12
FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS

FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS

Page 2: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

CONTEXT 1/2

2

20502018 2030

TWh

Win

d Po

wer To reach this in 2050:

1. Innovations, Faster, More Efficient, Cheaper and Safer2. Integration in energy system by flexibility, storage and

market models3. Spatial integration by mitigating ecological impact, building

with nature, multi-use of space, social acceptance and participation

Balancing solutions will become more expensive

Page 3: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

CONTEXT 2/2

Experimentation is becoming more and more difficult.

We must develop and derisk the interface between production sources and flexibility storage / conversion technologies.

Companies need the opportunity to pass through the valley of death

Industry and Governments need confidence in new solutions

3

Page 4: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

VISION 1SYSTEM INTEGRATIONFACILITY

4

Page 5: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

VISION 1 FOR NEW FACILITY

Vision: Establish and operate a joint Dutch infrastructure for the integration of wind energy in the energy system together with solar power, hydrogen production and energy storage.

Demonstrate and accelerate:System Controllable renewable sources (wind, solar)Electricity storage systemsProduction of energy carriers (H2) Use H2 to produce electricity and/or other products

5

Page 6: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

VISION 2WIND ROBOTICSFACILITY

6

Page 7: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

WIND TURBINE ROBOTICS TEST FACILITY

Zero subsidy can only be achieved with new ways of working.

Sending people offshore is costly, risky and results in long turbine downtime before repair.

Robotics can achieve repairs and inspections faster, cheaper and safer.

But, it is difficult to prove new concepts quickly enough. A test facility will be established to get through the “Valley of Death” efficiently, delivering reliable, effective new technology onto wind farms.

7

Page 8: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

ROBOTICS

8

+1,5 M€/GW/year

+4,75 M€/GW/year

-2 incidents/GW/year

G+ Global Offshore Wind Health & Safety Organisation “UK Offshore wind health and safety statistics 2016 t”

Assuming 6 interventions per turbine per year.One CTV carrying 12 technicians visits 6 turbines per day.

CTV costs €1,500/day to rent and technicians work 10 hours/day at €50/hour

If robotics only save 1/5 of technician journeys,

for minor work

Each incident costs 24 hours of production on average.Each turbine is 5MW and operates at 40% capacity factor, earning 80€/MWh

Page 9: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

9

Page 10: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

WHERE?

10

Page 11: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

THANK YOU

[email protected] OFFSHORE WIND BUSINESS DEVELOPMENT

Page 12: FACILITY FOR GRID INTEGRATION AND WIND TURBINE ROBOTICS op Z… · G+ Global Offshore Wind Health & Safety Organisation“UK Offshore wind health and safety statistics 2016 t” Assuming

OUR CONTRIBUTIONINCREASE PRODUCTION

LOWER OPEX

LOWER CAPEX

LOWER WACC / Risk

EXTEND LIFE

GRID INTEGRATION

MEASURMENT AND VALIDATION

NEW TECHNOLOGIES

NEW VALUE CREATIONE.g. Synergy With Oil and GasE.g. Power to Gas

12