Click here to load reader
Upload
henry-lamb
View
215
Download
0
Embed Size (px)
DESCRIPTION
f Beam Instrumentation Department 2 Instrumentation Department Organization
Citation preview
f Beam Instrumentation Department
Instrumentation -- present and future Instrumentation -- present and future (Jean’s title)(Jean’s title)
Bob WebberBob WebberAccelerator Run II MeetingAccelerator Run II MeetingThursday, January 8, 2004Thursday, January 8, 2004
2
f Beam Instrumentation Department
Instrumentation Priorities – My PerspectiveInstrumentation Priorities – My Perspective• NUMI tasks (struggling to identify the target and really get going)• TEV BPMs project (needs increased AD attention)• Rapid Transfer Line BPMs (no one presently assigned)• Recycler BPM finish-up (just to wrap it up)• Pbar Flying Wires (just to get it done)• SY-120 (except BPM front-end)• Flying Wire and Synch light front-end upgrades (for SDA robustness)• Flying Wire performance analysis (on going)• BLT standardization and robustification• Toroid signal integration and readout upgrades• TeV IPM• Accumulator BPM MOOC/ACNET upgrade• (MI BPMs hardly even make my list)• Tevatron BLM system at some priority (since I first made this list)
3
f Beam Instrumentation Department
Instrumentation Department OrganizationInstrumentation Department OrganizationDepartment Head Group Leaders Down 2.4 people since year ago
and Deputy
R. Webber J. Crisp A. CadornaS. Pordes B. Fellenz
J. FitzgeraldM. Olson J. SaboP. Prieto J. Seraphin
J. Van Bogaert(A. Semenov) awaiting visaA. Yousif D. Heikkinen
S. Pordes R. FloraE. LormanT. MeyerV. ScarpineD. Voy
G. Tassotto D. Schoo R. Pierce
J. Zagel D. Miller 60%C. Lundberg
Posted Openings Applications Physicist (interviewing)Tech II (internal, no applications since 9/17/2003 posting)
4
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/ProjectsCustomer Activity/System Project Requestor Personnel
Linac (maint.) BPMs M. Olson/J. Sabo
Linac (projects) BLMs E. McCrory M. Olson/J. Sabo
Booster (maint.) BPMs M. Olson/J. Sabo
BLMs M. Olson/J. Sabo
IPM J. Zagel
Booster (projects) Beam Current Normalizer J. Lackey J. Fitzgerald
Pbar (maint.) none
Pbar (projects) Accumulator BPM MOOC/ACNET upgrade Controls Dept. D. Voy
Flying Wire upgrades E. Harms J. Zagel et al.
5
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/Projects
Main Injector (maint.) BPMs M. Olson/J. Sabo
BLMs M. Olson/J. Sabo
MultiWires G. Tassotto
Toroids J. Crisp/A. Ibrahim
DCCT J. Crisp/A. Ibrahim
FBI J. Crisp/T. Meyer
SBD S. Pordes/R. Flora
AM-PM BLT E. Lorman/V. Scarpine
Flying Wires J. Zagel/S. Pordes
IPMs J. Zagel
Main Injector (projects) Flying Wires - upgrade front-end PC and Labview Instrumentation Dept. J. Zagel/E. Lorman
BLT - digitizer system Instrumentation Dept. D. Voy/V. Scarpine
FBI daq upgrade Integration Dept. J. Crisp/T. Meyer
2.5 MHz BLT development Instrumentation Dept. E. Lorman/D. Voy/P. Prieto
MI BPM Upgrade Run II Upgrade Plan TBD
MI BLM Upgrade (NUMI & SY120) TBD
6
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/ProjectsRecycler (maint.) Toroids J. Crisp/A. Ibrahim
DCCT J. Crisp/A. Ibrahim
BLT E. Lorman/V. Scarpine
Recycler (projects) Flying Wires - commission system S. Nagaitsev J. Zagel
Beam Line Tuner - replace SLAC card, redo software Instrumentation Dept. E. Lorman/D. Voy/P. Prieto
BPM - Complete commissioning - monitoring apps. Recycler Dept. P. Prieto et al.
