152
FACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II) Facility No.: 278 Projects: Facility Name: Acworth Elementary School Add HVAC to Gym Refresh Obsolete Workstations Refresh District Printers Refresh District Servers Refresh Existing District Network Computing Device for Every Teacher Refresh and Enhance Mobile Computing Access District Wide Copier/Duplicator Refresh Access Controls Custodial Equipment. Audio Visual Equipment. Add School Lettering to Building Replace Carpet and Tile in selected Areas IN ASSOCIATION WITH T HE F ACILITY GROUP Page 1 of 152

FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 278

Projects:

Facility Name: Acworth Elementary School

Add HVAC to Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Add School Lettering to Building

Replace Carpet and Tile in selected Areas

IN ASSOCIATION WITH THE FACILITY GROUP Page 1 of 152

Page 2: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 0

Projects:

Facility Name: Acworth Primary Elementary School

36 IU Primary School. K-2

Removal of Old Structures

IN ASSOCIATION WITH THE FACILITY GROUP Page 2 of 152

Page 3: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 0

Projects:

Facility Name: Acworth Site Middle School

New 71 IU Middle School.

IN ASSOCIATION WITH THE FACILITY GROUP Page 3 of 152

Page 4: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 259

Projects:

Facility Name: Addison Elementary School

Add 1 IU, P.E. Gymnasium with Restrooms

Install HVAC in Gym

Modify existing PE Gym to accommodate guidance and administration. New PE to be built

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Provide Canopy for Bus Lanes

Upgrade locks on Exterior Doors

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 4 of 152

Page 5: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 807

Projects:

Facility Name: Adult Education Center Special School

Main Switchgear & Panel Upgrades

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 5 of 152

Page 6: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 232

Projects:

Facility Name: Argyle Elementary School

Main Switchgear & Panel Upgrades

Painting

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Replace Carpet

Scrape Windows in Cafeteria to Remove Anti-Glare Film.

Add a Staff Restroom

IN ASSOCIATION WITH THE FACILITY GROUP Page 6 of 152

Page 7: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 276

Projects:

Facility Name: Austell Elementary School

Provide HVAC in Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Add Surveillance Cameras to the back of the Building.

Build an Additional Outdoor Storage Area

IN ASSOCIATION WITH THE FACILITY GROUP Page 7 of 152

Page 8: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 283

Projects:

Facility Name: Austell Primary Elementary School

New 36 IU Primary School. K-2

IN ASSOCIATION WITH THE FACILITY GROUP Page 8 of 152

Page 9: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 407

Projects:

Facility Name: Awtrey Middle School

Main Switchgear & Panel Upgrades

Replace HVAC in Office, Media Center, Gym and Theater

HVAC for Main Gym

Roofing for Sections of Building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Whiteboards

Add window to the interior wall of the front office.

Improve Climate Control to Reduce Excessive Humidity in Central Classroom

IN ASSOCIATION WITH THE FACILITY GROUP Page 9 of 152

Page 10: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 256

Projects:

Facility Name: Baker Elementary School

HVAC in Main Gym

Bus Lane Re-paving

Parking lot Re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Provide canopy for front area and bus area

Surround School with Fencing and a Gated Entrance

IN ASSOCIATION WITH THE FACILITY GROUP Page 10 of 152

Page 11: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 405

Projects:

Facility Name: Barnes Education Center

Main Switchgear & Panel Upgrades

Replace HVAC system for old school

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Provide Access Control at Entrances

IN ASSOCIATION WITH THE FACILITY GROUP Page 11 of 152

Page 12: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 235

Projects:

Facility Name: Bells Ferry Elementary School

Main Switchgear & Panel Upgrades

Painting

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Add Restroom in the Pre Kindergarten

Build Canopy over Sidewalk

Upgrade Playground Area to Improve Drainage Problems

IN ASSOCIATION WITH THE FACILITY GROUP Page 12 of 152

Page 13: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 214

Projects:

Facility Name: Belmont Hills Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main gym

Replace Water Piping, Plumbing Fixtures, and Hose Bibs

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Replace Carpet

Plant Sod in the Playground Area

Landscape Around Building

Replace Cafeteria Tables

IN ASSOCIATION WITH THE FACILITY GROUP Page 13 of 152

Page 14: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 240

Projects:

Facility Name: Big Shanty Elementary School

Main Switchgear & Panel Upgrades

Painting

Replace HVAC System for 1988 Addition

Replace Water Piping, Plumbing Fixtures, and Hose Bibs

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Install Water Fountain in Gym

Replace Office Furniture

Build Outdoor Storage Unit

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 14 of 152

Page 15: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 240

Projects:

Facility Name: Big Shanty Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 15 of 152

Page 16: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 244

Projects:

Facility Name: Birney Elementary School

Main Switchgear & Panel Upgrades

HVAC Main Gym

Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Carpet Replacement.

Install Lighting at Canopy.

IN ASSOCIATION WITH THE FACILITY GROUP Page 16 of 152

Page 17: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 274

Projects:

Facility Name: Blackwell Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Plant Sod on Area Leading to Primary Playground

Add Handrails at Sidewalks

IN ASSOCIATION WITH THE FACILITY GROUP Page 17 of 152

Page 18: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 221

Projects:

Facility Name: Brown Elementary School

Main Switchgear & Panel Upgrades

HVAC Main Gym

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Renovate Administration Offices for Security

Grade and Level Playground Area

Provide a Blacktop Area for the playground.

Add Sidewalk to Parking Lot

IN ASSOCIATION WITH THE FACILITY GROUP Page 18 of 152

Page 19: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 239

Projects:

Facility Name: Brumby Elementary School

Main Switchgear & Panel Upgrades

Replace Carpet

Replace HVAC System

HVAC Main Gym

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Enclose Open IU's in the Old Building

Paint Interior of Building as Needed.

IN ASSOCIATION WITH THE FACILITY GROUP Page 19 of 152

Page 20: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 266

Projects:

Facility Name: Bryant Elementary School

Main Switchgear & Panel Upgrades

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Landscape Driveway Entrance and Front of Building.

Correct Drainage Problem on Lower field

IN ASSOCIATION WITH THE FACILITY GROUP Page 20 of 152

Page 21: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 279

Projects:

Facility Name: Bullard Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 21 of 152

Page 22: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 517

Projects:

Facility Name: Campbell High School

Add 18 IU's; Band, Choral, Graphic Arts, Culinary Arts, Drafting & Design Technology, Horticulture, Law Enforcement, 11 Typical Classrooms.

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Football field.

HVAC Wills Gym

Modify existing undersized Band to be Orchestra. Modify the undersized Choral to be Drama.

Track Resurfacing/Track & Field upgrades

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Renovate Selected Portions of the Auditorium

Paint Lockers

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 22 of 152

Page 23: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 517

Projects:

Facility Name: Campbell High School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 23 of 152

Page 24: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 424

Projects:

Facility Name: Campbell Middle School

Add 3900 square feet to the administration and Pupil Personnel Services areas to conform with the Ed. Specs.

