36
07/09/2005 1 Fédération Internationale des Ingénieurs-Conseils FIDIC Annual Conference Quality Procurement Workshop Beijing, China September 7, 2005 BEST PRACTICE PROCUREMENT OF ENGINEERING SERVICES Gregs G. Thomopulos, P.E., FACEC Executive Committee Member FIDIC FIDIC

F édération I nternationale d es I ngénieurs- C onseils

Embed Size (px)

DESCRIPTION

F édération I nternationale d es I ngénieurs- C onseils. FIDIC. FIDIC Annual Conference Quality Procurement Workshop Beijing, China September 7, 2005 BEST PRACTICE PROCUREMENT OF ENGINEERING SERVICES Gregs G. Thomopulos, P.E., FACEC Executive Committee Member FIDIC. - PowerPoint PPT Presentation

Citation preview

Page 1: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 1

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

FIDIC Annual ConferenceQuality Procurement Workshop

Beijing, ChinaSeptember 7, 2005

BEST PRACTICE PROCUREMENTOF ENGINEERING SERVICES

Gregs G. Thomopulos, P.E., FACECExecutive Committee Member

FIDIC

FIDIC

Page 2: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 2

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

To promote the business interests of members providing technology-based intellectual services for the built and natural environment, and while so doing, accept and uphold our responsibilities to society.

FIDIC’s Mission:

Page 3: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 3

Selection Guide – Best Practice Principles

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

FIDIC emphasizes that quality is paramount in the selection of consultants, and that Quality Based Selection is the recommended method.

FIDIC emphasises the need for integrity, clarity and quality in the Inviting and Evaluation of Proposals for Consultant Selection.

Page 4: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 4

Guide to Quality ManagementGuide to ISO 9001:2000

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

FIDIC has published:

Guide to Quality Management in the Consulting Engineering Industry

Guide to the Interpretation and Application of the ISO9001:2000 Standard for the Consulting Engineering Industry

Training Kit: Quality Management in the Consulting Engineering Industry

Page 5: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 5

FIDICF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

BEST PRACTICE PROCUREMENT

MAXIMISING BENEFITS TO CLIENTS

Page 6: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 6

The IssueF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

General observation that the quality of the constructed project has been deteriorating.

This observation is confirmed by the Banks’ Project Managers, Executing Agencies and International Consultants.

It is also perceived that good International Consultants are losing interest in Bank-funded projects.

The current trend in diminished Quality Outcome of the constructed project needs to be reversed.

Page 7: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 7

Causes of Deterioration in QualityF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

A major cause is the diminished quality of design.

Lower quality design results in lower quality construction and increased variation orders, resulting in increased cost of the project.

Other factors contribute as well, including:

Corruption;

Incompetent Contractors;

Poor Project Management;

Lack of Resources to Manage Contractors.

Page 8: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 8

Selection Guide – Best Practice Principles

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

“Consultant selection is highly critical to the success of the entire project; to save a small percentage, perhaps 1% or less of project cost, is not worthwhile, considering the potential risks.”

Page 9: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 9

Selection Guide – Best Practice Principles

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

Quality in the process of selection of engineering consultants refers to those factors which will enable the consultant to produce the best value solution to the Client’s Terms of Reference: and includes the Firm’s relevant professional competence and experience, managerial ability, financial capability, availability of resources, capability of designated staff, quality and integrity management systems, and demonstrated understanding of the Project and the Client’s Brief.

Page 10: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 10

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

The Parties to Procurement

The Purchaser (Client or Employer)

The Professional Service Provider

The Financier

The Contractor

The Public – End Users

Page 11: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 11

Informed PurchaserF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

An Informed Purchaser is an Owner who either has the in-house technical expertise or engages outside experts necessary to:

clearly convey project vision;evaluate and select consultants;understand the risks and procedures

inherent in project execution; and follow through with proper O&M

procedures and monitoring of outcomes.

Page 12: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 12

Informed PurchaserF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

The Informed Purchaser will be better equipped to incorporate other Quality-Based Principles at the project development phase, including:

• Capacity Building; • Sustainability; and• Monitoring of Outcomes.

Page 13: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 13

Quality – Who Needs It?F

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

“It is unwise to pay too much, but it’s worse to pay too

little. When you pay too little, you sometimes lose

everything because the thing you bought was incapable of

doing the thing you bought it to do.”

“The common law of business balance prohibits paying a

little and getting a lot – it can’t be done.”John Ruskin (1819 – 1900)

British Poet, Scientist and Philosopher

“Price has no meaning except in terms of the quality of the

product.”Dr W. Edward Deming (1900-1993)

Page 14: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 14

Quality – Who Needs It?F

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Client: Public Sector

Spend public money wisely

Obtain best value, (which is not least cost);

Have regard to operating and life cycle costs;

Have regard to environment and sustainability

Encourage innovation

Encourage development of viable industry: capacity building

Avoid disputes, delays, non-productive costs

Page 15: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 15

Quality – Who Needs It?F

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Client: Private Sector

Spend shareholders money wisely

Obtain best value, (which is not least cost);

Have regard to operating and life cycle costs;

Have regard to environment and sustainability

Encourage innovation

Develop partnerships

Avoid disputes, delays, non-productive costs

Protect investment by the purchase of quality product

Page 16: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 16

Quality – Who Needs It?F

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Client: Design Build Contractor

Need to win the project;

Encourage innovation

Need to satisfy Clients Brief (needs expert advice)

Need to be able to construct for the price tendered

Avoid disputes, delays, non-productive costs

Develop partnerships

Page 17: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 17

QualityF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Low cost and lack of integrity inevitably lead to poor design and poor quality in the completed project.

