FEDERAL CAPITAL TERRITORY

ADMINISTRATION

MINISTERIAL PLATFORM

TO

COMMEMORATE NATIONAL DEMOCRACY DAY 2012

Presented by:

Senator Bala Abdulkadir Mohammed

Honourable Minister, FCT

17th May, 2012

MINISTERIAL P LATFORM FCT 1

Page 2: Federal Capital Territory

OUTLINEMandate

Background

Situation analysis

Addressing the Challenges

Achievement/Impact:

1.0 Effective & efficient administrative framework: policies, roadmap, reforms,

2.0 Infrastructure development: Districts development, Satellite Town

development, Roads, Water supply, Urban Renewal

3.0 Social services: Education, Health care, Art & Culture, City management,

Social menace,

4.0 Wealth Creation and poverty reduction: Agriculture, micro credit scheme,

empowerment,

5.0 Safe and secure environment: Sanitation, Environment, Security

6.0 Investment Initiatives

7.0 Partnerships: Private Sector Participation, International Donors,

2MINISTERIAL P LATFORM FCT

Page 3: Federal Capital Territory

MANDATEVision: “To be one of the top 20 capital cities in the

World by the year 2020 ”

Mission: “The provision of infrastructure, services and administration for the development of a first class Federal Capital Territory comparable to the

best in the world”

FCT Goals:

Goal 1: Provide, maintain infrastructure and utilities to the FCT residents

Goal 2: Reduce poverty through Economic Empowerment programs

Goal 3: Manage and promote a safe and beautiful Environment

Goal 4: Provide World class social services to FCT residents

3MINISTERIAL P LATFORM FCT

Page 4: Federal Capital Territory

Location: Federal Capital Territory of Nigeria, Western Africa

Constituencies: 6 Area Councils

Total Area: 8,000 sq km (FCC 250 sq km)

Population: 2.5 million (Approx)

Literacy: 70%

Natural Resources: Coal, columbite, Tantalite, Granite, Precious Stones, Gem Stones

Climate: Dust haze, cold & dryness

Weather: Rainy & Dry seasons with brief harmattan;

Geographic Features: Lush vegetation and rich soil, Rivers, Hills, Mountains & Forest.

FCT GDP at around US$5 billion (National Bureau of Statistics)

BACKGROUND

FCT

4MINISTERIAL P LATFORM FCT

Page 5: Federal Capital Territory

SITUATION ANALYSIS

On my assumption of duty as Minister of

FCT, I was confronted with the following

challenges: -

a chaotic and corrupt land administration

system,

abuse of mass housing programme,

endemic traffic congestion,

failing environmental orderliness,

threatening security situation,

inadequate transportation infrastructure &

services,

5MINISTERIAL P LATFORM FCT

Page 6: Federal Capital Territory

SITUATION ANALYSIS

inadequate transportation

infrastructure & services,

Inadequate access to quality

education,

over stretched and inadequate health

facilities,

poor revenue collection,

over-lapping and duplication of

departmental responsibilities.

6MINISTERIAL P LATFORM FCT

Page 7: Federal Capital Territory

7MINISTERIAL P LATFORM FCT

SITUATION ANALYSIS

Page 8: Federal Capital Territory

8MINISTERIAL P LATFORM FCT

SITUATION ANALYSIS

Page 9: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

9MINISTERIAL P LATFORM FCT

Page 10: Federal Capital Territory

ADDRESSING THE CHALLENGES

The Reforms:

Roadmap for sustainable development of FCTA

Land administration reform

Parks & Recreation Policy

Restructuring & reorganization of FCTA

The Policies:

16 draft Bills in the National Assembly

Trade & Investment Policy

Land SWAP Model

Monitoring & Evaluation Policy

Re-establishment of Satellite Towns Development Agency (STDA)

Transformation Agenda

10MINISTERIAL P LATFORM FCT

Page 11: Federal Capital Territory

ADDRESSING THE CHALLENGES

Roadmap for sustainable development of

FCTA

Land administration reform

Restructuring & reorganization of FCTA

Re-establishment of Satellite Towns

Development Agency (STDA)

11MINISTERIAL P LATFORM FCT

Page 12: Federal Capital Territory

ROADMAP FOR STRATEGIC DEVELOPMENT

12MINISTERIAL P LATFORM FCT

Page 13: Federal Capital Territory

LAUNCHING OF ACCELERATED

AREA COUNCIL TITLE REISSUANCE

SCHEME (AACTRIS)

Conversion of customary (Area Council) land titles to statutory titles saw the lunching of Accelerated Area Council Titles Reissuance Scheme (AACTRIS) on the 19th of December, 2011.

So far, the Project Implementation Committee has cleared 170 cases for issuance of Certificates of Occupancy with the hope of increasing this figure to 1000 in the shortest time.

ROADMAP FOR STRATEGIC DEVELOPMENT

13MINISTERIAL P LATFORM FCT

Page 14: Federal Capital Territory

ROADMAP FOR STRATEGIC DEVELOPMENT

A APPOINTMENT,PROMOTION& DISCIPLINE

S/No. ACTIVITIES NO. OF

BENEFICIARIES

1 Promotion 2,020

2 Conversion of Staff 93

3 Recruitment of Staff 1,496

4 Proper placement 114

5 Provisional and Temporary appointments 104

Series of disciplinary cases were concluded in 2011 by the FCTA

senior Staff Disciplinary Committee.

Staff attendance are monitored across SDAs

This method has led to improvement in staff dedication to duty

14MINISTERIAL P LATFORM FCT

Page 15: Federal Capital Territory

B MANPOWER PLANNING & DEVELOPMENT

1 International Training conducted for FCTA

staff

150

2 Local Training conducted for FCTA staff 3,000

3 In – Service Training 150

4 In –House Workshop 1,200

5 Payment of 1st 28th Days 638

6 Induction workshop 453

7 ICT Training Programme 50

8 Part – time training Programme 150

9 ICT Training for Teachers 1,200

ROADMAP FOR STRATEGIC DEVELOPMENT

15MINISTERIAL P LATFORM FCT

Page 16: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

1.0 Effective & efficient administrative framework: 1.1 4Nos. policies were adopted

1.2 Increased Internally Generated Revenue (IGR) by 35% over 2011

1.3 100% increase on Public Private Transactions under PPP

1.4 7Nos. Investment Initiatives were developed

1.5 140Nos. of stakeholder engagements conducted

1.6 Value ($4.6billion) of Foreign Direct Investment inflow into FCT

1.7 Drastic reduction in number of litigations

1.8 Upgrading of Satellite Town Infrastructure department to a Satellite Town Development Agency

16MINISTERIAL P LATFORM FCT

Page 17: Federal Capital Territory

17MINISTERIAL P LATFORM FCT

INFRASTRUCTURE DEVELOPMENT

Page 18: Federal Capital Territory

Primary Infrastructure

Rehabilitation and Expansion of Airport Expressway (Shehu

Musa Yar’Adua Expressway).

Rehabilitation and Expansion of Outer Northern Expressway

(Kubwa Road) Murtala Muhammed.

Extension of Inner Southern Expressway (ISEX) from Outer

Southern Expressway (OSEX) to Southern Parkway (S8/9).

Provision of Primary Road to Mass Housing (Arterial Road

S30), Abuja.

Completion of Roads B6/B12 and Circle Roads, Abuja Central

Area

Reconstruction of Lower Usuma Dam - Gurara Road Project

Abuja Rail Mass Transit Project (Lots 1&3) Phase 1

Tanks 1 & 6 and Associated Trunk mains

Construction of Phases 3 & 4 (20,000m3/hr) Lower Usuma

Dam Water Treatment Plants

18MINISTERIAL P LATFORM FCT

INFRASTRUCTURE DEVELOPMENT

Page 19: Federal Capital Territory

District Infrastructure

Development of District I (Kagini) of Abuja North West

District, Phase iv FCC

Provision of Engineering Infrastructure to Wuye District

Provision of Engineering Infrastructure to Jahi District

Provision of Engineering Infrastructure to Mbora District

Idu District – Industrial Area IB Abuja Phase III

Provision of Engineering Infrastructure to Abuja

Technology Village (ATV), Abuja.

Karmo Residential District Infrastructure

Provision of Infrastructure to Maitama Extension

(Goodluck District)

Provision of Engineering Infrastructure to Guzape District

Lot II19MINISTERIAL P LATFORM FCT

INFRASTRUCTURE DEVELOPMENT

Page 20: Federal Capital Territory

PPP Infrastructure Development

Initiatives

Land Swap Model

9 districts being embarked upon Ketti North, Sheretti, Ketti, Sherreti Chechi, Waru

Kpozaika, Burum, Burum West, Ketti East, and

Gwagwa Districts

Public Private Partnership (PPP)

4 districts being embarked upon

Durumi, Mabushi, Kado, Gwarinpa I

Industrial Park

Idu Industrial Park development

20MINISTERIAL P LATFORM FCT

INFRASTRUCTURE DEVELOPMENT

Page 21: Federal Capital Territory

District Layout

21MINISTERIAL P LATFORM FCT

INFRASTRUCTURE DEVELOPMENT

GUZAPE

DISTRICTKAGINI

KARMO

JAHI

WUYE

IDU

ATV

MBORA

MAITAMA EXT.

Page 22: Federal Capital Territory

REHABILITATION AND EXPANSION OF

AIRPORT EXPRESSWAY LOTS I

• Contractor: M/S Julius Berger Nig. Plc.

• Contract Sum:

Lot I: N59,223,254,545.70

• Award: 11th May, 2009

• Commencement: 13th May, 2009

• Completion: : 2013

• Scope of Work:- 10 lanes Expressway 14km length of road work

- 21 Nos. bridges

- 147 Nos. Culverts

- 2 Nos. clover leaf interchange s

- 3 Nos. Pedestrian Bridges and lay-by

- 47km length of Storm Water drainage

- 100 km Power Supply

- 1640 Nos. Street lighting

- 14 km length of Telecommunication Ducts

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

22MINISTERIAL P LATFORM FCT

Page 23: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

REHABILITATION AND EXPANSION OF AIRPORT

EXPRESSWAY LOTS I & II

LOT I

• Progress Status: 60%

• Achievement (May 2011-May 2012): 19%

• Achievement (May 2011-May 2012):

15%

Impact of the Project: The travel time has reduced

tremendously between the City and Airport

ROAD INFRASTRUCTURE

23MINISTERIAL P LATFORM FCT

Page 24: Federal Capital Territory

REHABILITATION AND EXPANSION OF

AIRPORT EXPRESSWAY LOTS II

• Contractor: M/S Julius Berger Nig. Plc.

