Facilities Master PlanPhase I Improvements
"For the children, For the community, For the future"
2
Mission
Our mission is to provide a safe learning environment where academics and integrity are
expected from all. We challenge all students to reach their full learning potential and inspire them to become productive
members of our society.
3
4
Pinecrest High
Phase I project already completed: • 11-classroom modular with restrooms, office/work space
• Began use in early 2007
• Funding through the County without impacting taxes
5
Area III - Pinehurst Elementary
Concerns: • Nearly 33% over capacity
• 9 classroom mobiles, 1 bathroom mobile
• Additional mobiles not permitted
• Rapid growth in this area
• Using buildings constructed between 1940's and 1990's
6
Area III - West End Elementary
Concerns:• Approaching 100 students over capacity
• 4 classroom mobiles
• Rapid growth in this area
• Using buildings constructed between the 1950's and the 1980's
7
Area III
Solution: • A new elementary school will be constructed along the Hwy. 211 corridor between Pinehurst and West End
• Core capacity: 650 students
• Initial classroom capacity: 500 students
8
Area I - New Century Middle
Concerns:• Beyond capacity
• 8 mobile classroom units and one mobile bathroom unit
• Significant growth predicted in Area I
9
Area I
Solution:• Construct a new middle school in the Union Pines "feeder" area
• Core capacity: 850 students
• Initial classroom capacity: 450 students
10
Highfalls Elementary
Concerns: • Nearing 100 students over capacity
• 6 classroom mobiles
• Inadequate, well-based water supply
11
Highfalls Elementary
Solution: • Construction of approximately 17,500 sq. ft.
of classroom and student support space
• Establish connection to existing municipal/county water system
12
Robbins Elementary
Concerns: • Insufficient program capacity
• 4 classroom mobiles
• Growing student population
13
Robbins Elementary
Solution: • Construct 13,860 sq. ft. of additional classroom and student support space
14
Westmoore Elementary
Concerns: • Student population exceeds capacity
• 5 classroom mobiles
• Inadequate, well-based water supply and on-site sewage system
15
Westmoore Elementary
Solution: • Construction of approximately 13,440 sq. ft.
of classroom and student support space
• Establish connection to existing municipal/county water/sewer system
16
Sandhills Farm Life Elementary
Concerns: • Student population exceeds capacity
• 5 classroom mobiles
• Growing student population
17
Sandhills Farm Life Elementary
Solution: • Construction of approximately 7,560 sq. ft.
of classroom and student support space
18
Cameron Elementary
Concerns: • Inadequate, on-site sewage system
19
Cameron Elementary
Solution: • Establish connection to existing municipal/county sewer system
20
Union Pines High
Concerns: • Nearly 300 students over capacity
• 5 classroom mobiles
• Insufficient program capacity
• Rapid growth in this area
21
Union Pines High
Solution: • Installation of 12-room modular unit
• 11,900 sq. ft. addition
• Teacher work stations
22
North Moore High
Concerns: • Insufficient program capacity
• Continued growth predicted
• School built 1965; one addition 1987
23
North Moore High
Solution: • Installation of 6-room modular unit
• 5,280 sq. ft. addition
• Teacher work stations
24
Union Pines/North Moore
Why Modular Units?
• Flexibility for future decisions regarding construction needs
• Meets needs in approximately 1/3 the time of permanent construction
• Cost effective way to meet immediate needs
• Meets same N.C. building standards as permanent, on-site construction
25
Athletic Facilities Improvements
Concerns: • Inadequate facilities for programs
• Growing participation in programs
• Limited handicap access
• Limited facilities support (restrooms, seating, etc.) for spectators
26
Athletic Facilities Improvements
Identified needs based on input of school/community athletic study:
Includes:
• Stadium/other athletic seating
• Tennis court improvements
• Field house expansion
• Field improvements
• Public restrooms
and . . .
27
Athletic Facilities Improvements
• Gymnasium improvements
• Concession facilities
• Fencing
• Storage facilities
• Water resources
28
Athletic Facilities Improvements
• Pinecrest High
• Union Pines High
• North Moore High
• West Pine Middle
All middle and high schools impacted!
• Elise Middle
• Westmoore Elementary
• Highfalls Elementary
• New Century Middle
• Southern Middle
29
Facilities Master Plan: Phase I
• New Middle School $17,750,045
• New Elementary School $12,666,060
• Highfalls Elementary $ 4,261,289
• Robbins Elementary $ 2,492,942
• Westmoore Elementary $ 5,015,864
• Sandhills Farm Life Elem. $ 1,421,671
• Union Pines High $ 746,800
and . . .
30
Costs
• North Moore High $ 539,400
• Cameron Elementary $ 1,227,072
• Middle/High school athletic
facilities improvements $ 6,032,400
• Contingency, other fees
$ 1,846,457
TOTAL $54,000,000
31
Mission
Our mission is to provide a safe learning environment where academics and integrity are
expected from all. We challenge all students to reach their full learning potential and inspire them to become productive
members of our society.
32
"For the children, For the community, For the future"