Federal Aviation Administration OSU & NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st & 22 nd , 2008

Federal Aviation Administration OSU NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

Embed Size (px)

DESCRIPTION

3 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Mini-Study ‘Mini-Study’ Complete –4 Labs In All –Two Honeycomb Panels S-SCCP (Brown) Marker Panel (White) OSU –Peak Heat Release Rate –2 minute Total Heat Release Rate –Time To Peak NBS –Maximum Specific Optical Density (4 Minute)

Citation preview

Page 1: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

Federal AviationAdministrationOSU & NBS Updates

2008 October Materials Meeting

Materials Working Group

Michael Burns, FAA Tech Center

October 21st & 22nd, 2008

Page 2: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

2 2Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Agenda1. “Mini” European Round Robin Results2. NBS Update

• Photometric System Round Robin• Experimental Furnace

3. Visit To Vatell Corp.• Calibration Method• Recoating Techniques

4. New FAA Equipment5. Maintenance Tips & Reminders6. Next Steps

Page 3: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

3 3Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

2008 Mini-Study • ‘Mini-Study’ Complete

– 4 Labs In All– Two Honeycomb Panels

• S-SCCP (Brown)• Marker Panel (White)

• OSU– Peak Heat Release Rate– 2 minute Total Heat Release Rate– Time To Peak

• NBS– Maximum Specific Optical Density (4 Minute)

Page 4: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

4 4Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Peak HRR% Standard Deviation = 22.0%

(44.9) (55.7) (59.9) (76.3)

0

10

20

30

40

50

60

70

80

90

A B C D

Lab Code

Peak

kW

/m2

Page 5: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

5 5Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Time to Peak HRR% Standard Deviation = 17.4%

(40) (42) (42) (57)

0

10

20

30

40

50

60

D A C B

Lab Code

Seco

nds

Page 6: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

6 6Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller - 2 minute Total HRR% Standard Deviation = 48.9%

(37.6) (41.8) (45.0) (94.7)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

B C A D

Lab Code

(kW

/m2)

Min

Page 7: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

7 7Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - Peak HRR% Standard Deviation = 40.7%

(34.7) (36.1) (42.6) (75.6)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

B A C D

Lab Code

kW/m

2

Page 8: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

8 8Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - Time to Peak HRR% Standard Deviation = 32.5%

(15) (30) (32) (35)

0

5

10

15

20

25

30

35

40

C D A B

Lab Code

Seco

nds

Page 9: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

9 9Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - 2 Min Total HRR% Standard Deviation = 57.6%

(30.7) (40.2) (47.2) (101.1)

0.0

20.0

40.0

60.0

80.0

100.0

120.0

C B A D

Lab Code

(kW

/m2)

min

Page 10: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

10 10Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Max Ds during 4 minutes% Standard Deviation = 15.8%

(141.8)

(182.7)

(193.4)

0.0

50.0

100.0

150.0

200.0

250.0

D A C

Lab Code

Ds

Page 11: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

11 11Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Photometric System Round Robin

• FAA Is Currently Conducting A Round Robin Check Out Of The NBS Photometric System Using Neutral Density Light Filters

• These Filters Provide A Linearity Check Of Five Data Points

Page 12: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

12 12Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Photometric System Round Robin• No Furnace Heat Or Pilot Burner Required • Zero Then Span system

• Gradually Slide Filter Over Lower Glass Window• 12 Domestic Labs Have Participated To Date• Filter Information:

• Edmund Optics• http://www.edmundoptics.com/onlinecatalog/Display

Product.cfm?productid=1523• Filters Available For International Lab Testing Within

The Next Few Weeks.

Page 13: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

13 13Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Furnace• NBS Furnace Upgrade

– Longer Service Life Of Heating Element.• Experimental Furnace Endurance Testing Progress

– Incoloy Vs. Inconel– Approx. 742 Hours Of Operation– 43 Cycles– 28 Samples

Page 14: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

14 14Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Visit To Vatell Corp.• Calibration Method

• Differed From What The FAA Has Been Doing Ramping Heat Up During Calibration Vs. Down

• New Study In Progress To Measure Any Differences Between Procedures

• Observed Re-Coating Techniques• 1000 - 1B’s (Lower Range, Most Common)

• Black Velvet• 1000 - 1A’s

• Krylon• Visit To Medtherm Corp. Slated For Early 2009

Page 15: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

15 15Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

New FAA Equipment• FAA Has Recently Purchased A New:

OSU Heat Release Rate Apparatus– Fire Test Technology Ltd.

NBS Smoke Chamber– Newport Scientific, Inc.

• Due To Arrive In the Next Few Weeks• Facility Being Painted• Installed Once Complete• Original Equipment Will Remain Available For Special

Testing And Occasional Training

Page 16: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

16 16Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Maintenance Tips & Reminders• OSU

- Inspect And Clean Lower Air Distribution Plate On A Regular Basis

- Keep The Upper Cone Walls And Chimney Clean• NBS

- Remember To Clean Windows Before Each Test (Top Then Bottom)

- Ensure Proper Alignment Of Pilot Tubes To Sample Face

Page 17: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

17 17Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Next Steps• International Labs Who Would Like To Participate In

The NBS Photometric System Round Robin Please Contact The FAA

• Complete Study To Measure Any Differences Between Heat Flux Gage Calibrating Procedures

• FAA Remains In The Process Of Updating Chapter 6 Of The FAA Handbook (NBS)

• Thank You For Comments On Chapter 6 Updates• FAA Contact Information:

Michael Burns At [email protected] +1 (609) 485-4985