• Contract Sum:

Lot II: N49,200,892,508.15

• Award: 11th May, 2009

• Commencement: 13th May, 2009

• Completion: : 2013

• Scope of Work:- 10 lanes Expressway 12.5km length of road

work

- 9 Nos. bridges

- 147 Nos. Culverts

- 1 No. clover leaf interchanges

- 3 Nos. Pedestrian Bridges and lay-by

- 37km length of Storm Water drainage

- 99km Power Supply

- 1748 Nos. Street lighting

- 12.5 km length of Telecommunication Ducts

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

24MINISTERIAL P LATFORM FCT

Page 25: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

REHABILITATION AND EXPANSION OF

AIRPORT EXPRESSWAY LOTS II

LOT II

• Progress Status: 90%• Achievement (May 2011-May 2012):

15%

Impact of the Project: The travel time has

reduced tremendously between the City and

Airport

ROAD INFRASTRUCTURE

25MINISTERIAL P LATFORM FCT

Page 26: Federal Capital Territory

Rehabilitation and Expansion of Outer Northern

Expressway (ONEX) (Kubwa Rd) Lot I

• Contractor: Lot I: M/S Dantata & Sawoe

• Contract Sum:

Lot I: N66,830,910,468.75

• Award: 7th May, 2009

• Commencement: May, 2009

• Completion: : 2013

• Scope of Work:

- 39km length of 10 lanes Expressway

- 2 Nos. bridges

- 35 Nos. Culverts

- 2 Nos. clover leaf interchanges

- 5 Nos. Pedestrian Bridges and lay-by

- Storm Water drainage

- Power Supply

-. Street lighting

- 19 km length of Telecommunication Ducts

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

Lot I

26MINISTERIAL P LATFORM FCT

Page 27: Federal Capital Territory

Rehabilitation and Expansion of Outer Northern

Expressway (ONEX) (Kubwa Rd) Lot I

- Construction of concrete Gallery

- Pedestrian Bridges and lay-by

- Storm Water drainage

- Power Supply and Street lighting

- Telecommunication Ducts

LOT I

• Progress Status: 81%

• Achievement (May 2011-May 2012): 20%

Impact of the Project: The travel time has

reduced tremendously between the City,

Kubwa and Zuba.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

27MINISTERIAL P LATFORM FCT

Lot I

Page 28: Federal Capital Territory

Rehabilitation and Expansion of Outer Northern

Expressway (ONEX) (Kubwa Rd) Lot II

• Contractor: Lot II: M/S CGC Nig. Ltd

• Contract Sum:

Lot II: N81,914,280,462.40

• Award: 7th May, 2009

• Commencement: May, 2009

• Completion: : 2013

• Scope of Work:

- 20.25km length of 10 lanes Expressway

- 21 Nos. Box Culverts

- 4 Nos. interchanges

- 6 Nos. Pedestrian Bridges

- 84 Nos. Storm Water drainage

- 20.35km of Power Supply and Street lighting

- 20km length of Telecommunication Ducts

- Concrete gallery

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

28MINISTERIAL P LATFORM FCT

Lot II

Page 29: Federal Capital Territory

Rehabilitation and Expansion of Outer Northern

Expressway (ONEX) (Kubwa Rd) Lot II

- Construction of concrete Gallery

- Pedestrian Bridges and lay-by

- Storm Water drainage

- Power Supply and Street lighting

- Telecommunication Ducts

LOT II

• Progress Status: 80%

• Achievement (May 2011-May 2012): 22%

Impact of the Project: The travel time has

reduced tremendously between the City,

Kubwa and Zuba.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

Lot II

29MINISTERIAL P LATFORM FCT

Page 30: Federal Capital Territory

CONSTRUCTION OF SOUTHERN PARKWAY FROM

INNER SOUTHERN EXPRESSWAY (ISEX) TO RING

ROAD I (RRI)

• Contractor: M/s Setraco Nig. Ltd

• Contract Sum: N53,333,27,967.71

• Award: 13/12/2010

• Commencement: January, 2011

• Completion: : July, 2013

• Scope of Work:

- Site Clearance and Earthworks

- Surface water Drainages

- Road works

- Bridge Works

- Culverts

- Power Supply and Streetlight

- Conduits for Post and Telecommunication

- Water supply

• Progress Status: 12%

• Achievement (May 2011-May 2012): 12% Impact of the Project: Reduction of traffic

congestion within the Southern part of the City.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

30MINISTERIAL P LATFORM FCT

Page 31: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

EXTENSION OF INNER SOUTHERN

EXPRESSWAY (ISEX) FROM OUTER

SOUTHERN EXPRESSWAY (OSEX) TO

SOUTHERN PARKWAY (S8/S9)

• Contractor: M/S Salini Nig. Ltd

• Contract Sum: N13,385,719,204.51

• Award: 11/01/2010

• Commencement: 20th January, 2010

• Completion: December, 2013

• Scope of Work:

- 3.8km length of 10 lanes Expressway

- Construction of two (2) under pass bridges

- Construction of one (1) Flyover

ROAD INFRASTRUCTURE

31MINISTERIAL P LATFORM FCT

Page 32: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

EXTENSION OF INNER SOUTHERN

EXPRESSWAY (ISEX) FROM OUTER SOUTHERN

EXPRESSWAY (OSEX) TO SOUTHERN

PARKWAY (S8/S9)

- 1.4km length of Storm Water drainage

- Power Supply and Street lighting

- 3.2km length of Telecommunication Ducts

- 2 No box culverts

- 1 No pedestrian bridge

• Progress Status: 56%

• Achievement (May 2011-May 2012): 36%

Impact of the Project: Reduce/eliminate

traffic congestion that is presently

experienced from North – eastern part of the

Country into the territory (AYA – Junction).

ROAD INFRASTRUCTURE

32MINISTERIAL P LATFORM FCT

Page 33: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

PROVISION OF PRIMARY ROAD TO MASS

HOUSING (ARTERIAL ROAD S.30), ABUJA

• Contractor: M/S Exsa Nig Ltd

• Contract Sum: N6,533,496,888.19

• Award: 30/12/2010

• Commencement: March, 2011

• Completion: : 2013

• Scope of Work:

- 9.72km length of Road

- 3 No 3 Cell 3x3 Box Culverts

- 1 No 2 Cell 2x2 Box Culverts

- 12km length of Storm Water

Drainage pipes

ROAD INFRASTRUCTURE

33MINISTERIAL P LATFORM FCT

Page 34: Federal Capital Territory

PROVISION OF PRIMARY

ROAD TO MASS HOUSING

(ARTERIAL ROAD S.30), ABUJA

• Progress Status: 20%

• Achievement (May 2011-May

2012): 20%

Impact of the Project: Reduction

in travel time

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PRIMARY INFRASTRUCTURE

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

SITE CLEARANCE

EARTHWORKS SURFACE WATER

DRAINAGE

CULVERT WORKS

ROAD WORKS

OUTSTANDING WORKS

ACHIEVEMENT TO DATE

34MINISTERIAL P LATFORM FCT

Page 35: Federal Capital Territory

COMPLETION OF ROADS B6, B12 & CIRCLE

ROAD, ABUJA CENTRAL AREA

• Contractor: M/S Julius Berger Nig. Plc

• Contract Sum: N66,831,381,113.01

• Award: 14/05/2007

• Commencement: 28th May, 2007

• Completion: 2014

• Scope of Work:

- Site Clearance and Earthworks

- Surface water Drainages

- Road works

- Bridge Works

- Retaining walls

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

35MINISTERIAL P LATFORM FCT

Page 36: Federal Capital Territory

COMPLETION OF ROADS B6, B12 &

CIRCLE ROAD, ABUJA CENTRAL

AREA

- Interchange Structure

- Culverts

- Power Supply and Streetlight

- Conduits for Post and

Telecommunication

• Progress Status: 47%

• Achievement (May 2011-May 2012): 5%

Impact of the Project: Reduction in

travel time

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

36MINISTERIAL P LATFORM FCT

Page 37: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

37MINISTERIAL P LATFORM FCT

RECONSTRUCTION OF LOWER USUMA

DAM – GURARA DAM-JERE ROAD

PROJECT

• Contractor: M/S SCC Nig Ltd

• Contract Sum: N13,840,383,768.75

• Award: 9/02/2011

• Commencement: 23rd March, 2011

• Completion: 23rd Sept. 2012

• Scope of Work:

- 72km length of Road

- 10 Nos. Culverts

- 144km length of Storm Water

Drainage

Page 38: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)ROAD INFRASTRUCTURE

38MINISTERIAL P LATFORM FCT

RECONSTRUCTION OF LOWER USUMA

DAM – GURARA DAM ROAD PROJECT

• Progress Status: 60%

• Achievement (May 2011-May 2012):

60%

Impact of the Project: Creates an

alternative route for movement out of

the City from Abuja to Kaduna

Page 39: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

EXTENSION OF INNER SOUTHERN

EXPRESSWAY (ISEX) FROM

OUTER SOUTHERN EXPRESSWAY

(OSEX) TO SOUTHERN PARKWAY

(S8/S9)

• Contractor: M/S Salini Nig. Ltd

• Contract Sum: N13,385,719,204.51

• Award: 11/01/2010

• Commencement: 20th January, 2010

• Completion: : December, 2013

• Scope of Work:

- 10 lanes Expressway

- Construction of two (2) under pass bridges

- Construction of one (1) full clover leaf

interchange

ROAD INFRASTRUCTURE

39MINISTERIAL P LATFORM FCT

Page 40: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

EXTENSION OF INNER SOUTHERN

EXPRESSWAY (ISEX) FROM OUTER

SOUTHERN EXPRESSWAY (OSEX) TO

SOUTHERN PARKWAY (S8/S9)

- One (1 ) diamond interchange

- Storm Water drainage

- Power Supply and Streetlighting

- Telecommunication Ducts

• Progress Status: 56%

• Achievement (May 2011-May 2012): 36%

Impact of the Project: Reduce/eliminate

traffic congestion that is presently

experienced from North – eastern part of

the Country into the territory (AYA –

Junction).

ROAD INFRASTRUCTURE

40MINISTERIAL P LATFORM FCT

Page 41: Federal Capital Territory

CONSTRUCTION OF TANKS 1 & 6 AND

ASSOCIATEDTRUNK MAINS

• Contractor: M/S M/S Sarplast (W.A)

Ltd

• Contract Sum: N22,892,354,814.20

• Award: 29/08/2006

• Commencement: 11th October, 2006

• Completion: 2014

• Scope of Work:

- construction of two (2) No. 40,000m3

capacity reinforced concrete

Tanks

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE

CONSTRUCTION OF TANK 6 IN

PROGRESS

41MINISTERIAL P LATFORM FCT

Page 42: Federal Capital Territory

CONSTRUCTION OF TANKS 1 & 6

AND ASSOCIATEDTRUNK MAINS

- Laying of Ductile Iron pipes

(1000mm to 1400mm diameter)

• Progress Status: 32%

• Achievement (May 2011-May 2012): 10%

Impact of the Project: Job creation

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE

CONSTRUCTION OF TANK 1 IN

PROGRESS

LAYING OF PIPES

42MINISTERIAL P LATFORM FCT

Page 43: Federal Capital Territory

CONSTRUCTION OF PHASES 3 & 4

(20,000M3/HR) LOWER USUMA DAM

WATER TREATMENT PLANTS

PROJECT.

• Contractor: M/S Biwater Nig. Ltd

• Contract Sum: N18,093,697,840.57

• Award: 14/07/2005

• Commencement: 5th August, 2005

• Completion: 2012

• Scope of Work:

- Construction of four (4No.) identical

water treatment modules, 5,000m3/hr

each.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE

43MINISTERIAL P LATFORM FCT

Page 44: Federal Capital Territory

CONSTRUCTION OF PHASES 3 & 4

(20,000M3/HR) LOWER USUMA DAM

WATER TREATMENT PLANTS

PROJECT.