SBD or FBI like system for RR ?? Recycler or Integration Dept. TBD
Transfer Lines (maint.) Multiwires G. Tassotto(including 400 MeV, MI-8, P150, A150, P2, RR transfers, AP1, & AP3) Toroids J. Crisp/A. Ibrahim
BPMs A. Yousif/D. Heikkinen/M. Olson/J. Sabo
BLMs M. Olson/J. Sabo
Transfer Lines (projects) Develop standard OTR Instrumentation Dept. et al. V. Scarpine/G. Tassotto
Toroid readout development Instrumentation & Pbar Dept. J. Crisp/A. Ibrahim/D. Heikkinen
Rapid Transfer Beamline BPMs Run II Upgrade Plan A. Yousif/TBD
7
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/ProjectsTevatron (maint.) BPMs M. Olson/J. Sabo
BLMs M. Olson/J. Sabo
DCCT J. Crisp/A. Ibrahim
FBI T. Meyer/S. Pordes
SBD R. Flora/S. Pordes
Flying Wires S. Pordes/J. Zagel/E. Lorman
Synch Light S. Pordes/E. Lorman/J. Zagel
BLT V. Scarpine
Tevatron (projects) BPM Upgrade Run II Upgrade Plan R. Webber
Flying Wires - upgrade front-end PC and Labview Instrumentation Dept. J. Zagel/E. Lorman
Synch Light - upgrade front-end PC and labview Instrumentation Dept. E. Lorman
Abort gap monitoring capability Tevatron Dept. S. Pordes/E. Lorman
Synch Light Slow photodiode readout Instrumentation Dept./TeV S. Pordes
Synch Light Fast PMT readout Instrumentation Dept. S. Pordes
Synch Light Move from C11 Instrumentation Dept./BTeV S. Pordes
FBI DAQ upgrade v2 Integration Dept. S. Pordes/T. Meyer
Lebedev BPM/Tune Processing Tevatron Dept. TBD
SBD upgrade v2 Integration Dept. S. Pordes/R. Flora
C0 low beta insertion/Btev design Collider Detectors/BTeV S. Pordes/M. Olson
TeV IPM project Run II Upgrade Plan J. Zagel et al.
DCCT readout development Instrumentation & TeV Dept. J. Crisp/A. Ibrahim/T. Meyer
TeV BLM project Run II Upgrade Plan S. Pordes/M. Olson
8
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/Projects
Global/Internal (maint.) PC support T. Meyer/E. Lorman
Labview Organization E. Lorman
Temp/Humid Monitors J. Seraphin
AC motor controllers G. Tassotto/D. Schoo
Global/Internal (projects) IPM vacuum understanding TeV & Recycler Dept. J. Zagel
F-W feedthru development Instrumentation Dept. J. Zagel
IPM calibration and RF sensitivity studies All IPM machines J. Zagel
Scope readout Instrumentation & Integ. Dept. S. Pordes/V. Scarpine/E. Lorman
Complete the multiwire signal cable tester Instrumentation Dept. G. Tassotto/D. Schoo
Document assembly of Gloor II (ceramic ) multiwire Instrumentation Dept. G. Tassotto/D. Schoo
Write test and QA instructions for the Gloor II multiwire Instrumentation Dept. G. Tassotto/D. Schoo
Documentation of AC Motor controller chassis circuit Instrumentation Dept. G. Tassotto/D. Schoo
Upgrade swic assembly facility Instrumentation Dept. G. Tassotto/D. Schoo
9
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/Projects
NUMI (projects) BPM system (hardware and software) NUMI project J. Crisp/P. Prieto
Profile Monitors NUMI project G. Tassotto/D. Schoo
Loss Monitors NUMI project G. Tassotto/D. Schoo
Intensity Monitors NUMI project J. Crisp/A. Ibrahim
NUMI beam monitoring in MI for Beam Permit System NUMI project J. Crisp/TBD
Wall current monitor and OTR profile monitor NUMI project
