7

f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 2: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 3: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 4: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 5: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 6: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not
Page 7: f4196616dc3ce6e00c30 …… · Metal detector tape shall be placed 2' above the pipe and follow the alignment of the pipe. ... DEDUCT METER INSTALLATION (FIGURE 2) Section View (Not