Quality Work Instructions 105Job Sequence Sheets 106
Quality Forms 108Management Review Meetings 109Contract Review Action Minutes 112Enquiry Log 118
Design Plan 120Document Control Master List 122Supplier & Subcontractor 124Purchase Order 126Requisition 128Job Number Register 130Serial Batch Number Register 132Job Sequence Sheet 133Monitoring & Test Plan 135Goods Received Advice 138Final Inspection 140Calibration Record 142Non-Conformance Report 143Delivery Advice 145Archive Register 147Internal Audit Report 149Job Description 152Employment Application Form 155Performance Review 160Training Record 165Service Report 168Statistical Report 170
Quality Schedules 173Document Retention Schedule 174Subcontractor Listing 176Internal Audit Plan 177Service Plan 178
Ezi Cut Tree Services Pty Ltd
Quality Manual Series
Introduction
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 11:29:29 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0001
PolicyIntroduction
DescriptionEzi Cut Tree Services Pty Ltd is engaged in the business of all aspects of Tree surgery and has been trading since
31st October 2003. Our principal products/services are Confined space tree removals, pruning, felling, stump
grinding and 24 hour emergency call outs, we offer these services to the Southern Highlands New South Wales.
Annual turnover is currently $260,000.00. Our Head Office is located at Hill top NSW and we have a total of 4
employees.
PurposeThe introduction to the manual should give the reader an idea of:
the "scope" of the manual, i.e. which sectors of the company it is applicable to - does it cover all geographical�
locations, all divisions of the company and all products of the company?
a description of the company - a brief overview giving a short history, location, size and operations of the�
company;
the revision and issue status - a page indicating current revision, summary of changes to previous revisions,�
date of issue of current and previous revisions, and the issuing authority. Refer to the document numbering
rules.
ScopeThis manual outlines our company's plan to satisfy the quality requirements of ISO 9001: 2008. It is applicable to
all of our operations throughout the state of New South Wales, Australia and covers the following range of
products and services.
All aspects of:
a) Tree Removal
b) Tree felling
c) Tree Pruning
d) Stump Grinding
The manual is a "controlled" document within our Quality System however "uncontrolled" copies can be
distributed to any interested party. The manual is intended to be used as a public document that displays this
company's commitment to achieving quality in all our activities.
Procedure
Issue No. Section No. Revision No. Date Issued Changes made
1 Entire manual A Final draft for review and approval
This manual is issued by our Quality Manager with the approval of the CEO and is reviewed annually or shorter
period (when necessary)
__________________________________________ ____/____/____
(Signature of CEO) (Date)
Definitions
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0002
PolicyDefinitions
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Definitions
PurposeThe purpose of this policy is to explain the general procedures relating to Definitions
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
Procedure
The following definitions are taken from the "Quality management and quality assurance – Vocabulary".
Contract Binding agreement.
Customer Organisation or person that receives a product.
Example: Consumer, client, end-user, retailer, beneficiary and purchaser. Note: a
customer can be internal or external to the organization
Conformity Fulfilment of a requirement
Note: The term "conformance" is synonymous
Non-conformity Non-fulfilment of a requirement
Process A set of inter-related or interacting activities that transform inputs into outputs.
Product The result of activities or processes.
Note: Product includes service.
Quality Degree to which a set of inherent characteristics fulfils requirements
Note:
1. The term "quality" can be used with adjectives such as poor, good or excellent
2. "Inherent" means existing in something, especially as a permanent
characteristic.
Requirement Need or expectation that is stated, generally implied or obligatory.
Service Service is the result of at least one activity necessarily performed at the interface
between the supplier and customer and is generally intangible.
Supplier An organisation or person that provides a product
Quality Policy
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:07:27 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0003
PolicyQuality Policy
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Quality Policy
PurposeThe purpose of this policy is to explain the general procedures relating to Quality Policy
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureEzi Cut Tree Services Pty Ltd is engaged in the business of All aspects of tree removal, pruning, felling and stump
grinding and this policy applies to all of our divisions throughout the organisation.
The purpose of this policy is to confirm our commitment to meeting the quality standards expected by our
customers in the delivery of the products and/or services that we supply to them.
Our quality system is based on the requirements of ISO 9001: 2008
Our quality objectives are to:
Use the Quality Management System as a tool in achieving best practice outcomes across the organisation;�
Ensure continuous improvement.�
To implement this policy we shall focus on the needs of our business with particular reference to consistently
meeting our customers' requirements and statutory obligations. Our quality management system will provide
mechanisms for detecting system shortfalls and for stimulating process improvements.
Ezi Cut Tree Services Pty Ltd will adopt procedures and disciplines to ensure that:
The system is effectively implemented by undertaking relevant skills training and conducting appropriate�
quality awareness training;
Responsibilities for quality are established by communicating these responsibilities clearly to all employees;�
The policy and procedures continue to be appropriate by initiating regular reviews to check its effectiveness�
and ongoing relevance, and the company regularly review the needs and expectations of our customers and
initiate continuous improvement activities to meet these expectations.
(Signature)
Chief Executive Officer
Date: ___/___/___
Ezi Cut Tree Services Pty Ltd
Quality Manual
Quality Management System
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:09:57 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0004
PolicyQuality Management System
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Quality Management System
PurposeThe purpose of this policy is to explain the general procedures relating to Quality Management System
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureGeneral Requirements
This Quality Manual has been developed to provide an overview of the Quality Management system developed
by Ezi Cut Tree Services Pty Ltd. It will be implemented and maintained throughout all the processes employed
by the company to consistently meet their customer’s needs and expectations and to continually improve the
system’s effectiveness in delivering a high level of customer service.
The system defines how processes interact and are documented and controlled. It ensures resources are
allocated where required and that processes are monitored, measured and outcomes analysed to show where
improvements are needed.
Documentation Requirements
SAMPLE TEXT OPTION ONE
Ezi Cut Tree Services Pty Ltd's Quality Management System is documented in a five-tiered structure:
Quality Policy – a statement of our company's commitment to quality and an enunciation of our quality
objectives. This is issued by our CEO/Managing Director and is to be reviewed annually.
Quality Manual – outlines what we will do to meet the requirements of each element of ISO 9001:2008 and
business quality objectives. In fulfilling these requirements we expect to satisfy the objectives of our
Quality Policy. The Quality Manual is issued by the Quality Manager with the approval of the CEO/Managing
Director and will be reviewed annually.
Quality Procedures – describes in detail how we will satisfy each element of ISO 9001:2008 and how we control
other critical processes in order to meet the commitments outlined in the Quality Policy. Quality Procedures are
issued by the Quality Manager in consultation with Department Managers and are reviewed as required due to
changing circumstances.
Quality Work Instructions – details the necessary steps for each quality-related or critical-related activity in
logical sequence so that the activities can be consistently repeated to the standard required in the procedures.
Quality Work Instructions are issued by the Quality Manager in consultation with Department Managers and are
reviewed as required to reflect changing circumstances
Quality Plans – these plans are specific to individual projects and outline the particular actions and
considerations that may be needed for that project to meet the company's quality objectives. Quality Plans are
issued by the Manager of the project in consultation with the Quality Manager and are only relevant for the
duration of the project.
Control of Records - Records provide evidence of conformity to requirements. Certain records are "controlled"
and as such a procedure defining who controls, where records are stored for how long the method of disposition
has been issued by the Quality Manager in consultation with Department Managers.
Refer Quality Procedures: QP 3.1 Quality Management System
SAMPLE TEXT OPTION TWO
Ezi Cut Tree Services Pty Ltd's Quality Management System is a 5-tiered structure:
Q U A L IT YP O L IC Y
�
IS S U E D b y C E OR E V IE W E D
A n n u a lly
Q U A L IT Y P R O C E D U R E SIS S U E D b y Q A M a n a g e r
( w ith D e p a r tm e n t M a n a g e r ’s a p p r o v a l)R E V IE W E D a s r e q u ir e d
Q U A L IT Y M A N U A LIS S U E D b y Q A M a n a g e r
(w ith C E O ’s a p p r o v a l)R E V IE W E D A n n u a lly
�
� � � � �
P R O J E C T - S P E C IF IC Q U A L IT Y P L A N SIS S U E D b y P r o je c t M a n a g e r ( w ith Q A M a n a g e r ’s a p p ro v a l)
R E V IE W E D a s re q u ire d d u r in g p ro je c t d u ra tio n
� � � � �
Q U A L IT Y W O R K IN S T R U C T IO N S / F O R M SIS S U E D b y Q A M a n a g e r
( w ith D e p a r tm e n t M a n a g e r ’s a p p r o v a l)R E V IE W E D a s r e q u ir e d
� � � � � � � �
Quality Manual
This quality manual has been established and maintained by Ezi Cut Tree Services Pty Ltd to comply with ISP
9001:2008. It includes:
A statement of the scope of the Quality Management system�
The documented procedures or reference to them�
A description of the interaction between the processes of the Quality Management system.�
Control of Documents
Ezi Cut Tree Services Pty Ltd will implement a procedure for controlling our quality-related documents to ensure
that only current revisions are in use throughout the organisation. These quality documents will include:
Quality Manual�
Quality Procedures�
Quality Work Instructions and Forms�
Quality Plans�
International and local standards�
Government regulations�
Equipment operating manuals�
Design drawings and layout plans�
We will control the distribution of these documents so we can locate each one should a revision be issued and
recall out-dated versions.
These documents will only be issued by an authorised person.
Refer Procedure: QP 3.2 Document and Data Control
Control of records
Ezi Cut Tree Services Pty Ltd will ensure that all records relating to our quality system, and verifying the
conformance of our product to specification, will be kept and held for a suitable period. Our written procedure
will:
Nominate what constitutes a 'record' showing the performance of the quality system;�
State how records will be collected, stored and maintained;�
Allocate a retention period to each type of quality record.�
The procedure will also provide guidance on how to handle records which are to be available to our customers.
Refer Procedure: QP 3.3 Control of Quality Records
Management Responsibility
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0005
PolicyManagement Responsibility
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Management Responsibilities
PurposeThe purpose of this policy is to explain the general procedures relating to Management Responsibility
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureManagement Commitment
Top Management of Ezi Cut Tree Services Pty Ltd is committed to the development and the implementation of
the Quality Management system and to continually improving its effectiveness. This is achieved by:
Communicating to all staff the importance of clearly defining customer, requirements as well as�
regulatory and statutory requirements.
Ensuring all staff are aware of the quality policy and their role in achieving quality objectives.�
Clearly defining quality objectives�
Conducting management reviews of the effectiveness of the system�
Ensuring adequate resources are available to meet stated quality objectives.�
Customer Focus
Top management of Ezi Cut Tree Services Pty Ltd are committed to clearly identify customer requirements and to
ensure that they are met or exceed customer expectations.
Quality Policy
The Quality Policy of Ezi Cut Tree Services Pty Ltd has been defined by top management and is:
Relevant and designed to meet the particular focus of Ezi Cut Tree Services Pty Ltd�
Has stated achievable quality objectives that will demonstrate the continual improvement system’s�
effectiveness
Reviewed at least annually to ensure it remains suitable and relevant�
Communicated at all levels of the organisation�
Planning
Quality Objectives have been defined in the quality policy and include objectives required to produce consistent,
cost effective products (or services). Top Management is responsible for communicating these objectives to all
levels of the company and to provide the means to measure system performance against these objectives.
Top Management of Ezi Cut Tree Services Pty Ltd has planned the quality management system so that it
adequately describes the processes involved in delivering our product (or service) and that these processes are
controlled, measureable, with adequate resources and that there is an effective system to correct problems as
they occur and monitor their effectiveness in improving the system. Any changes to the process can be
effectively planned and implemented and will not affect the integrity of the quality management system.
Responsibility, authority and communication
1. CEO/MANAGING DIRECTOR/GENERAL MANAGER
As senior executive officer, our CEO/Managing Director/General Manager has overall responsibility for setting
the company's quality goals and ensuring that they are met through the allocation of resources as required. The
CEO/Managing Director/General Manager also reviews the quality management system regularly. In line with its
commitment, the CEO/Managing Director is responsible for the following tasks:
To conduct regular formal communication sessions explaining business performance and how the�
organisation meets customer needs;
To conduct management reviews to verify how the organisation continues to meet quality objectives and�
quality plans and the availability of resources to meet such objectives and plans;
To coordinate activities meant to ensure that customer requirements are formally identified.�
Providing effective communication methods throughout the company by which means information on�
objectives and system performance is able to be passed on.
2. QUALITY REPRESENTATIVE/QUALITY MANAGER
The member of the Top management who is allocated the role of Quality Representative/Quality Manager has
the responsibility and authority to manage the day-to-day operation of the quality system, including advising
senior management on the performance of the system. The Quality Representative/Quality Manager is also
responsible for conducting training in quality awareness.
3. TOP MANAGEMENT
Top management as defined in the Organisation Chart have the responsibility of seeing that the company's
quality goals are translated into operational effectiveness. They are accountable for the quality outcomes of their
departments.
4. SUPERVISORS
Supervisors are responsible for implementing the quality system on a day-to-day basis. They are also responsible
for conducting work skills training.
5. ALL STAFF
Each person is individually responsible for ensuring that they understand their role in achieving quality outcomes
and then putting these principles into practice.
Refer Procedure: Management Responsibility
The structure of Ezi Cut Tree Services Pty Ltd is represented in the following chart:
QUALITY ORGANISATION CHART - Ezi Cut Tree Services Pty Ltd
QA Manager Personal Assistant
Sales staff
(Type no. here)
Sales Manager
Production staff
(Type no. here)
Supervisor
Production Manager
Design Engineer
Purchasing Manager
Service Manager
Operations Manager
Accounts staff
(Type no. here)
Accountant
Financial Controller
HR/Training Mgr
IT Manager
Other admin staff
(Type no. here)
Admin Manager
CEO/General Manager/
Managing Director
Refer procedure QP 3.4 Management Responsibility
Management Review
1. GENERAL
Ezi Cut Tree Services Pty Ltd reviews the Quality management system at least annually to ensure it continues to
be suitable to the company and effective in delivering a product (or service) that meets or exceeds our
customer’s expectations.
Detailed records of these reviews are maintained.
2. REVIEW INPUT
The following areas at least are included in the review:
Records of internal and external audits’�
Customer feedback,�
Process performance and product(or service) conformity,�
Status of Corrective and preventive actions’�
Follow up actions from previous management reviews’�
Changes that could affect the management system and�
Recommendations for improvement�
3. REVIEW OUTPUT
Any decisions or actions arising from the review may relate to;
Improvement of the effectiveness of the management system and processes�
Improvement of product or service related to customer requirements’�
Resource needs�
Resource Management
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0006
PolicyResource Management
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Resource Managements
PurposeThe purpose of this policy is to explain the general procedures relating to Resource Management
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureProvision of Resources
Ezi Cut Tree Services Pty Ltd provides relevant and adequate resources to ensure the system is maintained and
its effectiveness in identifying and meeting customer requirements improves over time.
Human Resources
Ezi Cut Tree Services Pty Ltd will ensure that we can always meet our quality objectives and deliver a product or
service that meets our customer's needs. We will ensure that the following activities are performed at least on
an annual frequency basis.
Personnel performing work affecting quality will be competent by:
Identifying the necessary competence;�
Conducting competency assessment to identify any deficiencies providing necessary training/education or�
other actions (such is the recruit of suitable qualified personnel, including subcontracting) to overcome these
deficiencies; and ensuring that records of such training and education are adequately maintained and
preserved.
Including suitable and measurable quality objectives to personnel for job tasks performed and measuring�
performance against objectives at least during formal annual reviews to ensure that personnel is aware of
the importance of their activities
Ezi Cut Tree Services Pty Ltd will ensure that everyone in a "quality-critical'' role is suitable for the role by having
regard to their existing skills and through the provision of on-going training.
Our staff are selected for their roles after careful consideration has been given to their previous work history (if
any), both within and outside Ezi Cut Tree Services Pty Ltd, their relevant academic study and any task-related
training already completed.
Where a need for training is identified, this will be arranged to an agreed priority and a record of this training will
be kept.
Our Training Manager/HR Manager/HR Department/Department Manager is responsible for identifying training
needs in consultation with Department Managers/Supervisors/Team Leaders and will arrange and monitor all
training programs.
Refer Procedure: QP 3.5 Resource Management
Infrastructure
To achieve product conformity, we will:
Produce an inventory of buildings, machinery and equipment, transport and communication facilities,�
hardware and software affecting the product quality;
Monitor its continuous suitability though scheduled regular workplace inspections.�
Work Environment
To achieve a work environment capable of producing consistent product (or service), we will:
Develop conditions of work to ensure best performance;�
and Monitor such conditions to ensure their continuous suitability�
Product Realisation
This document is controlled
Version: 2.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0007
PolicyProduct Realisation
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Product Realisation.
PurposeThe purpose of this policy is to explain the general procedures relating to Product Realisation
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureEzi Cut Tree Services Pty Ltd will ensure that we can always meet our objectives and deliver a product or service
that meets our customer needs, complies with regulatory requirements and satisfies our organisation standards.
We will follow a system of product realisation, before delivering the product to our customer. This will include:
Planning the product realisation - we will plan and develop the processes needed for product realisation1.
form conceptual/initial stages until delivery.
Prior any stage of product realisation we will determine the customer requirements and any statutory and2.
regulatory (legal) obligations to ensure that these requirements and obligations are clear and understood.
We will then review these requirements/obligations to ensure our capability to deliver, prior making any3.
commitments to the customer. If we do not have the capability, we will not take it on ourselves to make the
product.