Addition of 12 IU's: 9 Typical classrooms, Drama, Business / Computer, Career Connections.

Add 4800 Square feet to the Media Center to conform with the Ed. Specs.

HVAC Main Gym

Modify the existing administration areas to work with a new administration addition.

Modification and Renovation of the Kitchen and Cafeteria and Replacement of Food Service Equipment. Expansion of the Food Service Area Square Footage.

Media Center Modifications to accommodate the new Media Center addition.

Repave Bus Lane

Repave Parking Areas & Drives

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

IN ASSOCIATION WITH THE FACILITY GROUP Page 24 of 152

Page 25: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 424

Projects:

Facility Name: Campbell Middle School

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Bleachers in the New Gym

Upgrade Lighting and Sound Systems in Theater.

IN ASSOCIATION WITH THE FACILITY GROUP Page 25 of 152

Page 26: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 271

Projects:

Facility Name: Chalker Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Whiteboards

Install Hot Water Line to the Front Office

IN ASSOCIATION WITH THE FACILITY GROUP Page 26 of 152

Page 27: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 272

Projects:

Facility Name: Cheatham Hill Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Fencing around Playground

IN ASSOCIATION WITH THE FACILITY GROUP Page 27 of 152

Page 28: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 236

Projects:

Facility Name: Clarkdale Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC System for Classrooms and Media Center

HVAC Main Gym.

Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves

Replace Exterior Sanitary Sewer Piping, Cleanouts and associated Manholes

Roofing for entire Building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Replace Front Sign

Admin. Renovation--To include: installation of window and clinic enlargement

Replace Restroom Stalls and Doors

IN ASSOCIATION WITH THE FACILITY GROUP Page 28 of 152

Page 29: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 236

Projects:

Facility Name: Clarkdale Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 29 of 152

Page 30: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 233

Projects:

Facility Name: Clay Elementary School

Main Switchgear & Panel Upgrades

Painting

Replace HVAC System for Classrooms, Media and Cafeteria

HVAC Main Gym

Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Place Intercom Speakers in Playground and Parking Lot Areas

Install Sidewalk from Gym Door to Front Walk

Replace Cafeteria Blinds

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 30 of 152

Page 31: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 233

Projects:

Facility Name: Clay Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 31 of 152

Page 32: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.:

Projects:

Facility Name: Cobb County System Wide

As new students and staff with significant physical disabilities move to the Cobb County School District, and as new classes are established in schools which have previously had no students or staff with physical disabilities, modifications to the school facility are frequently needed. Examples include restroom adaptations, adding hot and cold running water to a classroom, door and thresh-hold modifications, handrails and ramps. Section 504 of the Rehabilitation Act and the Americans with Disabilities Act require such modifications to permit physical access.

Growth and attrition will require funding for replacement and new buses/support vehicles for the next five years.

Provide computer for every teacher with appropriate content specific software and training.

Complete copier/duplicator replacement program and commence refresh program.

Includes 236 digital duplicators capable of supporting the needs of local schools and 726 networked copier/printers capable of supporting the printing and copying needs of local schools and central administration.

Replace equipment and attached peripheral replacement and/or consolidation.

Includes mainframe equipment, storage area network equipment, and Sun server equipment (purchase, installation, and conversion services)

School facilities need to be accessible to many people during and after normal hours. Increased Security needs require that staff members be confident that the doors, windows and locks can completely control access to each facility. This program will provide limited access to only authorized personnel, identify any person or groups in the building and when they entered as well as numerous other features not available now.

IN ASSOCIATION WITH THE FACILITY GROUP Page 32 of 152

Page 33: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.:

Projects:

Facility Name: Cobb County System Wide

Equipment and Software needed for continued improvement in tracking, reporting and control of CCSD Financial Resources.

Local school building renovations and replacement of large kitchen equipment including, but not limited to, walk-in coolers and freezers, ice machines, steam kettles, steamers and serving lines.

Building renovations, replacement, repair and upgrades to furniture, fixtures and equipment for the Comprehensive Human Resources Information System (CHRIS).

Associated costs for SPLOST Program Management and equipment installationSPLOST Accountability ManagerDirector of Construction and Support PersonnelEquipment Planning and Installation PersonnelFinancial Reporting/Processing PersonnelFurniture/Equipment to Support Program

Replace carpet and repaint, replace blinds, insulation where removed in the ceiling, repair siding, roofing, windows, paneling, doors, ceilings, floor structure, gutters and downspouts.

Expand mobile computing access campus wide to support instructional and administrative initiatives.

Includes 500 access points for centralized District facilities, 2,400 access points for instructional and admin areas, 200 outdoor routers/access to portables, and 600 portable outdoor routers.

Provide support of computer printing needs of curriculum and administrative functions.

Purchase of approximately 3,170 printers at $2,200 each, would provide one printing device per 25 students and staff.

Refresh district servers using a 5-year refresh cycle.

IN ASSOCIATION WITH THE FACILITY GROUP Page 33 of 152

Page 34: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.:

Projects:

Facility Name: Cobb County System Wide

Includes 6 centralized Email servers, 100 Internet caching, 100 Mail servers for local schools, 100 Media Center servers, and 70 Middle/High school labs.

Refresh components of local school core infrastructure, protect servers , and ensure data integrity in case of power loss.

Includes 4 caching appliances, content filtering, 68 environmental control units, firewall, load balance/redundancy fail over, 1,500 network closet switches, switches and routers for central facility, 110 UPS for main, 300 UPS for other closets, and virus scanning.

Ensure continued student and staff access to instructional learning opportunities, assessment capabilities and Web-based administrative systems using energy efficient technology.

Estimated cost for 30,563 units includes installation, 3-year warranty, productivity software, connectivity to network, & enhanced server support as appropriate at time of implementation.

Funding to support the furniture and equipment needs resulting from enrollment growth or replacement of items which are beyond economical repair.

Security fencing, safety and security related signs, traffic flow indicators etc.

The construction of undesignated classrooms / instructional units for unforeseen future growth requirements.

Digital surveillance recording equipment at middle schools and high schools.

IN ASSOCIATION WITH THE FACILITY GROUP Page 34 of 152

Page 35: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 241

Projects:

Facility Name: Compton Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC System for main Building and Annex

HVAC Main Gym

Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves

Bus Lane Re-paving

Parking Lot Re-paving

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Carpet

Interior Painting

Replace Fencing at New Macland Road.

Add Locks to Classroom Doors in New Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 35 of 152

Page 36: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 241

Projects:

Facility Name: Compton Elementary School

Custodial Equipment.

Audio Visual Equipment.

Build Canopy Over Bus Lanes and between Annex and Main Building.

Add Restroom to Staff Lounge

Install an L-shaped Counter in Front Office

Landscaping at the Front of Building.

IN ASSOCIATION WITH THE FACILITY GROUP Page 36 of 152

Page 37: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 426

Projects:

Facility Name: Cooper Middle School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Air Condition Kitchen

IN ASSOCIATION WITH THE FACILITY GROUP Page 37 of 152

Page 38: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 408

Projects:

Facility Name: Daniell Middle School

Addition for Administration and Pupil Personnel to conform to the Ed. Specs.

