SCOPE OF WORK FACILITY ENERGY AUDIT Department of Transportation Ewing Headquarters Campus Ewing Township, Mercer County, N.J. PROJECT NO. A1100-OO STATE OF NEW JERSEY Honorable Chris Christie, Governor Kim Guadagno, Lt. Governor DEPARTMENT OF THE TREASURY Andrew P. Sidamon-Eristoff, Acting State Treasurer DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION Steven Sutkin, Director Richard Flodmand, Deputy Director Raymond A. Arcario, Deputy Director Date: January 26, 2010 Document Frmat Revision (12/1 5/0 9,)

FACILITY ENERGY AUDIT STATE OF NEW JERSEY … SOW/A1100-00 Facility... · FACILITY ENERGY AUDIT ... C. ENERGY AUDIT REPORT 1. Table ofContents 2. ... (MOB, F&A and E&O), Environmental

  • Upload
    lekiet

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

SCOPE OF WORK

FACILITY ENERGY AUDIT

Department of TransportationEwing Headquarters Campus

Ewing Township, Mercer County, N.J.

PROJECT NO. A1100-OO

STATE OF NEW JERSEYHonorable Chris Christie, Governor

Kim Guadagno, Lt. Governor

DEPARTMENT OF THE TREASURYAndrew P. Sidamon-Eristoff, Acting State Treasurer

DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION

Steven Sutkin, DirectorRichard Flodmand, Deputy Director

Raymond A. Arcario, Deputy Director

Date: January 26, 2010

Document Frmat Revision (12/1 5/09,)

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

TABLE OF CONTENTSSECTION PAGE

BJ]’1I’1 4

II. IJ LIFI 4TIONS .............. .. .. .. .. .. ......................... 4A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS

III. P1JECI’ ..................................................••......................... 4A. PROJECT COSTSB. COST ESTIMATiNG

PROJECI’ S IIEDIJLE........................................................................ 5A. ENERGY AUDIT SCHEDULEB. CONSULTANT’S PROPOSED PROJECT SCHEDULE

V. PROJECT SITE LOCATION & TEAM MEMBERS ...................... 6A. PROJECT SITE ADDRESSB. PROJECT TEAM MEMBER DIRECTORY

1. Client Agency Representative2. Office of Energy Savings

VI. PROJECT IEF’INITION ................................................................... 7A. BACKGROUI’TDB. FUNCTIONAL DESCRIPTION OF THE FACILITY

VII. CONSULTANT ENERGY AUDIT RESPONSIBILITIES .............. 8A. PROJECT COMMENCEMENT

1. Scope of Work Review2. Project Directory3. Existing Documentation

B. ENERGY AUDIT1. Data Gathering Coordination2. Building, Equipment and Systems Profile3. Building Energy Usage and Costs4. Energy Type Utility Rates5. Energy Type Annual Cost6. Green House Gas Emissions7. Facility Energy Profile Summary Table

PAGE 2

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-O0DATE: January 26, 2010

C. ENERGY AUDIT REPORT1. Table of Contents2. Executive Summary3. Building/Facility Information4. Utility Summary5. Measurements & Observations6. Energy Conservation Measures7. Renewable/Distributed Energy Measures8. Costs Estimates9. Energy Audit Report Copies

D. MEETINGS & PRESENTATIONS1. Meetings2. Presentations

E. SUB-CONSULTANT PARTICIPATION

‘7III. -III.R.i%.L ......................................................... 15A. SCOPE CHANGES

IX. S3V SI1iI’1JR1 4PPI J’/4.I. .. . . ..... .. .. ... ... . . . . . ..... . ......... 16

X. ........................................................ 17

XI. ...................................................................................... 18A. DPMC-38 PROJECT COST ANALYSIS FORMB. PROJECT FACILITY SITE MAPC. FACILITY ENERGY PROFILE SUMMARY TABLE (REQUIRED SUMMARY

FORMAT WITH SAMPLE DATA)D. ENERGY CONSERVATION MEASURE SUMMARY TABLE (REQUIRED SUMMARY

FORMAT WITH SAMPLE DATA)

PAGE 3

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

1. OBJECTIVE

The objective of this project is to conduct a comprehensive Energy Audit of the Departmentof Transportation (DOT) Ewing Headquarters Campus in order to identify EnergyConservation Measures (ECM’s), the projected savings of each ECM, and the cost toimplement each ECM

II. CONSULTANT QUALIFICATIONS

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS

The Consultant shall be a firm pre-qualified with the Division of Property Management &Construction (DPMC) in the P051 Energy Auditing Discipline and have in-house capabilitiesor Sub-Consultants pre-qualified in the P025 Estimating/Cost Analysis Discipline and allother Engineering and Specialty Disciplines necessary to complete the project as describedin this Scope of Work.

The firm shall also demonstrate that they have previous experience in conducting energyaudits of other campus type facility infrastructure, similar in size and scope to this project.

