FAIR – Facility for Antiproton and Ion Research GSI GmbH FAIR GmbH + CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Embed Size (px)

Citation preview

Page 1: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

FAIR – Facility for Antiproton and Ion Research

GSI GmbH FAIR GmbH+

CN DE ES FI FR GB GR IN IT PL RO RU SE

In 2015, 8 years and 1187 Million € later

Observers

Page 2: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

PAC QCD

PAC NUSTAR

PAC APPA

TAC

Observers:

FAIR Project

CORECost Review Groups

FCIFull Cost Issues

AFI Working GroupAdministrative + Funding Issues

LFILegal Framework Issues

STI Working GroupScientific + Technical Issues

ISCInternational Steering Committee

Present Committee Structure of the International Project FAIR

Mini-TACs• Cryogenics• Warm magnets •Cold magnets• Power Supplies• Beam Instrumentation• p-Linac

13 potential ‘M e m b e r s t a t e s’

CN DE ES FI FR GB GR IN IT PL RO RU SE

Page 3: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Volume 1 Executive Summary

Volume 2 Accelerator and Scientific Infrastructure

Volume 3A Experiment Proposals on QCD Physics 3.1 CBM

Volume 3B Experiment Proposals on QCD Physics

3.2 PANDA

3.3 PAX

3.4 ASSIA

Volume 4 Experiment Proposals on Nuclear Structure & Astro Physics (NUSTAR) 4.1 LEB-SuperFRS 4.2 HISPEC/DESPEC

4.3 MATS 4.4 LASPEC

4.5 R3B 4.6 ILIMA

4.7 AIC 4.8 ELISe

4.9 EXL

Volume 5 Experiment Proposals on Atomic, Plasma & Applied Physics (APPA) 5.1 SPARC 5.2 HEDgeHOB

5.3 WDM 5.4 FLAIR

5.5 BIOMAT

Volume 6 Civil Construction and Safety

FAIR BTR

FAIR Baseline Technical Report

Official FAIR project description

6 Volumes with more than 3500 pages and more than 2600 authors

CN DE ES FI FR GB GR IN IT PL RO RU SE

For down load of the report:

http://www.gsi.de/fair/reports/btr.html

Page 4: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

EU-6FP-CNI: FAIR injector SIS18 intensity upgrade, HADES upgrade + R3BmagnetEU-Support: 10,4 M€

EU-6FP-Design Study: Secondary Beams (RIB and Antiprotons)EU-Support: 9 M€

EU-6FP-I3 programmes I3HadronPhysics: FAIR related EU-Support: 10,8 M€ EURONS: FAIR related EU-Support: 2 M€

EU support for FAIR related activities in FP6

QuickTime™ and aTIFF (LZW) decompressor

are needed to see this picture.

Page 5: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Project Status and next steps:

Status:

Building Development plan legally settled

All environmental impact studies are accepted; Re-forestation and natural compensation measures are concluded and contractually settled

Controlling report for the preparatory phase accepted by GSI Supervisory Board

Core facility and Specifications defined

Layout defined

Project cost estimates (cost book, WBS) scrutinized and validated by expert groups

Prototyping has started

Scientific base programme is defined

Baseline Technical Report ready and issued 21 March (~ 3500 pages, ~2500 authors)

Page 6: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Status:

Legal documents and Governance structure (two-company model) finalized and agreed upon by the ISC (by laws to be completed; tax status to be confirmed)

Roadmap presented to the ISC. Goal: foundation of FAIR GmbH in May/June 2007 ( Joint Core Team)

The International Steering Committee confirmed all this joint preparatory workand its results as fully conforming to the requirements of the FAIR MoU and as

" the Project."

Consequence: all conditions to finalize negotiations on governmental level are met.

Project Status and next steps:

Page 7: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Next steps:

1. Finalization of by laws (AFI sub-group: national experts most welcome)

2. Establishment of the Joint Core Team (transition to FAIR GmbH);

calls coming soon (after October ISC)

3. Appointment of shareholders

4. Negotiations and final checks of legal documents

Project Status and next steps:

Page 8: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Proposed FAIR – Roadmap: Establishment of FAIR GmbH

Contracting Parties

Share-holders (SH)

Bylaw Subgroup

AFI

ISC

STI

IKAB

Joint Core-Team

07/06 08 09 10 11 12 01/07 02 03 04 05 06

Nomination of Shareholders + Completion

of negotiations

Completion of draft Bylaws

Signature of Convention

and Final Act

Signature AoA

STI

AFI AFI

joint meeting ISC/SHISC ISC

Bylaws, draft FAIR GmbH structure and

kick-off staffing

Convention, Final Act, AoA;

Joint Core Team

Technical evaluation of potential in-kind contributions (ongoing process up to the formation of FAIR GmbH)

Mandate for IKAB

Monitoring of technical planning and project costs (ongoing process up to the formation of FAIR GmbH)

Elaboration of the Bylaws (ongoing)

ConventionFinal Act AoA

First meeting: start senior

staffing

Constitutive Meeting of the

Council

Convention, Final Act, AoA;

Bylaws (first draft)

Bylaws, draft FAIR structure

Technical project decisions (follow up design changes) / FAIR preparation tasks (ongoing process up to the foundation of FAIR GmbH)