Add 5 IU's; 1 - Technology, 3 - Science, 1 - Business. Add 3 Teacher's Team Planning Rooms.

Replace gym floor

New tile in hallways and existing tiled rooms. Prep and level slabs to receive the VCT. Flooring for the Theatre also, some tile and some may be carpet.

HVAC Main Gym

Modify the existing administration areas to work with the new administration addition.

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Replace and Extend Canopy toward Theater Entrance

IN ASSOCIATION WITH THE FACILITY GROUP Page 38 of 152

Page 39: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 408

Projects:

Facility Name: Daniell Middle School

Custodial Equipment.

Audio Visual Equipment.

Whiteboards

Move Double Lockers and Replace and or Repair Existing Lockers

Safety Mats on the Walls Under the Basketball Goals.

Restripe Parking Lot

Replace Art Tables and Chairs

IN ASSOCIATION WITH THE FACILITY GROUP Page 39 of 152

Page 40: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 255

Projects:

Facility Name: Davis Elementary School

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Additional Laptop Computer Carts and Computers, and Desktop computers

IN ASSOCIATION WITH THE FACILITY GROUP Page 40 of 152

Page 41: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 417

Projects:

Facility Name: Dickerson Middle School

Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE.

Addition of 4 IU's, typical classrooms.

Replace HVAC system Main Building

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Replace Lockers in the boys and girls Locker Rooms

Correct drainage on the Athletic Field

Replace the Door Framing and Doors at the Front Entrance and at the Covere

Renovate Restroom Floors in the Old Building.

Upgrade Lighting and Sound Equipment in the Theater

IN ASSOCIATION WITH THE FACILITY GROUP Page 41 of 152

Page 42: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 417

Projects:

Facility Name: Dickerson Middle School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 42 of 152

Page 43: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 414

Projects:

Facility Name: Dodgen Middle School

Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs for the new FTE

Addition of 23 IU's; 15 Classrooms ( 3 Typical, 12 Science ) 2 Spec Ed., 2 Business / Computer, Career Connections, Exploratory Tech., Band, and Orchestra ( from the old Kitchen Modification). 22 new construction, 1 from modification

Add New Kitchen and Cafeteria

Main Switchgear & Panel Upgrades

HVAC Main Gym

Modify 3 Commons areas to be teacher planning rooms.

Modify the existing under sized Choral room to be Drama Classroom and the existing Band room to be Choral Classroom.

Modify the existing administration areas to work with the new administration addition.

Modify the existing Kitchen to be the Orchestra Classroom. 1 I.U. increase.

Modify General Music to be a Special Ed. Classroom.

IN ASSOCIATION WITH THE FACILITY GROUP Page 43 of 152

Page 44: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 414

Projects:

Facility Name: Dodgen Middle School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Gym Floor

Replace HVAC System

Enlarge Theater Window in the Sound Room

IN ASSOCIATION WITH THE FACILITY GROUP Page 44 of 152

Page 45: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 261

Projects:

Facility Name: Dowell Elementary School

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Build Canopy over Bus Lanes

Place Security Gates at Entrance

Upgrade Cafeteria Sound System

Install Hand Dryers to Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 45 of 152

Page 46: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 226

Projects:

Facility Name: Due West Elementary School

Addition for Administration and Pupil Personnel Services

Increase size of the cafeteria by 250 SF.

12 C.R.'s; 4 - K, 7 - P, 1 - Computer Classroom.

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main Gym and Portables

Add sprinkler system to the existing building to accommodate the new addition.

Modify existing admin. to work with the admin. addition.

Roofing for sections of building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Level and Grade Playground Area in rear of School

IN ASSOCIATION WITH THE FACILITY GROUP Page 46 of 152

Page 47: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 226

Projects:

Facility Name: Due West Elementary School

Custodial Equipment.

Audio Visual Equipment.

Replace School Sign

IN ASSOCIATION WITH THE FACILITY GROUP Page 47 of 152

Page 48: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 423

Projects:

Facility Name: Durham Middle School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

New Sound System for Cafeteria

IN ASSOCIATION WITH THE FACILITY GROUP Page 48 of 152

Page 49: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 404

Projects:

Facility Name: East Cobb Middle School

Addition for Administration and Pupil Personnel Services

Add 8 IU's; 8 Typical Classrooms

Main Switchgear & Panel Upgrades

Replace (7) HVAC RTUs, two split systems for Band and Choir rooms

HVAC Main Gym

Modify the existing administration areas to work with the new admin. addition.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Whiteboards

Upgrade Clocks

Strip and Refinish Gym Floor

Refinish Canopy to the Gym

IN ASSOCIATION WITH THE FACILITY GROUP Page 49 of 152

Page 50: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 404

Projects:

Facility Name: East Cobb Middle School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 50 of 152

Page 51: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 211

Projects:

Facility Name: East Side Elementary School

Main Switchgear & Panel Upgrades

Replace carpet throughout

Replace HVAC system for Annex modular bldg.

Air conditioning in PE building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Paint School as Needed and Pressure Wash Exterior

Repair Fencing

Replace Existing Canopy

Replace School Sign

IN ASSOCIATION WITH THE FACILITY GROUP Page 51 of 152

Page 52: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 230

Projects:

Facility Name: Eastvalley Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Roofing for sections of building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Provide 15 Overhead Projectors.

Cover the Blue Paint on the Exterior of Building with a Uniform Gray Golor

Landscape the Front of the School.

IN ASSOCIATION WITH THE FACILITY GROUP Page 52 of 152

Page 53: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 227

Projects:

Facility Name: Fair Oaks Elementary School

Addition of Administrative Suite including: Principal's office, Adminstrative Office, staff toilets, Pupil Personnel spaces. Also renovation of 1,000 SF of existing administrative space.

Enlarge the cafeteria area to accommodate the new FTE allowed by the SPLOST I classroom addition of 16 I.U.'s.

Addition of 3 I.U.'s lost to modification of the Media Center.

Main Switchgear & Panel Upgrades

Replace HVAC split systems

HVAC Main Gym

Modify the existing Admin. to work with new admin. Addition.

Increase the size of the Media Center to accommodate the increased FTE allowed by the previous classroom addition. Loss of 3 I.U.'s.

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

IN ASSOCIATION WITH THE FACILITY GROUP Page 53 of 152

Page 54: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 227

Projects:

Facility Name: Fair Oaks Elementary School

Custodial Equipment.

Audio Visual Equipment.

Paint School as Needed

New Marquee

Install Hand Dryers in Student Restrooms

Put Name of School on the Outside of the Building

Install Gym Water Fountain

Plant Grass on Playground Areas

IN ASSOCIATION WITH THE FACILITY GROUP Page 54 of 152

Page 55: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 409

Projects:

Facility Name: Floyd Middle School

Addition to the food service areas to accommodate the increased FTE.

19 IU's; 12 Typical Classrooms, 3 Science, Business/Computer,Career Connections, Intro to Technology, Exploratory Target.