For any new product, we will embark on a disciplined design control to ensure that quality objectives,4.
customer requirements and statutory obligations are fulfilled.
Purchasing operations related to product will be controlled to ensure that purchased product conforms to5.
pre-set specifications.
Production and service of product will always follow pre-set procedures and work instructions. Checks will be6.
performed at each stage of production and service to ensure product conformity.
Any monitoring and measuring equipment used to verify product conformity will be calibrated to ensure that7.
records of product verification of conformity are indeed adequate.
Planning of Product Realisation
Ezi Cut Tree Services Pty Ltd will ensure that we can always meet our quality objectives and deliver a product or
service that meets our customer needs and statutory obligations. This will include:
Determining the product requirements, specifications and quality objectives related to the product or the1.
service;
Determining the need to establish processes, documents, and provide resources specific to the product or2.
service;
Establishing the necessary processes of verification, validation, monitoring, inspection and test activities3.
specific to the product and the criteria for product acceptance.
Ensuring that records are collected to provide evidence of product conformity.4.
Customer-Related Processes
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0008
PolicyCustomer-Related Processes
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Customer-Related Processes
PurposeThe purpose of this policy is to explain the general procedures relating to Customer-Related Processes
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureEzi Cut Tree Services Pty Ltd will ensure that we can always meet our quality objectives and deliver product that
meets our customer needs whilst ensuring that we meet all applicable statutory obligations and organisation
standards. To do this effectively we will need the:
Identification of Product Requirements
Ask and obtain specific customer requirements, including requirements for delivery and any post-delivery
activities.
Determine any statutory and regulatory requirements related to the product.
Identify any additional requirements determined by our organisation
Formal Review of Product Requirements Prior Tendering or Quoting
Prior submission of a tender or quotation we will make sure that we understand the requirements and have the
capability to deliver on time and in full. If we are unable to fulfil these expectations we will either not tender or
quote, or offer a non-conforming tender/quote.
Order or Contract
When we receive a contract or an order to supply products we will check that the contract or order matches the
original specifications and that that we still have the capability to meet customer agreed requirements. If not we
will ensure that we resolve any differences with the customer prior to accepting the order or the contract. If such
differences cannot be resolved we will not accept the order or the contract.
Order/Contract Amendment
If an order or a contract requires amendment, we will do this amendment in a formal way including open
communication with the customer and other interested parties.
Record Keeping
The following records are considered Quality Records, therefore preserved and maintained by the Sales and
Marketing Manager:
Quotations,�
Tenders,�
Formal review of customer requirements,�
Contracts,�
Orders�
Amendments to contracts tenders and orders.�
Refer procedure: QP 3.6 Customer Related Process
Product Design and Development
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0009
PolicyProduct Design and Development
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Product Design and Development
PurposeThe purpose of this policy is to explain the general procedures relating to Product Design and Development
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureOur design process will be checked at various stages by suitably qualified staff to ensure that the design will
result in a product that meets our customer's specification. These stages will include:
Design and Development Planning
The design and development plan will outline the steps in the process, specify who is responsible for each part of
the design/development process and outline all the inputs to the process. It will also outline what is the
validation activity mandatory to be conducted at the end of each stage to ensure success. The design and
development plan may alter as the design progresses.
Design and development inputs
During the design process, inputs to the design process will be determined, clearly defined and records
maintained. Inputs will include:
Functional and performance requirements�
Statutory and regulatory requirements as applicable�
Information from previous designs where applicable;�
Other essential requirements�
Design and Development Outputs
During the design/development process, we will regularly check that the outcomes are according to specification
and that all departments that will be involved in implementing the design are consulted. We will ensure that the
design and development outcomes meet all statutory safety and environmental requirements.
Design and Development Review
At relevant stages during the design or development process, Ezi Cut Tree Services Pty Ltd will review progress
against planned requirements.
Any problems identified will have actions planned and implemented to correct the problem.
Records of reviews and any actions will be maintained. Participants in the review will include representatives of
staff involved in the design and development process.
Design and Development Verification
Ezi Cut Tree Services Pty Ltd will plan verification for designs to verify that design and development outputs meet
input requirements. Records of verification activities and any actions required will be maintained.
Design and Development Validation
During design and upon completion, the product or service will be tested to ensure that it performs as expected
at the commencement of the design process and to verify that the performance is in line with the customer's
specifications.
Control of Design and Development Changes
Any changes or modifications to the design after implementation will also be reviewed, documented and
approved before they are implemented.
Refer Procedure: QP 3.7 Design and Development Management
Purchasing
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0010
PolicyPurchasing
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Purchasing
PurposeThe purpose of this policy is to explain the general procedures relating to Purchasing
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedurePurchasing Process
Ezi Cut Tree Services Pty Ltd will ensure a quality product to our customers by checking that anything we
purchase which becomes an input to our quality process has been verified as meeting our specification. We will
do this by:
Before placing an order we will carefully evaluate the supplier to ensure that they can supply a product that
meets our requirements. We shall maintain records of the evaluation process.
Purchasing Information
Our requirements will be specified when we place an order with a supplier. This will include part numbers or
other identifiers, a clear and unambiguous description, copies of drawings if applicable, details of relevant
standards and any requirements relating to approval. Only authorised personnel shall be able to issue purchase
orders.
Verification of Purchased Product or Service
When appropriate, we will arrange for our own staff, or our customer, to check the product before it leaves the
supplier premises. We will specify this inspection process in our purchase order to the supplier.
On receipt of materials/goods:
Goods received by Ezi Cut Tree Services Pty Ltd will be inspected when received to ensure that they conform to
specifications such as the description on our order, the description on the delivery document and any
requirements of our process control procedure. The conforming product will be released to the Production
Department or Store and any non-conforming product will be quarantined until dealt with.
Refer Procedure: QP 3.8 Purchasing
Production and Service Provision
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0011
PolicyProduction and Service Provision
DescriptionEzi Cut Tree Services Pty Ltd Business Systems has guidelines for all employees regarding Production and Service
Provision
PurposeThe purpose of this policy is to explain the general procedures relating to Production and Service Provision
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureControl of Production and Service Provision
Ezi Cut Tree Services Pty Ltd will monitor our production and subsequent service process (if necessary) in order
to ensure that our products meet the specified standard and product requirements. Our system of monitoring
these processes will include:
1. Determining the product characteristic standards at the end of each production stage
Product standards during each stage of production process will be determined during product design and
development. These standards will be communicated to production personnel either by provision of drawings,
visual examples or other means to enable checks for conformity.
2. Documenting Production and Service Processes
The steps of the production process, delivery and post-delivery activities will be defined and documented in
procedures, with particular attention to ensure the product meets specified requirements and employee/user
safety. The aim of documented procedures is to establish a standard way of performing the process (i.e.:
everybody does it the same) to ensure product quality and employees safety.
Any relevant standards will be listed in these procedures along with criteria on expected work standards and
acceptance criteria for the product. Any hold-points for inspection and testing of the product will be specified.
Where special qualifications are required by people or equipment, these will be also specified. Any measuring
and monitoring equipment critical to ensuring both the product meets requirements and operator safety will
also be specified, including when they are to be used and how.
3. Suitable Equipment
We will provide the correct equipment for each task and it will be maintained in working order. The limits on
operation of the equipment will be defined in the written procedures or written work instructions.
4. Handling of the Product during prodcution, packaging, delivery and installation
Work procedures/instructions will include details on how to ensure that the product is not damaged during
production, inspection, packaging, loading, delivery and installation. We will ensure that the product is not
damaged.
5. Control and Monitoring of Each Production Stage
During Production activities we will follow proper procedures to ensure that this process is controlled.
Refer procedure:
QP 3.9 Control of Production�
QP 3.20 Servicing�
Production Monitoring
As specified in our process control procedure, our product will be inspected and tested during production so that
any non-conforming product is detected and removed or reworked. Product status (good, reject, on hold) will be
identified during each production stage.
All products will be held until inspections and tests are completed. Products can however be released under our
'positive recall' system in certain circumstances, providing it is identified so that it can be recalled at a later date
for inspection and testing.
Prior to release or installation
Our product will not be released to the customer until final inspection and testing is complete. These final checks
will verify that the finished product meets its original specification and that previous inspections and tests on
receipt and during production have been completed satisfactorily. All relevant documentation will be completed
and authorised
Records will be kept of inspections and tests completed throughout the process to show that our product has
met the appropriate acceptance criteria and that people with suitable authority have completed these
inspections and/or tests.
Refer procedure; QP 3.10 Monitoring and measurement
Validation of Processes for Production and Service Provision
Where Ezi Cut Tree Services Pty Ltd has processes for production and service provision where the final product or
outcome can only be verified after completion or when the product is in use, only prescribed equipment and
personnel who are appropriately qualified for the task will be allocated and complete the work. These conditions
will be monitored during the process to ensure compliance with specified requirements throughout the process.
The process will be reviewed and revalidated as appropriate to ensure control of production conditions. Records
of validation and monitoring activities will be maintained.
Identification and traceability
We will ensure that throughout production, testing and installation the product status is properly identified and
traced so that if anything is found to be non-conforming we can identify not only the source of the problem but
also how many products of the same batch/model are affected. This will enable proper corrective action to be
taken.
Proper identification of the products or storage area will enable us to the current inspection and test status of
the product (awaiting inspection, inspected and approved, production hold, product rejected).
Refer procedure: Production and Service
Refer Procedure:
QP 3.11 Monitoring and Measurement Status�
QP 3.12 Product Identification�
Customer Property
Ezi Cut Tree Services Pty Ltd clearly identifies and maintains property supplied by the customer for use or
incorporation into the product whilst it is the responsibility of the company. If the customer property is lost
damaged or unsuitable for incorporation into the product, this will be reported to the customer and records will
be maintained.
Refer procedure: QP 3.13 Control of Customer Property
Preservation of Product
Ezi Cut Tree Services Pty Ltd has procedures in place to ensure product (or its constituents) continue to conform
to requirements throughout the production process and during delivery. This includes where applicable,
identification, handling, packaging, storage and protection.
Refer procedure: QP 3.14 Preservation and Handling
Control of Monitoring and Measuring Equipment
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0012
PolicyControl of Monitoring and Measuring Equipment
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Monitoring and Measuring
Equipment
PurposeThe purpose of this policy is to explain the general procedures relating to Control of Monitoring and Measuring
Equipment.
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureEzi Cut Tree Services Pty Ltd will implement procedures to ensure that all equipment used for inspecting,
measuring or testing our product is controlled, has been calibrated and is maintained. Equipment will be
calibrated to a known standard and calibration tolerances will be sufficient to correctly verify conformance of our
product to its specifications. Procedures will also define what action is taken if the acceptance criteria are not
met and equipment is found to be out of calibration.
Any software or test hardware used for comparison purposes will be checked to make sure that it is able to verify
acceptability of product, and that further checks will be conducted periodically.
If our customer requests technical data on our testing equipment to verify that it is performing adequately, this
information will be provided.
Our procedures will ensure that our inspection, measuring and test equipment has been:
Chosen as suitable for the task;�
Identified as critical to product quality;�
Calibrated to acceptable tolerance at prescribed intervals;�
Recorded as to identification, location, frequency and method of checks and acceptance criteria;�
Labelled for identification and to indicate calibration status;�
Used in appropriate environmental circumstances that would not influence test results;�
Stored so that the accuracy of the equipment is maintained;�
Adjusted only by authorised personnel.�
Refer Procedure: QP 3.15 Control of Monitoring and, Measuring Equipment
Measurement, Analysis and Improvement
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0013
PolicyMeasurement, Analysis and Improvement
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Measurement, Analysis and Improvement
PurposeThe purpose of this policy is to explain the general procedures relating to Measurement, Analysis and
Improvement
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureGeneral
Ezi Cut Tree Services Pty Ltd is keen to ensure that our business objectives are implemented on time and in full.
To this extent we will ensure:
1. Product Conformity and Control of Non-Conformance Product
Production procedures will include requirements for measuring sample products. Such samples will be then
analysed using quality statistical tools, as appropriate, to ensure that products conform to requirements.
Non-conforming product will be segregated as per defined procedure to ensure that it is not sent to customers.
Non-conforming product will also be measured to ensure the reject rates do not exceed maximum allowable
rates. We will analyse rejects to identify root causes and to generate actions for control of such root causes.
2. Processes Conformity
Processes affecting product quality will also be measured with data recorded and analysed on a regular basis.
Critical processes will have their capability measured and analysed as the starting initiative for improving their
performance
3. Customer Satisfaction
We will identify the top 10 customers of the business. Proactively, we will conduct customer surveys on a regular
basis and act upon their findings. We will also regularly visit these critical customers to monitor their satisfaction
with our product and services.
4. Quality System Performance
At planned intervals we will conduct internal audits to determine whether the quality system conforms to
planned arrangements and if it is effectively implemented and maintained. Qualified auditors will conduct such
audits.
5. Continuous Improvement
Data collected from product conformity/non-conformity, process capability, customer surveys, internal audits,
business performance and quality objectives measurement, will generate corrective and preventive actions. Our
organisation will also aim to train all of our employees in quality tools and techniques and aim for involvement in
formal and informal Improvement Projects.
Monitoring and Measurement
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0014
PolicyMonitoring and Measurement
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Monitoring and Measurement
PurposeThe purpose of this policy is to explain the general procedures relating to Monitoring and Measurement
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureCustomer Satisfaction
Ezi Cut Tree Services Pty Ltd has implemented methods of collecting feedback from customers on their
perception of product and service provision. Data collected from these methods will be analysed for trends and
with the view of identifying areas where improvements can be made and reviewed in future.
Internal Audit
Ezi Cut Tree Services Pty Ltd will institute a procedure for regular internal auditing of our quality system. This will
be designed to:
Conduct audits on a scheduled basis at regular intervals;�
Identify any areas of the organisation where operations do not conform with the requirements of our quality�
system;
Provide a report to responsible management for action to be taken on correcting any non-conformance;�
Follow-up to ensure that corrective action has been effective;�
Identify possible improvements to the quality system;�
Maintain records of internal quality audits.�
Internal audits will be conducted by suitably trained personnel. The auditors will be independent from the areas
that they are auditing.
Refer Procedure: QP 3.16 Internal Quality Audits
Monitoring and Measurement of Processes
Processes affecting product quality will also be measured with data recorded and analysed on a regular basis.
Critical processes will have their capability measured and analysed as the starting initiative for improving their
performance.
Monitoring and measurement of Product
Ezi Cut Tree Services Pty Ltd monitors and measures the product (or service) to show that it continues to meet
stated requirements at specified points in the production (or delivery) process. Where product does not meet
specifications, correctives action will be identified and carried out. This will be followed up to ensure the problem
does not recur. The person releasing the product for delivery to the customer will be indicated on the test
records.
Control of Non-conforming Product
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0015
PolicyControl of Non-conforming Product
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Non-conforming Product
PurposeThe purpose of this policy is to explain the general procedures relating to Control of Non-conforming Product
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureIn order to ensure that non-conforming product does not reach our customers, Ezi Cut Tree Services Pty Ltd will
implement a procedure to control any of our product or processes which are assessed as not conforming to
specified requirements.
When a non-conformance is identified we shall:
Act promptly to evaluate the effect of the non-conformance;�
Mark the product with its status;�
Segregate the product if necessary;�
Determine what shall be done to correct the non-conformance;�
Take action to correct the non-conformance;�
Document the process.�
Refer procedure: QP 3.17 Control of Non Conformances
Analysis of Data
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0016
PolicyAnalysis of Data
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Analysis of Data
PurposeThe purpose of this policy is to explain the general procedures relating to Analysis of Data
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureEzi Cut Tree Services Pty Ltd identifies where data can be collected to demonstrate the effectiveness of the
system in enhancing customer satisfaction and meeting statutory and regulatory requirements. The data will be
collected, analysed and evaluated to demonstrate continual improvements made in the system.
Data includes measurements made as part of monitoring processes and from other relevant sources.
The analysis of data will include information on:
Customer satisfaction�
Product conformity�
Details and trends of processes including opportunities for preventive action.�
Supplier information�
Refer procedure: QP 3.18 Data Analysis
Improvement
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0017
PolicyImprovement
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Improvement.
PurposeThe purpose of this policy is to explain the general procedures relating to Corrective and Preventive Action
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureContinual Improvement
Ezi Cut Tree Services Pty Ltd will continually improve the effectiveness of the quality management system
through the use of the Quality Policy, quality objectives, audit results, analysis of data, corrective and preventive
actions and management review.
In the event of a non-conformance, Ezi Cut Tree Services Pty Ltd will implement our procedure to take corrective
and preventive action which is designed to eliminate the chance of a similar event in the future.
Corrective Action
We will:
ensure that reports from our customers of non-conforming product or service are dealt with promptly and�
effectively to the satisfaction of ourselves and the customer;
investigate the causes of the non-conforming product;�
decide how to correct the causes of non-conformance;�
follow-up to ensure that corrective action is effective;�
keep records of the corrective action process;�
refer corrective action for management review.�
Preventive Action
We will:
analyse all information available to detect possible future non-conformances;�
decide how to prevent the problem occurring;�
take action to prevent the problem occurring and follow-up to ensure the action was effective;�
identify possible improvements to the quality system which will avert potential problems;�
keep records of the preventive action process;�
refer preventive action for management review.�
Corrective and preventive action investigations will be conducted by authorised personnel.
Refer Procedure: QP 3.19 Corrective and Preventive Action
Ezi Cut Tree Services Pty Ltd
Quality Procedures
Quality Management System 1
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0018
PolicyQuality Management System 1
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Quality Management System 1
PurposeThe aim of this procedure is to define how the quality system of Ezi Cut Tree Services Pty Ltd is documented.