Formation FAIR GmbH

Negotiations (ongoing, 'till end of 2006)

meetings

Page 9: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

External Committees:

Scientific Advisory CommitteesAccelerator Advisory Committee

Resource Review Boards

DRAFT: Organizational plan of the FAIR GmbH

Council -Shareholders assembly

Management

(2 managing directors)FAIR Director,

Director for Finances and Administration

management team (directors office)

audit &controlling

public relations

EU projects

safety

Finances and Administration

Research Accelerator Integration

Financing and budget

Bookkeeping &accounting

Contract follow up

General administration

Mech. Interfacing

quality management

project coordination

NUSTAR resource coordinator technical coordinator

CBM

HESR

Electr. Interfacing

Finance Committee Scientific Council

visitors science prog.

engineeringdocumentation

PANDA

APPA

Civil Construction

planning

Regulatory aspect

& Permits

NESR

p-Bar TARGET

RESR/CR

Super-FRS

p-LINAC

SIS100

SIS300

HEBT

+ member states relations

Injector Upgrade

Page 10: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

[FTE at startup]

External Committees:

Scientific Advisory CommitteesAccelerator Advisory Committee

Resource Review Boards

DRAFT: FAIR Joint Core Team

Council -Shareholders assembly

Management [1]

management team [2] (directors office)

audit &controlling

public relations

EU projects [1]

safety

Finances and Administration

[4]

Research [4]Accelerator [6]

Integration[1]

Financing and budget

Bookkeeping &accounting

Contract follow up

General administration

Mech. Interfacing

quality management

project coordination

NUSTAR resource coordinator technical coordinator

CBM

HESR

Electr. Interfacing

Finance Committee Scientific Council

visitors science prog.

engineeringdocumentation

PANDA

APPA

Civil Construction

planning

Regulatory aspect

& Permits

NESR

p-Bar TARGET

RESR/CR

Super-FRS

p-LINAC

SIS100

SIS300

HEBT

+ member states relations [2]

Injector Upgrade

Page 11: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers
Page 12: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

SC magnets for SIS300 : France, Italy and GSI

SIS300 QuadrupoleField calculations, Design, cryogenics

sc cabledevelopment

curved dipoleprototype

BNLfollow up of„GSI001“ 4 T, 1 T/s

Page 13: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

FAIR accelerator developments in Russia and Spain

BINP Novosibirsk

IHEP Protvino+ Rosatom

JINP Dubna

UNK dipole

Short NUCLOTRON-type prototyp at GSI

e--Isotope Collider

SIS100

SIS300

• Magnet, • power converters, • vacuum components on sc magnets

for NESR/RESR

Page 14: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

FAIR accelerator developments in China and India

Institute for Plasma Physics Hefei

Institute for Modern Physics Lanzhou

Superferric dipoles for Super-FRS and CRSuperferric dipoles for Super-FRS and CRand high intensity beam stoppersand high intensity beam stoppers

Center of Advanced TechnologyIndore

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Saha Institute of Nuclear Physics, Kolkata

Variable Energy Cyclotron Center, Kolkata

Page 15: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

HESR Consortium FZ Jülich, TSL Sweden and PANDA experiment collaboration

TSL

30 m cooling length

PelletronElectron energy 4 - 8 MeV

30 m cooling length

Collaboration>350 participants

14 m

107 events/s

Page 16: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Key technology: Fast Cycling Synchrotrons

Developments: Reduction of AC losses during ramp, achievements: 40 W/m -> 13 W/m

Bmax= 2 T, dB/dt = 4T/s,

f = 1 Hz

SIS100 magnets: 50 K yoke with superconducting coil (Nuclotron JINR Dubna)

SIS 300 magnets: cos - magnet

Developments: Reduction of AC losses during ramping

by improved cable and coil design Efficient conductor cooling Bmax = 6 T, dB/dt = 1 T/s

(HERA: 4 mT/s, RHIC: 70 mT/s, LHC: 8 mT/s)

„GSI001“ 4 T, 1 T/s by BNL

Page 17: FAIR – Facility for Antiproton and Ion Research GSI GmbHFAIR GmbH+ CN DE ES FI FR GB GR IN IT PL RO RU SE In 2015, 8 years and 1187 Million € later Observers

Conclusions on Commitments for Accelerator parts No written commitments exist on in-kind contributions, besides Sweden for Cryring

• CN-China: Interest expressed verbally for design and construction of CR and Super-FRS dipoles

• DE-Germany: GSI: items to be specified

FZ-Jülich: HESR design and construction

• ES-Spain: Dipoles NESR and RESR, power supplies, vacuum,

• FI-Finnland: items to be specified

• FR-France: items to be specified (design of SIS300 quadrupoles),

• GB-United Kingdom: items to be specified, meeting foreseen October 12 th,

• GR- Greece: items to be specified, no contact so far

• IN-India: Energy Buncher (4x 80 t sc dipoles), beam stoppers, verbally agreed

• IT-Italy: SIS300 dipoles proposed verbally

• PL-Poland: items to be specified

• RO-Rumania: items to be specified

• RU-Russia: SIS100 magnets, SIS300 magnets, e--RIB collider,.........

•SE-Sweden: Cryring, part of Electron Cooler, other items to be specified

CN DE ES FI FR GB GR IN IT PL RO RU SE