Addition of new Media Center to meet the Ed. Specs. and the new FTE,to replace the existing undersized one.

Main Switchgear & Panel Upgrades

Replace HVAC RTUs in Art room and Theater, add RTUs in Classrooms

HVAC Main Gym

Upgrade Toilets, Urinals, Sinks, Water Coolers, and Valves

Modify the existing Media Center spaces to be Administration and Pupil Personnel Services.

Modifications to the old Music Spaces, Band and Choral to be Drama and typical classrooms.

Roofing for Sections of Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 55 of 152

Page 56: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 409

Projects:

Facility Name: Floyd Middle School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Reconfigure Parking Lot to Include Bus and Car Areas

Install New Lockers in the Halls and Gym

Cafeteria Tables

Replace and Repair Fencing

Provide Canopy Between Science and Main Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 56 of 152

Page 57: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 264

Projects:

Facility Name: Ford Elementary School

HVAC Main Gym

Bus Lane Re-paving

Parking Lot Re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Provide Additional Lighting in Parking Areas

IN ASSOCIATION WITH THE FACILITY GROUP Page 57 of 152

Page 58: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 269

Projects:

Facility Name: Frey Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Landscaping and Additional Trees

Whiteboards

Place Acoustical Panels in the Gym

IN ASSOCIATION WITH THE FACILITY GROUP Page 58 of 152

Page 59: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 412

Projects:

Facility Name: Garrett Middle School

Main Switchgear & Panel Upgrades

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Enclose Media Center and Add Security Gates

Add Covered Walkway Between Eighth Grade and New Wing

Replace Theater Seating

Theater Renovations Lighting and Sound System

IN ASSOCIATION WITH THE FACILITY GROUP Page 59 of 152

Page 60: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 251

Projects:

Facility Name: Garrison Mill Elementary School

Replace existing Emergency Generator Connect lights, cooler, freezer, & phone system to emergency generator

Upgrade Air Conditioning in Gym and Kitchen

Bus lane re-paving

Parking lot re-paving

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Add callback Buttons to Every Classroom

Increase Number of Parking Spaces

IN ASSOCIATION WITH THE FACILITY GROUP Page 60 of 152

Page 61: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 270

Projects:

Facility Name: Green Acres Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Fix Drainage Droblems in Playground Area

Add Fencing Between Street and Portables.

Increase Lighting in Parking Area and Back of Building

Add Canopy from Entrance to Parking Area

Plant trees to Buffer Neighbors

IN ASSOCIATION WITH THE FACILITY GROUP Page 61 of 152

Page 62: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 411

Projects:

Facility Name: Griffin Middle School

Addition for Administration and Pupil Personnel Services to conform to the Ed. Specs. and to accommodate the new FTE.

Addition of new cafeteria and kitchen.

Addition of 14 IU's: 12 science classrooms, Orchestra, and Choral. Add Band lost to modification for Drama.Add 9 Classrooms lost to modification to increase existing classroom size.Totat IU's to be constructed is 24.

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main Gym

Modify the existing undersized classrooms to be the correct size. Convert each pod from a 4 classroom pod to a 3 classroom pod -- a loss of 9 classrooms.

Modify 3 commons areas to be teacher team planning rooms.

Modify the existing administration areas to work with the new administration addition.

Modify kitchen to be Intro to Technology, Band to be Drama, and Orchestra to be Computer Classroom.

Re-conditioning/metal roof replacement for covered play area

IN ASSOCIATION WITH THE FACILITY GROUP Page 62 of 152

Page 63: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 411

Projects:

Facility Name: Griffin Middle School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Renovate Theater- Electronic Screen, Sound System, Curtains, Carpet

Provide Flooring and Network Access to Covered Play Area

Add wall to isolate restroom from Media Center

Canopy to Bus Lot

IN ASSOCIATION WITH THE FACILITY GROUP Page 63 of 152

Page 64: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 213

Projects:

Facility Name: Harmony Leland Elementary School

Addition of 10 IU's, 6 Kindergarten, 4 Primary. Six new IU's and four are to replace those lost to modification of existing building for Administration.

Main Switchgear & Panel Upgrades

HVAC Upgrades

HVAC Main Gym

Modify the existing building for Administration and Pupil Personnel Services. Four IU's will be lost.

Provide fire suppression sprinkler system to the existing building to accommodate the addition of classrooms and administration.

Roof Replacement

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Replace School Sign

IN ASSOCIATION WITH THE FACILITY GROUP Page 64 of 152

Page 65: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 213

Projects:

Facility Name: Harmony Leland Elementary School

Custodial Equipment.

Audio Visual Equipment.

Landscaping Improvements

Drainage Improvements

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 65 of 152

Page 66: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 516

Projects:

Facility Name: Harrison High School

Replace Cooling Towers

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Pave Busport and Upper Parking Lot

Renovate Classrooms in 814 Building

Resurface Tennis Courts

Provide Additional Storage Area

Provide Additional Outdoor Lighting.

Theater-Remove Arch, add Accoustics, Curtains, Lighting

Add Motion Detectors

IN ASSOCIATION WITH THE FACILITY GROUP Page 66 of 152

Page 67: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 209

Projects:

Facility Name: Haven Academy: Fitzhugh Lee Center

Main Switchgear & Panel Upgrades

Bus Lane Re-Paving

Parkinig Lot Re-Paving

Reroof sections of the building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 67 of 152

Page 68: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 729

Projects:

Facility Name: Haven Academy: Hawthorne Center

Main Switchgear & Panel Upgrades

Painting

Replace HVAC system

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 68 of 152

Page 69: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 267

Projects:

Facility Name: Hayes Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Enclose Walkway Between Buildings

Paint interior and exterior (As Needed)

Replace Restroom Tiles

IN ASSOCIATION WITH THE FACILITY GROUP Page 69 of 152

Page 70: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 421

Projects:

Facility Name: Hightower Trail Middle School

Addition for Band and Orchestra

HVAC Main Gym

Modify the existing Orchestra and Choral to accommodate Drama and ensemble practices. Loss of 1 I.U.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Theater Lighting

Replace 12 Folding Walls with Permanent

Landscaping

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 70 of 152

Page 71: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 242

Projects:

Facility Name: Hollydale Elementary School

Main Switchgear & Panel Upgrades

Paint Entire Building

Replace HVAC system for original building

HVAC Main Gym

Upgrade toilets, urinals, sinks, water coolers, and valves

Roofing for front canopy

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Classroom Function Door Locks on Needed Interior Doors

Install 3 Speed Bumps in Front Parking Area Safety

Increase Electrical Outlets in Classrooms

Upgrade Intercom

IN ASSOCIATION WITH THE FACILITY GROUP Page 71 of 152

Page 72: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 242

Projects:

Facility Name: Hollydale Elementary School

Custodial Equipment.

Audio Visual Equipment.

Cafeteria Tables

IN ASSOCIATION WITH THE FACILITY GROUP Page 72 of 152

Page 73: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 254

Projects:

Facility Name: Keheley Elementary School

Air Conditioning for Covered Play Area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Repair and restripe parking lot.