• Progress Status: 96%

• Achievement (May 2011-May 2012):10%

Impact of the Project: Job creation

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)WATER INFRASTRUCTURE

44MINISTERIAL P LATFORM FCT

Page 45: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.1 Development of District 1 of Abuja North

West District, phase IV, FCC

• Contractor: M/S Salini Nig. Ltd

• Contract Sum: N52,609,879,284.47

• Award: 30/12/2010

• Commencement: 7th March, 2011

• Completion: 7th March, 2015

• Scope of Work:

The scope of works involve provision

of complete Engineering Infrastructure to

the District as follows:

- Site Clearance and Earthworks

- Road Works

- Interchanges (Flyover): 2 No

DISTRICT INFRASTRUCTURE

45MINISTERIAL P LATFORM FCT

Page 46: Federal Capital Territory

- Box Culverts: 23 Nos.

- Storm Water Drainage of about 71.93Km of

pipes

- Foul Sewer of about 85.12Km of pipes

- Water Supply of about 95.54Km of pipes

- Power Supply and Street lighting

- Telecommunication Ducts

• Progress Status: 5%

• Achievement (May 2011-May 2012): 5%

• Impact of the Project: Provide access to 1000

commercial and Residential Plots and improve

the socio-economic well being of the residents

of FCC.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.1 DEVELOPMENT OF DISTRICT 1 (KAGINI) CONTD

DISTRICT INFRASTRUCTURE

46MINISTERIAL P LATFORM FCT

Page 47: Federal Capital Territory

2.1.2 PROVISION OF ENGINEERING

INFRASTRUCTURE TO WUYE DISTRICT,

ABUJA.

• Contractor: Arab Contractors (OAO) Nig. Ltd

• Contract Sum: N39,681,137,736.47

• Award: 21/8/09

• Commencement: 23rd September, 2009

• Completion: : 23rd January, 2013

• Scope of Work:

- Road works of about 34km.

- 2Nos of bridges

- 5Nos. box culverts

- 2 Nos. of pipe culvert

- 54km length of water drainage system.

- 30km Waste Water Drainage Network.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

47MINISTERIAL P LATFORM FCT

Page 48: Federal Capital Territory

- 52km length water supply network

- Power supply – 2 Nos. 33/11KV electrical

Injection Substations, 220km cables and street

lighting.

- 22km length of telecommunication ducts.

• Progress Status: 45%

• Achievement (May 2011-May 2012): 11%

• Impact of the Project: Provide access to 1700

commercial and Residential Plots and improve

the socio-economic well being of the residents

of FCC

2.1.2 PROVISION OF ENGINEERING

INFRASTRUCTURE TO WUYE DISTRICT,

ABUJA.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

DISTRICT INFRASTRUCTURE

48MINISTERIAL P LATFORM FCT

Page 49: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.3 PROVISION OF ENGINEERING

INFRASTRUCTURE TO JAHI DISTRICT

• Contractor: M/S Gilmor Nig. Ltd

• Contract Sum: N39,681,137,736.47

• Award: 21/8/09

• Commencement: 23rd September, 2009

• Completion: : 23rd January, 2013

• Scope of Work:

55km of Site Clearance & Earthworks

(244.36Ha)

55km of road works

Construction of 41 Nos. Reinforced concrete

box Culverts .

DISTRICT INFRASTRUCTURE

49MINISTERIAL P LATFORM FCT

Page 50: Federal Capital Territory

87km of water supply network

89km storm water drainage system

75.43km of sewage drainage system

2No. 33kv/11kv injection substations

100km Telecommunication ducts

200km of Electrical power supply cables

2385 Nos. Street lighting poles

River Training/Channelization.

• - Progress Status: 45%

• Achievement (May 2011-May 2012): 11%

• Impact of the Project: Provide access to 200

commercial and Residential Plots and improve the

socio-economic well being of the residents of FCC

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.3 PROVISION OF ENGINEERING

INFRASTRUCTURE TO JAHI DISTRICT

DISTRICT INFRASTRUCTURE

50MINISTERIAL P LATFORM FCT

Page 51: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.4 PROVISION OF PRIMARY ENGINEERING

INFRASTRUCTURE TO MBORA DISTRICT PHASE I.

DISTRICT INFRASTRUCTURE

51MINISTERIAL P LATFORM FCT

• Contractor: M/S Sammya Nigeria Limited

• Contract Sum: N6,664,244,869.17

• Award: 09/02/2011

• Commencement: 14th February, 2011

• Completion: : February, 2014

• Scope of Work:

- 23.55km Road Works

- 3 Nos. Box Culverts

- 14.029km length of Storm Water Drainage

- 9.022km length of Foul Sewer

- 4.8km length of Water Supply network

- Power Supply and Street lighting

- 9.248km Telecommunication Ducts

Page 52: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

2.1.4 PROVISION OF PRIMARY ENGINEERING INFRASTRUCTURE TO MBORA DISTRICT PHASE I.

• Progress Status: 8%

• Achievement (May 2011-May 2012): 8%

• Impact of the Project: Provide access

to commercial and Residential Plots

and improve the socio-economic well

being of the residents of FCC.

DISTRICT INFRASTRUCTURE

52MINISTERIAL P LATFORM FCT

Page 53: Federal Capital Territory

IDU DISTRICT – INDUSTRIAL AREA 1B –

ABUJA PHASE III

Design and Construction of the District

Infrastructures• Contractor: M/S Salini Nig. Ltd

• Contract Sum: N6,093,230,212, E186,523,176.33

• Award: 29/01/2002

• Commencement:13th September, 2003

• Completion: : 2014

• Scope of Work:

ROADS NETWORK OF VARIOUS CATEGORIES: Arterials Stot: 7.82 Km Collectors Stot: 3.98 Km Locals Stot: 8.92 Km

4 LORRY PARKS

4 BRIDGES

CULVERTS

Box and Pipe Total Length: 1,340 m

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

53MINISTERIAL P LATFORM FCT

Page 54: Federal Capital Territory

IDU DISTRICT – INDUSTRIAL AREA 1B – ABUJA PHASE

III CULVERTS

Box and Pipe Total Length: 1,340 m

Storm Water Underground Drainage System Total Length

(PVC+R/C): 46,060 m

District Foul Sewer Drainage System Total Length (PVC+R/C):

29,994m

Water Supply Distribution Network Total Length: 34,394 m

ELECTRICAL WORKS:

2 Substations 33/11 KV 108 Local Substations 11/0.415 KVA (Transformers) 70.265m of Power Supply Distribution Network 810 Street Lighting Poles 35,471m Street Lighting Network

70,800m of telecommunication ducts

1 mini sewage treatment plant

• Progress Status: 68%

• Achievement (May 2011-May 2012): 16%

• Impact of the Project: Provide access to 240 commercial and

Industrial Plots and improve the socio-economic well being of the

residents of FCC and employment to about 500 Nigerians.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

54MINISTERIAL P LATFORM FCT

Page 55: Federal Capital Territory

PROVISION OF ENGINEERING INFRASTRUCTURE TO

ABUJA TECHNOLOGY VILLAGE (ATV), ABUJA.

• Contractor: M/S Gilmor Engineering (Nig) Ltd.

• Contract Sum: N20,873,175,507.00

• Award: 24th May, 2007

• Commencement: 8th June, 2007

• Completion: : 2014

• Scope of Work:

- 33km length of Road works

- 25km length of Surface water Drainages

- 37km length of foul sewerage

- 67.2 km length of water supply networks

- 2 Nos. 5000m3 elevated storage tanks

- 1 No. 4,000m3 ground storage tank

- 20.13km gas pipeline

- Bridge Works

- Retaining walls

- Interchange Structure

- Culverts

- 57km length of Power Supply cables

- 1,339 Nos. of Streetlight

- 1 No. 33/11kva injection substation

- 133km Telecommunication ducts

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

55MINISTERIAL P LATFORM FCT

Page 56: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

56MINISTERIAL P LATFORM FCT

PROVISION OF ENGINEERING

INFRASTRUCTURE TO ABUJA TECHNOLOGY

VILLAGE (ATV), ABUJA.

• Progress Status: 58%

• Achievement (May 2011-May 2012): 12%

Impact of the Project: Enhancing the kick starting of

ATV free zone site activities, provision of access

and primary Engineering Infrastructure to over 350

plots, Provision of Employment to over 350

Nigerians.

Page 57: Federal Capital Territory

KARMO RESIDENTIAL DISTRICT

INFRASTRUCTURE • Contractor: M/S SCC (Nig) Ltd

• Contract Sum: N14,216,597,391.56

+

E251,453,895.213

• Award: 29/02/2002

• Commencement: September, 2003

• Completion: : 2014

• Scope of Work:- 99.72km length Road Works

- 1.06km length of Box Culverts

- 38.91km Storm Water Drainage pipes

- 48.51km Foul Sewer pipes

- 44.61km Water Supply networks

- 123.91km Power Supply and

- 1053 Nos. of Street lighting poles

- 2 Nos. injection sub-stations

- 41km Telecommunication Ducts

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)DISTRICT INFRASTRUCTURE

57MINISTERIAL P LATFORM FCT

Page 58: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

KARMO RESIDENTIAL DISTRICT

INFRASTRUCTURE

Progress Status: 85%

Achievement (May 2011-May 2012): 15%

Impact of the Project: Provide access to

272 Residential Plots and improve the

socio-economic well being of the residents

of FCC.

DISTRICT INFRASTRUCTURE

58MINISTERIAL P LATFORM FCT

Page 59: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

PROVISION OF ENGINEERING

INFRASTRUCTURE TO

MAITAMA EXTENSION (GOODLUCK

DISTRICT)

• Contractor: M/S Mangrovetech Nig. Ltd

• Contract Sum: N23,650,000,000

• Award: 4th May, 2011

• Commencement: 7th July, 2011

• Completion: : 2014

• Scope of Work:- 21km length of Road of various types.

- 1No. interchange structure

- 3Nos. Bridges

- 26.4km length of storm water line of various

sizes.

- 31.8km length of foul sewer line of various sizes.

- 38.7km length of water supply line

- 1 No. booster pump station

DISTRICT INFRASTRUCTURE

59MINISTERIAL P LATFORM FCT

Page 60: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

PROVISION OF ENGINEERING INFRASTRUCTURE

TO

MAITAMA EXTENSION DISTRICT

- 1000m3 clean water reservoir.

- Network of electricity distribution

- 1 No. 33KV/11KV injection substation.

- Street lighting

- telecommunication ducts

• Progress Status: 10%

• Achievement (May 2011-May 2012): 10%

• Impact of the Project: Provide access to 186

commercial and Residential Plots and improve the

socio-economic well being of the residents of FCC.

DISTRICT INFRASTRUCTURE

60MINISTERIAL P LATFORM FCT

Page 61: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

PROVISION OF ENGINEERING INFRASTRUCTURE

TO GUZAPE DISTRICT, LOT II

• Contractor: M/S Gilmor Engineering

(Nig) Ltd.

