Page 1: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

© 2016 Electric Power Research Institute, Inc. All rights reserved.

Brian Deaver

Jason Taylor

September 20, 2016

Fall 2016 AdvisoryProgram 180:

Operations

Page 2: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

2© 2016 Electric Power Research Institute, Inc. All rights reserved.

Agenda for this Morning

DMS Guides on Switch Order Management Project

Operational Research Project

DA/FLISR Application with DER Project

Application of DA Switch Placement

ENEL Convergence Project

Distribution Operations Interest Group

Page 3: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

3© 2016 Electric Power Research Institute, Inc. All rights reserved.

DMS Guides on Switch Order Management Project

Page 4: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

4© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Management System Guides(P180.012)

• Overall research objectiveExpand electric distribution industry knowledge of Distribution Management System (DMS).

• What are we doing in 2016?Developing guides to provide specific, proven and practical guidance for deploying and operating Switch Order Management.

• Why is it valuable?Members participating in this research can apply the Switch Order Management (SOM) Guide to support the creation, execution, display, modification, maintenance, and printing of switching orders and benefit by being able to take advantage of the experiences of multiple utilities, avoiding pitfalls and accelerating achievement of benefits.

Page 5: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

5© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Management System Guides(P180.012)

• Deliverables

Technical Update Reports:

1. Distribution Management System Guides – Switch Order Management

• Completion Date

December 2016

• Project Life

IVVC Report

OFC Report

SOMReport

2016 Project Tasks

CompletedIn ProcessUpcoming

Project Plans & Scope

Industry Scan

Develop Guide

Webcast/Report(s)

Document Options / Case Studies

2014 2015 2016

Page 6: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

6© 2016 Electric Power Research Institute, Inc. All rights reserved.

DMS Guides (P180.012) Progress and Future Plans

DMS GuidePub: Dec 31, 2012ID #1024385

DA GuidePub: Dec 31, 2013ID #3002001292

Volt/VAR GuidePub: Dec 31, 2014ID #3002003244

Optimal Feeder ConfigurationAnd Load Balancing GuidePub: Dec 31, 2015ID 3002006128

Switch Planning GuidePub: Dec 31, 2016ID TBD

Page 7: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

7© 2016 Electric Power Research Institute, Inc. All rights reserved.

2016 Activities

Held a Web WorkshopDid an Industry Scan on DMS Based SOM SolutionsDeveloped a Request for Utility InputReceived Input from 12 utilities

Comprehensive Guide in Progress

Page 8: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

8© 2016 Electric Power Research Institute, Inc. All rights reserved.

Outline of Requested Information

• Planned Switching Process Outline• Description of Personnel Involved in Process• Example of Request Form• Example of Switching Plan• Description of DMS Type Tools

– DMS or Home Grown or Other– Functionality– Integration to GIS / OMS / Workforce Management

• Lessons Learned, Tips, Tricks, etc.

Page 9: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

9© 2016 Electric Power Research Institute, Inc. All rights reserved.

Operational Research

Page 10: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

10© 2016 Electric Power Research Institute, Inc. All rights reserved.

Operational Studies and Research(P180.013)• Overall research objective

This research will investigate and expose the impacts of the changing distribution utility landscape on Distribution Operations. This new project, initiating in 2016, will encompass a wide range of studies and research to determine the most effective approaches to a number of operational decisions.

• What are we doing in 2015?The challenges and opportunities associated with adaptive feeder protection (e.g. fuse saving, reclosing, etc.) will be studied and evaluated.

• Why is it valuable?Existing decisions may be based on historical norms for a particular utility, regulatory requirements or pressures, local customer expectations or some other combination of factors. This research will expose the key contributing factors that lead to different approaches, enabling utilities to evaluate the benefits of changing from their existing operational practices.

Page 11: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

11© 2016 Electric Power Research Institute, Inc. All rights reserved.

Operational Studies and Research(P180.013)

• Deliverables

Technical Update Reports:

1. Operational Studies and Research

• Completion Date

December 2015

• Project Life

Adaptive Protection TBD TBD

2016 Project Tasks

CompletedIn ProcessUpcoming

Project Plans & Scope

Member Surveys

Data Analytics

Webcast/Report(s)

Literature Review

2016 2017 2018

Page 12: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

12© 2016 Electric Power Research Institute, Inc. All rights reserved.

