FAS2050 System Installation and Setup Copyright © 2009 NetApp, Inc. All rights reserved. Unpack and verify contents Before you begin 1 2 If you have not already done so, gather the required information and confirm your site requirements, as described in the Site Requirements Guide at http://now.netapp.com/. Your system comes with an accessory kit that includes the following components: - This installation poster - Power cables - Software license flyer - DB-9 to RJ-45 console adapters - System Manager CD-ROM - Rail kit (for two-post and four-post racks) - Grounding kit Install in rack 3 Caution: Only use the NetApp ® rail kit to install your system. Using a different rail kit can cause injury to you or damage to your system. Four-post rack Cable the system 4 Connect power Connect the installed PCI card, as needed. 5 Cable controllers RJ-45 to DB-9 adapter to console port (required) 1 e0b e0a 0a 0b 8 Fibre Channel Ethernet Console Remote Management Port Port labels Network cables to e0a and e0b ports 3 e0b e0a 0a 0b 8 Console cable to adapter 2 e0b e0a 0a 0b 8 Boot the system and proceed with setup 5 - Turn on the power to your system. It takes the LEDs on your system power supplies a few seconds to illuminate. - Windows® environments with DHCP: Install System Manager from the CD-ROM and run it on a Windows client system to discover, configure, and manage your system. Connect your Windows client system through the management LAN. - All other configurations: Use the console interface and proceed through the setup questions. See the Data ONTAP Software Setup Guide at http://now.netapp.com/. Cable disk shelves These are a few common configurations. For additional options, see Supported Configurations for FAS2000-series Systems at http://now.netapp.com. or Active/Active NAS or ISCSI: 1 Fibre Channel Disk Shelf Stack (Multipath) Active/Active SAN: 4 FCP Connections 1 Fibre Channel Disk Shelf Stack (Multipath) U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 1 Controller to shelf U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 3 Shelf to controller U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 2 Shelf to shelf U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 1 Controller to switches U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 3 Shelf to controller U S P U S P DS14 IN OUT IN OUT U S P U S P DS14 IN OUT IN OUT U S P U S P FAS2050 a 0 e a 0 1b 1a e0b 0b 1b 1a CM-B b 0 e a 0 e a 0 0b 10101 10101 2 Controller to shelves Note: Refer to the rail kit installation flyer included with the rail kit for the two-post procedure. 210-03951+C0 Note: You do not need to ground your system. Network cable to Remote Management port 4 6 e0b e0a 8 0a 0b 8 1 1 (4x) 4U 3U 3U FRONT SIDE Clip nut (4x) (2x) (2x) Front rail Clip nut tool Note: The disk shelf IDs for the disk shelves should be set in the range 1 to 6. Leave the FAS2050 disk shelf ID at the preset value of 00. 1 0 Shelf ID switch Note: Remove handles after the system is supported by the shelf. Setting the Disk Shelf IDs (2x)

FAS2050 System Installation and Setup - NetApp · - This installation poster - Power cables - Software license flyer - DB-9 to RJ-45 console adapters - System Manager CD-ROM - Rail

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FAS2050 System Installation and Setup - NetApp · - This installation poster - Power cables - Software license flyer - DB-9 to RJ-45 console adapters - System Manager CD-ROM - Rail

FAS2050 System Installation and Setup

Copyright © 2009 NetApp, Inc. All rights reserved.

Unpack and verify contentsBefore you begin1 2If you have not already done so, gather the required information and confirm your site requirements, as described in the Site Requirements Guide at http://now.netapp.com/.

Your system comes with an accessory kit that includes the following components:

- This installation poster - Power cables- Software license flyer - DB-9 to RJ-45 console adapters- System Manager CD-ROM - Rail kit (for two-post and four-post racks)- Grounding kit

Install in rack3 Caution: Only use the NetApp® rail kit to install your system. Using a different rail kit can cause injury to you or damage to your system.

Four-post rack

Cable the system4

Connect power

Connect the installed PCI card, as needed.5

Cable controllersRJ-45 to DB-9 adapter to console port (required)1

e0be0a0a 0b

8

FibreChannel

Ethernet

Console

RemoteManagement

Port

Port labels

Network cables to e0a and e0b ports3

e0be0a0a 0b

8

Console cable to adapter2

e0be0a0a 0b

8

Boot the system and proceed with setup5- Turn on the power to your system. It takes the LEDs on your system power supplies a few seconds to illuminate. - Windows® environments with DHCP: Install System Manager from the CD-ROM and run it on a Windows client system to discover, configure, and manage your system. Connect your Windows client system through the management LAN.- All other configurations: Use the console interface and proceed through the setup questions. See the Data ONTAP Software Setup Guide at http://now.netapp.com/.