III. PROJECT BUDGET

A. PROJECT COSTS

The Consultant shall determine the costs associated with the improvements recommendedfor each ECM in the Energy Audit, including but not limited to, construction costs, design andconstruction ad ministration fees, affirmative action, DPMC management fees, constructionmanagement services, monitoring fees, testing and survey services, inspection fees,contingencies, permits, allowances, and escalation factors for the anticipated constructionyear(s) of the improvements.

The cost estimate shall be adjusted for items including, but not limited to premium time,construction phasing, regional location, site environmental factors, weather conditions,restrictions regarding the contractor’s use of the premises, imposed. constraints caused byClient Agency program schedules or building occupants, temporary relocation and movingcosts, demolition costs, removal of hazardous materials, location of work within the buildings,security issues, utility interruption and shut down constraints caused by building use, andconcurrent construction activities with other projects at the facility.

PAGE 4

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

B. COST ESTIMATING

The Consultant or Sub-Consultant providing the cost estimate must be pre-qualified withDPMC in the P025 Estimating/Cost Analysis Specialty Discipline.

All cost estimates must be submitted on a DPMC-38 Project Cost Analysis form at eachphase of the project with a detailed construction cost analysis provided for all appropriatedivisions and subdivisions identified in the 2004 Edition of the CSI Master Format. SeeExhibit “A” for a copy of the DPMC-38 Project Cost Analysis form.

IV. PROJECT SCHEDULE

A. ENERGY AUDIT SCHEDULE

The following schedule identifies the estimated phases for this project and the estimateddurations.

PHASE ESTIMATED DURATION (WEEKS)

1. Kick-off Meeting & Data/Document Gathering 1

2. Preliminary Audit Phase (25% Completion) 2QES, Client Agency, & DPMC Reviews (Concurrent w/Draft Audit Phase) 1

3. Draft Audit Phase (90% Completion) 5OES, Client Agency & DPMC Reviews 2

4. Final Audit Phase (100% Completion) 2QES, Client Agency & DPMC Approvals 1

B. CONSULTANT’S PROPOSED PROJECT SCHEDULE

The Consultant shall submit a project bar chart schedule with their technical proposal whichreflects the projected schedule for performing the Energy Audit described in this Scope ofWork.This schedule will be reviewed by the Consultant Selection Committee as part of theevaluation process and will be assigned a score commensurate with the informationprovided.

PAGE 5

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

V. PROJECT SITE LOCATION & TEAM MEMBERS

A. PROJECT SITE ADDRESS

Department of TransportationEwing Headquarters Campus1035 Parkway AvenueTrenton, NJ 08625

See Exhibit “B” for the facility site map.

B. PROJECT TEAM MEMBER DIRECTORY

The following are the names, addresses, and phone numbers of the Project Team members.

1. Client Agency Representative:

Name: Michael DeAngelo, Supervising EngineerAddress: Department of Transportation

1035 Parkway Avenue, 15t Floor MOBTrenton. New Jersey 08625

Phone No: 609-530-2031E-Mail No: mike.deangelo(ädot.state.nj.us

2. Office of Energy Savings:

Name: Edward E. Mercer, Proiect ManagerAddress: Office of Energy Savings

50 West State St., 4th floorTrenton, New Jersey 08625

Phone No: 609-984-1624E-Mail No: ed.e.mercerttreas.state.ni.us

PAGE 6

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

VI. PROJECT DEFINITION

A. BACKGROUND

By virtue of Executive Order # 11, dated April 22, 2006, Governor Jon S. Corzine createdwithin the Department of Treasury, the position of Director of Energy Savings. The ExecutiveOrder authorizes the Director to implement programs to increase energy efficiency, reduceenergy consumption and cost, and reduce environmental impact across all Statedepartments and facilities.

The Director of Energy Savings is also directed to oversee the performance of Energy Auditsat State facilities and the subsequent implementation of the recommendations in the mostcost-effective manner available. These audits shall, at a minimum, analyze energyefficiencies and the feasibility of installing on-site renewable energy systems.

B. FUNCTIONAL DESCRIPTION OF THE FACILITY

The Department of Transportation (DOT) Ewing Headquarters Campus is the largest of theDOT facilities within the State. It provides workspace for approximately 1,950 employeesand is comprised of 42 buildings ranging in age from 23 years to over 80 years old. The totalsquare footage of the buildings on the campus is 861,274 square feet.

The buildings on the campus include Administrative, Financial and Engineering Offices(MOB, F&A and E&O), Environmental Support and Training Rooms (Foran), Vehicle RepairGarages, Sign Shop, Electrical Maintenance, Storage and Warehouse (Fernwood), GeodeticSurvey (CS), Materials Testing Laboratories, Accident Records and Print Shop (Thiokol), a24 hour Vehicle Fuel Facili.ty and a Central Steam Plant. See Exhibit “B” for the facility sitemap.