• Contract Sum: N13,179,573,398.12

+

E130,461,116.78

• Award: 7/03/2003

• Commencement: 10th December, 2003

• Completion: : 2014

• Scope of Work:

- 30.8km length of Road Works

- 22 Nos. Box Culverts

- 33km length of Storm Water Drainage pipes

- 53km length of Foul Sewer pipes

DISTRICT INFRASTRUCTURE

61MINISTERIAL P LATFORM FCT

Page 62: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

PROVISION OF ENGINEERING

INFRASTRUCTURE TO GUZAPE DISTRICT,

LOT II

- - 33.5km length of Water Supply Networks

- 163km of Power Supply cables

- 50km length of Telecommunication Ducts

- 1 No. 33/11kva injection sub-station

• Progress Status: 85%

• Achievement (May 2011-May 2012): 10%

• Impact of the Project: Provide access to 350

commercial and Residential Plots and

improve the socio-economic well being of the

residents of FCC.

DISTRICT INFRASTRUCTURE

LANDMARK ACHIEVEMENT

AS OF YEAR ENDING MAY

2011SITE

CLEARA

NCE

AND

EARTH

WORKS

SURFAC

E

WATER

DRAINA

GE

LANDMARK ACHIEVEMENT

AS OF YEAR ENDING MAY

2012

SITE

CLEARA

NCE AND

EARTHW

ORKS

SURFACE

WATER

DRAINAG

E

ROAD

WORKS

62MINISTERIAL P LATFORM FCT

Page 63: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)RAIL INFRASTRUCTURE

63MINISTERIAL P LATFORM FCT

Abuja Rail Mass Transit Project

Phase Ⅰ (Lots 1&3)

Contractor - M/s China Civil

Engineering Construction

Corporation (CCECC) Nig Ltd.

Contract Sum – US$841Million

Award – 27 May 2007

Commencement - May 2009

New Completion date - 2015

Scope - Detailed design and

construction of 60.67km of standard

gauge double track rail

Page 64: Federal Capital Territory

Abuja Rail Mass Transit Project

Phase Ⅰ (Lots 1&3)

Progress status: 22%

Achievement (May 2011 – May 2012): 1%

Signing of Chinese Loan Agreement

of $500million

Impact: 430 jobs created

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)RAIL INFRASTRUCTURE

64MINISTERIAL P LATFORM FCT

Page 65: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

65MINISTERIAL P LATFORM FCT

District Infrastructure Projects

Regional (Link) Road Projects

Rural Road Projects

Township Roads

Future focus:

Private Sector participation in

housing development

Designate districts in the Area

Councils as affordable housing

STDA to provide site and

services

Page 66: Federal Capital Territory

Provision of Engineering Infrastructure to

Kubwa Satellite Town (Districts 4 & 5)Contractor: Messrs SCC Nig Ltd.

Contract Sum: N 18,884,104,962.39

Revised Contract Sum: N 42,683,490,832.51

Award: 7th March, 2007

Date of Revision: November, 2011

Commencement: May, 2007

Completion: 24 Months from Date of revision

Scope of Work: Road-94km, Culvert-19.70km, U-

channel Concrete Line Drain-41km, Stone

Pitched drains - 463, 539m2, Water line -17km and

Electricity – 11KV line -59.59km, LT line – 86.46kmof LT line

Progress Status: 43%

Achievement (May 2011-May 2012): 6%

Impact of the Project:

Ready access to about 2,300 plots for development of

Building Structures

Movement of people from Federal capital City to

KubwaSatellite Town.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

66MINISTERIAL P LATFORM FCT

Page 67: Federal Capital Territory

Bwari Satellite Town (Districts 1 & 2) Contractor: Messrs Arab Contractors O.A.O. Nigeria Limited

Contract Sum: N13,131,947,653.56

Award: 26th November, 2006

Commencement: 27th February, 2007

Completion: 26th November, 2008 but this has not been

tenable due Poor cash flow.

Scope of Work: Provision of 26km of Road, 3Nos. Bridges, 7Nos.

Box Culverts, Drains and Pipe Culverts, Water Supply & Power

Supply.

Progress Status: 58%

Achievement (May 2011-May 2012): 22%

- 15% Length of Road Completed

Power substation Completed

3Nos. Bridges Completed

4Nos. Box Culverts Completed

20% of Open Concrete Line Drain Completed

25% of Pipe Culverts Completed

Impact of the ProjectEmployment Creation

Rural - Urban Migration reduced.

Services to 2,656 of plots and ready for building developers.

Growth of cottage industries as a result of improved power

reticulations.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

67MINISTERIAL P LATFORM FCT

Page 68: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

68MINISTERIAL P LATFORM FCT

Provision of Engineering Infrastructure to Karshi

Satellite Town (Districts 1&2), FCT.Contractor: Messrs SCC (Nig) Limited

Contract Sum: N11,520,240,993.12

Revise Contract Sum: N28,220,048,498.00

Date of Award: 7th March, 2007

Date of Revision: 24th November, 2011

Date of Commencement: June, 2007

Date of Completion: 24th November, 2013

Scope of Work: Roads 42km Culverts 3.67km, U

Shape Concrete side drains 68km, Water

line 38.57km, Electrical Reticulation

Progress Status: 40.10%

Achievement (May 2011-May, 2012): 5%

Impact of the Project:

provide access to about 390 plots for the development

of building structure

Movement of people from the Federal Capital City to

Karshi Satellite Town.

Page 69: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

69MINISTERIAL P LATFORM FCT

Provision of Roads, Water and Electricity Supply to the Resettlement site of Galuwyi/Shere

Contractor: M/S Parsons Science Engineering Company Limited

Contract Sum: N6, 050,071,212.9 (Phase 1)

Award: 3rd December 2010

Commencement: 14th January 2011

Completion: October 2013

Scope of works: Construction of 17km network of asphalt surface finished road, laying of 700m of 20mm UPVC pipe, provision and installation of 508 high and low tension poles and

installation of transformers.

Progress status: 16%

Achievement (May 2011 – May 2012: 13%

8km network of roads completed up-to Sub- base level, 3km completed up-to formation level and 165m length of concrete pipe culverts completed.

Impact of the project:

Informal employment of persons

450 units of Resettlement houses connected with network of roads.

Page 70: Federal Capital Territory

Project: Construction of Karshi-Ara Road

Contractor: Messrs Mangrovetech Construction and

Engineering Nig. Ltd

Contract Sum: N4,097,185,656.30

Award: 4th August 2010

Commencement: 3rd September, 2010

Completion: May, 2012

Scope of Work: 25km Asphalt road with 2 No.

Bridges and culverts

Progress Status: 23%

Achievement (May 2011-May 2012): 17%

9km Earthworks

2.5km of sub-base

0.6km of Asphalt road

Impact of the Project:

Ready access from Karshi-Ara for vehicular

and human traffic

Informal employment of persons

Linking of ten villages, viz: Gasaki, Jeje,

Kodayi, Stakuwa, Ara-Sabo, Angwan Kupi,

Kuwada, Panda, Taka Lafia and Ara

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

70MINISTERIAL P LATFORM FCT

Page 71: Federal Capital Territory

Project: Construction of Karshi-Apo Road

Contractor: Messrs Mangrovetech Construction

and Engineering Nig. Ltd

Contract Sum: N2,258,423,468.23

Award: 22nd December, 2010

Commencement: 10th January , 2011

Completion: September, 2012

Scope of Work: 14km of Asphalt Road with pipe and

box culverts.

Progress Status: 29%

Achievement (May 2011-May 2012): 20%

7.5km Earthwork to sub-base

1.480km stone base

1.37km of Asphalt road with some pipe and box

culverts completed

Impact of the Project:

Ready access from Apo to Karshi for vehicular

and human traffic

Informal employment of persons

Linking of three villages, viz: Wasa, Madalla, Chori

and Karshi

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

71MINISTERIAL P LATFORM FCT

Page 72: Federal Capital Territory

Rehabilitation of Gwagwalada – Dobi – Izom

Road

Contractor: M/S Ndubuieze Engineering

International Company Nig. Ltd (NEIC)

Contract Sum: N1,611,691,830.00

Award: 7th December, 2010

Commencement: 13th January, 2011

Completion:

Scope of Work: 27 Km of Asphalt Road with

drainage structures

Progress Status: 28%

Achievement (May 2011-May 2012): 21%

15 km of Earthwork to formation level, 111

meters of culverts.

Impact of the Project:

Ready access to several Villages along the

Road,

informal employment to the locals,

reduction in travel time.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

72MINISTERIAL P LATFORM FCT

Page 73: Federal Capital Territory

Construction of Onex Bwari Road

Contractor: Messrs Parsons Science Engineering

Co Ltd

Contract Sum: N2,017,002,504.83

Award: 9th December, 2010

Commencement: 13th January , 2011

Completion: 13th January, 2013

Scope of Work: 14km of Asphalt Road.

Progress Status: 8%

Achievement (May 2011-May 2012): 12%

7.5km of Earthworks (cut & fill)

4km stone base work

Impact of the Project:

Informal employment of persons

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

73MINISTERIAL P LATFORM FCT

Page 74: Federal Capital Territory

Construction of 11km Mpape –Galuwyi/Shere Road

Contractor: M/S Petroline Global Solutions Limited

Contract Sum: N1,558,443,337.37

Award: 3rd November, 2010

Commencement : 10th December, 2010

Completion: December 2013

Scope of works: Construction of 11km length of asphaltic Concrete surface finished road, 255m length of pipe culvert and 100m length of box culvert.

Progress Status: 9%

Achievement (May 2011- May 2012: 6%

Earthworks on 5km length of roads in progress, 30m length of box culvert 80m length of pipe culverts completed

Impact of the project:

Ready access to Galuwyi from Mpape for vehicular and human traffic,

Linkage of four villages to the city

Informal employment to persons.

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

74MINISTERIAL P LATFORM FCT

Page 75: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

75MINISTERIAL P LATFORM FCT

Construction of 20km, A2 Kwaita-Yebu

Road Contractor: M/S Abdec Nigeria. Limited

Contract Sum: N1,239,569,575.38

Award: April, 2005

Commencement:June, 2005

Completion: May 2013

Scope of works : Construction 20km length of

surface roads, 1 No. 2 span bridge, 2074m3 of box

culvert and 600m length of pipe culvert

Progress Status: 83%

Achievement (May 2011-May 2012): 14%

4km length of road completed up-to surface

dressing, 40m length of pipe culvert completed and

deck of the two Span bridge completed

Impact of the project:

Linkage of six villages to the city

Informal employment of persons.

Page 76: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

76MINISTERIAL P LATFORM FCT

Provision of Road Infrastructure and Water

Reticulation to Kubwa Owner Occupier Estate Phase

II

Contractor: Messrs Mangrovetech Nigeria Limited

Contract Sum: N883,175,415.49

Award: 22nd February, 2011

Commencement:10th March, 2011

Completion: April 2013

Scope of Work: 6km of Asphalt Roads with drainage

structures

Progress Status: 26.5%

Achievement (May 2011-May 2012): 20.5%

1.52km Asphalt Road and 3.22km trapezoidal

Concrete Drains.

Impact of the Project: Easy movement within the

Estate.