Member Survey Results

Fuse Saving deployed on over 50% of feeders

11

Fuse Sacrifice deployed on over 50% of feeders

7

Approximately 50% split between fuse sacrifice and fuse

saving protection schemes3

During normal blue sky days, do you mostly employ FUSE SAVING or FUSE SACRIFICE on your distribution feeders?

Page 13: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

13© 2016 Electric Power Research Institute, Inc. All rights reserved.

Member Survey Results

Yes3

No19

Do you adaptively switch from FUSE SAVING to FUSE SACRIFICE based on operating conditions

(temperature, weather conditions, etc.)?

Page 14: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

14© 2016 Electric Power Research Institute, Inc. All rights reserved.

Member Survey Results

How many shots of reclosing do you typically set on overhead distribution feeders?

0

2

4

6

8

10

12

14

2 shots 3 shots 4 shots Varies

Num

ber o

f Res

pond

ents

Number of Reclosing Attempts

Page 15: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

15© 2016 Electric Power Research Institute, Inc. All rights reserved.

Member Survey Results

Do you adaptively add shots of reclosing during storm operations?

Yes1

No21

Page 16: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

16© 2016 Electric Power Research Institute, Inc. All rights reserved.

Next Steps

Instead of looking at data that was previously collected, we need to collect fresh data for the next year.Each Utility picks 4 feeders

– Treed– Significant Fault History

For the next 12 months collect detailed fault information for these feeders (Oct 1 2016 – Sept 30 2017)– Breaker / Recloser Operations– Digital Fault Record Including Maximum Fault Current– Concurrent Fuse Outages– Mainline Patrol Results (if part of normal processes)

EPRI will analyze these records looking for correlations with wind/lightning, fault current, etc.

Page 17: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

17© 2016 Electric Power Research Institute, Inc. All rights reserved.

DA/FLISR Application with DER Project

Page 18: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

18© 2016 Electric Power Research Institute, Inc. All rights reserved.

Smart Distribution Applications for Distributed Energy Resources (P180.014)

• Overall research objectiveDetermine expanded role of DERs in volt-VAR optimization, reliability improvement measures, system reconfiguration, microgrid operation and control, and other DA/DMS applications

• What are we doing in 2016?In 2016, this work will continue with deep dives into the specific changes necessary to deploy an automated restoration (fault location isolation and service restoration, FLISR) application, as well as the changes necessary to deploy predictive fault location on distribution systems with high penetration of DERs.

• Why is it valuable?Provides insight into new functions and operational benefits from integration of DERs.

Page 19: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

19© 2016 Electric Power Research Institute, Inc. All rights reserved.

Smart Distribution Applications for Distributed Energy Resources(P180.014)

• Deliverables

Technical Update Reports:

1. Smart Distribution Applications for Distributed Energy Resources (DER) – FLISR

• Completion Date

December 2015

• Project Life

Volt/VAR/CVR Prototype

FLISR Prototype TBD

2016 Project Tasks

CompletedIn ProcessUpcoming

Project Plans & Scope

Requirements for FLISR Application

Perform Sensitivity Analysis

Technical Update / Webcast

Prototype FLISR Application

2015 2016 2017

Page 20: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

20© 2016 Electric Power Research Institute, Inc. All rights reserved.

2016 Project: DA/FLISR with DER

THE PROBLEMAutomated Restoration (FLISR, FDIR, FISR, etc.) solutions

lack visibility and control of DER assets

IMPACTRestoration Control algorithms do not account for total load

(resulting from the loss of DER after initial trip)Existing algorithms will fail in several different ways:

– Restore then trip on overcurrent– Restore then an asset (wire) will fail on overload– Fail to Restore

Page 21: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

21© 2016 Electric Power Research Institute, Inc. All rights reserved.

Example of the Problem – DA/FLISR with DER

1 b c

2 j k l

f g

8.1 MVA 6.2 MVA 3.1 MVA

0

9.4 MVA 7.2 MVA 4.0 MVA 0

0

0

a1.1 MVA

2.3 MVA0.9 MVA

Page 22: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

22© 2016 Electric Power Research Institute, Inc. All rights reserved.

Step 1 – Fault causes Breaker 2 to Lock Out

1 b c

2 j k l

8.1 MVA 6.2 MVA 3.1 MVA

9.4 MVA 7.2 MVA 4.0 MVA 0

0

0

a1.1 MVA

0 MVA0 MVA

12.6 MVA 9.5 MVA 6.3 MVA

The FLISR Algorithm is only aware of 9.4 MVA, however with the loss of all DER supply, the actual Load to be Restored is 12.6 MVA.

f g 0

Page 23: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

23© 2016 Electric Power Research Institute, Inc. All rights reserved.