Electric and Gas utilities are provided by the Public Service Electric and Gas Company.There are 11 individual electric accounts and 8 gas accounts providing service to thiscampus. The Central Steam Plant houses two (2) 600 Hp Cleaver Brooks High PressureSteam Boilers which provides heat to the Central Steam Plant, the MOB, F&A, E&OBuildings as well as Fernwood Buildings 1, 1A, IB, 2, 4, 7, 8, 10, 11, 17, 19, 20, 21, 23, 24,24A, 24B and 26. The Central Steam Plant also houses two (2) 700 Ton Trane CentrifugalElectric Chillers which provides chilled water for the air conditioning of the MOB, F&A andE&O Buildings. The E&O Building also has two (2) 83 Hp Smith hot water boilers whichprovides reheat to the building in the summer. This building also has two (2) 350 Ton CarrierChillers in the penthouse of the building but they were taken out of service in 2002.

PAGE 7

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

There are also other units in various locations throughout the campus with some of the unitsbeing identified as follows:

Thiokol — Buildings 2, 3, 4, 5 and 9• (2) 200 Hp and (1) 50 Hp Envirotec Boilers• (1) 115 Ton and (1)60 Ton Trane RTU• (1)ll5Ton,(2)36Tonand(1)lOTonMcQuayRTU

Thiokol — Buildings 6 and 8• (1)30 Ton and (2)10 Ton York RUTs• (1) 10 Ton Trane RTU• (1) 10 Ton Carrier RTU

Foran• (1) 40 Ton Split system Carrier Unit

Geodetic Survey• (3) 5 Ton Split System Units

Fernwood — Building I• (1) 10 Ton Split System Carrier Unit

Fernwood — Building 8• (1) 5 Ton Split System Carrier Unit

Fernwood — Building 28• (1) 5 Ton Split System Carrier Unit

VII. CONSULTANT ENERGY AUDIT RESPONSIBILITIES

The information provided in this section of the Scope of Work is intended as a guide for theConsultant to understand the overall basic objective of the Energy Audit for this project. TheConsultant is expected to use their professional judgment to include items that may not belisted and that will demonstrate major energy savings for the facility. The Consultant shallalso review all aspects of interdependency or contingency of equipment and/or controls sothat recommended ECM’s are assured of compatibility with other elements of the structureand systems.

PAGE 8

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

A. PROJECT COMMENCEMENT

Prior to the start of the Energy Audit, the Consultant shall meet with the members of theProject Team to obtain and/or coordinate the following information:

1. Scope of Work Review:

Conduct a meeting with the Project Team members and approved facility representatives todiscuss the objective of the project scope of work, the project schedule, site visit policies, andthe procedures that will be used by the Consultant to inspect the buildings, equipment,systems, and facility infrastructure for the Energy Audit.

2. Project Directory:

Develop a project directory that identifies the name and phone numbers of key designatedrepresentatives of the facility that must be contacted to arrange the project site visits andbuilding inspections.

3. Existing Documentation:

Obtain and review all available facility documentation that is related to this project such asreports, studies, surveys, equipment manuals, as-built drawings, maintenance records, utilityenergy data, etc. The State does not attest to the accuracy of the information provided andaccepts no responsibility for the consequences of errors by the use of any information andmaterial contained in the documentation provided. It shall be the responsibility of theConsultant to verify the contents and assume full responsibility for any determination orconclusion drawn from the material used. If the information provided is insufficient, theConsultant shall take the appropriate actions necessary to obtain the additional informationrequired for the project at no additional cost to the State.

All original documentation shall be returned to the provider at the completion of the project.

B. ENERGY AUD!T

1. Data Gathering Coordination:

The Consultant shall meet with the Project Team members and approved representatives ofthe facility to develop an approved schedule and time to access each building, identify theareas and equipment that will be inspected, describe the methods and equipment that will beused to acquire needed data, the number of interviews to be conducted, and the duration ofeach building inspection.

PAGE 9

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-0ODATE: January 26, 2010

Surveys, measurements, photographs and other data collection methods shall be performedin such a way as to minimize disruption to the building occupants. A structured interviewprocess shall be used to determine existing equipment, utilities, maintenance, and operationissues for the building.

Note: The Consultant is responsible for protecting the information collected and preventingits’ disclosure to unauthorized personnel. Individual site requirements will be discussed at theConsultant Pre-bid meeting.

A one week “look ahead” schedule shall be provided to the facility representatives for reviewand approval prior to each building inspection.

2. Building, Equipment and Systems Profile:

Provide the name and number for each building, the year of original building construction andany building additions, building square footage, and fuel type.

Characterize the building usage, type of construction, occupancy profiles, constructionfeatures including a description of the building envelope.

Provide a detailed inventory and descriptive narrative for all building energy consumingequipment including an estimate of their energy consumption, efficiency, and remaininguseful life. Items shall include, but not be limited to boilers and furnaces, cooling systems,energy recovery systems, heating systems, ventilation systems, domestic hot water heaters,meters, automatic control systems, energy management systems, electrical systems andlighting, data centers, motors, manual controls, etc.