Page 77: Federal Capital Territory

Construction of township roads in 6 Area Councils

Contractor: m/s Sochez int’l Ltd, Birak Engr. & Constr. Co. Ltd, Bilsha Nig. Ltd, Sahabi Liman & Sons Ltd, Proxy Ltd, Commade Nig. Ltd, Momreta Nig. Ltd, Niko Engr. Ltd, Marwamagdi Constr. Co. Nig. Ltd, Crane Builders & Engr. Ltd.

Contract Sum: N 7.2Billion

Award: 22 February 2011

Commencement: 1st March 2011

Completion: June 2012

Scope of Work: Construction of 60km asphalt with drainage structures in the 6 area councils.

Progress Status: 40%

Achievement (May 2011-May 2012): Bwari 35%, Kuje 55%, Gwagwalada 21%, Kwali 27%, Abaji 25%, AMAC 31%

15 km length of road to asphalt level, 25km length of road to sub-base level, 20km length of road to formation level

Impact of the Project: Easy movement within the Estate, Informal employment of persons and Reduction of flooding of plots located at the low areas of the Estate

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)SATELLITE TOWNS INFRASTRUCTURE

77MINISTERIAL P LATFORM FCT

Page 78: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

78MINISTERIAL P LATFORM FCT

Land Swap Model

FCT Administration is to grant agreed

percentage of land in a Greenfield district to a

Developer for real property development under a

Special Contract envisaged by the Land Use Act;

In exchange for the grant, the Developer is to

provide primary infrastructure in the agreed

district without any financial, technical or demand

risk on the part of the FCTA;

Page 79: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

79MINISTERIAL P LATFORM FCT

Land Swap Model

The primary infrastructure which the Developer is to provide is as

follows:

The detailed district design and the Bill of Engineering;

Agreed kilometers of roads of varying specified sizes within the districts;

Agreed kilometers of Storm Water Drains;

Agreed kilometers of Foul Water Drains;

Agreed kilometers of Water distribution lines;

Agreed kilometers of Street Lighting Lines;

Agreed kilometers of Electrical Power distribution lines;

Agreed kilometers of telecommunication ducts; and

Agreed Number of mini Sewage Treatment Plants

The Developer is to deliver a Business plan that shows its technical capacity,

financial capability and managerial competence

Page 80: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

80MINISTERIAL P LATFORM FCT

Land Swap Model

Legal Justification for the Relationship

under section 8 of the Land Use Act FCT may make any grant of

land subject to a Special Contract; and

The Hon. Minister has the power to revoke such grant in the

event that there is any breach of the Special Contract

Basic Terms of Relationship

Commitment fee N350 million on presentation of Business Plan

to fund Physical Plan, Preliminary design, Detailed Engineering

Design, Survey plan, Feasibility Studies, and Preparation of

Agreement;

Detailed design and provide Infrastructure in the district within a

maximum period of 48 months;

Page 81: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

81MINISTERIAL P LATFORM FCT

Land Swap Model

Strict compliance with FCDA Specifications and Standards for

district infrastructure works;

The Developer shall not commence real property development

or sale of any land in the district until it achieves at least 35%

of functional Infrastructure works;

The release of land titles to the Developer shall be made as

follows:

15% of the Rights of Occupancy shall be released to the

Developer on evidence of transfer of 15% of the infrastructure

cost to the Project Account;

80% of the Rights of Occupancy shall be released on the basis

of interim measured certificates, the minimum value of which

shall not be less than 20% of the Infrastructure works;

5% Retained till after the retention period of 12 months

Page 82: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

82MINISTERIAL P LATFORM FCT

Land Swap Model

Note that the Rights of Occupancy are to be warehoused in a bank

mutually agreed by the parties;

The structure of the total project Cost shall consist of Construction

Cost, Financing Cost, Professional fees, Resident Supervision Cost,

12 months Operating Cost, Resettlement & Compensation Cost,

and Return on Investment

The funding structure of the project must include an

acceptable ratio as follows:

Debt - 50%

Equity - 15%

Off-Plan Sales - 35%

The Developer is to provide an acceptable Performance Bond

from a reputable Bank or Insurance company;

FCTA is to retain at least 40% of buildable plots in the district

Page 83: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)

83MINISTERIAL P LATFORM FCT

Land Swap Model

LIST OF INVESTORS THAT EXPRESSED INTERESTS

Dangote Group Plc;

Edimo Gruppo of Italy;

Adkan Services Nigeria Limited;

Ridley Group;

Afri-International Projects & Consulting Limited;

China Railway Construction Company;

Hongye Group;

Rosehill Group;

Nimec Investment Company limited;

Balmus International Limited;

First Aries Crude Oil Production;

System Properties Development Consortium Limited

Gilmor Engineering Nigeria Limited

Page 84: Federal Capital Territory

Caraway Dallas District Development Project

Partner: Messrs. Plethora Realty & Facility Managers Limited

Location: Along Keffi road, adjacent to highbrow Sunrise Estate and the Mogadishu Barracks

Dev. Cost : N24 billion

• Scope of Work: to provide integrated civil

infrastructure 222 hectares and is parcellized

into 413 plots as follows:

• 339 residential,

• 52 diplomatic,

• 7 Commercial and

• 15 Others (Green & Institutional)

Progress Status:

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PUBLIC PRIVATE PARTNERSHIP (PPP) LAND SWAP MODEL

84MINISTERIAL P LATFORM FCT

Page 85: Federal Capital Territory

Caraway Dallas District Development Project

• The infrastructure to be provided include

amongst others:

16.7 km of roads of varying specified

sizes;

16.4km of Storm Water Drains

21.2km of Foul Water Drains

22.3km of Water distribution lines;

19.9km of Street Lighting Lines

27.6km of Electrical Power distribution

lines

14.5km of telecommunication ducts; and

3 Nos. mini Sewage Treatment Plants

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PUBLIC PRIVATE PARTNERSHIP (PPP) LAND SWAP MODEL

85MINISTERIAL P LATFORM FCT

Page 86: Federal Capital Territory

THE DEVELOPMENT OF ENGINEERING INFRASTRUCTURE BY PPP

FOR KATAMPE DISTRICT, PHASE II, FCC, ABUJA

DEVELOPER: DEANSHANGER PROJECT LIMITED, ABUJA

DEVELOPMENT COST: N61, 194,747,645:00 (Sixty One Billion, One

Hundred and ninety four million, seven hundred and forty seven thousand,

six hundred and forty five naira)

SIZE OF DISTRICT: 777 Hectares

TOTAL NUMBER OF PLOTS: 2,583 Plots consisting of 1,788 high,

600 medium and 195 low density plots

COST OF DEVELOPABLE SPACE: N12,000:00 per Square metre.

TOTAL LENGTHS OF ROADS IN CATEGORIES:

Arterial (6- lane carriage way) - 5,137m

Collector (4- lane carriage way) - 6,182m

Special Important Local Street (2-lane way) -7,802m

Important Local Street (2-lane way)) - 2,075m

Local Street (2-lane way) -19,436m

Minor Access Road (2-lane way) -28,880m 69,512m

ACHIEVEMENTS/IMPACTS (INFRASTRUCTURE)PPP

86MINISTERIAL P LATFORM FCT

Page 87: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Impacts

70% reduction in travel time (Kubwa – City Centre from

2h/30min -35min and Airport – City Centre from 1h/30min –

45min)

65% reduction in accident rate

16,000 more houses built as a result of district

infrastructure provision

87MINISTERIAL P LATFORM FCT

Page 88: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Impacts

42% population have access to potable water supply in the

FCC

Reduction in water borne diseases (No cholera and other

disease outbreak)

Reduction in travel time from satellite towns of Bwari,

Karshi and Kuje to the City Centre.

88MINISTERIAL P LATFORM FCT

Page 89: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)SERVICES

89MINISTERIAL P LATFORM FCT

90%

50%

13%

61%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

HT

C f

or

PM

TC

T

AC

CE

SS

(C

OV

ER

AG

E %

)

PMTCT

Universal Access Target for PMTCT to be reached by 2015

National Cummulative PMTCT Target to be reached by 2011

National Cummulative Actual PMTCT Coverage achieved in 2011

FCT Cummulative Actual PMTCT Coverage achieved by end of 2011

PREVENTION OF MOTHER TO CHILD TRANSMISSION) FCT

PMTCT OF HIV TARGET AND ACHIEVEMENT IN 2011

Page 90: Federal Capital Territory

Service Sector :

Education

Social Development

Health

Land Administration

Abuja Geographic Information System (AGIS)

Transportation

Environment & Sanitation

Development Control

Water Supply

Parks & Recreation

Urban Affairs

ACHIEVEMENTS/IMPACTS (SERVICES)

90MINISTERIAL P LATFORM FCT

Page 91: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

91MINISTERIAL P LATFORM FCT

Improved Meaningful Access to Education

for Residents at all levels and Types of

Education

Increased Enrolment from 2011 – 2012:

ECCE – 3,893 children (22.9%)

Primary - 4,249 pupils (2.4%)

Junior Secondary - 6,824 students (8.3%)

Senior Secondary - 5,403 students (12.2%)

Non Formal Education - 1,225 learners (7.4%)

Improved access was achieved through:

enrolment drive

establishment of new schools

construction, rehabilitation and furnishing of additional classrooms

toilets and other facilities in schools.

Page 92: Federal Capital Territory

28 new schools were established

to decongest existing schools and

accommodate new enrolments

1,553 classrooms were completed

to accommodate 6,138 students at

both Basic & Senior Sec levels

29 learners graduated from the

VTCs in 2011;

FCTA supported training of 400

adult learners in the acquisition of

different skills that will empower

them to be self reliant

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

92MINISTERIAL P LATFORM FCT

Page 93: Federal Capital Territory

6 learners were given materials such as

computers , sewing machines and other

equipment

22,468 pupils/students who were

indigenes and indigent were given

educational assistance to the tune of

N404,865,000.00

UNFPA also supported the

empowerment of 53 learns who had

undergone skill acquisition training

Technology Incubation center was set up

at Karu to empower youths Science and

Technology Education

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

93MINISTERIAL P LATFORM FCT

Page 94: Federal Capital Territory

provision of facilities at COE Zuba permanent

site to enhance learning:

Library Complex

Science Labs

Auditorium

Access roads

Abuja University of Technology Abaji (AUTA):

completion of take off Admin Block,

10 Blocks of Classrooms,

6 faculty offices,

5 bungalows of staff quarters,

3 blocks of science labs,

bore hole

electricity installations

It is hoped that academic activities will

commence in the 2012/2013 academic session

ACHIEVEMENTS/IMPACTS (SERVICES)

Higher Education Services:

94MINISTERIAL P LATFORM FCT

Page 95: Federal Capital Territory

Sustainable Energy Resource Centre has

been set up in Karu

120 Mathematics Teachers have already

been trained on improved methods of

teaching through the Mathematics

Improvement Project set up in 2011

Work at the International Technical

&Vocational Institute Utako has reached 58%

completion:

production centre

Admin Block

Technical Drawing Lab

Dining hall and Canteen

6 Workshops

Male Hostel

ACHIEVEMENTS/IMPACTS (SERVICES)

