Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Embed Size (px)

Citation preview

Page 1: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday
Page 2: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

www.nsri.co.uk

Fabrication and Installation considerations for Subsea

Hydrocarbon Storage

David Sinclair, Bibby Offshore

April 2016

Page 3: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

NSRI - Thursday 21 April 2016

FABRICATION AND INSTALLATION CONSIDERATIONS FOR

SUBSEA HYDROCARBON STORAGE

Page 4: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

AGENDA

• Company Overview

• Hydrocarbon Storage Tank

• Installation

• Hook Up and Commissioning

• Solan SOST Case Study

• Conclusions

Page 5: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

COMPANY OVERVIEW:

WHO WE ARE NOW

• Established in 2003

• Leading subsea services provider

• North Sea geographical core and growing internationally

• Global fleet of five vessels

• Modern fleet of 18 advanced ROVs

Page 6: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

COMPANY OVERVIEW:

WHAT WE DO

• Subsea installation, construction, inspection, repair and

maintenance

• Our capabilities extend from ROV inspection to saturation

diving and construction activities

• Leading subsea decommissioning contractor with an

outstanding track record in safety and efficiency

Page 7: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Design Considerations

Operational

• Production constraints & contingencies

• Production rate

• Frequency of offloading

• Single vs multiple tanks

• Service life & reusability

• Fishing friendly?

Fabrication & installation

• Ease of manufacture & transportation

• Installation

• Diver access/ROV interfaces

• Modular approach

• Decommissioning

Modular cells in the gravity

base foundation

Subsea Storage Tank

HYDROCARBON STORAGE

TANK

Page 8: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

LOGISTICS

Considerations

• Suitably sized port

• Port availability

• Cost constraints i.e. vessels & port fees

• Delivery to UK?

• Long term storage

Semi-submersible ship Tug boat with barge

Page 9: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Seabed surveying

Geotechnical study

Seabed core Sampling

Seabed surveying

Creating a level

seabed

Debris clearance

Suction dredging

Mass flow excavation

HP water jetting

Foundations

Pile foundations

Subsea mud mats

Other methods include

• Concrete mattress

• Rock dump

Dredging machine Pile driven into seabed

INSTALLATION

SEABED PREPARATION

Page 10: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Olympic Ares

• DP2

• Crane capacity - 250Te

• Deck area - 1300m2

250Te Crane

Olympic Ares

INSTALLATION CSV VESSEL

Page 11: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Tandem Crane

• DP2 vessel

• Tandem crane lift on

Monohull vessel

• Tandem cranes up to

2,000Te

Heavy Lift Semi-

Submersible

• DP3 vessel

• Tandem cranes up

to 14,200Te

Tandem Crane Vessel

Semi-submersible

INSTALLATION

TANDEM CRANE OR SEMI-SUB

Page 12: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Operations

• Load-out

• Shallow draught surface tow

• Ballasting & trimming

• Transit tow

• Positioning

• Set down

• Float-off

INSTALLATION SDS

Page 13: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

HOOK UP & COMMISSIONING

Post Tank Installation Tasks may

include

• Removal & recovery of lifting points and

lift rigging

• Installation of pipelines

• Installation of tie-in spools

• Installation of control umbilical

• Installation of offloading system

• Leak testing system – topside/DSV

supported

• Commission system

• Concrete mattress protection to spools

• Periodic inspection tasks/ integrity testing

Bibby Topaz spool deployment

Olympic Ares Flexible Lay

Page 14: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

CASE STUDY

PREMIER SOLAN

The field consists of a SOST, an OLS, 2-off production wells and 2-off

water injection wells and a production platform

Map of Solan

Solan Field Layout

Page 15: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Tank Details

• Size - 45m×45m×25m

• Weight - 9,500 Te

• Capacity – 300,000 barrels

• Water depth – 137m

Bibby Offshore Scope

• Removal of installation aids

• Spool tie-ins & flexible pipeline

installation

• Install tank level instrumentation

• Pressure-test and

commissioning of tank

SOLAN SOST

OVERVIEW

Page 16: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

SOLAN SOST

FABRICATION/TRANSPORT

Method

• Fabrication in Dubai

• Transport to Lerwick via semi

submersible

• Preparation work in Lerwick

• Floated in Lerwick and towed to

Solan fieldFabrication in Dubai

Delivery to Lerwick

Page 17: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

SOLAN SOST IN LERWICK

Page 18: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Deployment of tank in field Divers working on tank

SOLAN SOST

DEPLOYMENT &

DECOMMISSIONING

Page 19: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

CONCLUSIONS

• Key installation considerations

• Size

Multiple tanks vs single large tank

Simplicity of fabrication, logistics &

installation

• Modular construction

• Reusability

• Decommissioning

• Opportunity for innovation

Page 20: Fabrication and Installation considerations for … ss david sinclair bibby.pdfconsiderations for Subsea Hydrocarbon Storage David Sinclair, Bibby Offshore April 2016 NSRI - Thursday

Bibby Offshore

Atmosphere One

Prospect Road

Westhill

Aberdeenshire

Tel: +44 (0) 1224 857755

Email:

[email protected]