Assess how the various building systems and equipment are set-up, their actual operatingconditions, and the control methods used to manage the systems. Provide coloredphotographs of the equipment and systems inspected.

Review all aspects of interdependency or contingency of equipment and/or controls so thatrecommended ECM’s are assured of compatibility with other elements of the structure andsystems.

For example, for lighting, for each area of each building, provide existing fixture type, existinglamp type, existing lamp count and existing ballast type, current watts per fixture and currentenergy cost per room/building. The existing lamp count shall identify the maximum number oflamps that can be installed in a fixture and the number that are actually installed as somelamps have been purposely removed from existing fixtures. Similar detail should be providedfor other equipment.

PAGE 10

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

lamps have been purposely removed from existing fixtures. Similar detail should be providedfor other equipment.

Evaluate the building envelope for energy consumption, including but not limited to the roofand walls, insulation, external windows, and doors.

Evaluate the operation, maintenance, and testing programs for the building equipment.

3. Building Energy Usage and Costs:

Compile monthly energy usage and costs for each building for the twelve months prior to theaudit including kW, kWh, BTUs, therms, gallons, etc.

4. Energy Type Utility Rates:

Identify the utility rate or contract rate schedules under which services are provided to eachmeter or delivery point for each energy type.

5. Energy Type Annual Cost:

Provide the annual average unit cost for each energy type, per unit volume and per MMBTU.

6. Green House Gas Emissions:

Provide the equivalent annual GHG (Green House Gas) emissions associated with each fueltype.

7. Facility Energy Profile Summary Table:

The annual facility energy use and peak demand for each energy type shall be reported. Thisshall include annual consumption, cost, and greenhouse gas emissions associated with eachenergy type. This information shall be supplied in the sample Facility Energy ProfileSummary Table format provided in Exhibit “C”.

C. ENERGY AUDIT REPORT.

Based on the results of the audit findings, the Consultant shall prepare a bound 8 1/2” x 11”copy of the facility Energy Audit Report that incorporates the following elements:

PAGE 11

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

1. Table of Contents:

Include a listing of the major section titles in the report and the page on which each sectionbegins.

2. Executive Summary:

Include a brief introduction to the facility and a description of the project objective and overallconclusions and recommendations of the Energy Audit.

3. BuildinglFacility Information

Provide a general background description of the facility, building components, mechanicalsystems, electrical systems, automation systems, and operational profiles and schedules. Adescription of the building envelope, age and construction history, number of employees,occupancy patterns, and a discussion of the O&M program shall be included.

The building information section shall also contain relevant photos of the facility, buildings,and mechanical systems, a description of energy types used, and a description of theprimary mechanical systems and controls.

4. Utility Summary:

Provide energy accounting information for a minimum of one year, as well as selected chartsand graphs that will demonstrate the overall energy usage patterns of the facility or building.A copy of the utility rate schedules and any other discussion or evaluation of rate alternativesfor which the facility may qualify can be part of this section.

5. Measurements & Observations:

Provide specific measurements such as temperature, relative humidity, light levels, air flows,etc. where appropriate. Also, relevant observations shall be noted such as damper positions,operating deficiencies, control settings, damaged equipment, maintenance shortfalls, etc.

6. Energy Conservation Measures:

Provide a narrative summary for each recommended ECM that meets the objective of thisproject scope of work. Provide the estimated cost, estimated savings, simple payback, andother data for each ECM in the required Energy Conservation Measure Summary FormatTable depicted in Exhibit “D”. The description of each ECM shall also include the followinginformation following this Energy Conservation Measure Summary Format table:

• A one or two page description of each ECM and supporting calculations.

PAGE 12

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

• No-cost measures such as adjusting equipment, control systems, or schedules shall beaddressed first.

• Energy use and savings calculations and economic analysis.

• Assumptions that were made regarding operation or equipment efficiency.

• Estimated installation cost, including cost of all equipment and materials, and source ofcost estimate.

• Estimated energy savings (in energy specific volume units and total MMBTU’s).

• Estimated annual energy cost savings based on current historical energy costs of thefacility.

• Estimate of any rebates/financial incentives available through New Jersey’s Clean EnergyProgram or from other sources.

• Estimated annual operating cost savings, including reductions in maintenance expenses.

• Estimated lifetime energy cost savings.

• Simple payback.

• Options for funding the installation of recommended measures.

• Equipment standards that must be used in the design, procurement, and installation of allECM’s such as ASHRAE 90.1, ASHRAE 155P for Commercial Boiler Efficiency, etc.

7. RenewablelDistributed Energy Measures:

Recommend any viable renewable/distributed energy technologies including solar power,wind power, geothermal systems, etc. which could be cost effectively implemented for thesubject facility.

8. Cost Estimates:

The cost to implement each ECM shall be estimated and presented in CSI format (2004) inan appendix of the report. A table shall be included that identifies costs associated with eachimprovement. The information and cost data will be used to make decisions on facilityplanning and yearly capital appropriation requests.

