Page 1: F. Toral CLIC Workshop. 3-11-2011 CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT

F. ToralCLIC Workshop. 3-11-2011

CIEMAT contribution to CLIC Experimental Verification

F. Toral on behalf of Accelerator Technology Group, CIEMAT

Page 2: F. Toral CLIC Workshop. 3-11-2011 CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT

F. ToralCLIC Workshop. 3-11-2011

Present developments for CTF3: TBL PETS (I)

CIEMAT contribution

First prototype: Engineering design. Fabrication and assembly. Low power RF Test.

Test Beam Line in CTF3: Study and validate the drive beam

stability during deceleration.

Scheduled 16 PETS (TBL with 12 PETS in 2012)

Series production: Implementation of

modifications. Assembly of 3 PETS tanks. Low power RF test. Fabrication of several parts for

8 tanks + 4 tanks more

Page 3: F. Toral CLIC Workshop. 3-11-2011 CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT

F. ToralCLIC Workshop. 3-11-2011

Present developments for CTF3: TBL PETS (II)

RF low power test

Assembly

Assembly

Waveguide

Cooling pipes

Page 4: F. Toral CLIC Workshop. 3-11-2011 CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT

F. ToralCLIC Workshop. 3-11-2011

TBL PETS commissioning status

FIRSTCIEMATPETS

SECOND CIEMATPETS

THIRDCIEMATPETS

FOURTHCIEMATPETS

SER

IES P

RO

DU

CTIO

N

PR

OTO

TYPE

Installed in TBL and decelerating 14 A and 19 A beams

Sent to CERN in week 36, 2011

Sent to CERN in week 38, 2011 Courtesy of Steffen Doebert

Present developments for CTF3: TBL PETS (III)

Page 5: F. Toral CLIC Workshop. 3-11-2011 CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT

F. ToralCLIC Workshop. 3-11-2011

Future contributions to Experimental Verification

CTF3-003: Task 1: Development of PETS with two couplers for

TBL+.CTF3-004:

CIEMAT contribution to components of the Two Beam modules is accounted in CTC-TBM work package.

CLIC-001: Task 3: Development of bunchers for drive beam

injector.

(In all cases, final numbers for available resources are still under discussion with the Spanish Ministry of Science and Innovation, to be confirmed soon)