Faro Mine Remedia-on Project – Electronic Data Capture and Fieldaccessible Project Data Alan Campbell, CH2M HILL Photo taken by: Howard Thomas/VBC

Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

  • Upload
    vuminh

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Faro  Mine  Remedia-on  Project  –  Electronic  Data  Capture  and  Field-­‐accessible  Project  Data  

Alan  Campbell,  CH2M  HILL  

Photo  taken  by:  Howard  Thomas/VBC  

Page 2: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Presenta-on  Outline  

•  Overview  of  project  and  field  ac-vi-es  •  Hardware  •  Moving-­‐map  GPS  naviga-on  •  Directories  of  project  files  •  Electronic  Data  Capture  •  Pending  Improvements  

•  Summary  of  Benefits    

Page 3: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Overview  of  Project  and  Field  Ac-vi-es  

Page 4: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Faro  Mine  Site:  • Operated  from  1969-­‐1998  • Footprint  of  25  km2  • 376  million  tons  of  waste  rock  • 84  million  tons  of  tailings  • 3  open  pits  and  one  backfilled  pit  

Scope  of  current  project:  • Contracted  by  Yukon  Government  to  advance  final  closure  plan  developed  by  previous  consultant  

• Replace  WTP  • Upgrade  exis-ng  dams  and  surface  water  diversion  structures  • Install  groundwater  intercep-on  systems  

• Ongoing  engineering  support  for  client  

Page 5: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Field  Work:  • Drilling  /  Test  Pi\ng  /  Well  Installa-on  • Groundwater  Sampling  • Soil  Gas  Sampling  • Surface  Water  /  Seep  Sampling  • Geological  Mapping  • Streambed  Surveys  • Aquifer  Tes-ng  • Dye  Tes-ng  • Water  level  and  Flow  Monitoring  • Meteorological  Monitoring  • Vegeta-on  and  Soil  Surveys  • Instrumented  Cover  Trials  on  Tailings  and  Waste  Rock  Dumps  • CPT  • Wildlife  Surveys  • Pit  Lake  Profiling  

Page 6: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Hardware  •   Samsung  Galaxy  Tab  2  10.1”  with  Android  4.1.1  OS  •   Wi-­‐Fi  and  Bluetooth  connec-vity    •   Built-­‐in  GPS  and  support  for  external  GPS  via  Bluetooth  • Rear-­‐facing  camera  •   Water  resistant  rubber  case  and  screen  protector      

Page 7: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Moving-­‐Map  GPS  Naviga-on  

•   Applica-on  Oruxmaps    •   Plots  GPS  posi-on  to  roughly  +/-­‐  3m  accuracy  •   Displays  various  online  and  offline  map  imagery  files  •   Displays  point  vector  files  and  aeributes  •   Limited  support  for  display  of  linear  vector  features  

Page 8: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Select  among    various  offline  map  imagery  files  

Page 9: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Low  al-tude  2012  aerial  Ortho-­‐imagery  

Page 10: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Pre-­‐mining  topographic  map  

Page 11: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Surficial  geology  and  soil  geochemistry  

Page 12: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Bedrock  Geology  

Page 13: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Overlay  waypoints  /  vector  point  files  

Page 14: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• List  of  waypoint  files  on  device  

Page 15: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Searching  /  Filtering  list  of  waypoints  • Select  point(s)  to  display  on  map  

Page 16: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Selected  monitoring  well  displayed  on  map  

Page 17: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Selected  monitoring  well  displayed  on  map  

Page 18: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Tapping  on  monitoring  well  displayed  on  map  

Page 19: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Overlay  linear  vector  features  

Page 20: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Directories  of  Project  Files  

Page 21: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Electronic  Data  Capture  • Flexible  custom  form  genera-on  • Various  data  input  fields:  

• Text  • Boolean  • Integer    • Real  Number  • Mul-  select  • String  Select  • Calcula-on  • Date  /Time  • Photo  capture  • GPS  coordinate  capture  

• Data  entry  valida-on  and  input  field  precedence  • Frequent  data  backup  to  external  drive  • Output  to  CSV  file  –  send  via  email  or  USB  cable  

Page 22: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Comple-ng  a  form  entry  

Page 23: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Demonstra-on  of  eDC  during  seep  sampling.  

Page 24: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• View  of  completed  sample  logs  and  collected  photographs  

Page 25: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Expor-ng  data  as  csv  file  via  email  

Page 26: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• CSV  Output  File  from  Memento  • Photographs  on  project  Sharepoint  

Page 27: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

• Groundwater  Purge  Log  

Page 28: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Data  Quality  and  Project  integra;on  • Develop  automated  workflow  process  for  QA/QC  of  collected  data  and  upload  to  project  database  • Improve  data  valida-on  in  field  forms  to  provide  immediate  iden-fica-on  of  significant  changes,  regulatory  exceedance  or  adap-ve  management  plan  triggers  

• Develop  automated  system  for  deploying  updated  FSPs,  SOPs,  waypoints  to  devices      

Improvements  

Project  Sharepoint  Network  Field  Data  

Photos  

Project  Technical  Leads  

Project  Database  

QA/QC    Workflow  

Updated  FSPs,  SOPs,  Waypoints  Valida-on  Criteria    

Page 29: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Devices:  •  Plog  for  borehole  and  Test  pit  logging  –  GINT-­‐ready  output,  ability  to  preview  graphical  log  output  while  logging  in  field  

•  Applica-on  for  groundwater  sampling  purge  log  •  Pre-­‐load  well  comple-on  informa-on  and  calculate  well  volumes  using  database  of  exis-ng  wells  

• Wireless  communica-on  with  sonde  to  log  field  parameters.    •  Con-nuously  chart  changes  and  calculate  stability.  

•  Reduce  Screen  Glare  –  shroud,  an--­‐glare  film,  alterna-ve  hardware      

Improvements  

Page 30: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Summary  of  Benefits  •  Rapid  data  QA/QC  and  distribu-on  •  Eliminate  costs  and  poten-al  error  associated  

with  digi-za-on  of  hardcopy  logs  •  Consistency  /  standardiza-on  of  field  

observa-ons  •  Provide  specific  and  relevant  project  

informa-on  to  field  staff  when  and  where  they  need  it  

•  Supports  conceptual  site  model  visualiza-on      

Page 31: Faro%Mine%Remediaon%Project–Electronic%Data Capture… · Faro%Mine%Remediaon%Project–Electronic%Data Capture%and%Field9accessible%ProjectData Alan%Campbell,%CH2MHILL % Photo%taken%by:%Howard%Thomas/VBC%

Ques-ons?