FACT SHEET A NEW ROADWAY PROJECT WILL BEGIN IN YOUR AREA State Road (SR) 9 Connector From north of NW 141 Street to Golden Glades Park and Ride FIN# 429184-1-52-01 Begins: June 2014 OVERVIEW The Florida Department of Transportation (FDOT) is scheduled to begin a roadway construction project the week of June 16, 2014, along the SR 9 Connector from north of NW 141 Street to the Golden Glades Park and Ride in Miami- Dade County. PROJECT SCHEDULE June 2014 November 2014 ESTIMATED CONSTRUCTION COST $2.4 million WORK TO BE PERFORMED Repaving and restriping the roadway Installing new signage and pavement markings Drainage improvements Upgrading pedestrian signals and lighting Installing new guardrails and fencing Bridge enhancements AFFECTED MUNICIPALITIES City of Opa-locka City of Miami Gardens LANE CLOSURE AND DETOUR INFORMATION To do this work safely, it will be necessary to close travel lanes at times. Work and lane closures will occur along SR 5/US 1 during non-peak hours on non-event days, nights and weekends from: 9 a.m. to 3:30 p.m., weekdays 9 p.m. to 5:30 a.m., Sunday through Thursday 11 p.m. to 7 a.m., Friday and Saturday HELPFUL TIPS Allow extra time to reach your destination Obey all posted signs and speed limits ALWAYS PUT SAFETY FIRST For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. Wearing a safety belt is the single most effective way to protect people and reduce fatalities in motor vehicle crashes. The Department takes steps to reduce construction effects, but you might experience the following around the work site: Travel lane closures and detours Increased dust and noise Workers and equipment moving around the area Please note that this schedule could change due to bad weather or other unexpected conditions. FOR MORE INFORMATION Please contact FDOT Project Engineer Doug Schumann at (305) 962-4928, or Public Information Specialist Ivette Ruiz-Paz at (305) 640-7462 or [email protected]. 1000 NW 111 AVENUE MIAMI, FL 33172 Please visit our website: www.fdotmiamidade.com For real-time traffic information dial 511 or visit:

FACT SHEET - Opa-Locka, FL

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FACT SHEET - Opa-Locka, FL

FACT SHEET A NEW ROADWAY PROJECT WILL BEGIN IN YOUR AREA

State Road (SR) 9 Connector From north of NW 141 Street to

Golden Glades Park and Ride

FIN# 429184-1-52-01 Begins: June 2014

OVERVIEW The Florida Department of Transportation (FDOT) is scheduled to begin a roadway construction project the week of June 16, 2014, along the SR 9 Connector from north of NW 141 Street to the Golden Glades Park and Ride in Miami-Dade County.

PROJECT SCHEDULE June 2014 — November 2014

ESTIMATED CONSTRUCTION COST $2.4 million

WORK TO BE PERFORMED Repaving and restriping the roadway

Installing new signage and pavement markings

Drainage improvements

Upgrading pedestrian signals and lighting

Installing new guardrails and fencing

Bridge enhancements

AFFECTED MUNICIPALITIES City of Opa-locka City of Miami Gardens

LANE CLOSURE AND DETOUR INFORMATION To do this work safely, it will be necessary to close travel lanes at times. Work and lane closures will occur along SR 5/US 1 during non-peak hours on non-event days, nights and weekends from: 9 a.m. to 3:30 p.m., weekdays 9 p.m. to 5:30 a.m., Sunday through Thursday 11 p.m. to 7 a.m., Friday and Saturday

HELPFUL TIPS Allow extra time to reach your destination Obey all posted signs and speed limits

ALWAYS PUT SAFETY FIRST For your safety and the safety of others, please use caution when driving, walking or biking around any construction zone. Wearing a safety belt is the single most effective way to protect people and reduce fatalities in motor vehicle crashes. The Department takes steps to reduce construction effects, but you might experience the following around the work site:

Travel lane closures and detours Increased dust and noise Workers and equipment moving around the area

Please note that this schedule could change due to bad weather or other unexpected conditions.

FOR MORE INFORMATION

Please contact FDOT Project Engineer Doug Schumann at (305) 962-4928, or Public Information Specialist Ivette Ruiz-Paz at (305) 640-7462 or [email protected].

1000 NW 111 AVENUE MIAMI, FL 33172

Please visit our website: www.fdotmiamidade.com For real-time traffic information dial 511 or visit:

Page 2: FACT SHEET - Opa-Locka, FL

PROJECT LIMITS: SR 9 Connector from north of NW 141 Street to Golden Glades Park

and Ride

1000 NW 111 AVENUE MIAMI, FL 33172

Please visit our website: www.fdotmiamidade.com For real-time traffic information dial 511 or visit: www.fl511.com

Follow us on Twitter @MyFDOT_Miami

A NEW ROADWAY PROJECT WILL BEGIN IN YOUR AREA State Road (SR) 9 Connector

From north of NW 141 Street to Golden Glades Park and Ride

FACT SHEET

FIN# 429184-1-52-01 Begins: May 2014

LEGEND

Project Area

N