Install hand dryers into each restroom.

Place tack strips in the needed hallways throughout the building.

IN ASSOCIATION WITH THE FACILITY GROUP Page 73 of 152

Page 74: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 519

Projects:

Facility Name: Kell High School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Add six foot galvenized, finished, chain link fence around perimeter.

IN ASSOCIATION WITH THE FACILITY GROUP Page 74 of 152

Page 75: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 280

Projects:

Facility Name: Kemp Elementary School

Provide airconditioning in the Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Fence Perimeter

IN ASSOCIATION WITH THE FACILITY GROUP Page 75 of 152

Page 76: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 265

Projects:

Facility Name: Kennesaw Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Enclose Walkway Between Buildings

Install Hand Dryers in Student Restrooms

Venition Blinds in Classrooms and Library

Annex-Classroom Function Locks on Interior Doors

IN ASSOCIATION WITH THE FACILITY GROUP Page 76 of 152

Page 77: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 518

Projects:

Facility Name: Kennesaw Mountain High School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Repave Road to Practice Field

Provide exterior lighting in the parking areas.

Landscaping

Resurface Track

IN ASSOCIATION WITH THE FACILITY GROUP Page 77 of 152

Page 78: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 243

Projects:

Facility Name: Kincaid Elementary School

Replace existing Emergency Generator

Air Conditioning for PE Building

Bus Lane Re-Paving

Parking Lot Re-Paving

Roofing for sections of building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Gate at Main Entrance

Improve Drainage at Playgrounds

Sink in Art Room

Provide New Marquee

IN ASSOCIATION WITH THE FACILITY GROUP Page 78 of 152

Page 79: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 243

Projects:

Facility Name: Kincaid Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 79 of 152

Page 80: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 224

Projects:

Facility Name: King Springs Elementary School

Main Switchgear & Panel Upgrades

HVAC Upgrades

HVAC Main Gym

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Call Back Buttons

Shelving for Front Office

IN ASSOCIATION WITH THE FACILITY GROUP Page 80 of 152

Page 81: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 223

Projects:

Facility Name: LaBelle Elementary School

Addition for Administration and Pupil Personnel Services

Addition of 10 IU's: 6 - K, 4 - P.

Main Switchgear & Panel Upgrades

Replace HVAC system for main building

HVAC Main Gym

Modify the existing administration area to work with the new admin. addition.

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Additional Security Lighting

Enclose Walkways Between Buildings

Whiteboards

IN ASSOCIATION WITH THE FACILITY GROUP Page 81 of 152

Page 82: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 223

Projects:

Facility Name: LaBelle Elementary School

Custodial Equipment.

Audio Visual Equipment.

Security Cameras

Correct Moisture and Mold Problems

IN ASSOCIATION WITH THE FACILITY GROUP Page 82 of 152

Page 83: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 512

Projects:

Facility Name: Lassiter High School

Replace existing Emergency Generator

Main Switchgear & Panel Upgrades

Replace carpet throughout and add carpet to the Choral Room. Replace rubber base in all spaces including the corridors.

Replace gym bleachers

Replace cooling towers

Resurface track.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Improve Drainage and Add Sidewalk

Repair and Replace Theater Seating

IN ASSOCIATION WITH THE FACILITY GROUP Page 83 of 152

Page 84: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 252

Projects:

Facility Name: Lewis Elementary School

Add 1 IU, P.E. Gymnasium with restrooms.

HVAC Main Gym

Modify existing P.E. Gymnasium to accommodate Guidance and Administration. New PE to be built.

Bus lane re-paving

Parking lot re-paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Canopy at Front of School

Classroom Function Door Locks for Addition

Enclose Breezeway Connecting New Addition and Old Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 84 of 152

Page 85: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 425

Projects:

Facility Name: Lindley Middle School

Cooling System for Hardwood Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Add 10 Desktop Computers

Accoustical Panels in the Cafeteria

Install Exhaust Fans in Adult Toilets

Athletic Field Fencing

IN ASSOCIATION WITH THE FACILITY GROUP Page 85 of 152

Page 86: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 420

Projects:

Facility Name: Lost Mountain Middle School

Addition of 8 IU's.; 3 Science, 3 Special Ed., Band, Intro to Tech.

Add 3 rooms for teachers' team planning.

HVAC Main Gym

Modify Band to be Orchestra and modify Orchestra to be Drama.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Add Separate Vehicle Entrance to Parking Lot

Replace Sod on Field

Improve Lighting on the Theater Stage

IN ASSOCIATION WITH THE FACILITY GROUP Page 86 of 152

Page 87: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 216

Projects:

Facility Name: Mableton Elementary School

Main Switchgear & Panel Upgrades

Gymnasium HVAC Upgrades Add A/C.

Parking lot re-paving

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Add Canopy for Bus Loading Area

IN ASSOCIATION WITH THE FACILITY GROUP Page 87 of 152

Page 88: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 416

Projects:

Facility Name: Mabry Middle School

Addition for Administration Pupil Personnel Services

Add a new central cafeteria & kitchen

Add 18 IU's, Band, 12 Science, 4 Special Ed., 1 Technology

Main Switchgear & Panel Upgrades

HVAC Main Gym

Modify existing kitchen for classroom space, Technology.

Renovate existing commons areas for teacher workrooms

Roofing for entire building

Replace Skylight, Main hall

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Canopy from the Bus Lanes to the Front of the Building

Replace Shelving in Custodial Areas

IN ASSOCIATION WITH THE FACILITY GROUP Page 88 of 152

Page 89: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 416

Projects:

Facility Name: Mabry Middle School

Custodial Equipment.

Audio Visual Equipment.

Provide Metal Bar for Additional Security at Exterior Doors

Refurbish Gym Floor

IN ASSOCIATION WITH THE FACILITY GROUP Page 89 of 152

Page 90: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 418

Projects:

Facility Name: McCleskey Middle School

HVAC Main Gym

Bus Lane Re-Paving

Parking Lot Re-Paving

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Improve Lighting and Sound in Theater

IN ASSOCIATION WITH THE FACILITY GROUP Page 90 of 152

Page 91: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 501

Projects:

Facility Name: McEachern High School

Main Switchgear & Panel Upgrades

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Dining/Kitchen

Venetian Blinds

IN ASSOCIATION WITH THE FACILITY GROUP Page 91 of 152

Page 92: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 222

Projects:

Facility Name: Milford Elementary School

Addition for Administration and Pupil Personnel Services

Addition of 1 I.U. to replace one lost to tie-in of the new administration area

Main Switchgear & Panel Upgrades

HVAC Main Gym

Upgrade toilets, urinals, sinks, water coolers, and valves

Modify the existing admin. area and one classroom area lost to tie-in of new administration area.

Provide fire suppression sprinkler system to the existing building to accommodate the administration addition.

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

IN ASSOCIATION WITH THE FACILITY GROUP Page 92 of 152

Page 93: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 222

Projects:

Facility Name: Milford Elementary School

Custodial Equipment.

Audio Visual Equipment.