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureQuality Policy
Our CEO/Managing Director/General Manager of Ezi Cut Tree Services Pty Ltd is responsible for defining our
Quality Policy which is a statement of our company's commitment to meeting customer requirement, delivering
quality products and the continuous improvement of our quality management system effectiveness and business
performance. The Quality Policy will state our quality objectives that will be in line with other strategies and
objectives for management of the company as a strong, vital organisation. The Quality Policy will be distributed
throughout the organisation, displayed at prominent locations and we will ensure that all staff are aware of its
aims through quality awareness training. The policy will be reviewed annually by the CEO/Managing
Director/General Manager to ensure that it continues to be relevant and effective.
Quality Manual
The Quality Manual is prepared by our Quality Representative/Quality Manager and is issued with the approval
of the CEO/Managing Director/General Manager. It is a controlled document and is issued in accordance with QP
3.2: "Document and Data Control''. The Quality Manual is an overview of what we will do to meet the
requirements of ISO 9001:2008 and lists which procedures within our system are relevant to each element of the
standard.
Quality Procedures
Our Quality Procedures are prepared and issued by the Quality Representative/Quality Manager in consultation
with Department Managers and are controlled documents in accordance with QP 3.2: "Document and Data
Control''. Quality Procedures describe in detail how we will satisfy the requirements of ISO 9001:2008 and they
will include an aim, scope, list of references, responsibilities, method and records. Quality Procedures may be
reviewed at any time to reflect a change in circumstances or improvements to the system, but in any case they
will be reviewed annually.
Quality Work Instructions/Forms
Work Instructions and Forms are prepared and issued by the Quality Representative/Quality Manager in
conjunction with Department Managers and are controlled documents in accordance with QP 3.2: "Document
and Data Control". They detail the necessary steps for each quality-related activity in logical sequence so that the
activities can be consistently repeated to the standard required in the procedures. Work Instructions will include
an aim, scope, list of references, responsibilities, method and records. Work Instructions and Forms will be
reviewed and updated as necessary to reflect changing circumstances in order to accurately describe each task.
Quality Plans (including Continuous Improvement Projects)
Quality Plans are prepared and issued by the person in charge of the specific project (which is the subject of the
plan), in consultation with the Quality Representative/Quality Manager. They are controlled documents in
accordance with QP 3.2: "Document and Data Control''. Quality plans outline the particular actions and
considerations that may be needed for a particular project, contract, process or customer and they are only
relevant for the duration of that specific event.
Quality Plans will refer to existing Procedures and Work Instructions but will also address:
Whether any special controls, processes, equipment, resources or skills will be needed for the project;�
Ensuring that all the processes will be in accordance with relevant procedures;�
Ensuring that suitable inspection and testing techniques either exist or can be developed for the project.�
Where new techniques must be acquired, the plan will ensure that they can be developed in time;
Checking and verification procedures to be completed at the appropriate stages in the project;�
Standards of acceptability must be clearly understood;�
Preparation of appropriate quality records which will be maintained as part of the project.�
We will maintain documented Quality Plans as a quality record�
Document & Data Control
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0019
PolicyDocument & Data Control
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Document & Data Control
PurposeThe aim of this procedure is to ensure that only current revisions of quality documents and data are available for
reference and that they are suitably authorised and issued.
ScopeThis procedure applies to controlled documents (including data) in the quality system, including:
Quality Manual;�
Quality Procedures;�
Quality Work Instructions and forms;�
Quality Plans;�
International and local standards;�
Government regulations;�
Equipment operating manuals;�
Design drawings, layout plans and manufacturing drawings;�
(Specify others as appropriate).�
References
ISO 9001:2008 Clause 4.2.3
Quality Manual – Section 3.2 Document and Data Control
Form F5.6 – Document Control Master List
Responsibilty
Quality Representative/Quality Manager Issuing documentation, maintaining master list.
All staff Updating their documents with new issues.
ProcedureInternal Quality Documents
The internal quality documents listed above will be marked with a title, issuing authority, revision number and
date of issue.
Quality Procedures will each be given the Prefix of "QP", a number (relating to the relevant part of ISO 9001:2008
and, if necessary, a subordinate number if there are several procedures relating to the same part of the
standard).
Specific Safety Procedures will each be given the Prefix of "SP" followed by a number, as per Ezi Cut Tree Services
Pty Ltd Safety, Health and Environment Manual Procedures.
Specific Environment Procedures will each be given the prefix of "EP" followed by a number. In addition:
Work instructions will be similarly numbered using "WI" as the prefix.�
Forms will be similarly numbered using "F" as the prefix.�
Quality Plans will be numbered using "P" as the prefix.�
Schedules will be similarly numbered using "SCH" as the prefix.�
External Quality Documents
The external quality documents listed in the scope above will be identified by Ezi Cut Tree Services Pty Ltd with a
title, revision number (or some other means of determining revision status) and date of issue.
Issuing Quality Documents
All quality documents will be issued by the Quality Representative/Quality Manager after checking that they have
the appropriate authorisation. They will be issued to appropriate persons according to the need for relevant
instructions to be available where they will assist the effectiveness of the quality system.
A master copy of quality documents will be kept by the Quality Representative/Quality Manager and will be
available as a reference to all staff. Each copy of the document will be stamped with a "controlled" stamp and
given a "copy number'' so that they can be identified later.
Superseded or obsolete documents will normally be destroyed by the original holder, but where there is a need
to retain these documents for legal reasons or retention of knowledge, they will be marked "Superseded" and
only used for reference and not as part of normal quality processes.
Copies of quality documents may be issued to persons outside the company with the Quality
Representative/Quality Manager's approval but they will be stamped "uncontrolled" and will not be included in
the master list described below.
Documents will only be changed and updated by the original authoriser (or person holding that position).
Control of Quality Records
The Quality Representative/Quality Manager will maintain a master list of documents (Form F5.6) indicating the
holder of each document, the copy number, the revision number and the date issued.
Electronic Data
Documents and data kept in electronic form will be backed-up each day or week by the IT Manager and a copy of
the backup kept off site for security reasons.
Document Control Example
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0020
PolicyDocument Control Example
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Document Control Example
PurposeTo specify the processes required to:
control those documents needed to ensure the effective planning, operation and control of Ezi Cut Tree�
Services Pty Ltd’s processes; and
to prevent the use, intended or unintended, of documents that are obsolete or have not been authorised.�
ScopeThis procedure applies to all documents needed to ensure the effective planning, operation and control of Ezi
Cut Tree Services Pty Ltd’s processes. In most cases this will be written procedures and work instructions
required for staff to carry out their activities. However, other documents (e.g. plans, drawings, reports) are also
needed to comply with this procedure. More detail is provided at the end of this procedure.
Individual working documents, where these documents are not to be used by or made available to other
individuals or are not required for the effective operation of the Company, do not need to comply with this
procedure.
Definitions
Controlled Copy — An authorised copy of a document. This copy has the same authenticity as the original.
Uncontrolled Copy — A copy of a document that has not been authorised and has no authenticity.
NOTE: Uncontrolled copies have no status since they could have had unauthorised changes made or not be the
latest version.
REFERENCES - ISO 9001:2008 Clause 4.2.3
Procedure1. It is the responsibility of each section manager to identify those documents that need to comply with this
procedure in order to meet this procedure’s objective.
2. All staff are to be advised of the location of the controlled copies of documents. Staff are to be encouraged to
use controlled copies rather than uncontrolled copies (e.g. printed versions of electronic documents that are
kept on hand for convenience).
3. Where printed copies of electronic documents are used it is the responsibility of managers to ensure these are
the latest, authorised versions.
4. For electronic documents, IT procedures (e.g. backups) are required to ensure the documents are adequately
maintained, cannot be changed and are readily available. As far as possible only a single copy of the electronic
file is to be kept. Where, for practical reasons, more than one electronic copy is kept then managers must ensure
these are controlled copies.
5. For documents that only exist in hard copy, these documents shall be identified, their location advised to staff,
stored so they don’t deteriorate or are lost, and are readily available to those staff that need access to the
document.
6. Where a new version of a document is released, it is the responsibility of the author (for internally generated
documents) or other delegated staff member to remove the previous version. Where this earlier version is
required for archival purposes (e.g. the previous annual report) the document shall be clearly identified as
archival (i.e. not current) and preferably filed in a separate location (i.e. to avoid unintended use).
7. Before release, each document must be approved by the appropriate, delegated manager. Evidence of this
approval must be available.
8. A list of those individuals responsible for approving documents is to be maintained.
9. When approving documents for release, managers shall indicate whether the document is to be reviewed and
updated and, if so, by when and by whom.
10. Where electronic documents are to be circulated widely, it would be appropriate to use .pdf versions rather
than Word documents. This avoids the potential for unauthorised changes.
11. Documents (electronic or hard copy) are to include Version details (see below), the name or initials of the
author, and any archiving requirements.
Version control
The objective of version control is to avoid the unintended (or intended) use of obsolete or unauthorised
documents.
1. Each document must clearly identify the Version number and the date of drafting and, where appropriate, the
date of authorisation. (Dates and Version numbers are most commonly placed in a header or footer.)
2. Version numbers shall start at 1.0. Whole numbers (2.0, 3.0 etc.) are to be used for major revisions, and
decimals (1.1, 1.2, 1.3 etc.) for minor revisions.
3. Where the document is a draft (i.e. it has not yet been authorised for use) then the word DRAFT is to be part
of the Version number. There may be more than one version of a draft.
4. When the document is authorised and released then the Version number reverts to the next appropriate
number in sequence. For example, DRAFT Version 4.2 may, when authorised, become Version 3.2 – the next
number in the sequence.
5. The date shall clearly identify the date of drafting and, where appropriate, the date of authorisation. The MS
Word field code <date> should not be used since it updates each time the document is loaded and therefore
does not indicate the true date of drafting.
6. Documents that are un-controlled copies are to be clearly marked as uncontrolled (e.g. when using an
electronic file centrally located it is often marked ‘Uncontrolled when downloaded or printed’).
Archiving
Managers are to establish archiving polices and rules for documents relevant to their section. In developing these
rules applicable external requirements (e.g. Federal Government Archives Act) need to be taken into account.
Records
Records required by this procedure:
List of controlled documents, their title, version number (if appropriate), location, and the manager�
responsible for that document.
Examples of Documents Subject to this Procedure
For Ezi Cut Tree Services Pty Ltd ‘Documents needed by the organization to ensure the effective planning,
operation and control of its processes’ include, but are not necessarily limited to:
Policies�
Procedures developed for the control of processes (including check lists and flow charts).�
Work instructions that describe how to do a task.�
Planning documents (e.g. strategic plan, work plans, measurement and test plans).�
Reports (and/or statistical summaries) to senior management, the Board and external stakeholders.�
Marketing and promotional documents.�
All pages on the web site.�
Forms.�
HR documents (e.g. enterprise agreement, position descriptions)�
Administrative circulars.�
Templates and/or proforma documents such as letters or contracts.�
Organisational charts.�
Control of Critical Records
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0021
PolicyControl of Critical Records
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Critical Records
PurposeThe aim of this procedure is to ensure that records that verify quality and business activities of Ezi Cut Tree
Services Pty Ltd are collected and maintained for a suitable period.
ScopeThis procedure applies to the identification, collection, indexing, accessing, filing, storage, maintenance and
disposal of records listed below under Method.
References
Quality Manual – Quality Management�
Schedule SCH6.1 – Document Retention Schedule�
Form F5.18 – Archive Register�
Responsibilities
All staff Collection of records
Clerical staff Collection, indexing, accessing, filing, storage,
maintenance and disposal of records, completing
Archive Register
Quality Representative/Quality Manager Determination of suitable retention periods
ProcedureThe following documents will be kept as quality records:
Minutes of Management Review Meetings QP 3.4: Management Responsibility
Quality objectives and plans QP 3.4: Management Responsibility
Project-specific Quality Plans QP 3.1: Quality System
Inquiry log QP 3.6: Customer-related process
Customer correspondence, orders,
amendments
QP 3.6:Customer-related process
Tender submissions QP 3.6: Customer-related process
Contract Review QP 3.6: Customer-related process
Design Plans QP 3.7: Design and Development management
Drawing Register QP 3.7: Design and Development Management
Design reviews QP 3.7: Design and Development Management
Design outputs (calcs, tests, drawings,
models)
QP 3.7: Design and development Management
Computer models, files and simulations QP 3.7: Design and development management
Operating manuals resulting from design QP 3.7: Design and development management
Master List of Quality Documents issued QP 3.2: Document and Data Control
Supplier evaluations QP 3.8: Critical Purchasing
Requisitions QP 3.8: Critical Purchasing
Purchase orders QP 3.8: Critical Purchasing
Delivery Dockets QP 3.13: Control of customer property
Job Number Register QP 3.12: Product ID and Traceability
Batch or Serial Number register QP 3.12: Product ID and Traceability
Job Sequence Sheets QP 3.9 : Process Control
Records of special qualifications of workers QP3.5: Control of production and services
Records of special qualifications of
equipment
QP .3.9: Control of production and services
Inspection and Test Plans QP 3.11: Monitoring and measurement
Goods Received Advice QP 3.11:Monitoring and measurement Inspection and
Test
Calibration Record QP 3.15: Inspection, Measuring and Test
Purchase records for testing equipment QP 3.15: Inspection, Measuring and Test
Certificates for calibration masters QP 3.15: Inspection, Measuring and Test
Monthly NCR Report to Managers QP 3.17: Non-conforming Product
Non-conformance Reports QP 3.17: Non-conforming Product
Computer records of stock issued from Store QP 3.12: Preservation and Handling of Product
Copies of Delivery Advice/Transmittal Sheet QP 3.12: Preservation and Handling of Product
Archive Register QP 3.3: Control of Critical Records
Internal Audit Schedule QP 3.16: Internal Quality Audits
Internal Audit Reports QP 3.16: Internal Quality Audits
Job Descriptions QP 3.5: Human Resources Management
Employment Application Forms QP 3.5: Human Resources Management
Training Records QP 3.5: Human Resources Management
Annual and mid-year Performance Review QP 3.5: Human Resources Management
Service Schedules QP 3.9: Servicing Procedure
Service Reports QP 3.9: Servicing Procedure
Product performance analysis QP 3.18: Analysis Techniques
Indexing, Accessing, Filing, Storage and Maintenance
Records listed above will generally make reference to a job number and be filed with other documents relating to
that job. Alternatively they will be filed in the Department which actions them. All quality records will be stored
and maintained in a way that will protect them from theft, loss or deterioration. These records will be legible and
accessible.
Disposal of Records
Documents which are no longer required for daily use may be archived and the details recorded on Form F6.18
"Archive Register''.
The Quality Representative/Quality Manager will prepare a schedule (SCH 6.1"Document Retention Schedule''),
which states the statutory period that documents must be retained before they may be destroyed.
Records that are retained at the request of a customer must not be destroyed without the approval of the
customer.
Records
The following documents will be kept as quality records:
Archive Register (Form F5.18).
Control of Quality Records
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0022
PolicyControl of Quality Records
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Records
PurposeSpecifies the requirements for records needed to provide evidence of the effective operation of the management
system.
ScopeThis procedure applies to all records needed to provide evidence of results achieved or activities performed as
part of the operation of the quality management system. Some examples of records that may be needed are
listed at the end of this procedure.
Individual copies of records, where these records are not to be used by or are not required as an official record of
the operations of Ezi Cut Tree Services Pty Ltd, do not need to comply with this procedure.
Most financial records are outside of the QMS since they are required to meet other requirements such as
Accounting Standards and Government reporting.
References
ISO 9001:2008 Clause 4.2.4 applies�
Definitions
Record—a document stating results achieved or providing evidence of activities performed
Procedure1. It is the responsibility of each section manager to identify those records that need to comply with this
procedure in order to meet this procedure’s objective. Many procedures provide details of the records
generated by that procedure.
2. Managers are responsible for identifying the retention time and disposal method of records. These
requirements will take into account Government and statutory requirements.
3. The table at the end of this procedure lists those records that ISO 9001 specifies must be maintained in order
to claim compliance with the standard. Our senior managers will allocate responsibilities for collection and
storage of these records.
4. Each section will develop a schedule of records. This schedule will contain, at least the following:
Title of the record�
Responsibility for filing�
Location�
Retention time�
Disposal action�
Restricted access or distribution (privacy concerns)�
This schedule can be in electronic or paper form�
5. Senior management are to ensure that staff are aware of their responsibilities with regard to records,
including the nature and use of the filing systems and the release of documents.
6. All records are to be identified as to purpose and date. Identification is usually an intrinsic part of the record
(e.g. headings on a form, activity recorded and date of action) but where there is doubt then some form of
annotation should be used. Records do not require version control since they are not subject to change.
7. All records are to be filed in a systematic way so that they are readily accessible to staff and auditors.
8. Records are to be stored under conditions that prevent the degradation, legibility or premature
loss/destruction of the record.
9. For electronic records, appropriate IT procedures (e.g. backups) have been implemented to ensure the
documents are adequately maintained and are readily available. The IT section can provide details of how to gain
access to records that have been accidentally deleted.
10. As far as possible, only a single copy of a record will be kept. Where, for practical reasons, more than one
copy is needed then managers need to identify which copy is the 'official' version. Where multiple copies are
required it may be advisable to note where the additional copies are filed.
11. Records are to be readily retrievable by the staff that have authorised access to the record.
12. Managers will identify those records that require restricted access for privacy and confidentiality reasons
(e.g. personnel records).
