Upload
jayson-burns
View
216
Download
1
Tags:
Embed Size (px)
Citation preview
(Facility) Support- LCGT Handy Man -
The definition of “Support” is now under construction.
Many missing-tasks will be delivered to the support group.• CCD monitor deliver Circuit?• Scattered light control (IFO and Input optics) IOP?• Local sensing of mirrors’ motion Suspension?• Network• Etc…
Anyway, in 2010, the support group supports about mainly facility including…
Clean environment construction and rule Power supply and HAM(60Hz) buster Entrance System NetworkLCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
How to Make Clean Environment
Dry the areaKeep out dustNot raise dustNot collect dustAvoid sound and vibration
- Basic Policy -
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Humidity ControlHumidity kills IFO
Problems① Water from concrete walls and floors.② Water from side ditch.
Solutions for tunnel section① Baking after construction. But, no money and no
time due to tight schedule ?② Dry coverage only around vacuum instruments.③ Vacuum ducts taping with sheets.(but stainless
steel)④ Duct supports should be made of stainless steel ? or
steel with corrosion control.Solutions for Center , End station
① Baking.LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Dust ControlDust kills OpticsProblems
① Dust from Outside (arm and entrance tunnels).② Dust from walls (blowing concrete) and floors.③ Dust from people.
Solutions ① Clean and dry air generation using outside fresh air.
(Sound and vibration should be small.)② Keep a clean air flow from stations to outside.③ Antistatic floor and wall painting, etc….④ Extra clean area around TM Tanks using deck
structure.⑤ Air shower system introduction and clothes policy.⑥ Rules about instrument introduction.LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Vibration and Sound Control
No additional vibration and soundProblems
① Clean and Dry air Generator (CDG) makes large sound and vibration.
② HEPA in the lab also makes sound and vibration.
Solutions ① CDG is put as far as away from stations.② HEPAs are turned off during operation in stations③ Small CDG in tunnels for vacuum stuff and
electronics should be enclosed in some houses.
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Clean Environment Ideal Plan 1
Dry and clean air generation
Access Tunnel
10000
1 F
(Side view)
(Top view)
10000
クレーン
1000
Entrance
Anterior room 1
2 F
Anterior room 2
Anterior room
Anterior room
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Compromised Plan 1 by Tunnel Group
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Power SupplyProblems
① There is no ground earth in the tunnel.② According to experience, HAM (60Hz) spoiled IFO control and
data quality a lot, unless it was minimized.③ Ground loops due to cabling often troubles.④ How supply power line for the end station ? (from center ? or
individual?)
Solutions ① 6000VAC(where is it set ?) 100VAC(where?) 24VDC. ② 100VAC generation is isolated from lab area or not? If isolated,
many commercial electronics should be modified.③ 24VDC is delivered to each electronics? If so, Be careful with
ground loops. ④ Ground copper bars will be set on walls in stations for ?⑤ Never use switching regulators.⑥ Battery is possible?
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Entrance and Security SystemConditions and Requirements
① The LCGT entrance is completely different with that for SK.② We should keep tabs on every worker inside the mine by
ourselves.③ We should make some rules (security, car usage, emergency
contact) and do security education like SK. We should note especially security in 3km tunnel !!
④ “Emergency route”, “O2 monitor”, “fire-alarm box”, “surveillance monitors”, “air bottles”, “hand extinguisher”, etc… are required from the point of view of fire laws.
⑤ A security guard should come around.⑥ Mobile PHS and commercial mobile phone around the entrance
introduction. (We can scarcely use a mobile phone at Atotsu Entrance.)
Solutions ① We should learn many things from SK group.② Can we ask SK to extend his system and a guard security for
LCGT by cost sharing ? In the worst case, we should manual entrance check.
③ Ask a commercial company to build an antenna ?LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
Entrance and Security System
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba
CLIO members and collaborators use this system.
NetworkPresent Conditions & Requirements
① Several 1G or 10G lines for SK area are ready, but we don’t know we can use one of them that are belong to SK group.
② Some academic network is available at the Mozumi UT buildings.③ Because we have a plan to build a house at the new entrance for
LCGT, should we have an individual line from Mozumi UT buildings?④ How distribute the network to the end stations ? Because the Y-arm
end around Mozumi can be directly provided from UT building. Whereas, X-arm end should be provided from the center station?
LCGT f2f meeting Sept 27 2010 @ Kashiwa, Chiba