Upgrade Front Entrance

Replace Cafeteria Windows

IN ASSOCIATION WITH THE FACILITY GROUP Page 93 of 152

Page 94: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 249

Projects:

Facility Name: Mount Bethel Elementary School

Replace existing Emergency Generator

HVAC Main Gym

Roofing for sections of building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Provide Perimeter Fencing and Lockable Gates

Improve Lighting in Front Parking Lot

Modify Front Office for Safety and Security

Canopy at Bus Parking Area

Canopy at Front Walkway

IN ASSOCIATION WITH THE FACILITY GROUP Page 94 of 152

Page 95: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 253

Projects:

Facility Name: Mountain View Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Resurface/Restripe Parking Lot

Paint Interior and Exterior of Building

Build a Fence between Playground and Parking Lot

Provide Wireless Access Points in the Kindergarten Building

Landscape Play Areas

Large Interior Window at Front Office Safety

IN ASSOCIATION WITH THE FACILITY GROUP Page 95 of 152

Page 96: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 245

Projects:

Facility Name: Murdock Elementary School

Addition for Administration and Pupil Personnel Services

Addition of 17 IU's: 9 - K, 2 - P, 2 - Art, 2 - Music, 2 - Computer.

Main Switchgear & Panel Upgrades

HVAC Main Gym

Roofing for sections of building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Canopy over Sidewalk

IN ASSOCIATION WITH THE FACILITY GROUP Page 96 of 152

Page 97: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 262

Projects:

Facility Name: Nicholson Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Connect Back Exits with Sidewalks

Improve Drainage at Front of Building

Connect downspouts and Pipe to Existing Drainage System

Hand Dryers in Student Restrooms

Whiteboards

Replace Venetian Blinds

IN ASSOCIATION WITH THE FACILITY GROUP Page 97 of 152

Page 98: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 275

Projects:

Facility Name: Nickajack Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Improve Landscaping-additional trees etc.

IN ASSOCIATION WITH THE FACILITY GROUP Page 98 of 152

Page 99: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 505

Projects:

Facility Name: North Cobb High School

Addition for Administration and Guidance to conform to the Ed. Specs. and to accommodate the new FTE.

Add 13 IU's; Band, Choral, Orchestra, Home Ec.,Art, and 8 Typical Classrooms. Demolish existing 10 IU modular building and replace with 10 additional IU's. Total construction = 23 IU's.

Demolish old annex building to make room for a two story addition. 10,800 SF. Loss of 10 I.U.'s.

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Football field.

Replace gym floor

Modify the following areas replaced by the new addition: Existing Band and Choral to be Drama and a Black Box Theatre; existing Art to be a classroom, and existing Home Ec. to be Culinary Arts.

Modify the existing administration areas to work with the new administration addition.

Renovate Horticulture classroom to be used as typical classroom.

Roofing for sections of building

IN ASSOCIATION WITH THE FACILITY GROUP Page 99 of 152

Page 100: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 505

Projects:

Facility Name: North Cobb High School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Baseball Field Lighting

Improve Lighting outside the Old Gym and Science Building

Repair Lower PE Field

IN ASSOCIATION WITH THE FACILITY GROUP Page 100 of 152

Page 101: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.:

Projects:

Facility Name: Northwest Elementary School

New 61 IU Elementary School

IN ASSOCIATION WITH THE FACILITY GROUP Page 101 of 152

Page 102: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 428

Projects:

Facility Name: Northwest Middle School

New 71 IU Middle School. Possible 2- Story Building.

IN ASSOCIATION WITH THE FACILITY GROUP Page 102 of 152

Page 103: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 234

Projects:

Facility Name: Norton Park Elementary School

Add 3000 square feet for Administration and Pupil Personnel Services. Renovate 1800 square feet of the existing Administration areas.

Addition of 10 IU's. 6 Kindergarten, 4 Primary.

Main Switchgear & Panel Upgrades

install air conditioning in gym

Upgrade toilets, urinals, sinks, water coolers, and valves

Replace water piping, plumbing fixtures, and outside hose bibs

Modify the existing administration area to work with the new administration area.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Increase Security Lighting

Replace Carpet

IN ASSOCIATION WITH THE FACILITY GROUP Page 103 of 152

Page 104: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 234

Projects:

Facility Name: Norton Park Elementary School

Custodial Equipment.

Audio Visual Equipment.

Replace Risers

IN ASSOCIATION WITH THE FACILITY GROUP Page 104 of 152

Page 105: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 730

Projects:

Facility Name: Oakwood High School

Main Switchgear & Panel Upgrades

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Replace Gym Floor

Improve Lighting in the 100 and 300 Buildings

Modify Administrative Area Safety

IN ASSOCIATION WITH THE FACILITY GROUP Page 105 of 152

Page 106: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 507

Projects:

Facility Name: Osborne High School

Add 18 IU's. Typical Classrooms

Provide new Media Center to meet current space requirements to conform to the Ed. Specs..

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Baseball field.

Sports Lighting Football

Replace HVAC system for Gym, Cafeteria, and Theater

Upgrade toilets, urinals, sinks, water coolers, and valves

Modifiy old Media Center to be Administration and Guidance suites to meet current space requirements and to conform to the Ed .Specs. and to accommodate the new FTE.

Add 2 Additional Tennis Courts

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Replace Venetian Blinds

IN ASSOCIATION WITH THE FACILITY GROUP Page 106 of 152

Page 107: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 507

Projects:

Facility Name: Osborne High School

Custodial Equipment.

Audio Visual Equipment.

Upgrade Greenhouse

Refinish and Re-Line Gym Floor

Replace Stage Curtains

Install Sink In Nurse's Office

IN ASSOCIATION WITH THE FACILITY GROUP Page 107 of 152

Page 108: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 427

Projects:

Facility Name: Palmer Middle School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Build Stairway to Field

HVAC Kitchen

Improve Acoustics in Cafeteria

IN ASSOCIATION WITH THE FACILITY GROUP Page 108 of 152

Page 109: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 506

Projects:

Facility Name: Pebblebrook High School

Addition for Administration and Guidance to accommodate the new FTE.

Addition to the cafeteria and kitchen to conform to the Ed. Specs and to accommodate the new FTE.

22 IU addition, 2- story. Typical classrooms. Connect to existing new Fine Arts Facility.

Addition to the Media Center to accommodate the new FTE.

Replace or Repair the existing Sports Lighting at the Baseball field.

Sports Lighting - Football

Upgrade toilets, urinals, sinks, water coolers, and valves

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Resurface Student Parking Lot.

IN ASSOCIATION WITH THE FACILITY GROUP Page 109 of 152

Page 110: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 506

Projects:

Facility Name: Pebblebrook High School

Custodial Equipment.

Audio Visual Equipment.

Renovate Weight Training Classrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 110 of 152

Page 111: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 415

Projects:

Facility Name: Pine Mountain Middle School

Provide Band, Choral and Orchestra Addition .