Step 2 – Fault Isolation Based on Incorrect Data

1 b c

2 j k l

8.1 MVA 6.2 MVA 3.1 MVA

9.4 MVA 7.2 MVA 4.0 MVA 0

0

0

a1.1 MVA

0 MVA0 MVA

12.6 MVA 9.5 MVA 6.3 MVA

DA Switches J and K are opened to isolate the fault between Breaker 2 and Switch J.

f g 0

Page 24: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

24© 2016 Electric Power Research Institute, Inc. All rights reserved.

Step 3 – Restoration Switching Based on Incorrect Data

1 b c

2 j k l

11.3 MVA 9.4 MVA 3.1 MVA

6.3 MVA

3.2 MVA

0

a1.1 MVA

0 MVA0 MVA

Normally Open DA Switches F and L are closed to restore service. This is OK for Feeder 1, but the feeder supplying Tie L will get 2.3 MVA more than it expects. This could lead to an Overload or a Trip.

4.0 MVA

f g 0

Page 25: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

25© 2016 Electric Power Research Institute, Inc. All rights reserved.

Things to Investigate and Model with New FLISR AlgorithmMonitoring of DER to be able to monitor and react to TOTAL

LOAD, not just NET LOAD (Total Load – DER Contribution)

Simulate the ability to Control DER from FLISR commands to restore the DER Contribution within the FLISR restoration cycle

Model different control algorithms to determine which switching steps to use for FLISR based on presence of and contribution of DER

Integration FLISR with Volt/VAR/CVR controls

Page 26: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

26© 2016 Electric Power Research Institute, Inc. All rights reserved.

P180A Advanced System Planning Tool DevelopmentIssue:Lack of planning tools capable of evaluation and design of advanced distribution automation and controls

Objectives:Development and demonstration advanced planning capabilitiesDrive vendor capabilitiesDevelopment of standardized

controlsUser-written models

Joint P180A/F Evaluations: Volt-var Optimization (2015)

FLISR (2016)

Integration &

Delivery

Implementation &

Testing

Analysis &

RequirementsPrototypePlatform

Use Case Evaluations

Analysis Tools Planning Practices

Simulation and Model

Development

System Control Interface (SCI) Platform

Presenter
Presentation Notes
Concept for this application in OpenDSS in 1996 Promised by many but not achieved to date
Page 27: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

27© 2016 Electric Power Research Institute, Inc. All rights reserved.

Tool Enhancements

Visualization Improved comprehension

Better understanding of a integrated system

Improving assessment efficiencies

Computation Scenarios reduction

techniques

Modeling requirements

Parallel processing

Functionalities designed to improve system planning with increasing system complexity

Page 28: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

28© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Operations Interest Group

Page 29: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

29© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Operations Interest Group

The Distribution Operations Interest Group provides control center managers and staff the opportunity to discuss and share experiences related to critical issues:– Distribution Control Center (DCC) organization– Staffing levels– Operations practices– Operator training– Job progression– Distribution Automation– Control center facilities– Change management. – Impact of Distributed Energy Resources

Page 30: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

30© 2016 Electric Power Research Institute, Inc. All rights reserved.

Distribution Operations Interest Group

First Meeting (March 2014) – Hosted by Duke - Charlotte

Second Meeting (October 2014)– Hosted by GPC - Atlanta

Third Meeting (April 2015)– Hosted by Duke - Florida

Fourth Meeting (November 2016)– Hosted by APS – Phoenix

Fifth Meeting (March 2016)– Hosted by PPL - Allentown

Page 31: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

31© 2016 Electric Power Research Institute, Inc. All rights reserved.

Review of Agenda

Page 32: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

32© 2016 Electric Power Research Institute, Inc. All rights reserved.

Review of Agenda

Page 33: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

33© 2016 Electric Power Research Institute, Inc. All rights reserved.

Review of Agenda

Page 34: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

34© 2016 Electric Power Research Institute, Inc. All rights reserved.

Review of Agenda

Page 35: Fall 2016 Advisory - Amazon S3...• Planned Switching Process Outline • Description of Personnel Involved in Process • Example of Request Form • Example of Switching Plan •

35© 2016 Electric Power Research Institute, Inc. All rights reserved.

Next Meeting

Hosted by PG&ESan Francisco, CaliforniaOctober 19/20, 2016 Invitations Have Been Issued – See Back TableContact Eric Cornwell for information [email protected]