13. Policies, procedures and appropriate IT systems are to be established at the Executive and section level to
prevent the unauthorised release of confidential or private information.
Records required by the standard
The following records are required to be kept:
Clause Record required Section
Management review
5.6.1
Management reviews of operations and the QMS Executive/ Quality
manager
Competence, awareness and
training
6.2.2
Education, training, skills and experience of staff. HR
Planning of product
realization 7.1 (d)
Evidence that the processes used in developing
products and services, and the resulting product or
service meets requirements
All applicable sections
Review of requirements
related to the product
7.2.2
Results of the review of requirements (prior to
supply) related to the product or service and actions
arising from the review
All sections
Design and development
inputs 7.3.2
Design and development inputs relating to product
requirements
All applicable sections
Design and development
review 7.3.4
Results of design and development reviews and any
necessary actions
All applicable sections
Design and development
verification
7.3.5
Results of design and development verification and
any necessary actions
All applicable sections
Design and development
validation
7.3.6
Results of design and development validation and
any necessary actions
All applicable sections
Control of design and
development changes
7.3.7
Results of the review of design and development
changes and any necessary actions
All applicable sections
Purchasing process
7.4.1
Results of supplier (for purchases of physical
products and services) evaluations and any
necessary actions arising from the evaluations
Purchasing section
Validation of processes for
production and service
provision 7.5.2 (d)
As required by the organization to demonstrate the
validation of processes where the resulting output
cannot be verified by subsequent monitoring or
measurement
All sections
Identification and
traceability 7.5.3
The unique identification of the product (e.g. a
course or publication), where traceability is a
requirement
All applicable sections
Customer property
7.5.4
Customer property that is lost, damaged or
otherwise found to be unsuitable for use
All applicable sections
Control of monitoring and
measuring devices
7.6
Basis used for calibration or verification of measuring
equipment where no international or national
measurement standards exist
All applicable sections
Internal audit
8.2.2
Internal audit results and follow-up actions Executive/ Quality
manager
Monitoring and
measurement of product
8.2.4
Indication of the person(s) authorizing release of
product.
All applicable sections
Control of nonconforming
product
8.3
Nature of the product nonconformities and any
subsequent actions taken, including concessions
obtained
Executive/ Quality
manager
Corrective action
8.5.2
Results of corrective action Executive/ Quality
manager
Preventive action
8.5.3
Results of preventive action Executive/ Quality
manager
The required records are to be included in the records schedule of those sections responsible for the records.
Explanatory Note
Examples of records
It is difficult to be definitive on the other types records to be kept, and in many cases it will be up to the section
to decide. Care needs to be taken to ensure that you do not start collecting records ‘because we might need it’ or
because ‘they may be wanted by an auditor’. Decide what is essential to providing evidence of product
conformity to requirements and evidence of conformity to the QMS and just retain those.
Legal requirements (e.g. contracts, sick leave, OH&S incidents).
Planning (e.g. summary statistics, Key Performance Indicators, previous plans).
Contractual (e.g. customer requirements, sales advice, deliverables).
Provision of products (e.g. dispatch records, measurement and test results).
Financial (e.g. orders, invoices).
Customer support and satisfaction (e.g. sales records, complaints, customer surveys).
Demonstrating conformity (e.g. with ISO 9001, with the QMS, with documented procedures and policies, with
product and service specifications).
Administration (e.g. general correspondence, training, HR).
Management Responsibility
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0023
PolicyManagement Responsibility
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Management Responsibility
PurposeThe aim of this procedure is to define the executive manager's quality responsibilities and those of other relevant
staff.
ScopeThis procedure applies to the executive manager of Ezi Cut Tree Services Pty Ltd and other nominated roles
within the company.
References
ISO 9001:200 - Clause 5�
Quality Manual – Section 5 Management Responsibility�
Quality Manual – Section 5 Organisation Chart�
Form F5.2– Management Review�
Responsibility
As listed in the method.
ProcedureOur CEO/Managing Director/General Manager is responsible for:
Establishing a vision, policies and strategic and measurable objectives consistent with the purpose of the�
Organisation Ezi Cut Tree Services Pty Ltd. Vision, policies and objectives shall be kept as quality records.
Leading the Ezi Cut Tree Services Pty Ltd by example;�
Communicating Ezi Cut Tree Services Pty Ltd direction, values and objectives regarding quality and the�
quality management system. Communication minutes shall be kept as quality records.
Participating in improvement projects, searching for new methods, solutions and products. Improvement�
projects minutes shall be kept as quality records obtaining feedback directly on the effectiveness and
efficiency of the quality management system, preparing and distributing our Quality Policy and ensuring that
our commitment to quality is understood and implemented by our staff. This policy will reflect the needs of
our external customers as well as colleagues within the company who are viewed as internal customers;
Allocating sufficient resources to meet objectives;�
Allocating responsibility for quality management to a member of the management team;�
Conducting a Quality Review meeting at regular intervals (three months) to ensure that the system is�
delivering the quality results that are specified in the Quality Policy. Minutes of this meeting will be kept as a
quality record.
Conducting half-yearly and annual management performance review with all of his/her managers to review
performance and implementation of quality objectives and plans. Minutes of performance reviewed shall be
maintained as quality records.
Our Quality Manager/Quality Representative is responsible for:
Ensuring that processes, procedures etc. needed for quality management system are established,�
implemented and maintained day-to-day management of the quality system;
Advising senior management on the performance of the system;�
Conducting training in quality awareness, quality analysis tools and techniques of quality improvement;�
Conducting internal quality audits;�
Monitoring and investigating non-conformances;�
Maintaining calibration of inspection and testing equipment;�
Preparing the minutes of the Management Review meeting (Form F5.2);�
Preparing and distributing quality system documentation;�
Preparing statistics and associated reporting;�
Communicate customer and statutory requirements throughout the organisation.�
Our Management Team is responsible for:
Developing actions for meeting the strategic direction, set objectives and business plans.�
Managing quality outcomes in their own departments;�
Seeking improvements to the quality management system wherever possible;�
Reviewing the quality performance of their departments investigating and remedying quality�
non-conformances on time and in full participating in the selection of staff for their department and ensuring
that suitably qualified staff are selected;
Seeing that the training needs of their staff are met as planned in the annual training plans, Minutes of staff�
performance reviews, training skill matrix and department quality annual plans developed to meet
organisation quality objectives, shall be maintained as quality records.
Our Supervisors are responsible for:
Implementing the quality system requirements on a day-to-day basis;�
Training staff in work skills;�
Taking corrective and preventive action.�
Initiate and participate in continuous improvement activities with their staff.�
All staff are responsible for:
Making themselves aware of the company's quality objectives; values and policies�
Understanding their role in achieving quality outcomes;�
Acting in a manner consistent with quality procedures;�
Recommending possible improvements to the quality system;�
Considering the needs of their 'internal' customers.�
Participating in Continuous Improvement projects set by their supervisors/managers or own initiative�
Resource Management
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0024
PolicyResource Management
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Resource Management
PurposeThe aim of this procedure is to ensure that everyone who performs duties that has an impact on the quality of
our output to customers (both internal and external) will have suitable skills and conditions of work to
consistently carry out these tasks at the level required.
ScopeThis procedure covers our Resources Management including:
Training activities throughout all departments of Ezi Cut Tree Services Pty Ltd and across all categories of�
employees.
Rectification of substandard conditions at work.�
References
ISO 9001: 2008 Clause 6�
Quality Manual – Section 6 Resources Management�
Form F5.20 – Job Descriptions�
Form F5.21 – Employment Application Form�
Form F5.22 – Performance Review�
Form F5.23 – Training Record�
Responsibilities
Department Managers Prepare Job Descriptions conduct workplace inspections,
correct substandard conditions of work
HR Manager/HR Department Recruitment of personnel, maintenance of records
Training Manager/HR Manager Conduct initial skills audit, arrange training.
ProcedureHuman Resources Management
1. Job Descriptions
For each position within the company we maintain a current job description outlining the minimum level of skills,
qualifications and aptitudes that are necessary to meet the requirements of the position.
2. Recruitment
Each external applicant for a position within Ezi Cut Tree Services Pty Ltd will be required to complete an
Employment Application Form and only candidates whose skills, qualifications and aptitudes match the relevant
job description will be considered for the position.
Internal candidates must also have appropriate skills, qualifications and aptitudes that match the job description
for the position being considered.
3. Induction
Upon commencement, new employees will receive induction training from the Training Manager/HR
Manager/HR Department to introduce them to the company, our systems and procedures and as a general
orientation to their workplace. Details of induction completed will be included in each employee's "Training
Record'' (Form F1804).
4. Training
The Training Manager/HR Manager/HR Department shall conduct an initial skills audit of each position, in
consultation with Department Managers. This audit will confirm the skills required for each position (as
expressed in relevant job descriptions) and will map the existing skills of staff in each department.
Where a "gap'' is identified between required and existing skill levels, the Training Manager will source
appropriate training (either internal or external to Ezi Cut Tree Services Pty Ltd) and the Department Manager
shall prioritise and schedule the training within a reasonable time frame.
Records of skills training and quality awareness training undertaken shall be maintained in the staff members' HR
record or Department Managers files.
5. Performance Review
Subsequent annual performance reviews shall reflect the updated training history of each staff member and
potentially identify new training needs.
6. Records
We will keep the following documents as quality records:
Job Descriptions (Form F5.20);�
Skill records via Employment Application Form (Form F5.21);�
Annual Performance Review (Form F5.22);�
Training Records (Form F5.23).�
Workplace infrastructure and work environment management�
Workplace/workstation inspections�
Hazard reporting records�
7. Workplace inspections
Supervisors and staff will inspect at the beginning of each day the working conditions of their work stations and
report any substandard condition to their supervisor/manager.
8. Department Managers
Upon receiving a report of a substandard condition, the department manager will ensure that this condition is
assessed and rectified. If the substandard condition affects the product quality of the employee's safety, or could
cause damage to the environment, the job performance will stop immediately and the condition will be rectified.
Customer Related Processes
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0025
PolicyCustomer Related Processes
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Customer Related Processes
PurposeThe aim of this procedure is to ensure that specific to a particular product, Ezi Cut Tree Services Pty Ltd has a
clear understanding of customer and any applicable statutory requirements, that we can meet these
expectations, that we check all orders before proceeding and that we react appropriately if contract or order
requirements are changing.
ScopeThis procedure applies to all customer inquiries for our products or services, quotations, tenders, orders,
contract negotiations and regular communication with customers.
References
ISO 9001: 2008 Clause 7.2�
Quality Manual – Section 7.2 Customer related Processes�
QP 3.6: Customer Related processes�
Form F5.2– Contract Review Form�
Form F5.3 – Enquiry Log�
Responsibility
Sales Manager Managing the contract review process and the continuous communication with
customers, authorised to sign contracts under $ XX XXX
Sales staff Receiving inquiries, preparing tender documents, processing orders and contracts,
authorised to accept orders under $ XX XXX
Reception staff Forwarding inquiries to the sales department
Quality Manager Ongoing communication of customer requirements to the organisation, monitoring
customer complaint actions and providing feedback to Sales department
ProcedureCustomer Inquiries
On receipt of a telephone inquiry from a customer, our receptionist will transfer the call to a member of sales
staff for handling. If this is not possible, the receptionist will take details of the caller's name, company,
telephone number and the nature of the enquiry, and pass on the details to sales staff team when available. In
any case, the call should be returned within 24 hours.
Sales staff will also handle written enquiries within 24 hours of receipt.
In handling an enquiry, sales staff will ascertain the customer's requirements by writing the details in their
"Enquiry Log'' (Form F302). When we can clearly comply with the customer's needs by supplying a standard
product that is currently in stock, we will proceed by faxing our Terms and Conditions of Sale to the customer
and requesting an order to confirm.
Where we can't satisfy the customer's requirements with a standard product, the sales staff will commence the
'Contract Review' process outlined below.
Orders
Once an order is received it will be reviewed again by sales staff to ensure:
We have the items in stock, or they can be produced within the time-frame given;�
Our product matches the customer's specifications; there are no contradictions of these requirements with�
applicable regulatory or company standards for the product ordered;
The customer's Terms of Payment are agreeable and match our Terms and Conditions of Sale;�
If the customer is not a regular customer, the sales staff will initiate customer credit approval as per the level�
of authority.
If the above items are acceptable, sales staff will confirm with the customer that the order is accepted and pass it
on to Operations Department for the order to be filled.
If any of the above items are unacceptable, the Sales Manager will negotiate the necessary changes or advise the
customer that we cannot accept the order.
Tenders
The Sales Manager will determine which tenders will be submitted after review of tender specifications supplied
by the potential customer. A 'Contract Review' will be completed as described below to ensure that we can meet
the specifications outlined.
If we cannot meet the specifications, a "non-conforming bid" may be submitted at the discretion of the Sales
Manager.
Our tender will be submitted on or before the due date in the format requested by the customer. It will clearly
state if there are any exclusions from the customer's specifications.
Contracts
If a tender is successful, or we are offered a contract for another reason, we will complete the "Contract Review''
Form (form F5.2) to ensure that the terms of the contract are agreeable before proceeding. This will ensure:
The customer's specifications haven't changed from the tender or can still be met;�
We can deliver within the time-frame given;�
Contractual terms are within acceptable corporate guidelines;�
Payment terms are acceptable.�
If the above items are acceptable, sales staff will confirm with the customer that the contract is accepted and it
will be signed by the relevant signatory, subject to the limits of authority requirements for Ezi Cut Tree Services
Pty Ltd. The contract will then be passed on to Operations Department for the contract to be executed.
If any of the above items are unacceptable, the Sales Manager will negotiate the necessary changes within
his/her authority limits.
Contract Review Process
The contract review process will be conducted:
When the customer's requirements are not clearly understood;�
Prior to acceptance of an order for non-standard product;�
Prior to submission of a tender;�
Prior to signing a contract.�
The "Contract Review'' Form (F 5.2) will be completed by sales staff and reviewed by the Sales Manager or�
Marketing Manager. The first part of the form guides us through the process of determining whether we can
deliver to the customer's requirements.
What is the customer seeking?�
Are there any special requirements e.g. standards to be met, design required, special materials, special�
processes, acceptance criteria, customer inspection, delivery schedules, servicing requirements, safety or
environmental considerations?
Can we meet all these special requirements?�
Do we have sufficient resources (financial, people and materials) to complete the contract?�
Can we complete the contract in the time available?�
The second part of the form considers the commercial issues of a contract:
What are the contractual requirements?�
What liabilities are inherent in the contract?�
Is the project commercially rewarding at an acceptable level of risk?�
Are the payment terms acceptable?�
Is the credit risk of the intended customer at an acceptable level?�
At the completion of the Contract Review process a decision is made by the Sales Manager (contracts or orders
under $ XXX XXX) on whether or not we should continue with the tender, order or contract. This will usually be
undertaken in consultation with the Operations personnel and other members of the management team.
On agreement, a copy of the customer's requirements (via the order or contract) will be allocated a job number
according to QP 3.12: Product ID and Traceability. A file will also be created and passed to the Operations
Department who will carry out the work.
Contract Changes
If a customer advises Ezi Cut Tree Services Pty Ltd of changes to the contract after the agreement, it may be
necessary to conduct another Contract Review. The amendments can be accepted at the Sales Manager's
discretion depending on the magnitude of the changes and his/her authority limits. If the contract amendment is
accepted the relevant operational staff will be given a copy of the new requirements for implementation.
Records
We shall keep the following documents in the Sales Department as quality records:
Inquiry log (Form F5.3)�
Quotations�
Tender submissions�
Customer orders and/or amendments�
Contract review (Form F 5.2)�
Design and Development Management
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0026
PolicyDesign and Development Management
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Design and Development Management
PurposeThe aim of this procedure is to ensure that design and development processes undertaken by Ezi Cut Tree
Services Pty Ltd produce an outcome that meets the specified requirements of the design. Company has
guidelines for all employees regarding Design and Development Management
ScopeThis procedure relates to all design and development activities conducted by Ezi Cut Tree Services Pty Ltd.
References
ISO 9001: 2008 Clause 7.3�
Quality Manual – Section 7.3 Product Design and Development�
QP 3.7: Design and Development Management�
Form F 5.4 – Design Plan�
Responsibilities
Sales Manager Communicate customer requirements to the organisation and maintain ongoing
communication with the customer on design development progress
Operations Manager Establish Quality plan, determine the need or design activities, appoint project
leader
Design Engineer/Manager Plan, implement and test the design process
ProcedureWhere a contract or order contains a design and development component we will implement the following
process:
Customer requirements - communicated and understood
The Sales Manager will initiate the process by communicating customer requirements to Operations Manager
and Design Engineer/Manager. Unless these requirements are very clear and understood, we will not progress to
the design and development stage.
When customer requirements are understood:
Quality Planning - planning the design and development
The Operations Manager will develop a Quality Plan and schedule activities for design, development and
implementation. Through the Sales Manager, the plan will be communicated to the customer to ensure his/her
approval.
Design Plan
Our Design Engineer/Manager will continue the process by completing form F5.4 "Design Plan''. The form is used
in conjunction with any documentation that specifies the customer's requirements - for example, an order or
contract. This procedure will determine what the customer requires of the design, which is a critical step in
ensuring that these requirements are understood and satisfied. The Design Plan will also outline each of the
stages in the design process, who is responsible for them, what resources they will need and what other inputs
apply in relation to standard design codes. Only suitably qualified personnel will be assigned to design tasks. The
Design Plan will include the results of consultation with other participating departments.
