Page 1: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

f Beam Instrumentation Department

Instrumentation -- present and future Instrumentation -- present and future (Jean’s title)(Jean’s title)

Bob WebberBob WebberAccelerator Run II MeetingAccelerator Run II MeetingThursday, January 8, 2004Thursday, January 8, 2004

Page 2: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

2

f Beam Instrumentation Department

Instrumentation Priorities – My PerspectiveInstrumentation Priorities – My Perspective• NUMI tasks (struggling to identify the target and really get going)• TEV BPMs project (needs increased AD attention)• Rapid Transfer Line BPMs (no one presently assigned)• Recycler BPM finish-up (just to wrap it up)• Pbar Flying Wires (just to get it done)• SY-120 (except BPM front-end)• Flying Wire and Synch light front-end upgrades (for SDA robustness)• Flying Wire performance analysis (on going)• BLT standardization and robustification• Toroid signal integration and readout upgrades• TeV IPM• Accumulator BPM MOOC/ACNET upgrade• (MI BPMs hardly even make my list)• Tevatron BLM system at some priority (since I first made this list)

Page 3: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

3

f Beam Instrumentation Department

Instrumentation Department OrganizationInstrumentation Department OrganizationDepartment Head Group Leaders Down 2.4 people since year ago

and Deputy

R. Webber J. Crisp A. CadornaS. Pordes B. Fellenz

J. FitzgeraldM. Olson J. SaboP. Prieto J. Seraphin

J. Van Bogaert(A. Semenov) awaiting visaA. Yousif D. Heikkinen

S. Pordes R. FloraE. LormanT. MeyerV. ScarpineD. Voy

G. Tassotto D. Schoo R. Pierce

J. Zagel D. Miller 60%C. Lundberg

Posted Openings Applications Physicist (interviewing)Tech II (internal, no applications since 9/17/2003 posting)

Page 4: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

4

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/ProjectsCustomer Activity/System Project Requestor Personnel

Linac (maint.) BPMs M. Olson/J. Sabo

Linac (projects) BLMs E. McCrory M. Olson/J. Sabo

Booster (maint.) BPMs M. Olson/J. Sabo

BLMs M. Olson/J. Sabo

IPM J. Zagel

Booster (projects) Beam Current Normalizer J. Lackey J. Fitzgerald

Pbar (maint.) none

Pbar (projects) Accumulator BPM MOOC/ACNET upgrade Controls Dept. D. Voy

Flying Wire upgrades E. Harms J. Zagel et al.

Page 5: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

5

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/Projects

Main Injector (maint.) BPMs M. Olson/J. Sabo

BLMs M. Olson/J. Sabo

MultiWires G. Tassotto

Toroids J. Crisp/A. Ibrahim

DCCT J. Crisp/A. Ibrahim

FBI J. Crisp/T. Meyer

SBD S. Pordes/R. Flora

AM-PM BLT E. Lorman/V. Scarpine

Flying Wires J. Zagel/S. Pordes

IPMs J. Zagel

Main Injector (projects) Flying Wires - upgrade front-end PC and Labview Instrumentation Dept. J. Zagel/E. Lorman

BLT - digitizer system Instrumentation Dept. D. Voy/V. Scarpine

FBI daq upgrade Integration Dept. J. Crisp/T. Meyer

2.5 MHz BLT development Instrumentation Dept. E. Lorman/D. Voy/P. Prieto

MI BPM Upgrade Run II Upgrade Plan TBD

MI BLM Upgrade (NUMI & SY120) TBD

Page 6: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

6

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/ProjectsRecycler (maint.) Toroids J. Crisp/A. Ibrahim

DCCT J. Crisp/A. Ibrahim

BLT E. Lorman/V. Scarpine

Recycler (projects) Flying Wires - commission system S. Nagaitsev J. Zagel

Beam Line Tuner - replace SLAC card, redo software Instrumentation Dept. E. Lorman/D. Voy/P. Prieto

BPM - Complete commissioning - monitoring apps. Recycler Dept. P. Prieto et al.