PAGE 13

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

Each ECM cost estimate shall include:

• Narrative explanation of the work, including diagrammatic sketches if required to explainthe work.

• List of assumptions made in compiling the estimate.

• Cost of demolition of existing systems, if applicable.

• Cost of impact of facility operations on ECM implementation (work restrictions).

See Section III of this Scope of Work for additional information.

9. Energy Audit Report Copies:

Provide six (6) copies of the Energy Audit Report at each phase of the project to the ProjectManager. Also provide two (2) CD disks of the final approved report and all of the contentswith any drawings in “.dwg” (native file format for Aut0CAD) and ‘.tif” (Tagged Image File) fileformats.

D. MEETINGS & PRESENTATIONS

1. Meetings:

Conduct the appropriate number of review meetings with the Project Team members duringeach phase of the project so they may determine if the project meets their requirements andmake changes where appropriate. The Consultant shall describe the philosophy andprocess used in the development of the Energy Audit. Selected studies, sketches, costestimates, schedules, and other relevant information shall be presented to support therecommendations proposed.

It shall also be the responsibility of the Consultant to arrange and require all critical Sub-Consultants to be in attendance at the meetings.

2. Presentations:

The minimum number of presentations required for each phase of this project is identifiedbelow for reference:

Preliminary Energy Audit Phase (25% Completion): One (1) oral presentation at the phasecorn pletion.

PAGE 14

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

Draft Energy Audit Phase (90% Completion): One (1) oral presentation at the phasecompletion.

Final Energy Audit Phase (100% Completion): One (1) oral presentation at the phasecompletion

E. SUB-CONSULTANT PARTICIPATION

It is the responsibility of the Consultant to ensure that they have provided adequate hoursand/or time allotted in their technical proposal so that their Sub-Consultants may participatein all appropriate phases and activities of this project or whenever requested by the ProjectManager. This includes the pre-proposal site visit and the various meetings and site visitsdescribed in this Scope of Work. All costs associated with such services shall be included inthe base bid of the Consultant’s fee proposal.

VIII.GENERAL REQUIREMENTS

A. SCOPE CHANGES

The Consultant must request any changes to this Scope of Work in writing. An approvedConsultant Amendment Request DPMC-9d form reflecting authorized scope changes mustbe received by the Consultant prior to undertaking any additional work. The DPMC-9d formmust be approved and signed by the Director of DPMC and written authorization issued fromthe Project Manager prior to any work being performed by the Consultant. Any workperformed without the executed DPMC 9d form is done at the Consultant’s own financial risk.

PAGE 15

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

IX. SOW SIGNATURE APPROVAL SHEET

This Scope of Work shall not be considered a valid document unless all signatures appear ineach designated area below.

The Client Agency approval signature on this page indicates that they have reviewed thedesign criteria and construction schedule described in this project Scope of Work and verifiesthat the work will not conflict with the existing or future construction activities of other projectsat the site.

SOW PREPARED BY: ‘L‘ j/,JJO(FRED StULTS, MANAGER ‘D1rEDPMC SCOPE DEVELOPMENT UNIT

SOW APPROVED BY: 711&Y” z/ /tEDWARD MERCER, MANAGER DATEOFFICE OF ENERGY SAVINGS

SOWAPPROVEDBY: LLQ1LJMICHPL D AN’LO, ERVISING ENGINEER DA EDEPAFTMENT OF TRANSThORTATION

--

SOWAPPROVEDBY:___________________________JOHN H.)4HODES, DIRECTOR DATEOFFICE70F ENERGY SAVINGS

SOW APPROVED BY: ‘b//CRICHARD FLODMAND, DEPUTY DIRECTOR ‘ DATEDIV PROPERTY MGT & CONSTRUCTION

PAGE 16

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-00DATE: January 26, 2010

X. CONTRACT DELIVERABLES

The following is a listing of Contract Deliverables that are required at the completion of eachphase of this project.

PROJECT COMMENCEMENT

1.1 Meetings & Minutes (Minutes within 5 working days of meeting)

1.2 Correspondence

1.3 Project Commencement

1.3.1 sow Review1.3.2 Site Visit Policies, Contractors Use of the Premises, Project Directory1.3.3 Collect Existing Documentation

ENERGY AUDIT (ALL PHASES)

2.1 Energy Audit Submission Requirements

2.1.1 Data Gathering Coordination2.1.2 Building, Equipment, and Systems Profile2.1.3 Building Energy Usage and Costs2.1.4 Energy Type Utility Rates2.1.5 Energy Type Annual Cost2.1.6 Green House Gas Emissions2.1.7 Facility Energy Profile Summary Table

2.2 Energy Audit Report Submission Requirements

2.2.1 Table of Contents2.2.2 Executive Summary2.2.3 Building/Facility Information2.2.4 Utility Summary2.2.5 Measurements & Observations2.2.6 Energy Conservation Measures2.2.7 Renewable/Distributed Energy Measures2.2.8 Cost Estimates in CSI Format & DPMC-38 Project Cost Analysis Form2.2.9 Energy Audit Report: Six (6) sets each submission