The Design Plan will outline the acceptance criteria that will determine the suitability of the product for its
intended purpose. It will also be reviewed and updated where necessary during the design process to account for
any changes in customer requirements.
The Design Process
The results of our design will be documented. We will review these results against the design inputs at
appropriate stages to ensure that the original design plan is still being maintained and is valid. These reviews will
be documented and will be conducted by the Design Engineer/Manager in consultation with the Production
Manager and other participating departments as appropriate.
Our design results will also specify any characteristics of the design which are critical to correct use of the
product or service being designed. In addition to the relevant design drawings and other technical design data,
an operating manual will be produced as an outcome of the design and will be reviewed and approved before it
is released.
Design and Development Example 2
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0027
PolicyDesign and Development Example 2
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Design and Development Example 2
PurposeThe objective of this procedure is to give increased confidence that the design and development of new products
or services:
Will meet customer (client) requirements;�
Are under control and meet management expectations;�
Will meet any regulatory requirements; and�
Will assist motivation of staff involved in the design and development activities.�
ScopeThis applies to all new products and services. The procedure will also be used as the basis for all planning
activities including the implementation of new or changed administrative or managerial functions and processes.
It should be noted that key stakeholders include staff, management and Board members.
References
ISO 9001:2008 Clause 7.3 applies�
Procedure1. The need for the new product, service or activity, and associated target dates and implementation plan,
should be clearly identified and approved by the appropriate manager.
2. The person responsible for developing the new initiative and the implementation plan (the Project Officer) will
be clearly identified.
3. The scope and requirements/specifications for the project will be clearly identified and recorded. This will also
be the scope for the project plan. The staff involved in planning the new product or service will also be identified.
4. The project plan will be developed and include the following components:
Timelines and reporting mechanisms including final sign off of the plan and the new product or service.�
Timelines will include reviewing the draft product with internal and external experts and validating that what
has been produced fits the specification.
The human, financial and physical resources required to develop and implement the new product or service.�
The specific lines of responsibilities and authority for human resources.�
Specify reporting mechanisms for all human resources.�
Internal and external customers (or stakeholders). This will enable us to consult with them during the�
development process.
Who is responsible for approving any changes to the plan or the specifications?�
A budget based on specifications and resources needed.�
5. The Project Officer will determine with senior management (the project sponsor) the final date for delivering
the completed product, service or initiative.
6. Once the plan has been approved by the appropriate senior manager adequate resources (human, financial,
physical) will be allocated to allow the design and development process to be carried out.
7. The design and development process will consist of the following steps:
Design inputs (what is wanted or what problem has to be solved?)�
Design outputs (what is the final product or service?)�
Review of the design progress (Are we on track?)�
Verification (a pre delivery check from the viewpoint of our company).�
Validation (a check by the customer that we have produced what is needed).�
A systematic approach to any changes made to the design.�
8. Determining the design inputs will consist of:
Talking to customers to make sure the new product is actually needed.�
Determining the actual specifications of the product or service (e.g. physical characteristics, performance).�
Enduring and regulatory requirements are met (e.g. OH&S/WHS&S).�
Resolution of any conflicting needs.�
Specifying what the final acceptance requirements are (e.g. cost, timeliness, shipping, etc.) so that the�
customer(s) are clear of minimum delivery outputs.
Records of the design inputs will be kept.
9. The design output will meet the specifications determined in the design input and will include:
A prototype of the product or service that can be tested (validated) by the customer.�
Information on the production of the final product, including any special purchasing or subcontracting�
requirements. This will include a production budget.
Any special regulatory requirements, including labelling.�
A user manual or other instructions for operation.�
10. During the design and development process, the appropriate manager will ensure that the design process is
on track. This review process will include ensuring the product and service being developed is actually meeting
customer’s requirements, and that the project is on time and on budget. Records will be kept.
11. At the end of the design process (or where there are specific modules) we will verify that the product actually
meets the customer’s specifications. This verification will be generally done by our staff (although not necessarily
those on the design team) prior to delivering the product to our customer.
12. Records will be kept. If it is found that we have not met the customer’s specifications we will modify the
design as required.
13. Once we have verified the design, we will ask the customer to validate what we have produced to make sure
it meets the specified needs. These needs are those that have been identified and agreed to at the beginning of
the process. Where the customer is not satisfied, the Project Sponsor will negotiate with the customer over what
action to take (e.g. accept the product, redevelop the product). Records will be kept.
Where it is necessary to change the design during the development process we will ensure that:
All changes are agreed to by the customer, the project sponsor and the design team.�
All changes are in accordance with change policy, are documented and signed off by the relevant manager.�
Appropriate adjustments are to be made to the budget and personnel.�
Records
The following records will be kept:
Design Inputs�
Design Reviews�
Verification of the design�
Validation of the design�
Design Changes�
Purchasing
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0028
PolicyPurchasing
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding purchasing
PurposeThe aim of this procedure is to ensure that those goods and services supplied to Ezi Cut Tree Services Pty Ltd to
be included in product supplied to our customers meet our specified requirements and, through us, the specified
requirements of our customers.
ScopeThis procedure applies to specific product related purchasing activities of Ezi Cut Tree Services Pty Ltd.
References
ISO 9001:2008 Clause 7.4�
Quality Manual – Section 7 Product Realisation�
Form F5.6 – Supplier/Subcontractor Evaluation�
Schedule SCH6.2 – Suppliers/Subcontractors Listing�
Form F5.7 – Purchase Order�
Form F5.8 – Requisition�
Responsibilities
Purchasing Officer Manager Authorises purchase orders over $ XXX XXX
Purchasing staff Supplier evaluations and authorises purchase orders less
than $ XXX XXX
ProcedureEvaluation of suppliers
Ezi Cut Tree Services Pty Ltd will ensure that, as far as possible, we purchase those goods and services to be
incorporated into specific products, from only those suppliers who have a quality system complying with ISO
9001: 2000 or ISO 9001:2008. This is designed to eliminate non-conforming product from entering our system.
However, in the absence of certified suppliers, we shall comply with the following supplier approval regime in the
placement of orders.
Note: After November 2010, certified suppliers must be certified to ISO 9001:2008.
We have categories to place our subcontractors into the following groups:
1.Approved
suppliers/subcontractors
Evaluated - System certified to ISO
9001: 2000 or equivalent
Orders may be placed
2 Reserve suppliers Evaluated - have quality system
but not certified to ISO 9001:2000
or equivalent
Orders may be placed with Purchasing
Manager's approval
3 Potential suppliers Not yet evaluated Orders may NOT be placed until
evaluated and approved
4 Unapproved suppliers Evaluated – not approved as
suppliers/subcontractors
Orders NOT to be placed
Suppliers are assessed by purchasing staff using Form F601 "Supplier/Subcontractor Evaluation'' and may only be
approved by the Purchasing Manager.
Re-evaluations will be conducted periodically and the category of a supplier/subcontractor may be changed as a
result. Schedule SCH6.2 will list the category of each supplier/subcontractor.
Placing Purchase Orders
Ezi Cut Tree Services Pty Ltd staff requiring the purchase of goods or services will complete Form F603
"Requisition'' which is to be approved by a Supervisor/Manager. The request must include clear details as to the
description of the items and any special characteristics or acceptance criteria of the product or service required
of our supplier. The requisition is forwarded to the Purchasing Department for action.
Staff will select a suitable supplier and place an order using Form F602 "Purchase Order''. The order will clearly
describe:
description of the goods (including part number if available) or service required;�
quantity;�
special characteristics of goods/services to be supplied;�
acceptance criteria and inspection requirements;�
date and method of delivery required;�
price and whether delivery charge is included or otherwise;�
commercial terms applicable.�
Verification
In appropriate circumstances we may ask to inspect the goods at the supplier's premises and if this is the case,
such a request will be specified in our purchase order. We will similarly arrange for our customer to inspect the
goods at the supplier's premises if the customer so requires.
Records
We will keep the following as quality records in the Purchasing Department:
Supplier/subcontractor evaluations (Form F5.6)
Requisitions (Form F5.8)
Purchase orders (Form F5.7)
Control of Production
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0029
PolicyControl of Production
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Production
PurposeThe aim of this procedure is to ensure that Ezi Cut Tree Services Pty Ltd controls the production and servicing
processes to produce a quality outcome each time they are performed.
ScopeThis procedure relates to the control of all production, installation and servicing activities of Ezi Cut Tree Services
Pty Ltd.
References
ISO 9001:2008 Clause 7.5.1�
Quality Manual – Section 7.5 Product Realisation�
Form F5.11 – Job Sequence Sheet�
Form F5.15– Calibration Record�
Responsibilities
Production Manager Ensuring that production resources are available and production
activities affecting quality are performed as per procedures and work
instructions
Service Manager Ensuring that service resources are available and service activities
affecting quality are performed as per procedures and work instructions
Production Supervisor Supervision of production processes
Production and Service Staff Implementing quality work instructions
All staff Adhering to work instructions and quality procedures
Procedure
Our system for monitoring and controlling our production and servicing processes will include:
Documenting the Process
Each separate process will be documented by our Production and Service Managers using FM F901 "Job
Sequence Sheet''. This Job Sequence Sheet will give the following details:
Job number – allocated according to QP 3.12: "Product Identification";�
Description of Job – brief details describing the task;�
Materials required – list of parts and the quantities required;�
Controlled copies of drawings to use in the process;�
Task sequence – listing the individual tasks (including any special processes) in their logical order to�
complete;
Hold-points for testing – which tests to conduct at which stage of the process;�
The acceptance criteria – to ensure during production or service that the product or service can be verified�
by a test or measurement as compliant to the contract requirements;
A reference to the applicable section in the Inspection and Test Plan that may be called upon for further�
information (for convenience);
A reference to the relevant work instructions that are applicable in the particular process.�
The supervisor of the job will receive the Job Sequence Sheet and nominate the start date. A copy of the Job
Sequence Sheet will also be sent to the store for preparation of the materials required.
Each person who has tasks to complete will sign the Job Sequence Sheet at the conclusion of each task. The
supervisor will monitor the process and sign the Job Sequence Sheet at the completion of the job.
Copies of relevant Work Instructions that explain the required standards of workmanship will be available for
reference in the work place.
Equipment and Environment
Our Production and Service Managers are responsible for ensuring that all necessary machinery to be used in the
process is available and working and that equipment required for inspection and testing is calibrated (according
to Form F5.15 "Calibration Record'').
A maintenance schedule will be used to ensure that equipment/machinery is kept in good working order.
The Supervisor is responsible for ensuring that the work environment is safe and appropriate for the work to be
completed and that all necessary safety equipment is available.
Special Processes
Where Ezi Cut Tree Services Pty Ltd has special processes (i.e. those which cannot be tested after completion),
the "Job Sequence Sheet'' will define them. Only prescribed equipment and personnel who are appropriately
qualified for the task will be allocated and complete the work. These special processes will be monitored during
the process to ensure compliance with specified requirements throughout the process.
Records
We will keep the following documents as quality records:
Job Sequence Sheets (Form F5.11);�
Equipment maintenance records;�
Records of special qualifications of workers;�
Equipment calibration records (Form F5.15);�
Records of special qualifications of equipment
Monitoring and Measurement
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0030
PolicyMonitoring and Measurement
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Monitoring and Measurement
PurposeThe aim of this procedure is to ensure that the products and product realisation processes of Ezi Cut Tree
Services Pty Ltd are monitored, measured and, if applicable, tested to verify that they meet specified
requirements.
ScopeThis procedure applies to:
a) inspection and testing activities for all of our products;
b) measurement of product realisation processes to ensure their continuous capability.
References
ISO 9001: 2008 Clause 8.2.3�
Quality Manual – Section 8.2 Measurement, Analysis and Improvement�
Form F5.12 – Monitoring and Test Plan�
Form F5.13 – Goods Received Advice�
Form F5.11 – Job Sequence Sheet�
Form F5.14 – Final Inspection and Test�
QP 3.15: Control of Measuring Equipment�
QP 3.11: Monitoring and Measurement Status�
QP 3.17: Control of Non-conformances�
Responsibilities
Operations Manager Preparation of Inspection and Test Plans
Stores staff Completing Goods Received Advice
Production staff Completing Production Inspection and Test and Final Inspection and Test
Production supervisors Ensuring compliance with Inspection and Test Plans
ProcedureInspection and Test Plans
In relation to our standard product lines we will follow the procedure below for regular inspection and testing.
However, in relation to specific projects, production runs or contracts for service, it will be necessary to complete
a "Monitoring and Test Plan'' (Form F5.12) prior to the commencement of the project/production run/contract.
The "Inspection and Test Plan'' will be completed by the person responsible for the project and will have due
regard to any special considerations relating to inspection and testing on that job. The person responsible for the
job will also ensure that checking of the plan, at regular intervals, is being implemented.
Receiving inspection and testing
We shall ensure that goods received are not used in production until they have passed initial inspection by
placing them into an area marked "Goods Receivable Area" until inspected. The only exception is that
un-inspected goods may be released urgently for production on the authority of the Production Manager,
providing that the Job Sequence Sheet identifies these items and they can be verified at the earliest possible
time.
Stores staff will complete Form F5.13 "Goods Received Advice'' to verify that each delivery received matches
delivery documentation and to ensure that goods have been received in good condition. If we have inspected
these goods previously at the subcontractor/supplier's premises we may only need to verify their condition on
delivery. Once checked, the goods will be marked appropriately as outlined in QP 3.11 "Monitoring and
Measurement Status". Additional checks may be required if goods are the subject of an Inspection and Test Plan
as above.
Inspection and testing during production
At nominated stages of the production process (defined as "hold-points'') our product will be inspected to ensure
that it continues to meet specified requirements.
During a continuous production run, batches will be tested at intervals specified in the Inspection Test Plan. Tests
may include checking against acceptance criteria for functionality and performance, design or other
manufacturing standards, safety of operation, strength, dimensions and tolerances, appearance, quality of
workmanship and checking for completeness. Additional checks may be required if the process is the subject of
an Inspection Test Plan as above.
All testing will be completed using equipment that has been calibrated according to QP 3.15 "Control of
Measuring Equipment''.
These checks will be completed by nominated staff that are appropriately skilled, using Form F5.11 "Job
Sequence Sheet'' and the tester will sign the form. Specialist expertise for non-destructive examination shall be
engaged for this purpose if required by the project Quality Plan or Inspection and Test Plan.
If the product passes inspection and test it will be recorded on the form and marked appropriately as outlined in
Procedure 3.11: Monitoring and Measurement Status.
If the product fails inspection, these details will be recorded on the form and the product will be marked as
described in QP 3.11. It will then be removed to a quarantine area until reworked or scrapped and procedure QP
3.17: Control of Nonconformances will be implemented.
Final Inspection and Test
We will ensure that our product is not released for dispatch until final inspections and tests have been conducted
to verify that the product satisfies specified requirements. During this process we will not only check the
suitability of the final product but also that all previously scheduled checks have been completed.
All testing will be completed using equipment that has been calibrated according to QP 3.15: Control of
Measuring Equipment.
These inspections and tests will be completed by appropriately skilled Production staff using Form F5.14: Final
Inspection and Test however, additional checks may be required if the process is the subject of an Inspection and
Test Plan as above. After final inspection, the product which is suitable will be marked as described in QP 3.11:
Monitoring and Measurement Status and forwarded to dispatch department.
Where product fails final inspection, it will be marked as described in QP 3.11: Monitoring and Measurement
Status, and removed to a quarantine area until reworked or scrapped. Procedure QP 3.17: Control of
Non-conformances' will then be implemented.
The name of the person completing the final Inspection will be included on Form F5.14 "Final Inspection and
Test".
Records
The following documents will be kept as quality records:
Monitoring and Test Plan (Form F5.12) - In relevant project or contract files�
Goods Received Advice (Form F5.13) - In the Store�
Job Sequence Sheet (Form F 5.11) - In Job files�
Final Inspection and Test (Form F5.14) - In Job files�
Product Identification
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0032
PolicyProduct Identification
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Product Identification
PurposeThe aim of this procedure is to ensure Ezi Cut Tree Services Pty Ltd can identify individual jobs or batches and
products throughout the production process.
ScopeThis procedure applies to all of our production or service providing activities.
References
ISO 9001: 2008 Clause 7.5.3�
Quality Manual – Section 7.5 Product Realisation�
Form F5.9 – Job Number Register�
Form F5.10 – Batch/Model number /Serial Number Register�
Responsibility
Production Scheduler/Logistics
Manager
Allocating job numbers/serial numbers
Stores staff Identifying materials with job numbers
All staff Using job numbers and marking product serial numbers (if applicable)
throughout the production process.
ProcedureAllocating Job Numbers
On acceptance of a contract or order our sales staff will allocate the next sequential number from our Job
Number Register (Form F801). For the various products and services that Company Ezi Cut Tree Services Pty Ltd
supplies, the job or batch number will be prefixed as follows:
P = Sales of standard product�
J = Production job�
H = Hire of product�
S = Servicing contract�
C = Contract for services to be provided�
This number will be added to the documentation supplied by the customer (contract or order), a file created, and
then passed to the Operations Department who will carry out the work.
Identifying product with a Job Number
Production Scheduler will produce a schedule for production. The schedule list will be also forwarded to store
and production staff. Stores staff will assemble materials and parts required for production according to the
Production Schedule list and will place these into a container in a designated part of the store. This container will
be identified with a job number to which those items have been allocated. These materials and parts will remain
together until consumed in the production process.
Requirements of traceability
Where it is a contractual requirement, we will record which parts (or batch) were used on which job number so
that at some time in the future we can trace individual components through the system.