Cable disk shelvesThese are a few common configurations. For additional options, see Supported Configurations forFAS2000-series Systems at http://now.netapp.com.

or

Active/Active NAS or ISCSI:1 Fibre Channel Disk Shelf Stack (Multipath)

Active/Active SAN: 4 FCPConnections 1 Fibre Channel Disk Shelf Stack (Multipath)

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

1 Controller to shelf

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

3 Shelf to controller

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

2 Shelf to shelf

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

1 Controller to switches

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

3 Shelf to controller

USPUSP

DS14INOUT

IN OUT

USPUSP

DS14INOUT

IN OUT

USPUSP

FAS2050a0ea0

1b 1a

e0b0b

1b 1aCM-Bb0ea0ea0 0b

10101

10101

2 Controller to shelves

Note: Refer to the rail kit installation flyer included with the rail kit for the two-post procedure.

210-03951+C0

Note: You do not need toground your system.

Network cable to Remote Management port4

6 e0be0a

8

0a 0b

8

1

1

(4x)

4U

3U

3U

FRONT SIDE

Clip nut (4x)

(2x)(2x)

Front rail

Clip nuttool

Note: The disk shelf IDs for thedisk shelves should be set in therange 1 to 6. Leave the FAS2050disk shelf ID at the preset value of 00.

1

0

Shelf ID switch

Note: Remove handles after thesystem is supported by the shelf.

Setting the Disk Shelf IDs

(2x)

Trim-17” x 22”

Page 2: FAS2050 System Installation and Setup - NetApp · - This installation poster - Power cables - Software license flyer - DB-9 to RJ-45 console adapters - System Manager CD-ROM - Rail

Releasing a disk drive cam handle

Attention:For hot-swappable FRUs:Always consult http://now.netapp.com for current field-replaceable unit (FRU)replacement procedures.

Adding external storage or using FCP:You must order and use SFP modules onyour system, if you are connecting externalFibre Channel storage devices or using FCPwith the system.

Attention:For hot-swappable power supplies:The system shuts down two minutes afteryou remove a power supply.

Appliance rear Appliance front

Hardware Overview of the FAS2050 System

PCI slot

2 powersupplies

Controllermodule

Use assistancewhen moving or

lifting the equipment.

LIFTING HAZARDCAUTION

2 Fibre Channel ports

Console port

2 network ports

Drive 0

Drive 19

Disk drive,power, andfault LEDs

x4 Filler panel

Opening the system1. Properly ground yourself.

2. Loosen the thumbscrew on the controller module cam handle.

3. Remove any cabling from the controller module. Make sure that you keep track of where the cables were connected to the controller module.

4. Pull the controller module cam handle downward and slide the controller module out of the system. Make sure that you support the bottom of the controller module with your free hand.

5. Remove the controller module cover by completing the following substeps, using the illustration for reference:

a. Loosen the thumbscrew on the back of the controller module. b. Gently press the heel of your hand on the indentation in the controller module cover closest to the cam handle, then slide the cover toward the back of the module. c. Lift the cover straight up off the controller module.

Power supply

Disk drive

Controller module

Cam handle

Secondcontrollermodule (foractive/activeconfigurationsonly)

RM (Remote Management) port

Closing the system1. Align the controller module cover with the notches on the sides of the controller module, then slide the cover down and forward to seat it.

2. Align the end of the controller module with the opening in the chassis.

3. Gently push the controller module halfway into the chassis and recable the controller module, then push the controller module all the way into the chassis.

Result: For systems in an active/active configuration, the node reboots as soon as you seat the controller module completely into the chassis.

4. Firmly push up the cam handle to finish seating the controller module in the system, and then push the cam handle to the closed position and tighten the thumbscrew on the cam handle.

5. Complete the boot process.

IF your system has a single controller module, plug in the power supply and turn on the power.

IF your system is in an active/active configuration, wait a few seconds for the node to boot, then enter the following command from the partner console: cf giveback

System LEDsPowerFault

ControllerA ActivityControllerB Activity

Attention: Disk drives are fragile. Do not handle them except when replacing failed disk drives or moving them to a new chassis.

DIMMs

PCI accesspanel

Thumbscrew

Battery

Controller modulecover

Batterycover

Indentation

Thumbscrew

PCI card

CompactFlash® card

LockingNut

Shutting down a controller moduleShut down the target controller module (called a “node” in an active/active configuration) by completing the applicable procedure:

If you have an active/active configuration:

1. Check the status of the target node by entering the following command at the system console of either node: cf status

2. Take one of the following actions, depending on the result of the cf status command:

IF clustering is enabled and neither node is in takeover mode, go to step 3.

IF clustering is enabled and the partner node took over the target node, go to “Opening the System.”

IF clustering is enabled and the target node took over the partner node, correct the problem, run the cf giveback command from the target node console, and go back to step 1.

3. Take over the target node by entering the following command from the partner node’s console: partner> cf takeover

4. Go to “Opening the System” when the takeover is complete.

If you have a single-controller configuration:

1. Enter the following command from the system console: halt

2. Turn off the power supplies and unplug both power cords from the power source.

3. Check the nonvolatile memory (NVMEM) LED.

IF the LED is not flashing, go to “Opening the System.”

IF the LED is flashing, there is content in the NVMEM that has not been saved to disk. Reconnect the power supplies to the power source, reboot the controller module, and repeat Steps 1 through 3. If repeated attempts to cleanly shut down the controller module fail, be aware that you might lose any data that was not saved to disk. Go to “Opening the System.”

0 to 20disk drives