Main Switchgear & Panel Upgrades

Provide A/C for gym

Modify the existing Band Room to accommodate Drama with dressing rooms and modify existing Choral room to be 1 classroom.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Landscaping Upgrades

IN ASSOCIATION WITH THE FACILITY GROUP Page 111 of 152

Page 112: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 281

Projects:

Facility Name: Pitner Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 112 of 152

Page 113: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 515

Projects:

Facility Name: Pope High School

Replace Bleachers in Main Gym

Replace cooling towers

Resurface Stadium Track

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Window for Pupil Personnel Office

Theater Renovation

IN ASSOCIATION WITH THE FACILITY GROUP Page 113 of 152

Page 114: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 257

Projects:

Facility Name: Powder Springs Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Canopy at Bus Area

Replace Interior Door Locks with Classroom Function Door Locks

Additional Lighting in Bus Area

Fence Around Play Area in Back

Replace Media Center Case Work

IN ASSOCIATION WITH THE FACILITY GROUP Page 114 of 152

Page 115: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 217

Projects:

Facility Name: Powers Ferry Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main Gym

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Roofing for sections of building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Canopy for Bus Area

Book Cases for Classrooms

Sign For Front Of School

Add Name Of School To Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 115 of 152

Page 116: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 217

Projects:

Facility Name: Powers Ferry Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 116 of 152

Page 117: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 277

Projects:

Facility Name: Riverside Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Exterior Surveillance Cameras

IN ASSOCIATION WITH THE FACILITY GROUP Page 117 of 152

Page 118: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 282

Projects:

Facility Name: Riverside Primary Elementary School

36 IU Primary School. K-2

IN ASSOCIATION WITH THE FACILITY GROUP Page 118 of 152

Page 119: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 248

Projects:

Facility Name: Rocky Mount Elementary School

Main Switchgear & Panel Upgrades

Air Conditioning for the gym

Bus Lane Re-Paving

Parking Lot Re-Paving

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Install Vision Windows To Interior Doors

Place Room Numbers on Doors

Additional Parking Spaces

Venetian Blinds

Place Hand Dryers In Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 119 of 152

Page 120: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 248

Projects:

Facility Name: Rocky Mount Elementary School

Custodial Equipment.

Audio Visual Equipment.

Backstop for Field

Whiteboards and Tackboards

Add Sink To Teacher Lounge

Landscape Grounds

IN ASSOCIATION WITH THE FACILITY GROUP Page 120 of 152

Page 121: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 231

Projects:

Facility Name: Russell Elementary School

Addition for Administration and Pupil Personnel Services

Addition of 22 IU's: 6 - K, 13 - P, 1 - Art, 1 - Music, 1 - Computer.

Main Switchgear & Panel Upgrades

HVAC Main Gym

Upgrade toilets, urinals, sinks, water coolers, and valves

Modify the existing administration areas to work with the new administration addition.

Bus Lane Re-Paving

Parking Lot Re-Paving

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Venetian Blinds

Casework in Media Center

IN ASSOCIATION WITH THE FACILITY GROUP Page 121 of 152

Page 122: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 231

Projects:

Facility Name: Russell Elementary School

Custodial Equipment.

Audio Visual Equipment.

Canopy at the Bus Area

Perimiter Fencing and Gate

School Sign

Replace Restroom Stalls

IN ASSOCIATION WITH THE FACILITY GROUP Page 122 of 152

Page 123: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 273

Projects:

Facility Name: Sanders Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Acoustical Treatment for Gym

Restripe Parking Area

IN ASSOCIATION WITH THE FACILITY GROUP Page 123 of 152

Page 124: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 225

Projects:

Facility Name: Sedalia Park Elementary School

Addition of 8 IU's. 1 - K, 7 - P. Add 4 Primary Classrooms lost to modification for Administration. Total IU's constructed will be 12.

Air condition the gym and upgrade to multipurpose room

Modify existing administration area and 4 classrooms to accommodate Administration and Pupil Personnel Services. 4500 square feet. Loss of 4 I.U.'s.

Modify the existing administration areas to work with the new administration addition.

Roofing for sections of building

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Improve Security Lighting between Gym and New Addition

Additional Staff Parking

IN ASSOCIATION WITH THE FACILITY GROUP Page 124 of 152

Page 125: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 225

Projects:

Facility Name: Sedalia Park Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 125 of 152

Page 126: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 260

Projects:

Facility Name: Shallowford Falls Elementary School

Addition for Administration and Pupil Personnel Services

Addition of 21 IU's. : 5 - K, 6 - P, 6 - I, 1 - SE, 1 - Art, 1- Music, 1 - Computer.

HVAC Main Gym

Reroof Entire Building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Venetian Blinds

Whiteboards

Additional Security Window at Front Entrance

Upgrade and Repaint Playscapes

Canopy at Bus Area

IN ASSOCIATION WITH THE FACILITY GROUP Page 126 of 152

Page 127: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 260

Projects:

Facility Name: Shallowford Falls Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 127 of 152

Page 128: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 419

Projects:

Facility Name: Simpson Middle School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Pave Emergency Access Lane

Replace Media Casework

IN ASSOCIATION WITH THE FACILITY GROUP Page 128 of 152

Page 129: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 228

Projects:

Facility Name: Skyview Elementary School

Main Switchgear & Panel Upgrades

Replace HVAC system

HVAC Main Gym

Upgrade toilets, urinals, sinks, water coolers, and valves

Replace exterior sanitary sewer piping, cleanouts and associated manholes

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Additional Adult Bathrooms

Canopy Front Door to Bus Area

Resurface the Lower PE Area and the Four Square Areas.

IN ASSOCIATION WITH THE FACILITY GROUP Page 129 of 152

Page 130: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 228

Projects:

Facility Name: Skyview Elementary School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 130 of 152

Page 131: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 422

Projects:

Facility Name: Smitha Middle School

Addition of 8 IU's; 3 Typical CR's, 3 Spec. Ed., Orchestra, Intro to Technology.

Add 3 Team Planning Rooms

Replace carpet throughout

HVAC Main Gym

Modify Orchestra to be Drama Classroom.

Modify Special Ed. CR's (3), to be Science Classrooms. Remove operable walls from Special Education classrooms add science casework.

Roofing for entire building

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Improve Exterior Security Lighting

Renovate Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 131 of 152

Page 132: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 422

Projects:

Facility Name: Smitha Middle School

Custodial Equipment.

Audio Visual Equipment.

Canopy at Front of Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 132 of 152

Page 133: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 247

Projects:

Facility Name: Sope Creek Elementary School

Main Switchgear & Panel Upgrades

Make repair and modification and renovation items to the annex building.

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Replace library shelving as needed

Whiteboards

Extend Canopy in Front of School

Canopy at Bus Lanes

IN ASSOCIATION WITH THE FACILITY GROUP Page 133 of 152

Page 134: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 503

Projects:

Facility Name: South Cobb High School

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Baseball field.

Sports Lighting - Football

Replace all HVAC units in Theater, Media Center, offices, and add heat to cafeteria AHUs

Upgrade toilets, urinals, sinks, water coolers, and valves

Resurface track

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Improve Lighting and Sound Systems in Theater

Repair Elevators

IN ASSOCIATION WITH THE FACILITY GROUP Page 134 of 152

Page 135: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 510

Projects:

Facility Name: Sprayberry High School

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Football field.