For our continuous production runs we will allocate a batch number to the product produced on each day's
production run. This batch number will be marked on the final product and used to identify which product is sent
to the customer. Batch numbers are allocated using Form F5.10 'Batch/Serial No. Register'.
Large-scale components, which we produce, will be allocated a serial number for the purposes of traceability as
above. Serial numbers are allocated using Form F5.10 'Batch/Serial No. Register'.
Records
We will keep the following documents as quality records:
Job Number Register (Form F5.9)
Batch or Serial Number Register (Form F5.10)
Control of Customer Property
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status:
Tag: Approved By:
Policy RefPN0033
PolicyControl of Customer Property
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Customer Property
PurposeThe aim of this procedure is to ensure that any product/information deemed to belong to customer to be
included in the product supplied to this customer is handled and protected in such a way that it is not lost,
damaged or deemed unsuitable for use due to our actions.
ScopeThis procedure relates to any product or information that is supplied by our customers for incorporation into our
processes.
References
ISO 9001: 2008 Clause 7.5.4�
Quality Manual – Section 7 Product Realisation�
QP 3.14: Preservation and Handling�
QP 3.10: Monitoring and Measurement�
Responsibilities
Stores staff Identification and inspections on receipt of goods and correct
handling and storage. Communication with customer of any
damage lost items, etc.
Operations staff Correct handling during production
ProcedureHandling
On arrival at our store any product supplied by our customers will be identified with a label 'Customer Supplied
Product' and the name of the customer and will be stored in a designated area of the store according to QP 3.14:
'Preservation and Handling'. Stores staff will check the goods on receipt according to QP 3.10 'Monitoring and
Measurement' to ensure that the delivery docket matches the description of the goods, that quantities are
correct and that the condition of the goods when received is noted.
Customer-supplied product will maintain its identifying label until it is incorporated into our production process.
'Job Sequence Sheets' (Form F5.11) will record when customer-supplied product has been used.
Records
In the store we will retain delivery dockets of customer-supplied product as a quality record.
Preservation and Handling
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0034
PolicyPreservation and Handling
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Preservation and Handling
PurposeThe aim of this procedure is to ensure that product is protected from misuse, damage or loss due to handling.
ScopeThis procedure applies to the handling, storage, packaging, preservation and delivery of all products whether
incoming from a supplier, during production or during dispatch until its final destination.
References
ISO 9001: 2008 Clause 7.5.5�
Quality Manual – Section 7 Product Realisation�
QP 3.10: Monitoring and measurement�
Form F5.17 – Delivery Advice/Transmittal Sheet�
ProcedureEzi Cut Tree Services Pty Ltd will ensure that product is protected during all stages of production, in particular:
Handling
Goods will be handled appropriately so that they are not damaged.
This will include actions such as palletising product and handling in batches in product bins. Fragile product will
be handled with particular care so that it is not likely to be crushed. Safety Data Sheets will be maintained as a
reference to Stores staff so that product can be handled in a manner that will not harm people or other product.
Storage
Goods received in our Store and work in progress will be stored appropriately to prevent loss, damage or
deterioration.
This will include the use of suitable racking, bins or crates for each item, incorporating environmental and
security controls where necessary. Stock rotation shall also be implemented where a shelf life is evident and
goods are unlikely to be used during the life of the project or in other circumstances where appropriate.
Goods received in Store will be processed according the QP 10: 'Inspection and Testing'. The issuing of parts and
materials from store will be recorded on Job Sequence Sheets and/or computer software. Product issued from
the Dispatch Department will be accompanied by a Form 1501: 'Delivery Advice/Transmittal Sheet'.
Packaging
Packaging of items in the Store will be sufficient to assist identification and prevention of damage or
deterioration.
Packaging of product prior to dispatch will be conducted with the aim of protecting the quality of the finished
product during its journey to the customer. Product should reach the customer in the same form that it leaves
our plant.
If there are specific customer requirements for packaging and delivery these will be met by referring to the
project quality plan or inspection and test plans.
Preservation
Goods in our store and work in progress will be stored appropriately to preserve the characteristics of the
product.
This will include protection from weather, suitable environmental conditions and segregation of product where
its proximity to other product could lead to the deterioration of either.
Delivery
Where we are responsible for the delivery of product we will ensure that it is protected from loss, damage or
deterioration after it has passed final inspection and test. This will include packaging as outlined above, security
and appropriate physical handling.
Goods will be accompanied by Form F5.17 'Delivery Advice/Transmittal Sheet'.�
We will keep the following documents as quality records:�
Records of stock issued from store;�
Copies of form 'Delivery Advice/Transmittal Sheets' (Form F5.17).�
Control of Monitoring and Measuring Equipment.
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0035
PolicyControl of Monitoring and Measuring Equipment.
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Measuring Equipment
PurposeThe aim of this procedure is to ensure that Ezi Cut Tree Services Pty Ltd equipment used in measuring and testing
activities is correctly controlled, calibrated and maintained.
ScopeThis procedure applies to all Ezi Cut Tree Services Pty Ltd inspection, measuring and testing equipment (and
software) used for measuring the conformance of our product to specified requirements.
References
ISO 9001: 2008 Clause 7.6�
Quality Manual – Section 7 Product Realisation�
Form F5.15 – Calibration Record�
Responsibilities
Production Manager Determination of tests required
Quality Representative/Quality Manager Preparation of Calibration Schedule, control of equipment and
conducting calibration of equipment
All staff Correct use of inspection, measuring and test equipment
ProcedureEzi Cut Tree Services Pty Ltd will ensure the reliability of its testing equipment by using the following system.
Tests required
Except for tests outlined in QP 3.7: 'Design and Development Management', our Production Manager will
determine which tests are appropriate to determine the conformance of our product to specified requirements
and when these tests will be conducted. These tests shall be conducted according to QP 3.10: 'Monitoring and
Measurement'. The Production Manager will also determine the measures to be taken and will set acceptance
criteria by referring to customer's specified requirements.
Choice of inspection, measuring and test equipment
The Production Manager will ensure that appropriate equipment is chosen for conducting inspection, measuring
and testing activities as determined above and that it will meet defined acceptance criteria under the terms of
the order or contract.
Identification of equipment used for inspection, measuring and test
All equipment used to test the conformance of product to specified requirements will be marked with a unique
identifying number and labelled to show the current calibration status, that is, when the item was last calibrated.
The label on each item indicating calibration status will be updated at the time of calibration.
Use of inspection, measuring and test equipment
Staff using inspection, measuring and test equipment must ensure that it is labelled to indicate that it has current
calibration. The equipment will only be used in appropriate environmental circumstances that will not influence
test results.
The Quality Representative/Quality Manager (or authorised representative) will ensure that each item of
equipment being used for inspection, measuring and testing is currently in calibration and that calibration is
completed when due.
Method of calibration
Calibration will be conducted by checking equipment against a master that is stored in a secure area and in a
controlled environment that will prevent deterioration and unauthorised use. The master equipment will be
purchased from a recognised standards body that has authority to certify the equipment at time of purchase.
The equipment must be proven by the certifying body to be able to measure within the equipment designed
tolerances.
Under certain circumstances Ezi Cut Tree Services Pty Ltd may choose to certify the calibration of equipment
using external resources at suitably approved laboratories or by certified subcontractors. This may apply to
master test equipment or individual items. This alternative method shall be undertaken at the discretion of the
Quality Representative/Quality Manager providing the testing authority is an approved supplier or
subcontractor.
Frequency of calibration
The frequency of calibration will be determined by the rigors on the test equipment in its working environment
or to the manufacturer's recommendations, whichever is the lesser. In any event, the cycle of testing of each
item will not be less frequent than once per year.
Calibration records
We will maintain Form F5.15 'Calibration Record' (or an equivalent computer database) to indicate:
What inspection, measuring and test equipment we hold, including a unique identifier?�
What is the appropriate period of calibration for each type of equipment?�
When the next calibration is due for each item of equipment�
The results of the last calibration�
We will keep the following documents as quality records�
Calibration Record (Form F5.15)�
Equipment purchase records including original equipment specifications and testing tolerances�
Test certificates where appropriate�
Internal Quality Audits
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0036
PolicyInternal Quality Audits
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Internal Quality Audits
PurposeThe aim of this procedure is to provide a mechanism for ensuring conformity to the quality system and to assist
in the ongoing improvement to the system.
ScopeThis procedure applies to internal auditing of all quality-related activities of Ezi Cut Tree Services Pty Ltd.
References
ISO 9001: 2008 Clause 8.2.2�
Quality Manual – Section 8 Measurement, Analysis and Improvement�
Schedule SCH 6.3 – Internal Audit Plan�
Form F5.19 – Internal Audit Report�
Form F5.16 – Non-conformance Report�
Responsibilities
All staff Co-operation with internal auditor
Internal auditors Carry out audits
Quality Representative/Quality Manager Prepare audit plan, carry out and co-ordinate audits
Department Managers Take corrective action on non-conformances
CEO/Managing Director/General Manager Review internal audit findings at annual review
ProcedureScheduling of Internal Audits
The Quality Representative/Quality Manager will prepare Schedule SCH6.3 'Internal Audit Plan' which will cover a
period of six to twelve months ahead as follows:
| Six months | Six months | Six months | Six months |
Prepare plan for: XXXXXXXXXXXXXXX
Prepare plan for: XXXXXXXXXXXXXXX
Prepare plan for: XXXXXXXXXXXXXXX
Frequency of internal audits will depend on the importance of the activity being audited in achieving overall
quality aims. Audits may be conducted across all functions within one department or across all departments on
one particular subject.
Internal auditors
The Quality Representative/Quality Manager will be our senior auditor but other staff will receive training for
internal auditor roles. An internal auditor will not conduct audits within a department where they have direct
responsibilities.
Auditing Activities
Auditors will use Form F5.19 'Internal Audit Report' to assist them in identifying areas where operations do not
conform with the requirements of our quality system. Prior to an audit the auditor will plan their activity. They
will do this by completing page 2 of the form and by preparing a list of areas to inspect and questions to ask as
part of the audit. After the audit, the auditor will complete page 1 of the form to report on any issues of detected
non-conformance or suggested improvements to the system.
The issues raised by the audit will be discussed between the Department Manager and the Quality
Representative/Quality Manager and corrective action will be proposed for any non-conformances. The
'Non-conformance Report' will be completed for each non-conformance that was detected and the Department
Manager will implement the corrective action.
The 'Internal Audit Report' will be filed by the Quality Representative/Quality Manager for reference prior to the
next audit in that department.
Follow-up
The Quality Representative/Quality Manager will follow-up on the effectiveness of the corrective action at the
next audit of that department (or sooner if necessary).
Results of internal audits will be summarised and submitted to the CEO/Managing Director/General Manager for
consideration at the next Management Review meeting.
Records
The following documents will be kept as quality records:
Internal Audit Schedule (SCH6.3)�
Internal Audit Reports (Form F5.19)�
Control of Non-Conformances
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0037
PolicyControl of Non-Conformances
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Control of Non-Conformances
PurposeThe aim of this procedure is to ensure that products that do not conform to specified requirements are
prevented from unintended use or installation and if discovered after delivery, actions are taken according to the
magnitude of the non-conformance.
ScopeThis procedure applies to non-conformances in any quality-related activities of Ezi Cut Tree Services Pty Ltd.
References
ISO 9001: 2008 Clause 8.3�
Quality Manual – Section 8 Measurement, Analysis and Improvement�
QP 3.10: Monitoring and measurement.�
QP 3.19: Corrective and Preventive Action�
Form F5.16: Non-conformance Report�
Responsibilities
All staff Detecting and recording non-conformances
Quality Representative/Quality Manager Investigating and reporting on non-conformances
Department Heads Correcting non-conformances and reviewing statistics on
non-conformance
Supervisors Assisting with the investigation
ProcedureDetecting Non-conformances
Products that do not conform to specifications will be detected at the earliest stage possible. This may relate to
any requirements contained in ISO 9001:2008, our Quality Manual, Procedures or Work Instructions, customer
specifications, other national or international compliance standards, or any other legal or contractual
requirements. Non-conformances may be detected through customer complaint or warranty claim, in normal
day-to-day activities, during inspection and testing or during internal quality audits.
Reporting Non-Conformances
When a non-conformance is detected it shall be reported using Form F5.16'Non-conformance Report' which is
completed by the person discovering the non-conformance and forwarded to the Quality Representative/Quality
Manager for investigation.
The Non-conformance Report will describe the nature of the problem, what may have been the possible causes,
what was done immediately to remove the product (or service) from the system and who was advised of the
problem.
All customer complaints and warranty claims will be considered serious and reported on a Non-conformance
Report.
Investigating Non-conformances
Non-conformances reported on the Non-conformance Report will be investigated in detail by the Quality
Representative/Quality Manager in order to determine the root cause. Details of these investigations will be
recorded on the Non-conformance Report. A monthly report will be sent to the Manager of each department to
advise them of non-conformances detected and the probable root cause of each non-conformance.
If a non-conformance is detected in product supplied by a supplier/subcontractor or by a customer, a copy of the
Non-conformance Report will be forwarded to the subcontractor/supplier or customer for investigation and the
Quality Representative/Quality Manager will follow-up the result.
Acting on Non-conformance Reports
The non-conformance Report will be used to record what has happened to the particular product or service
where the problem arose and what has been done to correct the problem. Action to correct a non-conformance
and/or prevent further similar events will be taken in accordance with QP 3.19: 'Corrective and Preventive
Action'.
Records
We will keep the following documents as quality records:
Non-conformance Reports, including the investigative analysis done by the Quality Representative/Quality�
Manager (Form F5.16)
Monthly report to Managers.�
Data Analysis
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0038
PolicyData Analysis
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Data Analysis
PurposeThe aim of this procedure is to provide a means of collecting meaningful data for the analysis of statistical trends.
ScopeThis procedure relates to the collection and analysis of relevant statistical data within Ezi Cut Tree Services Pty
Ltd for the purpose of monitoring trends.
References
ISO 9001: 20008 Clause 8.4�
Quality Manual – QP 3.18 Data, Analysis�
Form F5.25 – Statistical Report�
Responsibility
Quality Representative/Quality
Manager
Collection of statistics and preparation of reports
Department Managers Analysis of trends, action resulting
CEO/Managing Director/General
Manager
Annual Management Review
ProcedureEzi Cut Tree Services Pty Ltd has determined that analysis of the following information will assist us in monitoring
the effectiveness of our quality system and improving our business:
number and date of non-conformances detected�
type of non-conformance�
the process area where non-conformances have been detected�
number, type and date of non-conformances by each subcontractor�
number of products failing final inspection�
extent and estimated cost of rework�
warranty failures and non-conformances by type and number�
Add others as appropriate.
Collection of data
Each department responsible for their own area of quality will provide details of non-conformances to the
Quality Representative/Quality Manager who will prepare reports and trend charts (Form F2001 'Statistical
Report') to reflect quality changes over time. This report will be prepared monthly and forwarded to relevant
Department Managers. A copy will be given to the CEO/Managing Director/General Manager for information.
Analysis of Data
Department Managers will be responsible for assessing any root causes of non-conformance that are highlighted
by the statistics and are required to act on any negative trends or systemic failures.
Statistics gathered in this process, and the response as to root causes from Department Managers, will be
reviewed by the CEO/Managing Director/General Manager as part of the annual Management Review.
Our CEO/Managing Director/General Manager will also be responsible for monitoring the ability of these
statistics to provide valid business information. Measures may be removed from, or other measures added to,
our statistical analysis as necessary.
Records
The following documents will be kept as quality records:
Statistical Reports (database or manual records) (F5.25).�
Corrective & Preventive Action
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0039
PolicyCorrective & Preventive Action
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Corrective & Preventive Action
PurposeThe aim of this procedure is to ensure that action is taken to eliminate the causes of actual and potential
non-conformances.
ScopeThis procedure applies to action taken on any reported non-conformances and potential non-conformances,
regardless of how they are detected, in our products.
References
ISO 9001: 2008 Clause 8.5.2 and 8.5.3�
Quality Manual – Section 8 Measurement, Analysis and Improvement�
QP 3.19: Corrective and Preventive Action�
Form F5.16 – Non-conformance Report�
Responsibilities
Quality Representative/Quality Manager Investigating causes and reporting the Department
Managers
Department Managers Acting to correct and prevent non-conformances
CEO/Managing Director/General Manager Annual review
Sales Manager Investigating customer complaints.
ProcedureNon-conformances reported according to QP 3.17: 'Control of Non-conformances' will be dealt with as follows:
Corrective Action
After investigation by the Quality Representative/Quality Manager of the causes of non-conformances,
Department Managers will take action to correct the current problem and then complete the section on the
Non-conformance Report which asks what has been done with the product.
Customer complaints will be investigated by the Sales Manager who will report to the relevant departments on
the causes of the complaint.
Warranty claims will be investigated by the Production Manager who will determine the validity or otherwise of
the claim and respond appropriately to the customer after consultation with the Operations Manager.
Preventive Action
Where a Non-conformance Report highlights a need for a change in quality documentation, the Quality
Representative/Quality Manager will ensure that these changes are made immediately.
Department Managers will take steps to ensure that the root cause of existing non-conformances are eliminated
so that similar events will not happen in the future. These steps will be listed on the Non-conformance Report
and the Quality Representative/Quality Manager will follow-up at the next internal quality audit to ensure that
the steps were effective in preventing repeat occurrences. Any systemic failures that are detected from the
analysis of the non-conformances shall be reported to the responsible manager who shall instigate system
review to remedy the reported failures.