SBD or FBI like system for RR ?? Recycler or Integration Dept. TBD

Transfer Lines (maint.) Multiwires G. Tassotto(including 400 MeV, MI-8, P150, A150, P2, RR transfers, AP1, & AP3) Toroids J. Crisp/A. Ibrahim

BPMs A. Yousif/D. Heikkinen/M. Olson/J. Sabo

BLMs M. Olson/J. Sabo

Transfer Lines (projects) Develop standard OTR Instrumentation Dept. et al. V. Scarpine/G. Tassotto

Toroid readout development Instrumentation & Pbar Dept. J. Crisp/A. Ibrahim/D. Heikkinen

Rapid Transfer Beamline BPMs Run II Upgrade Plan A. Yousif/TBD

Page 7: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

7

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/ProjectsTevatron (maint.) BPMs M. Olson/J. Sabo

BLMs M. Olson/J. Sabo

DCCT J. Crisp/A. Ibrahim

FBI T. Meyer/S. Pordes

SBD R. Flora/S. Pordes

Flying Wires S. Pordes/J. Zagel/E. Lorman

Synch Light S. Pordes/E. Lorman/J. Zagel

BLT V. Scarpine

Tevatron (projects) BPM Upgrade Run II Upgrade Plan R. Webber

Flying Wires - upgrade front-end PC and Labview Instrumentation Dept. J. Zagel/E. Lorman

Synch Light - upgrade front-end PC and labview Instrumentation Dept. E. Lorman

Abort gap monitoring capability Tevatron Dept. S. Pordes/E. Lorman

Synch Light Slow photodiode readout Instrumentation Dept./TeV S. Pordes

Synch Light Fast PMT readout Instrumentation Dept. S. Pordes

Synch Light Move from C11 Instrumentation Dept./BTeV S. Pordes

FBI DAQ upgrade v2 Integration Dept. S. Pordes/T. Meyer

Lebedev BPM/Tune Processing Tevatron Dept. TBD

SBD upgrade v2 Integration Dept. S. Pordes/R. Flora

C0 low beta insertion/Btev design Collider Detectors/BTeV S. Pordes/M. Olson

TeV IPM project Run II Upgrade Plan J. Zagel et al.

DCCT readout development Instrumentation & TeV Dept. J. Crisp/A. Ibrahim/T. Meyer

TeV BLM project Run II Upgrade Plan S. Pordes/M. Olson

Page 8: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

8

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/Projects

Global/Internal (maint.) PC support T. Meyer/E. Lorman

Labview Organization E. Lorman

Temp/Humid Monitors J. Seraphin

AC motor controllers G. Tassotto/D. Schoo

Global/Internal (projects) IPM vacuum understanding TeV & Recycler Dept. J. Zagel

F-W feedthru development Instrumentation Dept. J. Zagel

IPM calibration and RF sensitivity studies All IPM machines J. Zagel

Scope readout Instrumentation & Integ. Dept. S. Pordes/V. Scarpine/E. Lorman

Complete the multiwire signal cable tester Instrumentation Dept. G. Tassotto/D. Schoo

Document assembly of Gloor II (ceramic ) multiwire Instrumentation Dept. G. Tassotto/D. Schoo

Write test and QA instructions for the Gloor II multiwire Instrumentation Dept. G. Tassotto/D. Schoo

Documentation of AC Motor controller chassis circuit Instrumentation Dept. G. Tassotto/D. Schoo

Upgrade swic assembly facility Instrumentation Dept. G. Tassotto/D. Schoo

Page 9: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

9

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/Projects

NUMI (projects) BPM system (hardware and software) NUMI project J. Crisp/P. Prieto