Science & Technology Education

95MINISTERIAL P LATFORM FCT

Page 96: Federal Capital Territory

Science Laboratories

• 12 Science Labs and 2 Intro Technology Labs were constructed in Junior Secondary Schools

School Furniture

• 1,375 Sets of furniture were provided for Primary and Junior Secondary Schools

Textbooks & Instructional Materials

• 1,241,603 pupils/students and teacher textbooks and instructional materials were provided in 2011

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

96MINISTERIAL P LATFORM FCT

Page 97: Federal Capital Territory

Teacher Recruitment

• 2,500 Teachers were recruited for Basic and Senior Secondary Schools

Teacher Training & Development

• Trainings were carried out for 6,911 heads of schools & teachers in various areas for improved teaching and learning outcomes

Special Needs Education

• Provision of 20 specialized instructional materials/equipment: Braille Machine, Thermo phones, Audiometer, Embosser, Computers with special software, Braille papers, Wheel Chairs and Physiotherapy equipment . 18-Seater Bus was also provided to each of the 3 special needs schools

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

97MINISTERIAL P LATFORM FCT

Page 98: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Services:

Toilet Facilities

•Provision of 16 water system toilets with overhead tanks for Junior Secondary Schools

Libraries

•10 Libraries with a capacity to accommodate 140 pupils/students each were constructed, furnished and equipped in both Junior and Senior Secondary schools

e-Education

•Plans have been completed to pilot test integrated and systematic deployment in the management and provision of all educational services in 50 schools

•Implementation will take off fully when the 2012 budget is operational

98MINISTERIAL P LATFORM FCT

Page 99: Federal Capital Territory

JSS Jukwoyi 2011 SAGE Champions•Junior Secondary School Jikwoyi took first position in all competitions

organized by the Students for the Advancement of Global Entrepreneurship (SAGE).

•The school is now four times world Champion (Ukraine 2007, Nigeria 2008 & Brazil 2009), and USA (2011).

Science & Tech Awards•Promotion of science & technology in schools has earned FCT many laurels:

1st position in Nigerian Institute of Physics Competition, 1st position in the world space week completion, 1st position in the NNPC National Science completion

•The Secretariat successfully conducted competition in Science and technology Exhibition among students of FCT, Federal Ministry of Science & Tech Parastals and Private Companies

FGN/UBEC Awards

• FCT UBEB has consecutively taken the 1st position from 2006 –2011 in the North Central Zone for effective and efficient implementation of the UBE Programme through the intervention fund

ACHIEVEMENTS/IMPACTS (SERVICES)

Education Awards:

99MINISTERIAL P LATFORM FCT

Page 100: Federal Capital Territory

- Sustained surveillance, evacuation,

rehabilitation and repatriation of over

4,800 destitute.

- 35 mentally-ill persons (among the

destitute apprehended) were treated in

neuro-psychiatric hospital in Kaduna,

10 of them have fully recovered,

rehabilitated and reunited with their

families.

- Organised a medical and rehabilitation

outreach programme for over 500

elderly persons in FCT.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

100MINISTERIAL P LATFORM FCT

Page 101: Federal Capital Territory

- 500 Child-hawkers/beggar and

street-kids were apprehended and

later released to their

parents/guardians after thorough

counselling,

- Over 60 street-kids and child-

hawkers were enrolled into primary

schools by their parents/guardians.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

101MINISTERIAL P LATFORM FCT

Page 102: Federal Capital Territory

- 25 young physically-challenged

persons currently in Bwari

Vocational & Rehabilitation

Centre;

100 indigent patients, abandoned

babies, unidentified and

unconscious accident victims,

traumatized and abused (rape)

cases were supported and

rehabilitated;

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

102MINISTERIAL P LATFORM FCT

Page 103: Federal Capital Territory

3,000 Commercial Sex Workers were

apprehended and evacuated from their

flash-points in FCC,

300 of them, are undergoing further

rehabilitation programme in the FCT

Women Rehabilitation Centre, Sabon-

Lugbe, in various vocational trades,

The first batch of 50 trainees had

already graduated and passed-out on

6th October, 2011;

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

103MINISTERIAL P LATFORM FCT

Page 104: Federal Capital Territory

90 family cases were settled and re-

union of 38 children with family members

FCT has conducted Annual FCT PRO-

AM Golf Championship

a new Synthetic Basketball Court at

Area 10 Sports Complex has been

completed;

a Squash Hall also being constructed at

the complex is at its final stage of

completion.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

104MINISTERIAL P LATFORM FCT

Page 105: Federal Capital Territory

Enumeration exercise of all

hospitality establishments such as

hotels, guest houses, restaurants,

fast foods and eateries in all the six

Area Councils for documentation.

A directory called: “Hotel Guide” has

being produced

The pictorial guide catalogues Parks

and Gardens in Abuja.

The guide is a must have for every

nature and fun seeker.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

105MINISTERIAL P LATFORM FCT

Page 106: Federal Capital Territory

Development of Katampe Hill as a

Tourism Village

The concept of Katampe Hill is to

make it a one-stop tourism village

that in addition to the myth

surrounding it and its natural

endowment.

Tourism Information Desks (TIDs)

Designed for tourist information

dissemination which are

fundamental to tourism

development.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

106MINISTERIAL P LATFORM FCT

Page 107: Federal Capital Territory

Refurbishing of Ushaffa

Pottery Centre at Ushaffa in

Bwari Area Council, a Training

Centre for women and Youth

as well as a Tourist Centre.

Development of Taruga

Archeological Site, a major

Tourist site in the FCT located

in the Municipal Area Council.

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

107MINISTERIAL P LATFORM FCT

Page 108: Federal Capital Territory

Creation of State of the Art Cultural

Parks and Gardens which include

Sculptural, Horticultural Artistic,

Ecological and Nature Parks within

the FCT.

Children’s Holiday Workshop- an

avenue for talent hunt and creativity

Fair

ACHIEVEMENTS/IMPACTS (SERVICES)

Social Services

108MINISTERIAL P LATFORM FCT

Page 109: Federal Capital Territory

Parking Management System

On-Street Parking Management

system with 3600 spaces in two

zones within the FCC introduced.

650 jobs created

Reduced congestion in all controlled

zones

Traffic Light System

48 signalized intersections upgraded

ACHIEVEMENTS/IMPACTS (SERVICES)

Transportation Services

109MINISTERIAL P LATFORM FCT

Page 110: Federal Capital Territory

Traffic Management Devices installed:

900 solar powered road studs,

850 delineators,

35 solar warning lights,

1800 anti-glare curtains,

1050 Traffic signs

50 Speed bumps

ACHIEVEMENTS/IMPACTS (SERVICES)

Transportation Services

110MINISTERIAL P LATFORM FCT

Page 111: Federal Capital Territory

Operator License Scheme :

3 operators licensed for high capacity

bus operation.

AUMTCO, NURTW and FABREM

operating daily on some routes in FCT

with 150 buses.

Additional 300 high capacity buses

procured.

ACHIEVEMENTS/IMPACTS (SERVICES)

Transportation Services

111MINISTERIAL P LATFORM FCT

Page 112: Federal Capital Territory

Bus Rapid Transit (BRT) Pilot Scheme:

Dedicated lanes marked for the BRT

operation between Eagle Square and

Mararaba along Keffi Highway.

Peak time journey time reduced by

40 minutes

Increased ridership by 2000

passengers

610 jobs created

ACHIEVEMENTS/IMPACTS (SERVICES)

Transportation Services

112MINISTERIAL P LATFORM FCT

Page 113: Federal Capital Territory

DRTS Vehicle Registration:

E-registration technology introduced.

20000 additional vehicles registered

DRTS Operations:

35 new operational vehicles procured

Full geographical coverage of the Territory

500 additional vehicle license renewed

N75Million monthly average IGR

Additional 120 jobs created

ACHIEVEMENTS/IMPACTS (SERVICES)

Transportation Services

113MINISTERIAL P LATFORM FCT

Page 114: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

114MINISTERIAL P LATFORM FCT

Access to Health has been increased ;

80 beds in FCT secondary Care in 2011 (Zuba Cottage

Hospital 40 Beds, Nyanya Hospital 20 beds, Gwarinpa

Hospital 10 Beds and Kubwa 10 beds)

48 beds in the Primary Care in 2011(12 beds each in

Shere, Wasa, Apo Resettlement sites and kubwa owner

occupier

Employment of 900 Health workers cutting across all the

Professions in 2011

The incidence of Malaria in FCT dropped from 57705 in 2010 to 46504

in 2011(22% reduction)

Page 115: Federal Capital Territory

15% increase in out patient attendance in Secondary Care

Facilities in 2011 ( Total out patient seen in 2010 was 595264

compared to 654553 in 2011)

Establishing Primary Healthcare Development Board to oversee

the Primary Healthcare in FCT

Up scaling the FCT Mobile Outreach Programme (The Mailafiya)

Quality to Healthcare in FCT has been increased by ;

Supply and Installation of CT-Scan at Maitama District Hospital

Supply and Installation of CT-Scan at Asokoro District Hospital

Supply and Installation of Mammogram at Maitama District

Hospital

Supply and Installation of 3 HT Ulltrasound machines to 3 FCTA

Hospitals (Asokoro, Maitama and Gwarinpa Hospitals)

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

115MINISTERIAL P LATFORM FCT

Page 116: Federal Capital Territory

Construction of 60 Bed Cottage

Hospital at GwagwaladaContractor: M/S The Solid Concrete

Industries Ltd

Contract Sum:677,879,466.60

Award: 18-11-10

Date of Commencement: Feb. 2011

Date Of Completion: 2012

Scope of Work: Construction of 60

bedded main Hospital building

comprising Wards, Theater, Pharmacy,

Laboratory, A&E unit, Antenatal /

Maternity and residential qtrs.,

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

116MINISTERIAL P LATFORM FCT

Page 117: Federal Capital Territory

Construction of 60 Bed Cottage

Hospital at Gwagwalada

Progress Status: 15%

Achievement: (May 2011 – May 2012): 15%

Impact: Employment of site staff and

wealth creation

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

117MINISTERIAL P LATFORM FCT

Page 118: Federal Capital Territory

Construction of 225 Bed Hospital

Karu

Completed the Project and

concessioned half of the Hospital to

M/S Primus International Supper

Specialist and is currently

operational.