Page 18: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 18

Quality in Selection of Consulting Engineers

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

The procurement of consulting engineer services has the greatest impact on the Life-Cycle Cost of the project, yet is the least costly component. The Owner’s challenge is to get a good “return on investment” in design services.

Life Cycle Cost

Impact on Project Success

Engineering

Construction

Representation of Typical Life Cycle Cost and Impact on Project Success

Operation & Maintenance

Page 19: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 19

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

Page 20: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 20

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

FIDIC – Principles of Best Practice Procurement

FIDIC Guidelines for Selection

Quality

Transparency

Capacity Building

Integrity

Fair Competition

Harmonisation

Liability

Monitoring Outcomes

Page 21: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 21

The Steps in the Procurement ProcessF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Announcement and Pre-qualification (long listing)

Short List Request for Proposal

Letter of Invitation Terms of Reference Information to Consultant The Proposed Agreement

Preparation and Submission of Proposal Receipt and Opening of Proposals Evaluation Negotiation and Award De-Briefing

Page 22: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 22

It is essential that the consultant addresses the

TOR and the evaluation criteria faithfully and

accurately. Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

Proposals

Page 23: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 23

EvaluationF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

This is a key feature of the Procurement Process which is so often carried out in a questionable way, thus frustrating quality consultants and penalising the end client.

Page 24: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 24

Recommended Criteria for the Selection of the Evaluating Committee Members

Féd

érat

ion

Inte

rnat

iona

le d

es In

géni

eurs

-Con

seils

Professional Experience Familiarity with Selection and Evaluation Objectivity The Client Decides on the

Number of Members Independence

Page 25: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 25

The Contract AgreementF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

The recommended form of agreement is the FIDIC Client – Consultant Model Services Agreement (White Book) or at least a recognised standard contract, with appendices filled in as appropriate, reflecting the scope of work. The final TOR and the agreed methodology shall be incorporated in the scope of work. The selected firm should not be allowed to change the key staff or any major items included in its proposal, unless both parties agree that undue delay in the selection has made it necessary.

Page 26: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 26

Result of Good Quality OutcomeF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Quality in Selection produces quality designs. Quality designs produce quality projects. Quality projects have fewer variation orders

during construction. Fewer variation orders result in lower

construction costs. Quality designs and lower construction costs

result in lower life-cycle costs. Quality in Selection is in the Owner’s best interest.

Page 27: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 27

Result of Poor Quality OutcomeF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Hyatt Regency Hotel, Kansas City, Missouri

In July of 1981, two elevated walkways over the lobby of the Kansas City Hyatt Regency Hotel collapsed during a party, killing 111 people and injuring 188 others.

In 1995 a pedestrian bridge collapsed at the Maccabiah Games in Israel causing the deaths by drowning of about 40 athletes.

Engineering services for the structures were awarded on the basis of price.

Page 28: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 28

FIDICF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

“ …selection of an Architect or Engineer solely on price-competition basis provides the potential for reductions in quality due to initial underestimation of the costs and resources required to adequately perform the work.”

U.S. House of Representative

Subcommittee Report on Structural Failures

Page 29: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 29

Business Integrity ManagementF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Corruption undermines the achievement of a Quality Outcome, and the practice of business integrity is crucial to fighting corruption.

FIDIC recommends that consulting engineers adopt the FIDIC Business Integrity Management System (BIMS), and that Owners have regard to this policy during selection.

Page 30: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 30

Capacity BuildingF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Improves the Quality Outcome of the constructed project.

Fee competition is detrimental to Capacity Building.

As a result of fee competition, local firms are not adequately compensated.

Banks may want to examine the need for “set-asides” of projects for local consultants.

The procurement for such “set-asides” should be based on quality principles.

Page 31: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 31

SustainabilityF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Sustainability integrates the environmental, economic, and social dimensions of development, and is therefore fundamental to a Quality Outcome.

The FIDIC Project Sustainability Management (PSM) process provides a framework for the Owner and Engineer to balance project vision against cost and available alternatives, and select appropriate project goals and indicators for sustainable development. The indicators are linked back to higher level goals such as global warming, biodiversity, access to fresh water, and materials and energy use.

Page 32: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 32

Quality-Based Project ManagementF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

FIDIC recommends that consulting engineers adopt a Quality Management System, and that Owners have regard to this policy during selection.

A Quality Management System is a formalized project management structure that incorporates: Customer-focused leadership and organization; Employee involvement; A process and factual approach to decision making; Continuous improvement; and Mutually beneficial supplier (sub consultant) relationships.

Page 33: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 33

Quality-Based ConstructionF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

Quality principles extend to the tendering and construction phase. Means to incorporate quality principles include: Prequalification of contractors; Quality-based construction management procedures; and Documentation of contractor performance. Selection of Contractors to include quality

elements

Page 34: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 34

Conclusion – A Working PartnershipF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

The consulting engineering industry remains largely responsible for the planning, design, construction, inspection and management of the infrastructure needed to meet the world’s ever-increasing demand for food, water, sanitation, shelter, health services, transportation and energy. It tackles on a daily basis the problems of how to improve peoples’ lives while preserving natural resources in a world with a growing population.

Page 35: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 35

ConclusionF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

The incorporation of Quality-Based Principles in the

execution of projects is essential to the achievement

of the stated goal: a reversal

of the trend of diminished

Quality Outcomes on projects.

Page 36: F édération  I nternationale  d es  I ngénieurs- C onseils

07/09/2005 36

QualityF

édér

atio

n In

tern

atio

nale

des

Ingé

nieu

rs-C

onse

ils

“I told you to use Quality Principles to build this bridge.”