Welcome

FEDERAL Blvd from 5th Ave to Howard

PUBLIC OPEN HOUSE

Welcome

BIENVENIDOS

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Page 2: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

5:45 SHORT PRESENTATION

6:00 CONTINUED REVIEW OF INFORMATION

7:00 OPEN HOUSE COMPLETE

5:00 OPEN HOUSE REVIEW OF INFORMATION

Agenda for Tonight’s Meeting

WelcomeBIENVENIDOS

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Page 3: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

HISTORIA DEL PROYECTOPROJECT HISTORY

Planning and Environmental Linkage (PEL) Completed in 2009

Preliminary Design Started (February 2011)

Funding for Construction (December 2013)

Corridor Vision Established - Federal Boulevard Corridor Plan (CCD, 1995)

Environmental Assessment (In Progress)

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Page 4: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

NEXT STEPS & SCHEDULEPRÓXIMOS PASOS Y HORARIO

Complete Final Design

Begin Right-of-Way ProcessBegin Construction

Complete Environmental Assessment and(Decision Document)

Early 2015

Public Review Period (30 days) October 2014Draft Environmental Assessment Document Ready September 2014

Early 2015Summer 2016

December 2014

Environmental Assessment

Final Design

Right-of-Way

Construction

Task 2014 2015 2016 2017 2018

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Page 5: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Environmental Assessment ProcessPROCESO DE EVALUACIÓN AMBIENTAL

• Public and agency outreach• Data gatheringIdentify Potential Areas

of Concern

• Traffic and safety assessmentsDevelop Purpose

and Need

• Develop and refine design

Alternative Analyses

• Identify potential impacts to resources• Identify mitigation measuresImpact Assessment/

Mitigation Planning

•Respond to comments from EA review•Provide commitment to mitigation measures•Document decision/action to be taken•Signed by FHWA and CDOT (lead agencies)

Prepare Decision Document

• We are hereIdentify Preferred Alternative

• Document EA process• Publish and provide for 30-day review

and comment periodPrepare Environmental

Assessment (EA)

Page 6: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

PROYECTOS CONJUNTOSADJACENT PROJECTS

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

Federal Boulevard, 5th to Howard (7th to Holden Design)

• Widening to 6 lanes, improved sidewalks• Construction Timing • Lead Agency: City of Denver

Federal Boulevard over 6th Avenue Bridge Replacement

• Bridge replacement, 6 lanes plus turn lanes, improved sidewalks• • Lead Agency: CDOT

Federal Boulevard, Alameda to 5th

• Currently under construction, completion in 2013• 6 lanes plus turn lanes, improved sidewalks• Lead Agencies: CDOT/City of Denver Project

West Corridor Light Rail + Decatur Station

• • Replaced Federal bridge over Lakewood Gulch• Lead Agency: RTD

Federal Boulevard over Colfax Bridge Replacement

• Bridge replacement, minor roadway changes• Construction in 2012, 2013• Lead Agency: CDOT

Myers Gulch, Platte River

• Bike Trail improvements• Lead Agency: City of Denver

US6US6

I-25

8th Avenue8th Avenue

10th Avenue 10th Avenue

Holden Place

14th Avenue

Colfax Avenue

Howard Place

Fede

ral B

oule

vard

Fede

ral B

oule

vard

Fede

ral B

oule

vard

2nd Avenue

1st Avenue

12th Avenue

Colfax Avenue

Fede

ral B

oule

vard

Completion Anticipated Summer 2016

: In progress

Opened

Page 7: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

PROJECT LIMITS ZONA DEL PROYECTO

Holden Place

Howard Place

Colfax Avenue

7th Avenue

10th Avenue

US 6 US 6

I-25I-25

12th Avenue

8th Avenue

Fede

ral B

oule

vard

N

Page 8: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

No-ActionTypical Section

Recommended Typical Section

SECTION VIEW OF FEDERALSECCIÓN TĺPICA DE FEDERAL

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

11’

8’

Lane

2.5’Curb &Gutter

2.5’Curb &GutterPedestrian

Zone

10.5’ to 16.5’ 14.5’ - typical11’Lane

11’Lane

16’

Raised Median w/Left Turn Lane atIntersections

11’Lane

11’Lane

11’Lane

Varies 109’ to 113’

Righ

t-of

-Way

Righ

t-of

-Way

8’

PedestrianZone

9.5’

68’

Lane

5.5’

Cur

b, G

utte

r, an

d Si

dew

alk

Righ

t-of

-Way

Righ

t-of

-Way

5.5’

Cur

b, G

utte

r, an

d Si

dew

alk

9.5’Lane

9.5’Lane

9.5’ExistingTwo-wayLeft-turn Lane

9.5’Lane

9.5’Lane

Page 9: FEDERAL Blvd from 5th Ave to Howard...FEDERAL Blvd from 5th Ave to Howard PUBLIC OPEN HOUSE Welcome BIENVENIDOS CONSULTING ENGINEERS TSIOUVARAS SIMMONS HOLDERNESS 5:45 SHORT PRESENTATION

During the public review and comment period for this EA, submit comments:

In Writing: Karen Good 201 West Colfax Department 509, Denver, CO 80202

By Email: [email protected] Via Fax: 720-865-2676 Online: www.denvergov.org/infrastructure/PolicyandPlanning/Curent/ Projects/FederalBoulevard/tabid/442758/Default.aspx

EA Review Locations: CDOT, Region 1 Offices - 2000 S. Holly Street Denver, CO 80222 Federal Highway Administration Offices - 2300 W. Dakota Avenue Lakewood, CO 80228 City and County of Denver Webb Building - 201 W. Colfax Avenue, Denver, CO 80202 Barnum Recreational Center - 360 Hooker Street, Denver, CO 80219 Rude Park Recreational Center - 2855 W Holden Place, Denver, CO 80204 Denver Workforce Center at Westside - 1200 Federal Boulevard Denver, CO 80204

C O N S U LT I N G E N G I N E E R S

TSIOUVARAS SIMMONS HOLDERNESS

How to Comment on the Federal Boulevard EAFORMAS PARA COMUNICAR SU OPINIÓN