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

118MINISTERIAL P LATFORM FCT

Page 119: Federal Capital Territory

Construction and Equipping of 220-Beb

Utako Hospital Contractor: PPC Medical systems

Contract Sum: N4,263,501,682.10

Award: 22-09-08

Commencement: Jan. 2009

Completion: 2014

Scope of Work: Construction and equipping of 220

bedded main Hospital building comprising Wards,

Theater, Pharmacy, Radiology Laboratory, A&E unit,

Antenatal / Maternity and residential qtrs. and supply

and Installation of Hos[ital. Equipment,

Progress Status: 57%

Achievement: (May 2011 – May 2012): 6%

Impact: Reduction in Mobility and Mortality in Utako and its

environs , it also increases access to quality care

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

119MINISTERIAL P LATFORM FCT

Page 120: Federal Capital Territory

Contractor: M/s Mabinu cosy Investment Co. Ltd, and 21 Other contractors

Contract Sum: N361,246,445.42

Date of Award: 2009-2011

Date of Commencement:2010

Date Of Completion: Majority completed in 2011 few remaining to be

completed 2012

Scope of Work: Provision of additional Wards, Expansion of Radiology unit

, Maternity, Laboratory, staff Qtrs., Laundry units and general rehabilitation and

landscaping

Progress Status: 80%

Achievement: (May 2011 – May 2012) : 15%

Impact: Reduction in Mobility and Mortality in FCT and its environs ,

increases access to quality care and reduce waiting time and increase capacity to

handle FCT’s dynamic population

ACHIEVEMENTS/IMPACTS (SERVICES)Healthcare Services

120MINISTERIAL P LATFORM FCT

Expansion and Rehabilitation of Asokoro , Maitama, Wuse , Abaji, Bwari,

Gwarinpa, Kubwa and Nyanya Hospitals

Page 121: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

40 Bed Cottage Hospital Zuba

The project has attained 100%

completion both in Construction and

furnishing..

121MINISTERIAL P LATFORM FCT

Page 122: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services Hostel Block for School of Nursing and

MidwiferyContractor: M/S SA Consult LTD, M/S Princecom

Int. Ltd, Ben-lob & Co Ltd and 3 others

Contract Sum: N533,462,530.66

Date of Award: 08 -09-10

Date of Commencement: Jan. 2011

Date Of Completion: 2012

Scope of Work: Rehabilitation of Hostel and

Classroom Area, Construction of additional 18Nos

Classroom with staff common rooms and Offices,

Construction of additional 180 Bedded Hostel and

Perimeter fencing of the entire school

Progress Status: 70%

Achievement: (May 2011 – May 2012): 30%Impact: Human Resource for Health Manpower development,

provision of skilled personnel for Midwifery Service Scheme,

improved Health awareness at community level and reduction in

Maternal Mortality rate in FCT

122MINISTERIAL P LATFORM FCT

Page 123: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

Expansion of Nyanya General

Hospital

The project has attained 100%

completion both in Construction and

furnishing..

123MINISTERIAL P LATFORM FCT

Page 124: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services HIV COUNSELING & TESTING) FCT HCT

TARGET AND ACHIEVEMENT AS AT 2011

124MINISTERIAL P LATFORM FCT

Page 125: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

Distributed of 524,157pcs (2/household) Long

Lasting Insecticide Nets (LLINS) during campaign in

FCT still planning for mop-up activity.

Distributed 41,196 doses of ACTs to focus public

health facilities.

Distributed 1, 517 RDT kits to focus public health

facilities in FCT for evidence based

Diagnosis.

Distributed 6, 289 doses of SP to focus public

health facilities for pregnant women in FCT.

98% Monthly Routine data for M&E was carried out

in 2011 and is still ongoing

125MINISTERIAL P LATFORM FCT

Page 126: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

90%

50%

13%

61%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

HT

C fo

r P

MT

CT

AC

CE

SS (

CO

VE

RA

GE

%)

PMTCT

Universal Access Target for PMTCT to be reached by 2015

National Cummulative PMTCT Target to be reached by 2011

National Cummulative Actual PMTCT Coverage achieved in 2011

FCT Cummulative Actual PMTCT Coverage achieved by end of 2011

PREVENTION OF MOTHER TO CHILD TRANSMISSION) FCT

PMTCT OF HIV TARGET AND ACHIEVEMENT IN 2011

126MINISTERIAL P LATFORM FCT

FCT

Page 127: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

Attendants at delivery by Area council

127MINISTERIAL P LATFORM FCT

Page 128: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

Immunizing babies at high

levels of commitment by the

FCT Minister/ wife of the

HM, FCT during a

supplemental immunization

campaign

128MINISTERIAL P LATFORM FCT

Page 129: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services Static PHC structures located in the 52

clusters in FCT Communities.

12 prototype PHC completed and

operational in communities

18 prototype PHC facilities are at various

stages of completion

22 additional PHCs are being procured

These will serve as static operational

bases for the mailafiya teams in the

clusters.

129MINISTERIAL P LATFORM FCT

Front Entrance of Staff Qtrs

at Kuchako Community.

Front Entrance to the PHC clinic

Page 130: Federal Capital Territory

Increasing access, improving response rate to disease outbreakin the communities and the quality of healthcare service delivery

Treated and managed (60,000) cases of tropical diseases and(90) minor surgical procedures done in 336 communities of theFCT.

The programme was presented at the World Conference onInformation Technology in Amsterdam and Health CareIndustry conference in London and in Glasgow Scotland

Creation of dependable data base for tracer diseases and othermorbid human situations in communities in the FCT. Detailscould be found at the mailafiya website -www.fctmdgmailafiya.org

Hosted the PAN African Health Summit in Abuja Nigeria

Was given the “Best Rural Health Practice” by the FMOH

Formulation of the e-Health policy for the Territory and the mounting of an e-Health pilot policy platform

ACHIEVEMENTS/IMPACTS (SERVICES)

Healthcare Services

130MINISTERIAL P LATFORM FCT

Page 131: Federal Capital Territory

Comprehensive Water

Supply Scheme for Abaji

& Its Environs

A Water supply project

sponsored by the MDG PSU,

FCTA and the Abaji Area

Council which is been

executed by Messrs. CGC,

ACHIEVEMENTS/IMPACTS (SERVICES)

Water Supply

131MINISTERIAL P LATFORM FCT

Page 132: Federal Capital Territory

Comprehensive Water

Supply Scheme for Abaji &

Its Environs

The project is being

supervised by the Water

Board is presently

ongoing at Abaji.

The project commenced

fully in January 2011 and

has reached 83%

completion stage.

ACHIEVEMENTS/IMPACTS (SERVICES)

Water Supply

132MINISTERIAL P LATFORM FCT

Page 133: Federal Capital Territory

Kuje Water Supply

A scheme has also been conceived to

provide potable water supply to Kuje, Pegi

satellite town and other adjoining Housing

estates including Custom, Immigration, Air

force etc, along Bill Clinton Way (Airport

Road).

The design of the Kuje Dam and the

treatment Plant / Pegi satellite town water

reticulation and Pegi Distribution Tank

and Trunk Mains to Pegi Distribution Tank

have all been commissioned.

Rubochi Mini Water Project

Water has been provided to Rubochi

community serving over 5000

population after over 100 years of

lack of pipe borne water

ACHIEVEMENTS/IMPACTS (SERVICES)

Water Supply

133MINISTERIAL P LATFORM FCT

Page 134: Federal Capital Territory

Metering and Water Usage

Management

4000 metres (pre paid & AMR) have

been installed in the city to boost

revenue generation.

Massive installation of conventional

meters and prepayment meters in the

satellite Towns.

ACHIEVEMENTS/IMPACTS (SERVICES)

Water Supply

134MINISTERIAL P LATFORM FCT

Page 135: Federal Capital Territory

Successfully installed the new 400feet

mast,

2Nos. of stereo FM Radio transmitters,

Provision of street lights, supply and

installation of automatic voltage regulator,

uninterrupted power supply, digital audio

workstation and provision of ICT facility.

Carry out Aso Radio Live Coverage in line

with the Transformation Agenda of Mr.

President

2NOS.FM Radio Stereo Transmitter with

FM –HD EXITER

ACHIEVEMENTS/IMPACTS (SERVICES)

*Broadcasting Services

135MINISTERIAL P LATFORM FCT

Page 136: Federal Capital Territory

Handover of Source Code of AGIS II

Project in December 19, 2011

marking the formal disengagement

of Julius Berger Nig. (JBN)

Consultants from the operational

management of the AGIS system

after more than 7 years of

engagement;

FCTA inaugurated the Committee

on Forgery and Falsification of Land

titles

ACHIEVEMENTS/IMPACTS (SERVICES)

Services

136MINISTERIAL P LATFORM FCT

Page 137: Federal Capital Territory

Repositioning of AGIS as a centre of

excellence for geospatial data and

computerization services for FCT

Take over of AGIS II Project from Julius

Berger Consultants in 2010 (including

source code)

E-Payment System as a replacement for

draft payment, increase IGR by 35%

Enhancement of the security of AGIS

System and Physical Access

Commence the regularization of Area

Council Titles (Pending in AGIS repository

since 2005)

ACHIEVEMENTS/IMPACTS (SERVICES)

Services

137MINISTERIAL P LATFORM FCT

Page 138: Federal Capital Territory

Land Administration:

Powers Of Attorney Approved And Registered - 249

Fresh Land Applications

Residential Applications - 7,558

Commercial (Organization) - 2,900

Land Allocations

Residential - 138

Commercial (Organization)- 126

Rights of Occupancy Issued - 1025

Certificates of Occupancy

Total received (Stored) - 730

Issued (Conveyed) - 306

Title Regularization Approvals Received - 324

Registered Transactions in the Deed Registry

Assignments - 100

Mortgages - 96

Deed of Release - 22

Deed of Sublease - 5

Certified True Copy -

Certificates of Occupancy - 19

Rights of Occupancy - 75

Acknowledgements - 58

ACHIEVEMENTS/IMPACTS (SERVICES)

Services

138MINISTERIAL P LATFORM FCT

Page 139: Federal Capital Territory

Development Control:

942 were granted approval for Building

Plans applications

1065 complete setting-out approvals

granted to commence development

6447 illegal structures were removed in and

around the Federal Capital City (FCC)

In collaboration with NigComSat a software

for monitoring and enhanced processing of

building plan has been developed for the

FCT to be launch in July 2012

The sum of N2,662,752,299.27 had been

generated as revenue within the first and

second quarter of 2012

ACHIEVEMENTS/IMPACTS (SERVICES)

City Management

139MINISTERIAL P LATFORM FCT

One of the Iconic buildings granted

approval

(PTDF Corporate Headquarters)

The World Trade Center (Churchgate)

Page 140: Federal Capital Territory

Facility Maintenance & Management:

Improvement in the performance of street

lights from about 45% to 80%.

Construction of zonal offices in Kuje, Bwari,

and Gwagwalada towards effective

monitoring and supervision of developments

in satellite towns

Procurement of official offices/residences

for International Agencies in Abuja.

ACHIEVEMENTS/IMPACTS (SERVICES)

City Management

140MINISTERIAL P LATFORM FCT

Page 141: Federal Capital Territory

Parks and Recreation:

Development of Parks and Recreation

Policy for the FCT

Greening and Beautification of the FCC

and satellite town through the activities

of Abuja Green Society

Propagation of over 50,000 trees by the

two nursery plants of the department

Installation of Solar lights in selected

neighbourhood parks

Contract for tree planting for Airport and

OSEX awarded

ACHIEVEMENTS/IMPACTS (SERVICES)

City Management

141MINISTERIAL P LATFORM FCT

Page 142: Federal Capital Territory

Urban Affairs:

Established Fire Training School in

Gwarinpa

Procured Emergency Rescue Equipment

to meet up with the current security

challenges of the country and other

natural or man made disasters

Developed Disaster Data Bank for the

FCT

Trained FCT Fire Service personnel in

and outside the country in disaster

management.