The annual Management Review will consider non-conformance trends and ensure that effective steps have
been taken to reduce actual and potential non-conformances. These systemic reviews and implemented
remedies shall also form part of the annual review.
Records
The following documents will be kept as quality records:
Non-conformance Reports detailing action taken to correct or prevent non-conformances (Form F5.16)�
Servicing
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0040
PolicyServicing
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Servicing
PurposeThe aim of this procedure is to provide a system of regular after-sales service to our product where contractually
required by our customer.
ScopeThis procedure applies to all servicing activities performed on our product after dispatch.
References
ISO 9001: 2008 Clause 7.5.1�
Quality Manual – QP 3.9 Control of Production�
Schedule SCH6.4 – Service Plan�
Form F5.24 – Service Report�
Responsibility
Service Manager Preparation of Service Schedule, co-ordinate servicing activities
Service staff Conduct servicing activities
ProcedureWhen service is a specified requirement of the contract with our customer, we will prepare a 'Service Schedule'
(SCH6.4) which outlines the frequency of service that is necessary in order to maintain the viability of the product
and ensure its ongoing performance to acceptable standards. The customer will be contacted at the appropriate
time and the service will be arranged.
Prior to a scheduled service we will prepare Form F5.24 'Service Report' with details of activities to be
completed, tests to be carried out and the relevant acceptance criteria.
At the completion of either planned service or on-call service, our staff will report on the performance of the
product against the acceptance criteria and what work has been performed during the service, as well as the
next due date of service. The customer will be given a copy of the 'Service Report'.
Records
Service Schedules (SCH6.4)�
Service Reports (Form F5.24)�
Ezi Cut Tree Services Pty Ltd
Quality Work Instructions
Job Sequence Sheets
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0041
PolicyJob Sequence Sheets
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Job Sequence Sheets
PurposeThe aim of this work instruction is to provide the workshop with an outline of tasks to be followed during the
manufacture of a product. The resulting Job Sequence Sheet will be a record for traceability and verification of
the manufacturing process.
ScopeThis work instruction applies to all manufacturing activities.
References
ISO 9001: 2008 Clause 7�
Quality Manual – Product Realisation�
Quality Procedure QP 3.1 to QP 3.20�
Form F901 – Job Sequence Sheet�
Responsibility
Production and Service Managers Preparation of Job Sequence Sheets
Store staff Preparation of materials on the Job Sequence Sheet
Production and Service
supervisors
Monitoring of tasks on Job Sequence Sheet
Production and service staff Completion of tasks on Job Sequence Sheet
ProcedureJob Sequence Sheets will be prepared when the Production Department receives notification of a new order
from the Sales Department. They are generated from a spreadsheet file named 'Standard Sequence Sheets' and
each new Job Sequence Sheet will be named, numbered and filed under the job number.
The Production Manager will raise a separate Job Sequence Sheet for each new job number. Details on the Job
Sequence Sheet will be gathered from:
The Inspection and Test Plan�
The detail drawings�
Customer requirements�
Discussions with appropriate people e.g. Operations Manager, Sales Manager, Design Engineer�
A copy of the Job Sequence Sheet ('JSS') will be forwarded to the stores department, together with any bills of
materials where necessary, for preparation of any materials required. The original copy will be given to the
Production Supervisor who will nominate the start date and time for this sequence of tasks.
The Job Sequence Sheet will follow the item throughout the stages of manufacture. As the necessary steps are
completed the Job Sequence Sheet is to be signed off and dated by the operator. The Job Sequence Sheet is then
moved to the next workstation with the item being produced. This process is repeated until all stages are
complete and the Job Sequence Sheet is returned to the workshop office.
The Production Supervisor will ensure that all tests have been conducted with acceptable results before the
sequence continues to the next stage of manufacture.
Any unsigned task may be authorised by the Production Supervisor (after confirming that step has been
satisfactorily completed), if the person who originally completed the process is not available.
If a change to the Job Sequence Sheet is required, the sheet will be returned to the originator who will review the
requested changes, incorporate them into the Job Sequence Sheet and initial the amendment.
If a new Job Sequence Sheet is required, the original will be returned to the originator who will stamp it 'revised',
sign and date it and file the sheet in Job files. The new Job Sequence Sheet (rev 2) will be issued with any
necessary changes and the tasks already completed will be marked 'see revision 1'. Production staff will continue
to complete and sign-off any incomplete operations on the new Job Sequence Sheet (rev 2).
If the originator is not available to complete steps 7 or 8, the Production Supervisor is authorised to issue the
revised Job Sequence Sheet, by exception only.
When all operations have been completed and the Job Sequence Sheet is returned to the workshop office, it will
be filed with other documentation relating to the particular job.
Ezi Cut Tree Services Pty Ltd
Quality Forms
Management Review Meetings
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0042
PolicyManagement Review Meetings
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Management Review Meetings
PurposeThe purpose of this policy is to explain the general procedures relating to Management Review Meetings
ScopeThe following guidelines are to be adhered to by all employees, supervisors and employees.
ProcedureFORM No F5.1 - Management Review Meetings
MEETING PURPOSE:
MANAGEMENT REVIEW OF QUALITY SYSTEM
PRESENT
DATE: PAGE: 1 OF: COPY
ITEM
NO
CONTRACT REVIEW CHECKLIST
ITEM
RESPONSE ACTION
BY
WHOM
DATE
REQ'D
1 Business arising from previous
minutes
ITEM
NO
CONTRACT REVIEW CHECKLIST
ITEM
RESPONSE ACTION
BY
WHOM
DATE
REQ'D
2 New business
2.1 Management Responsibility Are all responsibilities being fulfilled as outlined
in QP 3.4?
2.2 Quality System Does any part of the system need modifying,
particularly Quality Policy?
2.3 Sales orders review Sales Manager to give a review of Sales
activities, particularly any issues raised during
contract reviews
2.4 Process Issues Review of Issues arising from the process
2.5 Document & Data Control Quality Representative/Quality Manager to give
an overview of effectiveness of document
control procedures
2.6 Purchasing Purchasing Manager to give a review of
purchasing activities, particularly the
performance of subcontractors
2.7 Control of Non-conformances Quality Representative to review levels and
trends in non-conformances
2.8 Corrective & Preventive Action Department Heads to give overview of actions
taken to correct and prevent non-conformances
2.9 Control of Records Quality Representative to give overview of
quality record control as detected during audit
activities
2.10 Internal Audit Activities Quality Representative to review results of
audits
2.11 Training & employee
performance Rectification of
substandard conditions
HR/Training Department to give a review of
training activities
Occupational Health& Safety Manager /
coordinator
2.12 Business performance and
data analysisCEO/Managing Director/General Manager to
review trends revealed from analysis of
statistical techniques
3 Any other business
3.1 Meeting closed at time
Contract Review Action Minutes
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0043
PolicyContract Review Action Minutes
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Contract Review Action Minutes
PurposeThe purpose of this policy is to explain the general procedures relating to Contract Review Action Minutes
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. F5.2 - Contract Review Action Minutes
MEETING PURPOSE:
TENDER OR CONTRACT REVIEW
{Strike out whichever is not applicable}
PRESENT
DATE: PAGE: 1 OF: COPY JOB No
EST No
ITEM
NO
CONTRACT REVIEW
CHECKLIST ITEM
RESPONSE BY
WHOM
DATE
REQ'D
ITEM
NO
CONTRACT REVIEW
CHECKLIST ITEM
RESPONSE BY
WHOM
DATE
REQ'D
1 SCOPE OF WORK {Detail here exactly what products and/or services the
customer is expecting, and what action you should take
to comply with the tender. If Ezi Cut Tree Services Pty
Ltd cannot comply, note the non-compliances. If it is
anticipated to submit a non- conforming tender the
alternative tender qualifications should be identified. If
it is a contract review and the contract requirements
cannot be met the actions to be taken must be noted}
2 RELEVANT
COMPLIANCE
STANDARDS
{Note here the national or international standards to
which the products and/or services must comply. If
there is a conflict between required standards and
ability to comply, the non-compliances must be noted
for action.}
3 DELIVERY
REQUIREMENTS{Note here when the products and/or services are
required to be completed and any actions to be taken as
a consequence}.
4 PRICING DETAILS {Analyse the anticipated sales and the projected
margins. For a tender these may only be estimates}.
5 RESOURCE
REQUIREMENTS
{Note here the requirements for resources under the
proposed contract and whether Ezi Cut Tree Services Pty
Ltd can satisfy the resource requirements. Document
and action anything that has to be done to comply or
otherwise}.
Plant & Equipment�
Manning levels (available Vs. projected)�
Cash Flow�
Finance�
Bank Guarantees�
Design & technology; manufacturing drawings�
6 INSURANCE
REQUIREMENTS
{Discuss here any project specific insurance needs that
may be required and consequential actions}.
7 CONTRACT RISK {Complete a formal review of the contract terms, using
legal advice if necessary, to determine the extent of the
contract risk profile and the ability of Ezi Cut Tree
Services Pty Ltd to comply with the contract. Record
actions during the review process.}
Damages:
Damages for delay in completion�
Performance related damages�
Warranties:
Defects liability�
Performance warranties�
Design & product warranties�
Revenue or cash flow issues:
Lump sum/schedule of rates�
Fixed or variable pricing; if variable, under what�
terms and conditions?
Foreign exchange exposure? Hedging�
necessary?
Cash retention applicable? Repaid when and�
under what conditions?
What is the time for certification and payment�
of claims?
Are there equitable variation clauses?�
Does the contract provide for the payment of�
Progress claims?
Are you satisfied with the Customer credit�
worthiness? Evidence?
Contract Terms:
Are there any extensions of time provisions &�
force major clauses?
Risks:
Are security deposits and/or performance�
bonds required? Can these be in the form of
bank guarantees or insurance bonds? Any
impact on finances?
Are there equitable terms for dispute settling�
procedures?
Are there any indemnities required by the�
customer that may impinge on Ezi Cut Tree
Services Pty Ltd Business Systems and which
may threaten its viability?
Is there any exposure to consequential loss?�
Is there a cap on the liabilities of Ezi Cut Tree�
Services Pty Ltd under this proposed contract?
7 CONTRACT RISK {Complete a formal review of the contract terms, using
legal advice if necessary, to determine the extent of the
contract risk profile and the ability of Ezi Cut Tree
Services Pty Ltd to comply with the contract. Record
actions during the review process.}
Damages:
Damages for delay in completion�
Performance related damages�
Warranties:
Defects liability�
Performance warranties�
Design or cashflow issues�
Revenue or cashflow issues:
Lump sum/schedule of rates�
Fixed or variable pricing; if variable, under what�
terms & conditions?
Foreign exchange exposure? Hedging�
necessary?
Cash retention applicable? Repaid when and�
under what conditions?
What is the time for certification and payment�
of claims?
Are there equitable variation clauses?�
Does the contract provide for the payment of�
Progress Claims?
Are bonds permissible in lieu of cash retention?�
Are you satisfied with the Customer credit�
worthiness? Evidence?
Contract Terms:
Are there any extensions of time provisions &�
force major clauses?
Risks:
Are security deposits and/or performance�
bonds required? Can these be in the form of
bank guarantees or insurance bonds? Any
impact on finances?
Are there equitable terms for dispute settling�
procedures?
Are there any indemnities required by the�
customer that may impinge on Ezi Cut Tree
Services Pty Ltd Business Systems and which
may threaten its viability?
Is there any exposure to consequential loss?�
Is there a cap on the liabilities of Ezi Cut Tree�
Services Pty Ltd under this proposed contract?
{Complete a formal review of the contract terms, using
legal advice if necessary, to determine the extent of the
contract risk profile and the ability of Ezi Cut Tree
Services Pty Ltd to comply with the contract. Record
actions during the review process.}
Damages:
Damages for delay in completion�
Performance related damages�
Warranties:
Defects liability�
Performance warranties�
Design & product warranties�
Revenue or cash flow issues:
Lump sum/schedule of rates�
Fixed or variable pricing; if variable, under what�
terms & conditions?
Foreign exchange exposure? Hedging�
necessary?
Cash retention applicable? repaid when and�
under what conditions?
What is the time for certification and payment�
of claims?
Are there equitable variation clauses?�
Does the contract provide for the payment of�
Progress claims?
Are bonds permissible in lieu of cash retention?�
Are you satisfied with the Customer credit�
worthiness? Evidence?
Contract Terms:
Are there any extensions of time provisions &�
force major clauses?
Risks:
Are security deposits and/or performance�
bonds required? Can these be in the form of
bank guarantees or insurance bonds? Any
impact on finances?
Are there equitable terms for dispute settling�
procedures?
Are there any indemnities required by the�
customer that may impinge on Ezi Cut Tree
Services Pty Ltd Business Systems and which
may threaten its viability?
Is there any exposure to consequential loss?�
Is there a cap on the liabilities of Ezi Cut Tree�
Services Pty Ltd under this proposed contract?
Enquiry Log
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0044
PolicyEnquiry Log
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Enquiry Log
PurposeThe purpose of this policy is to explain the general procedures relating to Enquiry Log
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. F5.3 Enquiry Log
DATE NAME COMPANY PHONE/FAX NATURE OF ENQUIRY ACTION TAKEN
SALESPERSON'S NAME SIGNATURE
Design Plan
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0045
PolicyDesign Plan
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Design Plan
PurposeThe purpose of this policy is to explain the general procedures relating to Design Plan
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. F5.4 - Design Plan
PROJECT: JOB NUMBER: REVISION STATUS:
CUSTOMER: RESPONSIBLE DESIGNER: DATE OF ISSUE:_____/_____/_____
ITEM No DESIGN
ITEM
ACTION
REQ'D
DESIGN
RESOURCE
OTHER
INPUTS
TO DESIGN
DESIGN
ACCEPT.
CRITERIA
APPLICABLE
DESIGN
STANDARD
_____________________________
Signed by Desginer
Document Control Master List
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0046
PolicyDocument Control Master List
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Document Control Master List
PurposeThe purpose of this policy is to explain the general procedures relating to Document Control Master List
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. F5.5 Document Control Master List
KEY for Item column:
QM = Quality Manual QP = Quality Procedures WI = Work Instructions
F = Forms PL = Quality Plans S = Standards
R = Government Regulations M = Operating Manuals D= Design or manufacturing drawings
NAME OF RECIPIENT ITEM
TYPE
REV NO COPY NO DATE SENT
Supplier & Subcontractor
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0047
PolicySupplier & Subcontractor
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Supplier & Subcontractor
PurposeThe purpose of this policy is to explain the general procedures relating to Supplier & Subcontractor
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.6 - Supplier Evaluation
NAME OF SUPPLIER: ADDRESS OF SUPPLIER:
Goods or services to be supplied by Supplier
Does the supplier have a quality system in place?
If so, is the system certified to ISO 9001: 2000 or 2008? If Yes, Which?
If Yes, who was the certifying third party?
If not, what method do they use to ensure compliance to customer requirements?
Has the supplier quality system been audited by Ezi Cut Tree Services Pty Ltd? If Yes, When?
Does the supplier issue a written guarantee or warranty?
Can the supplier delivery on time? Do they maintain a supply of stock on hand?
During site visit, what inspection and checking procedures did you observe?
Date of site visit ____/____/____
Any other comments from site visit – housekeeping, documentation, product range etc.?
Supplier / subcontractor assessed as:
o Approved (have certified quality system)
o Reserve (have quality system but not certified)
o Unapproved (no system or unacceptable system)
Assessed By:
Date Assessed:
Review Date:
Purchase Order
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0048
PolicyPurchase Order
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Purchase Order
PurposeThe purpose of this policy is to explain the general procedures relating to Purchase Order
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureSample Form - Purchase Order
Ezi Cut Tree Services Pty Ltd’s Company Details
Name:
Address:
Telephone:
Fax:
ORDER PLACED ON:
Company Name:
Company Address:
Contact Name:
Phone: Fax:
ORDER NUMBER:
DATE: ______/______/______
LINE
NO
DESCRIPTION OF ITEMPART NO
QTY
RQD
UNIT
PRICE
EXTENDED
PRICE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
ORDER TOTAL
DELIVERY DATE REQUIRED DELIVERY ADDRESS
SPECIAL REQUIREMENTS:
Standards to be met, inspection requirements, acceptance criteria etc.
ORDER PLACED BY:
Name Signature
Requisition
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0049
PolicyRequisition
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Requisition
PurposeThe purpose of this policy is to explain the general procedures relating to Requisition
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm no. 5.8 - Requisition
DESCRIPTION OF GOODS REQUIRED
Include any special characteristics or standards
with which the goods must comply
PART NUMBER
(If known)
QUANTITY
REQUIREDJOB NUMBER
Preferred Supplier: Name Of Person Requesting Goods:
Preferred Delivery Method: Date Of Requisition:
Date Required: Requisition Approved By:
Job Number Register
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0050
PolicyJob Number Register
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Job Number Register
PurposeThe purpose of this policy is to explain the general procedures relating to Job Number Register
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.9 - Job Number Register
KEY for Job Type column
P = Sales of Standard Products J = Production Job
H = Hire of Product S = Servicing Contract
C = Contract for Provision of Services
JOB
TYPE
JOB NO CUSTOMER ORDER NO DETAILS DATE
AWARDED
000001
000002
000003
000004
000005
Etc.
Serial Batch Number Register
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0051
PolicySerial Batch Number Register
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Serial Batch Number Register
PurposeThe purpose of this policy is to explain the general procedures relating to Serial Batch Number Register
ScopeThe following guidelines are to be adhered to by all employees, supervisors and employees.