Profile Monitors NUMI project G. Tassotto/D. Schoo

Loss Monitors NUMI project G. Tassotto/D. Schoo

Intensity Monitors NUMI project J. Crisp/A. Ibrahim

NUMI beam monitoring in MI for Beam Permit System NUMI project J. Crisp/TBD

Wall current monitor and OTR profile monitor NUMI project

MiniBooNE (maint.) BPMs A. Yousif

Multiwires G. Tassotto/D. Schoo

BLMs M. Olson/J. Sabo

Toroids J. Crisp/A. Ibrahim

MiniBooNE (projects) Assemble and test new target multiwire MiniBooNE G. Tassotto/D. Schoo

Page 10: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

10

f Beam Instrumentation Department

Responsibilities/ProjectsResponsibilities/Projects

SY120 (maint.) Multiwires G. Tassotto/D. Schoo

Swics G. Tassotto/D. Schoo

TLM G. Tassotto/D. Schoo

PWCs G. Tassotto/D. Schoo

SEMs/Ion Chamber G. Tassotto/D. Schoo

SY120 (projects) BPM Front-end DAQ SY-120 D. Voy

Replace 3 Swics with multiwires SY-120 G. Tassotto/D. Schoo

Install 2 PWCs for E-907 SY-120 G. Tassotto/D. Schoo

QXR spill regulation system SY-121 P. Prieto

Page 11: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

11

f Beam Instrumentation Department

R. Webber J. Crisp A. CadornaS. Pordes B. Fellenz

J. FitzgeraldM. Olson J. SaboP. Prieto J. Seraphin

J. Van Bogaert(A. Semenov)A. Yousif D. Heikkinen

S. Pordes R. FloraE. LormanT. MeyerV. ScarpineD. Voy

G. Tassotto D. Schoo R. Pierce

J. Zagel D. Miller 60%C. Lundberg

Current ActivitiesCurrent Activities

BPM, BLM maint.

Spare BPMsMI DCCT, mentoring

MI DCCT, toroid electronics

A1, P1 BPMs

BLTs, OTR r&dFBIs, DCCTsSynch light, BLTs

SBDs

RR, NUMI, and TeV BPMs, QXR, Temp/Humidity

SY120 support, NUMI TLMs, NUMI profile monitors

RR BPM, Back Door, Accum BPM

Pbar Flying Wires, TeV IPM

Synch light, BLMs, Flying Wires, SBDs

Page 12: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

12

f Beam Instrumentation Department

Priorities vs. AssignmentsPriorities vs. Assignments

• Priorities and current assignment of manpower are not necessarily self-consistent – due to the skill mix and operational maintenance responsibilites of

individuals within the Department.

• Some projects are not being worked on at the level of effort that task prioritization would indicate appropriate.– That's why you might judge some things in above list as not properly

prioritized; they just end up being high priority for persons less well qualified for other things.

– Sad but true.

Page 13: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

13

f Beam Instrumentation Department

Collaborations/Outside ContributorsCollaborations/Outside Contributors

• PPD – Flying wires, multiwires, electronics assembly, synch light, Flying Wire PMT and OTR mechanics

• CD – Tev BPM project, Recycler BPMs• University of Texas – NUMI profile monitors

• POST-PRESENTATION ADDITIONS:– I failed to acknowledge that the Instrumentation Department also

receives critical support and cooperation from the AD Controls, Mechanical Support, and RF Departments

– I did mention at the meeting, although not included in these slides, that much instrumentation work is also done to varying degrees by each of the machine systems departments.

Page 14: F Beam Instrumentation Department Instrumentation -- present and future (Jean’s title) Bob Webber Accelerator Run II Meeting Thursday, January 8, 2004

14

f Beam Instrumentation Department

What Worries MeWhat Worries Me

• NUMI tasks (struggling to identify the target and really get going)

• TEV BPMs project (needs increased AD attention)• Rapid Transfer Line BPMs (no one presently assigned)• Pbar Flying Wires (just to get it done)• SY-120 (continued maintenance of disparate systems)• BLT standardization and robustification• Accumulator BPM MOOC/ACNET upgrade• Tevatron BLM system at some priority (since I first made

this list) • (MI BPMs hardly even make my list)