ACHIEVEMENTS/IMPACTS (SERVICES)

City Management

142MINISTERIAL P LATFORM FCT

FCT fire man at un building bomb site

FCT FIRE MEN AT THISDAY BOMB SITE

Page 143: Federal Capital Territory

Services:Average time to grant R of O and C of O is reduced

from 6months – 3 months

The cost of commuting is reduced (N2.50/km

between Kubwa - Abuja)

Reduction in the number of accident rate/day from

10/day to 5/day

60% reduction in average time for the evacuation

of waste in the city (10hrs – 8hrs)

80% increase in functional street lights

30% reduction in registration time

ACHIEVEMENTS/IMPACTS (SERVICES)

143MINISTERIAL P LATFORM FCT

Page 144: Federal Capital Territory

Services:

50% increase in construction sites proactively

checked for compliance with permit conditions

Reduction in number of days to complete first

building plan approval

Reduction in Average time for regularization of

titles

40% reduction in social menaces in FCT

Reduction Under 5 mortality rate, 80 per 1000

live births

20% reduction in accident rate

ACHIEVEMENTS/IMPACTS (SERVICES)

144MINISTERIAL P LATFORM FCT

Page 145: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Services:

18,995 people Enrolled In Non-Formal

Education Sub-Sector

65% of the rural population have access to

potable water

No reported outbreak of water borne diseases

58% of population have access to health care

services in FCT

Maternal mortality rate stand at 375 per

100,000

145MINISTERIAL P LATFORM FCT

Page 146: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SERVICES)

Services:

Increase in enrolments from 2010 to 2011:

2.4% in Primary, 8.3% in JSS, 12.2% in SSS &

7.4% in Non Formal Education

82.6 gross enrolment ratio

Reduction in Pupil/Student : Classroom Ratio

from 1:67-1:50

75.1% Pass Rate(JSCE)

15.6% Pass Rate(SSCE)

146MINISTERIAL P LATFORM FCT

Page 147: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (IMPOWERMENT)

Youth Empowerment Programme:

The programme is targeted at the

unemployed youth with bias to gender in

the 6 Area councils to make them

economically and socially responsible and

self reliant through vocational skills

acquisition and business development.

The programme is divided into 4

component namely,

Skills acquisition,

Community Empowerment Agricultural Initiative,

Microcredit Scheme and

conditional cash Transfer

Empowerment

147MINISTERIAL P LATFORM FCT

Page 148: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (IMPOWERMENT)

- 181 were train in 5 trade areas at

the skill

- 1,125 presently undergoing

training in different trade areas

including livestock production.

- 35 communities are presently

participating in Irrigation Farming

Skill Acquisition

148MINISTERIAL P LATFORM FCT

Page 149: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (IMPOWERMENT)

- 172 farms were opened in 172

communities

18,040 jobs were created from the

initiative

- A total of 640.6 tonnes of assorted

grains were produced by the

communities

Valued at the current market price of

N37,332,000.00

Community Empowerment

Agricultural Initiative

149MINISTERIAL P LATFORM FCT

Page 150: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (IMPOWERMENT)

- 1,312 Farmers and

Entrepreneurs are being

assessed for loans

disbursement for small

business.

Micro Credit schemes

150MINISTERIAL P LATFORM FCT

Page 151: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (IMPOWERMENT)

The Condition Cash transfer (CCT)

is a programme for the core poor

whereby cash is transfer to poor

families on the condition that those

families make investments in

human capital e.g.

Sending children to School regularly

Taking children to regular health check-

ups

Overall objective is to break

intergenerational transfer of poverty

Conditional Cash Transfer (CCT)

151MINISTERIAL P LATFORM FCT

Page 152: Federal Capital Territory

ACHIEVEMENTS/IMPACTSDesign and Construction of Cultural

Centre and Millennium Tower

Wealth creation and tourism

development

Expected project period 8years

Percentage completion 42%

Work in progress

152MINISTERIAL P LATFORM FCT

Page 153: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Empowering the communities with

the program 1 Village One

Product of Shea Butter project

- 2012 Batch A Corps Members

being sensitized on

Entrepreneurship

Enterprise Development

153MINISTERIAL P LATFORM FCT

Page 154: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Other wealth creation, employment

and poverty alleviation:

Outreach Services

Business Clinic

Access to suitable Workspace

such as business premises

Linking mentee to mentors

Organized Annual Abuja

Business Plan Competition

(ABPC)

Micro – Finance Complex Kwali

Enterprise Development

154MINISTERIAL P LATFORM FCT

Page 155: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Wealth Creation and poverty reduction:

26,000 jobs created through agricultural activities

# of Jobs created through empowering communities

8.51mt and Crops 697.03 Volume of agric

production (mt)

55,000 farmers empowered and engaged in

profitable farming enterprise

155MINISTERIAL P LATFORM FCT

Page 156: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (SECURITY)

Through coordination and provision of logistics supports to

the Security Agencies of the FCT Commands have

resulted in some of the success recorded. They include: 370 stolen vehicles recovered.

150 suspected armed robbers arrested.

Prompt response to distress calls reduced from 30 minutes to 10

minutes.

Several criminal hideouts were raided in various locations in Abuja.

About 600 kilograms of substances suspected to be Indian hemp

and other hard drugs recovered

35 drug addicts were rehabilitated and 19 are still undergoing

rehabilitation.

24 hours surveillance and guards in strategic location in Abuja.

Ensured crime free festivities during the EMBER months.

156MINISTERIAL P LATFORM FCT

Page 157: Federal Capital Territory

ACHIEVEMENTS/IMPACTS4 numbers of kidnap attempts were foiled.

FCTA embarked on Community Policing

G7 security summit resuscitated comprises

Benue, FCT, Kaduna, Kogi, Nasarawa, Niger

and Plateau States to reduce crime rate.

12 (twelve) number police post built in 12

communities of the six Area Councils.

157MINISTERIAL P LATFORM FCT

Page 158: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Construction of Police

Stations in Three (3)

Districts in FCC

Expected project period 12

months

Percentage completion

100%

Work in progress

Police Station Wuye District Abuja

Police Station Garki District Abuja

158MINISTERIAL P LATFORM FCT

Page 159: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

There were issues of security

interest recorded during the year

under review especially bomb

blasts at the Louis Edet force

Headquarters, the United Nations

building and recently the attack at

Thisday Newspaper office

complex at Jabi.

This new dimension of crime

“terrorism” has made the security

agencies to beef up security in

the FCT to forestall future

occurrences

159MINISTERIAL P LATFORM FCT

Page 160: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Safe and secure environment:Reduced crime rate by 30%

80% of areas with security coverage

Improved greening of the environment by 25%

Reduction in average response time to crime

prevention to 1hr.30min (police preparedness)

25,000 population have access to improved

sanitation facilities

# of emergency response to distress call attended to

160MINISTERIAL P LATFORM FCT

Page 161: Federal Capital Territory

The FCTA through AICL partnered with

The Churchgate Group to develop the

Abuja World Trade Centre (WTC). The

project is rising from the ashes of the

former Bakassi market in the Central

Business Area

The Abuja WTC is located on a 6.102

hectares site along Constitution Avenue,

CBD, Abuja

The site is being transformed

into a mega complex consisting

of high rise residential towers (37 floors),

office towers, conference facilities and a

shopping mall with entertainment facilities

The first phase will be delivered by the

year 2013 at an estimated cost of N156Bn

ACHIEVEMENTS/IMPACTS (INVESTMENT)

World Trade Center Project

161MINISTERIAL P LATFORM FCT

Page 162: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INVESTMENT)

Fairway Estate in Games Village

In line with the FCTA’ s vision of

providing housing to the various

categories of residents of the FCT,

AICL has recently completed the

construction of Fairway Estate at

Games Village, Abuja

The Estate consist of 8 units,

semi-detached, 5-Bedroom

luxury duplexes

The total project cost is

approximately N600Mn

The sale of the houses is in progress

162MINISTERIAL P LATFORM FCT

Page 163: Federal Capital Territory

The FCTA constructed a district

market in Mabushi through a PPP

arrangement

The Build, Operate, & Transfer (BOT)

was carried out by a private

company, Metshade Limited. The

market will revert to FCTA at the end

of the period stipulated in the BOT

agreement i.e., 10 years

The market consist of over 2,000

shops of various types, ranging from

lock-up shops, open stalls,

warehouses, to restaurants

The project is completed and is

awaiting commissioning

ACHIEVEMENTS/IMPACTS (INVESTMENT)

BOT Markets - Mabushi

163MINISTERIAL P LATFORM FCT

Page 164: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INVESTMENT)

164MINISTERIAL P LATFORM FCT

• There is an existing collaboration

between the FCTA and Balkan

Energy Centre Inc. (USA) for the

project.

• FCTA provided the land mass of

17.3 hectares in three (3) phases,

• Phase I and II to cater for 3,502

Condominium/ apartments,

• 5 star hotel with 798 rooms,

• office and banking spaces and

multi level parking spaces

Partnership

Page 165: Federal Capital Territory

ACHIEVEMENTS/IMPACTS (INVESTMENT)

165MINISTERIAL P LATFORM FCT

Partnership • While the Company agreed to

develop the said land area into

mixed use of

• condominiums/apartments,

• commercial centres,

• 5 star hotel,

• office & Banking spaces,

• multi-level parking and

• other structures of World-Class

standard

• The project is estimated to cost

over $2.6 billion

Page 166: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

The FCT Archives And History Bureau has a purpose built ,state of the Art Archives building, at No 5 peace Drive, Area 11,Garki

Presently, the Bureau has established and equipped the following units:-

Photo Gallery

Cyber cafe with a capacity for 30 people

Reference library, for Scholar, Researchers, and Policy Makers.

Well equipped 250 capacity conference hall open to the public on rent.

STUDENTS ON EXCURSION

Partnership

166MINISTERIAL P LATFORM FCT

Page 167: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Partners on community

nutrition support

Collaborative review meeting

with development partners

during immunization

supplemental campaigns/

cooperation for modern

family planning services

delivery in the six area

councils

Partnership

167MINISTERIAL P LATFORM FCT

Page 168: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

Collaboration between FCTA

and Kuje Area Council for the

construction of Rubochi

Water Works to supply water

to munu, Rubochi and its

environs

Partnership

168MINISTERIAL P LATFORM FCT

Page 169: Federal Capital Territory

In collaboration with JICA/

UNIDO and Kaiyo Sanyo

for End of Life Vehicle

project in FCT

Auto Pound

All abandoned vehicles are

kept in an Auto Pound for

recycling.

ACHIEVEMENTS/IMPACTS (PARTNERSHIP)

Partnership

169MINISTERIAL P LATFORM FCT

Page 170: Federal Capital Territory

Partnership between United

Nation System, Donor

Agencies and other

organizations such as (World

Bank, JICA, etc).

ACHIEVEMENTS/IMPACTS (PARTNERSHIP)

Partnership

170MINISTERIAL P LATFORM FCT

Page 171: Federal Capital Territory

ACHIEVEMENTS/IMPACTS

(INVESTMENT)

Increase in Foreign Direct Investment (FDI) by 600%

Investment initiatives for infrastructure development of

FCT

171MINISTERIAL P LATFORM FCT

Page 172: Federal Capital Territory

Thank you for listening.

172MINISTERIAL P LATFORM FCT