Upload
jsmith84
View
217
Download
0
Embed Size (px)
Citation preview
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 1/14
Feasibility Report
Steam Power GenerationPresented by
Faheem Abbas(ECT-13) Umar Farooq(ECT-19)
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 2/14
Criteria
o Introduction
o Briefings
o Land & infrastructure
o Machinery requirement
o Threats
o Cost
o Conclusions
Contents
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 3/14
Electric power generation with steam at the
individual household level is making a comeback. Basic source of steam power generation is steam as
the name implies but where to get it the primeobjective that has to full fill in my allocated project .
Basically here the project is leading to cyclic processthat is production of steam will be obtained throughwaste gases from own plant expelled .
Introduction
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 4/14
Starting with the working & Principles as defined
earlier plant will supply 17MW electric generation thatis sufficient to run a single plant .
Efficient way of production because there is no issueof Main power obtaining from water & power development authority.
Saves electric utility sinking with wapda andconsumes more power from steam power Gridstation .
Briefings
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 5/14
Room for machinery required for setting up steam
turbine ,generators ,condensers etc and 30 canalsland requirement is proceeded.
Land requirement for Central control roomrequirement of 5 canals for central rooms includingengineering station & operating station .
Water development & storage cottage should bethere so a vital need of land for water site so 10canals land for this purpose will take the part.
Land & infrastructure
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 6/14
Extra land for pipeline setup as power plant will be
built outside of main production plant Area require for grid station will be wide enough to
cover whole installation and transmission insulationsincluding arresters & towers.
Land & infrastructure
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 7/14
High oil prices, growing concerns over energy
security, and the threat of climate change have allstimulated investment in the development ofalternatives to conventional oil.
Lack of water resources is the basic problem
everywhere The environmental impact of electricity.
Threats
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 8/14
Scalability and Timing
construction of equipment and manufacturingprocesses for its production, output grows in astepwise function only as new capacity comes online.
Capacity factor
One indication of intermittency challenges in electricpower generation is the capacity factor, or theaverage percentage of time in a year that a power plant is producing at full rated capacity
Threats
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 9/14
Name Cost
Turbine 80lac/- Generators 10lac/-
Motors 3.5lac/-
Boilers 80,000/-
Transformers(CTs & PTs) 60lac /- Automation equipments 15lac /-
Condensers 5lac/-
Machinery requirement & cost
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 10/14
Turbine is very first part of power generation machinery
On the wings of turbine steam falls & in turn rotates .
Cost varies with rpm(revolution per minute ) and power generated per kilo hour
Generator converts mechanical energy into electrical
energy . Possible sources of mechanical energy includesteam engines, water falling through a turbine or waterwheel, an internal combustion engine, a hand crank.
Machinery requirement & cost
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 11/14
Condenser is a device or unit used to condense a
substance from its gaseous to its liquid state, typicallyby cooling it.
Condensation action requires more and more water and
there should be water storage towers and indeed
pumps and motors requirement for suction andsupplication of water to the condensers .
Transformers and grid installation .
Machinery requirement & cost
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 12/14
If we talk about the cost of grid station both
transformer and transmission lines from grid to plantwill be required .Approximated cost as for as gridinstallation is concerned will be 60lac.
Automation on plant.
Motors and other electronic instrumentation are notas cost effective as turbine and generators are.
Machinery requirement & cost
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 13/14
Those people who actually manages and operates the
whole plant. Depending upon their designation organization has to
pay salary to all of them.
Engineers in engineering station in CCR and operators
in operating station in CCR ,most of staff will berequired for these stations.
Human resources
7/28/2019 Feasibility Report 13
http://slidepdf.com/reader/full/feasibility-report-13 14/14
Conclusion
The steam power plant is efficient in providing power.
It works on cyclic process.
Through this plant we can increase the annualproduction and can get rid of extra charges of water and power development authority .
Conclusion