Replace gym bleachers

Resurface tennis courts

Resurface Track

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Renovate Existing Science Labs

Upgrade Fire Alarm System

Improve Outdoor Lighting

Replace Stalls and Doors in Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 135 of 152

Page 136: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 246

Projects:

Facility Name: Still Elementary School

Addition for Administration and Pupil Personnel Services

Expand the cafeteria to accommodate the additional FTE

Addition of 21 IU's: 9 - K, 8 - P, 1 - Art, 1 - Music, 2 - Computer.

Replace existing Emergency Generator

Main Switchgear & Panel Upgrades

Replace kitchen exhaust and make-up air units

Provide air conditioning in Gym.

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Whiteboards

Reconfigure Traffic Pattern

Upper Parking Lot Re-Paving

IN ASSOCIATION WITH THE FACILITY GROUP Page 136 of 152

Page 137: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 246

Projects:

Facility Name: Still Elementary School

Custodial Equipment.

Audio Visual Equipment.

Fencing Around Playground

Replace Restroom Partitions and Doors

IN ASSOCIATION WITH THE FACILITY GROUP Page 137 of 152

Page 138: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 413

Projects:

Facility Name: Tapp Middle School

Main Switchgear & Panel Upgrades

Painting

Replace kitchen exhaust and make-up air units

install air conditioning in gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Replace Lockers and Repaint the Locker Rooms

Remove Media Center Interior Walls

Improve Drainage Campus Wide

Parking Lot Re-Paving

Hand Dryers in Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 138 of 152

Page 139: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 413

Projects:

Facility Name: Tapp Middle School

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 139 of 152

Page 140: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 238

Projects:

Facility Name: Teasley Elementary School

HVAC Main Gym

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Repair or Replace Fire Alarm Panel

Replace Canopy at Front of School

Upgrade Entrance and Front Elevation of Building

Replace Drinking Fountains

Pave Sidewalk on Side of School

Renovate Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 140 of 152

Page 141: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 258

Projects:

Facility Name: Timber Ridge Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Extend Canopy to End of Bus Lanes

Gates at Both Entrances

Convert Open Area on Lower Level into Additional Storage

IN ASSOCIATION WITH THE FACILITY GROUP Page 141 of 152

Page 142: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 805

Projects:

Facility Name: Transportation Dept. South Cobb Drive Support Facility

Replace HVAC System

Roofing for office

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

IN ASSOCIATION WITH THE FACILITY GROUP Page 142 of 152

Page 143: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 250

Projects:

Facility Name: Tritt Elementary School

Replace HVAC

HVAC Main Gym

Re-conditioning/metal roof replacement for covered play area

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Enclose Walkways

Improve Acoustics in Cafeteria

IN ASSOCIATION WITH THE FACILITY GROUP Page 143 of 152

Page 144: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 263

Projects:

Facility Name: Varner Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Landscape Grounds

Create Entrance/Exit for Buses.

IN ASSOCIATION WITH THE FACILITY GROUP Page 144 of 152

Page 145: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 268

Projects:

Facility Name: Vaughan Elementary School

HVAC Main Gym

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Access Controls

Custodial Equipment.

Audio Visual Equipment.

Gate at Entrance

ReCarpet Worn Areas

Paint Interior of School

Hand Dryers to Student Restrooms

IN ASSOCIATION WITH THE FACILITY GROUP Page 145 of 152

Page 146: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 511

Projects:

Facility Name: Walton High School

Add 6 I.U.'s that were lost to the modification of the old building ; 6 Typical Classrooms

20 IU addition. Typical classrooms.

Replace existing Emergency Generator

Main Switchgear & Panel Upgrades

Redesign HVAC for main building

Modify the existing previously open plan classroom areas to be standard classrooms and corridors so that each classroom has a door to the corridor. 36 IU's existing modified to be 30 IU's, loss of 6 IU's. Renovate the Office Areas.

Modification and Renovation of the Kitchen and Cafeteria, and Food Service Equipment Replacement.

Bus Lane Re-Paving

Parking Lot Re-paving Add Striping for Car Parking in the Bus Area.

Roofing for Sections of Building

Roofing for the Weight Lifting Building

IN ASSOCIATION WITH THE FACILITY GROUP Page 146 of 152

Page 147: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 511

Projects:

Facility Name: Walton High School

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Custodial Equipment.

Audio Visual Equipment.

Surveillance Cameras

Renovate Restrooms

Replace Water Fountains

Renovate Locker Rooms

Replace Exterior Doors

Construct Sidewalk from A-parking Lot to Bus Lanes

Replace Hall Lockers Excluding the E-wing.

Install Speed Bumps

Replace Theater Doors

IN ASSOCIATION WITH THE FACILITY GROUP Page 147 of 152

Page 148: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 0

Projects:

Facility Name: West Cobb Middle School

New 71 IU Middle School.

IN ASSOCIATION WITH THE FACILITY GROUP Page 148 of 152

Page 149: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 0

Projects:

Facility Name: West Cobb #1 High School

New 98 IU High School

IN ASSOCIATION WITH THE FACILITY GROUP Page 149 of 152

Page 150: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 0

Projects:

Facility Name: West Cobb #2 High School

98 IU High School

IN ASSOCIATION WITH THE FACILITY GROUP Page 150 of 152

Page 151: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 509

Projects:

Facility Name: Wheeler High School

Add 6 IU's; 6 - Science Labs: 4 Chemistry, 1 - Biology, 1 - Physics.Add 2 IU's ; 2-Science ( Physics ) lost to modification.8 Classrooms constructed, net increase of 6 IU's.

Main Switchgear & Panel Upgrades

Replace or Repair the existing Sports Lighting at the Baseball field.

Sports Lighting - Football

Replace HVAC for Theater, Annex basement, field house, Media center, 300 building, and Cafeteria

Modify 6 existing undersized science labs to be typical classrooms, ESOL and Special ED. Loss of 2 I.U.'s

Refresh Obsolete Workstations

Refresh District Printers

Refresh District Servers

Refresh Existing District Network

Computing Device for Every Teacher

Refresh and Enhance Mobile Computing Access District Wide

Copier/Duplicator Refresh

Surveillance Cameras

Auditorium Renovations

Replace Lights in Old Gym

IN ASSOCIATION WITH THE FACILITY GROUP Page 151 of 152

Page 152: FACILITY SUMMARY OF APPROVED PROJECTS › SPLOST › SPLOST2 › pdf › FacilitySummary.pdfFACILITY SUMMARY OF APPROVED PROJECTS 2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST

FACILITY SUMMARY OF APPROVED PROJECTS2003 SPECIAL PURPOSE LOCAL OPTION SALES TAX (SPLOST II)

Facility No.: 509

Projects:

Facility Name: Wheeler High School

Custodial Equipment.

Audio Visual Equipment.

Install Sidewalk Around Visitors Side of Football Field

IN ASSOCIATION WITH THE FACILITY GROUP Page 152 of 152