MiniBooNE (maint.) BPMs A. Yousif
Multiwires G. Tassotto/D. Schoo
BLMs M. Olson/J. Sabo
Toroids J. Crisp/A. Ibrahim
MiniBooNE (projects) Assemble and test new target multiwire MiniBooNE G. Tassotto/D. Schoo
10
f Beam Instrumentation Department
Responsibilities/ProjectsResponsibilities/Projects
SY120 (maint.) Multiwires G. Tassotto/D. Schoo
Swics G. Tassotto/D. Schoo
TLM G. Tassotto/D. Schoo
PWCs G. Tassotto/D. Schoo
SEMs/Ion Chamber G. Tassotto/D. Schoo
SY120 (projects) BPM Front-end DAQ SY-120 D. Voy
Replace 3 Swics with multiwires SY-120 G. Tassotto/D. Schoo
Install 2 PWCs for E-907 SY-120 G. Tassotto/D. Schoo
QXR spill regulation system SY-121 P. Prieto
11
f Beam Instrumentation Department
R. Webber J. Crisp A. CadornaS. Pordes B. Fellenz
J. FitzgeraldM. Olson J. SaboP. Prieto J. Seraphin
J. Van Bogaert(A. Semenov)A. Yousif D. Heikkinen
S. Pordes R. FloraE. LormanT. MeyerV. ScarpineD. Voy
G. Tassotto D. Schoo R. Pierce
J. Zagel D. Miller 60%C. Lundberg
Current ActivitiesCurrent Activities
BPM, BLM maint.
Spare BPMsMI DCCT, mentoring
MI DCCT, toroid electronics
A1, P1 BPMs
BLTs, OTR r&dFBIs, DCCTsSynch light, BLTs
SBDs
RR, NUMI, and TeV BPMs, QXR, Temp/Humidity
SY120 support, NUMI TLMs, NUMI profile monitors
RR BPM, Back Door, Accum BPM
Pbar Flying Wires, TeV IPM
Synch light, BLMs, Flying Wires, SBDs
12
f Beam Instrumentation Department
Priorities vs. AssignmentsPriorities vs. Assignments
• Priorities and current assignment of manpower are not necessarily self-consistent – due to the skill mix and operational maintenance responsibilites of
individuals within the Department.
• Some projects are not being worked on at the level of effort that task prioritization would indicate appropriate.– That's why you might judge some things in above list as not properly
prioritized; they just end up being high priority for persons less well qualified for other things.
– Sad but true.
13
f Beam Instrumentation Department
Collaborations/Outside ContributorsCollaborations/Outside Contributors
• PPD – Flying wires, multiwires, electronics assembly, synch light, Flying Wire PMT and OTR mechanics
• CD – Tev BPM project, Recycler BPMs• University of Texas – NUMI profile monitors
• POST-PRESENTATION ADDITIONS:– I failed to acknowledge that the Instrumentation Department also
receives critical support and cooperation from the AD Controls, Mechanical Support, and RF Departments
– I did mention at the meeting, although not included in these slides, that much instrumentation work is also done to varying degrees by each of the machine systems departments.
14
f Beam Instrumentation Department
What Worries MeWhat Worries Me
• NUMI tasks (struggling to identify the target and really get going)
• TEV BPMs project (needs increased AD attention)• Rapid Transfer Line BPMs (no one presently assigned)• Pbar Flying Wires (just to get it done)• SY-120 (continued maintenance of disparate systems)• BLT standardization and robustification• Accumulator BPM MOOC/ACNET upgrade• Tevatron BLM system at some priority (since I first made
this list) • (MI BPMs hardly even make my list)