PAGE 17

PROJECT NAME: Facility Energy AuditPROJECT LOCATION: DOT Ewing Headquarters CampusPROJECT NO: A1100-0ODATE: January 26, 2010

2.2.9.1 Diagrammatic Sketches/Drawings if appropriate — Six (6) hardcopysets and two (2) CD discs in “.dwg” (native file format for AutoCAD)and “tif” (Tagged Image File) file formats

2.2.10 Bar Chart of Energy Audit Schedule2.2.11 Oral Presentation of Submission to Project Team (Oral Presentation at 25%,

90%, and 100% with six (6) sets of the Energy Audit Report due with eachsubmission)

2.2.12 SOW Compliance Statement2.2.13 This Submission Checklist2.2.14 Deliverables Submission in Booklet Form — Six (6) sets

2.3 Approval of Submission

2.3.1 Respond to Submission Comments

XI. EXHIBITS

The attached exhibits in this section include a DPMC-38 Project Cost Analysis Form, aFacility Site Map, a Sample Facility Energy Profile Summary Table, and a Sample EnergyConservation Measure Summary Table.

END OF SCOPE OF WORK

PAGE 18

PROJECT COST ANALYSIS DPMC NUMBER: A1100-OODate:

________________

Project Phase:Project Name:

___________________________________________________________

Scope of Work

Location:

Cost Phase “C” - Construction

1 General Construction 02 Structural Steel 03 Plumbing 04HVAC 05 Electrical 06 Other Trades (specify):

______________________________

07 TOTAL CONSTRUCTION COST ESTIMATE (CCE) (Lines 1 thru 6) 0

Cost Phase “D” - Design

8 Consultant Design Fee 09 Consultant Construction Administration Fee 010 Asbestos Remediation Design Fee 011 Asbestos Monitoring Fees 012 Survey Services 013 Testing Services 014 Roofing Inspection 015 Other (specify):

______________________________

016 TOTAL DESIGN SERVICES (Lines 8 thru 15) 0

Cost Phase “K” - Affirmative Action17 Affirmative Action (1/2 % of Line 7) 0

Cost Phase “M “- Management Fees18 DPMC Management Fee (8% of Line 7) 0

Cost Phase “N” - Construction Management19 Construction Management Services (CM/CPM) 0

Cost Phase “0” - Contingency

20 Construction (10% of Line 7) 021 Design (10% of Line 16) 022 TOTAL PROJECT CONTINGENCY (Lines 20 & 21) 0

Cost Phase “P” - Permits

23 U.C.C. (DCA or DPMC) Plan Review Fee 024 U.C.C. Permit/Field InspectionlC.O. Fee 025 Soil Conservation 026 Other (specify):

______________________________

027 TOTAL PERMIT FEES (Lines 23 thru 26) 0

Cost Phase “R” - Arts Inclusion28 Arts Inclusion Allowance 0

Cost Phase “B” - Other Costs

29 Other (specify):

_____________________________

0

30 Other (specify):

________________________________

031 TOTAL OTHER COSTS (Lines 29 & 30) 0

32 CURRENT WORKING ESTIMATE (CWE) (Lines 7+16+17+18+19+22+27+28+31) $0

1’YT-TT TT”A”DPMC-38 Revised 9/02 (automated form)

vT

1r4$---

t.

—A

WA-

rr

p-.

16F

erff

wpod

Thio

kol

.::

-.

E&

Qr

:c

-

w.flcm

on

&

%flL

-*—

4—

6\;