ProcedureForm No. 5.10 - Serial Batch Number Register
SERIAL
NUMBER
DATE
PRODUCEDJOB NO
DESCRIPTION OF
GOODSSUPERVISOR
000001
000002
000003
000004
000005
Etc.
Job Sequence Sheet
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0052
PolicyJob Sequence Sheet
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Job Sequence Sheet
PurposeThe purpose of this policy is to explain the general procedures relating to Job Sequence Sheet
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm Sample - Job Sequence Sheet
JOB NUMBER: JSS ORIGINATOR:
CUSTOMER: DATE OF ISSUE:
Operation Production
Centre
PROCESS
OPERATIO
N
Materials
Required
Acceptance
Criteria
REF. (ITP,
DRAW’G,
WORK
INST)
Production
Measurement
Verified
OK
(Initials)
Monitoring & Test Plan
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0053
PolicyMonitoring & Test Plan
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Monitoring & Test Plan
PurposeThe purpose of this policy is to explain the general procedures relating to Monitoring & Test Plan
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.12 Monitoring and Test Plan (ITP)
See the form below.
Job Number: ITP Originator:
Customer: Date of Issue:
Hold
Point
Process
Operation
Reference
(Standard,
Drawing, Work
Inst.)
Test To Be
Completed
Equipment To
Be Used For
Test
Acceptance
Criteria
Comments Tests
Complete
Ok
(Initial)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Etc.
Goods Received Advice
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0054
PolicyGoods Received Advice
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Goods Received Advice.
PurposeThe purpose of this policy is to explain the general procedures relating to Goods Received Advice.
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.13 - Goods Received Advice
SUPPLIER: DESCRIPTION OF GOODS RECEIVED:
RECEIVED BY:
Name: Signature:
DATE RECEIVED:
_____/_____/_____
Delivery docket received?
Quantity correct? If not correct, state quantity received.
Goods match description on docket? If not, give description of goods received.
Good received in good condition? If not, state damage sustained.
Goods Passed Receiving Inspection: Goods Failed Receiving Inspection:
Stored in Bin Number: Action Taken:
Final Inspection
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0055
PolicyFinal Inspection
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Final Inspection
PurposeThe purpose of this policy is to explain the general procedures relating to Final Inspection
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.14 - Final Inspection & Test
CUSTOMER: PROJECT: JOB NUMBER:
Item
No
Description
of Item Being
Inspected
Inspection Details Final
Inspection
Criteria
Results
Job
Sequence
Sheets
Sighted
Test
Certificates
Comply
No
outstanding
non-
conformance
Other Final
Inspection
Checks
INSPECTION CARRIED OUT BY
Name: Signature:
Transport Instructions:1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Etc.
Date of Inspection:
Calibration Record
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0056
PolicyCalibration Record
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Calibration Record
PurposeThe purpose of this policy is to explain the general procedures relating to Calibration Record
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.15 - Calibration Record
Item Of
Equipment
Equipno. Date Calib'd By Whom Results Calib'n
Period
Date Due
Non-Conformance Report
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0057
PolicyNon-Conformance Report
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Non-Conformance Report
PurposeThe purpose of this policy is to explain the general procedures relating to Non-Conformance Report
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.16 - Non-Conformance Report
Description of the Non-Conformance (to be completed by the person detecting the non-conformance):
Possbile Causes (to be completed by the person detecting the non-conformance):
Immediate Action (to be completed by the person detecting the non-conformance):
Describe what was done to rectify the problem. Was product removed? Who was informed?
Name:
(Person Detecting Non-Conformance)
Signature: Date:
Send form to Quality Representative
Investigation of Root Causes (to be completed by Quality Representative/Quality Manager)
Investigation Completed By (Name): Signature: Date:
Quality Representative to discuss non-conformance with Department Manager
Further Corrective Action Required and taken (To Be Completed By Department Manager)
Preventative Action Taken (to be completed by Department Manager)
Quality Representative to check at next audit whether preventive action effective: YES / NO
Action taken by:
(Department Manager Name)
Signature: Date:
Delivery Advice
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0058
PolicyDelivery Advice
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Delivery Advice
PurposeThe purpose of this policy is to explain the general procedures relating to Delivery Advice
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. F5.17 - Delivery Advice/Transmittal Sheet
Ezi Cut Tree Services Pty Ltd‘s details:
Employee’s Name:
Address:
Telephone:
Fax:
REFERENCE ORDER NO.
DELIVERY TO:
Company Name:
Company Address:
Contact Name:
Phone:
Fax:
Date: _______/_______/_______
Note: When transmitting quality documents use this section to advise what action to take with superseded
documents
Description of Item Quantity Notes
DELIVERY METHOD:
Archive Register
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0059
PolicyArchive Register
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Archive Register
PurposeThe purpose of this policy is to explain the general procedures relating to Archive Register
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.18 - Archive Register
Box No Date
Filed
Filed By Summary Of Contents Destruction Date
00001 Person's name
00002
00003
00004
00005
00006
00007
Etc.
Internal Audit Report
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0060
PolicyInternal Audit Report
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Internal Audit Report
PurposeThe purpose of this policy is to explain the general procedures relating to Internal Audit Report
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.19 - Internal Audit Report
Audit Report Number: Date Of Audit:
Auditor's Name: Auditor's Signature:
Scope Of The Audit
Department/Area Audited:
__________________________________________________________________________________________
Procedures Audited:1.
2.
3.
4.
Persons Assisting Audit:
Names Of People Interviewed In The Department/Area Being Audited
Summary of Results:
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
REF NO. Details of Non-Conformance NCR
NO.
Proposed Corrective / Preventive Action
Internal Audit Report
Form F.101
Authorised By:
Revision A
Date:
Page 1 of 2
KEY to Results Column
C = Complies with the Standard NC = Does not Comply (non-conformance)
O+ = Positive observation (good system) O- = Negative observation (system could be
improved)
Ref Check Outcome Result
Prepare a list of sample questions and
areas you wish to review ( or reference
to procedures to audit)
Record answers to questions or results of
observations.
Job Description
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0061
PolicyJob Description
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Job Description
PurposeThe purpose of this policy is to explain the general procedures relating to Job Description
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.20 - Job Description
Job Title:
Department:
Reports to:
Prepared by:
Date Prepared: ___ /___ /___
Approved by:
Date Approved: ___ /___ /___
Overview:
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
Essential Duties and Responsibilities:�
�
�
�
�
�
�
�
Supervisory Responsibilities:�
�
�
Qualifications:�
�
�
Certificates, Licenses, Registrations:�
�
�
Education (Qualifications) and/or Experience:�
�
�
Language Skills:�
�
�
Mathematical Skills:�
�
�
Reasoning Ability:
�
�
�
Physical Demands:�
�
�
Work Environment:�
�
�
Employment Application Form
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0062
PolicyEmployment Application Form
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Employment Application Form
PurposeThe purpose of this policy is to explain the general procedures relating to Employment Application Form
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.21 - Employment Application Form
Application for Employment
The applicant is required to fill in all the information in this application form. The information you provide
along with the personal interview will be used to make a decision on your suitability for the position.
Important note: This company is an EEO (Equal Employment Opportunity) employer and does not discriminate
against any current or future employee. If you feel that at any stage this company or a representative of this
company has discriminated against you, we encourage you to seek the appropriate legal advice.
Position applying for:
__________________________________________________________________________________________
How did you find out about this position?
_________________________________________________________________________________________
Applicant Details
First Name: Last Name:
Address:
Suburb: State: Postcode: Country:
Phone Number: Mobile Number:
Do you drive? Yes / No
(This has may/may not have bearing on your
employment)
Drivers licence number:
Have you ever lost your driver’s licence? Yes / No
(This has may/may not have bearing on your employment)
Date of Birth: Marital Status (optional)
Emergency Contact (Name): Relationship to you:
Contact Phone: ( ) Mobile:
Medical
Do you have any special medical conditions that may hinder your job tasks or are there any adjustments that
we need to make to accommodate you? (This has no bearing on your employment)
Qualifications and Skills
List your qualifications related to this position and any relevant certificates, diplomas or other.�
�
�
�
Briefly list your skills relating to this position �
�
�
Employment Application Form
Ezi Cut Tree Services Pty Ltd
Form F.101
Authorised by:
Revision A
Date:
Page 1 of 3
Provide previous employment details (start with your most recent):
Dates from/to:
Position:
Employer:
Address:
Suburb:
State:
Postcode:
Contact Person:
Position:
Contact Phone:
Can we contact this employer as part of our reference checking process? Yes / No
Dates from/to:
Position:
Employer:
Address:
Suburb:
State:
Postcode:
Contact Person:
Position:
Contact Phone:
Can we contact this employer as part of our reference checking process? Yes / No
Is there any further information that you wish to add?
__________________________________________________________________________________________
__________________________________________________________________________________________
References
Provide three references including, names, contact numbers, relationship to you (e.g., supervisor)
Name:
Contact Number:
Relationship:
Name:
Contact Number:
Relationship:
Name:
Contact Number:
Relationship:
Employment Application Form
Ezi Cut Tree Services Pty Ltd
Form F.101
Authorised by:
Revision B
Date:
Page 2 of 3
Education History
School Attended: Date Graduated:
Highest level achieved:
Major achievements at this level:�
�
�
�
Provide a referee:
Referee’s contact number:
Further Education:
Highest Level Achieved:
Institution attended: Date Graduated:
Course(s) completed:
Major Achievements at this level:�
�
�
�
Provide a referee:
Referee’s contact number:
From what date will you be able to start work?
What type of employment do you seek? full-time part-time casual contract
This job may require travelling. Do you have any concerns about travelling?
Have you ever applied for a position with this company? Yes/No
Have you worked for this company previously? Yes/No
Do you have a criminal record? Yes/No
If Yes, please specify.
_________________________________________________________________________________________
_________________________________________________________________________________________
Employee Declaration
To the best of my knowledge, I believe that the above statements are true and correct. I understand that any
deliberately false, misleading or incomplete statements may lead to my dismissal, if employed.
I, __________________________________ give this company permission to conduct the relevant reference
checks and obtain the required information from past employers and or other relevant parties. I understand
that this will be done in an ethical and legal manner and will not compromise my current employment
situation.
Signed _____________________________________ Date: ___/___ / ___
Employment Application Form
Ezi Cut Tree Services Pty Ltd
Form F.101
Authorised by:
Revision C
Date:
Page 3 of 3
Reference Checks
Reference Comments
1
2
3
4
5
Is a second interview required? Yes/No
Date and Time:
Has the person been notified? Yes/No
Notes:
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Performance Review
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0063
PolicyPerformance Review
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Performance Review
PurposeThe purpose of this policy is to explain the general procedures relating to Performance Review
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedurePerformance Review Form
Key to Ratings:
Low: U = Unsatisfactory
NI = Needs Improvement
M = Meets Job Requirements
High: E= Exceeds Job Requirements
O = Outstanding
Quantity
Criteria N/A Low High
Meets Productivity Standards
Completes work in timely manner
Strives to increase productivity
Works Quickly
Achieves established goals
Overall
Quality
Criteria N/A Low High
Demonstrates accuracy and thoroughness
Displays commitment to excellence
Looks for ways to improve and promote quality
Applies feedback to improve performance
Monitors own work to ensure quality
Overall
Job Knowledge
Criteria N/A Low High
Competent in required job skills and knowledge
Exhibits ability to learn and apply new skills
Keeps abreast of current developments
Requires minimal supervision
Displays understanding of how job relates to others
Uses resources effectively
Overall
Problem Solving
Criteria N/A Low High
Identifies problems in a timely manner
Gathers and analyses information skilfully
Develops alternative solutions
Resolves problems in early stages
Works well in group problem solving situations
Overall
Communications
Criteria N/A Low High
Expresses ideas and thoughts verbally
Expresses ideas and thoughts in written form
Exhibits good listening and comprehension
Keeps others adequately informed
Selects and uses appropriate communication methods
Overall
Initiative
Criteria N/A Low High
Volunteers readily
Undertakes self-development activities
Seeks increased responsibilities
Takes independent actions and calculated risks
Looks for and takes advantage of opportunities
Asks for help when needed
Overall
Adaptability
Criteria N/A Low High
Adapts to changes in the work environment
Manages competing demands
Accepts criticism and feedback
Changes approach or method to best fit the situation
Overall
Planning & Organisation
Criteria N/A Low High
Prioritises and plans work activities
Uses time efficiently
Plans for additional resources
Integrates changes smoothly
Sets goals and objectives
Works in an organised manner
Overall
Cooperation
Criteria N/A Low High
Establishes and maintains effective relations
Exhibits tact and consideration
Displays positive outlook and pleasant manner
Offers assistance and support to co-workers
Works cooperatively in group situations
Works actively to resolve conflicts
Overall
Judgement
Criteria N/A Low High
Displays willingness to make decisions
Exhibits sound and accurate judgement
Supports and explains reasoning for decisions
Includes appropriate people in decision-making process
Makes timely decisions
Overall
Dependability
Criteria N/A Low High
Responds to requests for service and assistance
Follows instructions, responds to management direction
Takes responsibility for own actions
Commits to doing the best job possible
Keeps commitments
Meets attendance and punctuality guidelines
Overall
Innovation
Criteria N/A Low High
Displays original thinking and creativity
Meets challenges with resourcefulness
Generates suggestions for improving work
Develops innovative approaches and ideas
Overall
Summary
Plans for Improvement
Employee Comments
Employee Acknowledgement
I have reviewed this document and discussed the contents with my manager. My signature means that I have
been advised of my performance status, and does not necessarily imply that I agree with the evaluation.
Employee Signature: _______________________________________ Date: _____________________
Reviewer Comments
Reviewer Signature: _______________________________________
Training Record
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0064
PolicyTraining Record
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Training Record
PurposeThe purpose of this policy is to explain the general procedures relating to Training Record
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No.5.23 - Training Record
Employee Name: Date of Commencement:
Position: Department:
Qualifications on Commencement:
Date:
Qualification:
Institution:
WORK SKILLS ON COMMENCEMENT: (Work experience)�
�
�
�
�
�
�
DATE TRAINING
COMMENCED
DURATION
Hrs./Days/
Weeks
COURSE COMPLETED NAME OF TRAINER
OR TRAINING BODY
Service Report
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0065
PolicyService Report
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Service Report
PurposeThe purpose of this policy is to explain the general procedures relating to Service Report
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 5.24 - Service Report
Customer: Date Of Service:
Service Technician: Reason For Service:
Programmed Call-Out Return to Base
Job Number: If Programmed, What Type?
1 Month 6 Month 12 Months
Item Activity Acceptance
Criteria
Test Result Checked Ok
(Initials)
1
2
3
4
5
6
7
8
9
10
Parts Used:
Service Report:
Further Action Required?
Next Service Due:
Service Charge: Labour (___hrs.) $
Parts $
Sundries $
Total $
_________________________________
Signature of Service Technician
Statistical Report
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0066
PolicyStatistical Report
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Statistical Report
PurposeThe purpose of this policy is to explain the general procedures relating to Statistical Report
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureForm No. 525 Statistical Report
REPORT FOR THE MONTH OF:
REPORT COMPLETED BY:
Number and type of non-conformance
Breach of Quality Management System
Design problem
Product Defect
Supplier Error
Customer Complaint
(incl. Warranty)
QTY YEAR
Graph
TIME
Area in process where non-conformance detected
Goods Receiving & Store
Sales
Design
Production
Final Inspection & Test Service
Delivery
Administration
QTY YEAR
Graph
TIME
Estimated cost of rework
Number of minor events X $000$
Number of major events X $0,000 $
TOTAL $
QTY YEAR
Graph
TIME
Number of products failing final inspection
Production
Service
QTY YEAR
Graph
TIME
Refer to next page for Back-Up Statistics
Date Training
Commenced
Duration
Hrs/Days/
Weeks
Course Completed Name Of Trainer
Or Training Body
Ezi Cut Tree Services Pty Ltd
Quality Schedules
Document Retention Schedule
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0067
PolicyDocument Retention Schedule
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Document Retention Schedule
Purpose
ScopeThe following guidelines are to be adhered to by all employees, supervisors and employees.
ProcedureProcedure for example:
Record Name Record
No.
Retention
Period
Person
Responsible
Location Disposal
Method
Management
review
Customer orders
Design plans
Purchase Orders
Production Records
Service Records
Calibration Records
Internal Audit
reports
Delivery Advice
Training records
Employee Records
Subcontractor Listing
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0068
PolicySubcontractor Listing
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Subcontractor Listing
PurposeThe purpose of this policy is to explain the general procedures relating to Subcontractor Listing
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureVisual Inspection1.
Cert of Compliance required2.
Compliance testing on Delivery3.
Supplier Address Contact details Level of
Inspection 1-3
Assessment
completed
Review Due
Internal Audit Plan
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0069
PolicyInternal Audit Plan
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Internal Audit Plan
PurposeThe purpose of this policy is to explain the general procedures relating to Internal Audit Plan
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
Procedure
Area to be
audited
Auditor Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
X: Planned X: Completed
Service Plan
This document is controlled
Version: 1.0.0.0 Created Date: 19/02/2015 9:00:05 AM
Created By: April McAlpine Modified Date: 19/02/2015 9:00:05 AM
Modified By: April McAlpine Status: In Progress
Tag: Approved By:
Policy RefPN0070
PolicyService Plan
DescriptionEzi Cut Tree Services Pty Ltd has guidelines for all employees regarding Service Plan
PurposeThe purpose of this policy is to explain the general procedures relating to Service Plan
ScopeThe following guidelines are to be adhered to by all managers, supervisors and employees.
ProcedureSee next page for example.
Machine
ID
Work
Instruction
No.
Location Technician Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec