10
Fall 2015 Co-Op Overview Nick Campbell

Fall 2015 Co-Op Overview

Embed Size (px)

Citation preview

Page 1: Fall 2015 Co-Op Overview

Fall 2015 Co-Op OverviewNick Campbell

Page 2: Fall 2015 Co-Op Overview

2Emerson Confidential

Abercrombie and Fitch

● Analyzed performance data of RTU retrofit

● Developed project summary and constructed payback period

● Took part in discussion of deciding future direction of project

Worked with:Sami Zendah, Emerson Climate Technologies

Colby Mekus, Abercrombie and Fitch Store

Page 3: Fall 2015 Co-Op Overview

3Emerson Confidential

CEE & ASHRAE Company Status Research

● Researched, analyzed, and organized customers’ position on future CEE and ASHRAE standards

● Developed visual aids to display and communicate findings

Worked with:Sami Zendah, Emerson Climate Technologies

Pete Lee, Emerson Climate Technologies

Page 4: Fall 2015 Co-Op Overview

4Emerson Confidential

Carrier Projections

● Participated in creating projections for Carrier with different installations Emerson UltraTech technology

● Constructed visual aids to communicate projections and benefits to Carrier and other clients

Worked with:Sami Zendah, Emerson Climate TechnologiesSahil Popli, Emerson Climate Technologies

Page 5: Fall 2015 Co-Op Overview

5Emerson Confidential

Updated Customer Profiles

● Executed in depth research on Carrier and Lennox products

● Updated existing customer company profiles (previous co-op)

Worked with:Sami Zendah, Emerson Climate Technologies

Page 6: Fall 2015 Co-Op Overview

6Emerson Confidential

Project RTU

Worked with:Sami Zendah, Emerson Climate Technologies

Lancelot Sharpe, Emerson Climate TechnologiesEJ Siriphone, Emerson Climate TechnologiesTJ Thomas, Emerson Climate Technologies

Ben Artz, Enervise

● Design testing plan to compare variable and digital compressor efficiency

● Trouble shot RTU various times to find the best solution approach numerous problems

● Logged, organized, and analyzed raw testing data to report out

Page 7: Fall 2015 Co-Op Overview

7Emerson Confidential

PSS Simulation Tool

Worked with:Sami Zendah, Emerson Climate TechnologiesAditya Kiran, Emerson Climate Technologies

• Assisted in resolving tool malfunctions • Helped start new SEER and HSPF additions • Reformatted user interface and selection options

Page 8: Fall 2015 Co-Op Overview

8Emerson Confidential

What I Learned● Learned the basic terminology, functions, and

standards of RTUs and select HVAC systems● Familiarized myself with the controls and abilities of

Emerson’s E2 Controller and how to apply them● Developed skills necessary to execute logging

functions of Ultrasite32 program● Became aware of the abilities of the PSS Simulation

Tool● Further developed skills in Microsoft Excel and

PowerPoint● Learned and furthered skills involving

communication, organization, and project accomplishing in a business setting

Page 9: Fall 2015 Co-Op Overview

9Emerson Confidential

Pros and Cons

● Workload decreased towards the end

● The work was challenging and it forced me to learn ● I was depended on to meet deadlines and complete

projects● I was able to work and develop relationships with

multiple individuals throughout Emerson

PROS:

CONS:

Page 10: Fall 2015 Co-Op Overview

10Emerson Confidential

Final NoteNick CampbellMechanical Engineering Wright State UniversityGraduation Date: May 2018

I really enjoyed my experience here. I feel adapting to the HVAC environment was challenging, but beneficial as I learned a great

deal. I believe that this experience has equipped me with skills that will be vital in the future.