New

Jers

eyDe

partm

ento

f iitn

spor

tatio

nH

eadq

aarte

rsM

ap--

<1

03

5P

ark

way

’Av

en

ue

-‘tb

-T

ren

ton

,N

J0

86

25

/‘a

A_

Eer

nwoo

dC

ompl

ex3u

ildin

gE

-C

entr

alS

team

Pla

ntB

uild

ing

16—

Soi

lsB

uild

ing/

Em

erge

ncy

Mgt

.&

Sto

rage

Thi

okol

Com

plex

MO

BM

ain

Off

ice

Bui

ldin

g3u

ildin

gI

-E

quip

men

tO

ffic

e/ca

r&

Tru

ckS

hop

Bui

ldin

g17

—C

onst

ruct

ion

Sho

pB

uild

ing

1—

Vac

ant

3uild

ing

IA-

Mow

er/M

achi

neS

hop

Bui

ldin

g18

—V

acan

tB

uild

ing

Bui

ldin

g2—

Bit

umin

ous

&C

hem

istr

yL

abs

E&

OEn

gine

erin

g&

Ope

rati

ons

3uild

ing

lB-

Sto

rage

Bui

ldin

g19

—P

lant

Mai

nten

ance

Bui

ldin

g3—

Mat

eria

lsT

esti

ngL

abSu

ildin

g2

-Pl

owS

hop

Bui

ldin

g20

—C

entr

alE

lect

rica

lO

pera

tion

s/R

adio

Sho

pB

uild

ing

4—

Phy

sica

lT

esti

ngL

abF&

AFi

nanc

e&

Adm

inis

trat

ion

3uild

ing

4-

Pla

ntM

aint

enan

ceS

hop

Bui

ldin

g21

—Si

gnS

hop

Bui

ldin

g5—

Sto

rage

Suild

ing

5-

Sto

rage

Bui

ldin

g22

—Sw

itch

Gea

rB

uild

ing

6—

Acc

iden

tR

ecor

ds/M

VC

/NJS

PF

atal

Uni

t3u

ildin

g6

-F

umit

ure

Sto

rage

&O

verh

ead

Sig

nC

rew

Bui

ldin

g23

—O

verh

ead

Sig

nC

rew

Bui

ldin

g8

—Pr

int

Sho

p3u

ildin

g7

-E

quip

men

tR

ecei

ving

Bui

ldin

g24

—W

areh

ouse

Sto

ckR

oom

Bui

ldin

g9

—C

oncr

ete

test

ing

Map

Cre

ated

and

3uild

ing

8—

Pav

emen

tM

anag

emen

t/R

ecor

dsS

tora

geA

nnex

A—

Dep

artm

ent

ofH

ealt

hG

S—

Geo

deti

cS

urve

y3u

ildin

g9

—V

ehic

leW

ash

Bui

ldin

gA

nnex

B—

Cri

min

alJu

stic

eM

aint

aine

dby

3uild

ing

10—

Veh

icle

Gas

&N

atur

alG

asS

tati

ons

Bui

ldin

g25

—C

rim

inal

Just

ice

The

Web

Dev

elop

men

tU

nit

3uiid

ing

ii—

Insp

ecti

onS

hop

Bui

ldin

g26

—B

ody

Sho

pD

ivis

ion

ofIT

FACI

LITY

ENER

GY

PRO

FILE

SUM

MA

RY

TAB

LE(R

EQ

UIR

ED

SUM

MA

RY

FOR

MA

TW

ITH

SAM

PLE

DA

TA)

Ann

ual

Ene

rgy

Equ

ival

ent

CO2

Ene

rgy

Pro

file

Ann

ual

Vol

ume

(wit

hE

nerg

yC

onve

rsio

nA

nnua

lE

nerg

yA

vera

geC

ost

per

Ave

rage

Cos

tper

CO2

Con

vers

ion

Con

sum

ptio

nE

mis

sion

s(M

etri

c(P

rim

ary

1)re

levan

tun

its)

Fac

tor

Cos

t($

)U

nit V

olum

eM

MB

TU

Fac

tor

(Sit

ek

Btu

s)T

ons

3)

Ele

ctri

city

7,00

0,00

0kw

h3,

412

kBtu

/kW

h23

,884

,000

$560

,000

$0.1

4/k

wh

$23.

451.

1lb

/kW

h1,

995

Nat

ural

Gas

200,

000

ther

ms

100

kBtu

/th

20,0

00,0

00$1

70,0

00$0.8

5/t

her

m$8

.50

120.

6lb

/MM

Btu

273

#2O

il(D

iese

l)6

3,00

0ga

llon

s13

8kB

tu/g

al41

4,00

0$5

,400

$1.8

0/ga

l$1

3.04

22.4

lb/g

al30

#4O

il3,

000

gall

ons

144

kBtu

/gal

432,

000

$5,0

10$1

.67/

gal

$11.

6022

.4lb

/gal

30#6

Oil

(LS)

3,00

0ga

llon

s14

4kB

tu/g

al43

2,00

0$5

,010

$1.6

7/ga

l$1

1.60

26lb

/gal

35P

ropa

ne10

0ga

llon

s91

.6kB

tu/g

al9,

160

$90

$0.9

0/ga

l$9

.83

12.7

lb/g

al1

Chi

lled

Wate

r2

6,00

0to

n-h

ou

rs12

kB

tu/t

on

-hr

472

,000

$900

$0.1

5/t

on

-hr

$12.

50TB

DTB

DH

otW

ate

r2

15,0

00CF

7.3

kB

tu/C

F10

9,50

0$1

,369

$0.0

9/C

F$1

2.50

TBD

TBD

Ste

am2

80M

lbs

1,00

0kB

tu/M

lb‘

80,0

00$1

,216

$15.

20/M

lb$1

5.20

TBD

TBD

45,4

32,6

60$7

48,9

95$1

6.49

2,36

4

Tot

alA

nnua

lE

nerg

yC

onsu

mpt

ion

(Site

Kbt

u)45

,432

,660

Tot

alA

rea

ofFa

cilit

yC

ondi

tion

edS

pace

(sq

ft)

250,

000

Fac

ilit

yE

nerg

yU

seIn

tens

ity

(Sit

ekB

tu/s

qft

)18

2

1S

houl

don

lylis

tpr

imar

yen

ergy

type

sfo

rth

issu

mm

ary

(ex.

Incl

udin

gna

tura

lga

sfu

elfo

rbo

iler

but

not

the

boil

erst

eam

prod

ucti

on)

2S

houl

don

lyin

clud

ese

cond

ary

ener

gyty

pes

inth

ista

ble

ifth

eyar

epu

rcha

sed

from

ase

par

ate

enti

ty(e

x.th

ird

part

yC

HP

supp

ly)

For

CO2

emis

sion

s,22

05lb

s=

1m

etri

cto

n

Act

ual

ener

gyco

nser

vati

onfa

ctor

sfo

rse

cond

ary

ener

gyty

pes

tobed

eter

min

edby

cons

ulta

ntba

sed

onre

leva

ntm

etri

cs(e

x:te

mp.

,pr

essu

re,

met

ered

unit

s,et

c.)

CO2

conv

ersi

onfa

ctor

sfo

rse

cond

ary

ener

gyty

pes

shou

ldbe

base

don

fuel

and

effi

cien

cyof

prov

ider

,if

know

n.6

Whe

nre

port

ing

#2fu

eloi

lor

dies

el,

only

coun

tw

hat

isus

edfo

rfa

cilit

ypu

rpos

es.

Do

not

incl

ude

dies

elco

nsum

ptio

nfo

rve

hicl

efu

elin

g.

ENER

GY

CO

NSE

RV

AT

ION

ME

ASU

RE

SUM

MA

RY

TAB

LE(R

EQ

UIR

ED

SUM

MA

RY

FOR

MA

TW

ITH

SAM

PLE

DA

TA

)(L

ist

ino

rder

ofsi

mp

lepa

ybac

k)

— —EC

M5

shou

ldbe

sum

mar

ized

ina

way

that

avoi

dsov

erla

pan

ddo

uble

coun

ting

(ex:

clai

min

gth

esa

me

elec

tric

ity

use

redu

ctio

nfr

omV

FDs

and

Dem

and-

Con

trol

led

Ven

tila

tion

)2

Shou

ldre

pres

ent

tota

len

ergy

redu

ctio

nfo

rea

chm

easu

re,

expr

esse

din

mill

ion

Btu

’S(M

MB

tu)

Ele

ctri

cey

Fuel

luth

erE

nerg

yW

ater

O&

MT

otal

Cos

tsan

dB

enef

its

Ann

ual

Ann

ual

Ann

ual

Fuel

Tot

alA

nnua

lE

lect

rici

tyA

nnua

lFu

elA

nnua

lA

nnua

lA

nnua

lO

&M

Ann

ual

SREC

Tot

alA

nnua

lA

nnua

lC

O2

Sim

ple

ECM

Ele

ctri

city

Use

ECM

Gro

ssR

ebat

esor

ECM

Net

Ene

rgy

ECM

Des

crip

tion

Use

Cos

tW

ater

Wat

erC

ost

Cos

tS

avin

gsor

DR

Cos

tS

avin

gsR

educ

tion

Pay

back

No.

Cos

tS

avin

gsR

educ

tion

Cos

t($

)In

cent

ives

($)

Cos

t($

)R

educ

tion

Red

ucti

onR

educ

tion

($)

Sav

ings

(gal

)S

avin

gs($

)($

)R

even

ue($

)IS

)(m

etri

cto

ns)

(yea

rs)

1$)

(MM

BtU

)(M

MB

tu)

(kw

h)

1W

ater

Con

serv

ing

Fix

ture

s0

$082

$698

142,

800

$571

0$1

,064

$0$0

$1,0

6482

$1,2

692

0.6

—L

ight

ing

Upg

rade

wit

hS

enso

rs53

6,23

0$7

5,07

20

$00

$09,

525

$160

,000

$17,

060

$0$1

42,9

401,

830

$84,

597

268

1.7

3V

FD’s

and

mot

ors

338,

884

$47,

444

0$0

0$0

0$1

43,5

00$3

3,14

7$0

$110

,353

1,15

6$4

7,44

416

92.

34

HV

AC

cont

rols

Upg

rade

10,8

87$1

,524

3,57

9$3

0,42

20

$025

,000

$336

,000

$0$0

$336

,000

3,61

6$5

6,94

620

05.

9S

Dem

and-

Con

trol

led

Ven

tila

tion

’0

$041

5$1

5,50

00

$00

$95,

200

$0$0

$95,

200

415

$15,

500

256.

16

Tra

nsf

orm

erU

pgra

de

183,

312

$25,

664

0$0

0$0

0$1

59,0

40$0

$0$1

59,0

4062

5$2

5,66

491

6.2

7So

lar

IPV

)S

yste

m80

,000

$11,

200

0$0

0$0

0$5

25,8

00$0

$48,

000

$525

,800

273

$59,

200

408.

9—

9

1,14

9,31

3$1

60,9

044,

076

$46,

620

142,

800

$S71

$34,

S25

$1,4

20,6

04$5

0,20

7$4

8,00

0$1

,370

,397

7,99

7$2

90,6

2079

54.

7